SlideShare a Scribd company logo
1 of 5
Page 1 of 5
Josh Higgins
56 Fred Bush Rd., Hazlehurst GA, 31539  912-375-9031  jhiggins3315@gmail.com
JOB OBJECTIVE
Project Manager of Large Scale Commercial and Industrial Electrical Construction Projects
(Providing marketable experience and relevant skill sets that can be effectively utilized within any job market)
SUMMARY OF QUALIFICATIONS
 Three (+) y ears’ Project Management of new and add to existing major commercial, industrial, data
center/mission critical, and p harmaceutical/healthcare electrical constr uction projects.
 Served fifteen (+) y ears’ in the Electrical Contracting/Construction industry overall.
 Thoroughly trained and exp erienced at nearly all job duties and responsibilities p ertaining to the
p rogression of a major commercial/industrial electrical construction p roject; from the reception of
the bid invitation, to a p roject’s close-out.
 Excep tional team management and critical task recognition/delegation skill set s.
 Robust record of career achievements and successes in the pursuit of p rofessional goals,
p erformance of tasked objectives in high p ressure situations, and efficiently operating within pre-
determined timeline.
 Resp onsible and tenacious about monthly billing and invoicing; “Cash Is King” is a mission
statement I have adopted when referencing p roject cash flow.
PROFESSIONAL EXPERIENCE
2008-Present Cleveland Electric Company Atlanta, GA
Project Manager  Baxter Healthcare Corp. - P rogram Covington P lasma P rotein M anufacturing F acili ty, S ept. 2 013-Pres.
 Turner Construction Co. [East Bid Package] Base Contract Value of - $6.5 Million
 Turner Construction Co. [North Bid Package] Base Contract Value of - $17 Million
Position Objective Achievements
Administrator, in collaboration with the project’s Field Labor Superintendent, over the daily operations of all general
project site logistics and activities; successfully managing five individual contracts simultaneously and a diverse work
force comprised of:
(10) Individual Sub-contractor accounts
(8) In-house Project Engineers
(3) In-house Quality Control Professionals
(6) Field Labor General Foremen
(35) Field Labor Foremen
(251) Field Labor Craftsmen
(1) Administrative Assistant.
Essential Duties andResponsibilities
 Pre-Project Mobilization Execution
 Familiarized myself with thestructureand contextthateach awarded bid packageproposalwascomposed and
written.
o Competently reviewedallprojectspecifications,drawings, and transmitted bid documents.
o Coordinated bid proposaland scopereview hand-off meetingwith theassociated pre-construction
teamand estimators,ensuringthattheawardedproposalvaluesare unambiguousand clearly
expressed to adequately supportthecontractualterms and conditions.
o Identified and coordinated opportunities forpre-fabricationinvolvement, materialsubstitutions, and
valueengineering changes designed to improveefficiency or increasejob profitability.
 Established and maintainedcustomerrelationsas theprimary channelof communication between Cleveland
and thecustomer on allcontractualand financialmatters.
o Engaged in contract negotiationswith customer to establish monthly billingcriteria,coordination of
a billablescheduleof values, and changeorder ratecoordination withtheobjectiveof attainingthe
highest feasiblemargin.
o Coordinated,prepared, and approved theprojectbudget and detailed engineering, procurement, and
constructionschedules.
o Co-coordinated and established a hierarchy of field labor managers, and the development of a
Page 2 of 5  jhiggins3315@gmail.com
Josh Higgins
Continued
multi-tiered organization chart featuring the projects chain of command.
 Day to Day Operations
 Overseer of field engineering, labor production, and on-sitemanagementofficials.
 Worked closely with theField LaborSuperintendenttomaximizelabor productivity and reduceinefficiency.
 Kept and completed allnecessary recordsand reportsrequired by Clevelandupper managementincluding:job
statusreports, budgeting/trackingreports,and A/R trackingreports.
 Prepared and approved allapplicableinvoicesand amresponsiblefor promptpaymentby thecustomer,
includingany retention.
 Ensured thatappropriateprojectpersonnelarethoroughly familiar with thescopeof thework, thebasisof the
estimate, theprojectbudgetand schedules,and thecontractterms.
o Coordinated informationflow fromthecustomer and fromvendors.
o Monitored engineering, procurement,and constructionprogressagainstscheduleand initiatesany
necessary action whererequired.
o Responsiblefor ensuringthatfield supervisory personnelallowsufficientlead timewhenordering
materials for delivery tothejob site.
 Prepares and maintainsO&M manuals forclient atprojectcompletion.
 At completion of contract, obtainscustomer acceptance, closes contract, obtainsany waivers of liensthatmay
berequired, and continuestoberesponsiblefor ensuringthatCleveland is fully and timely paid for allwork
performed.
 Assumesresponsibility fortheprofitability of contracts forwhichIam responsible
 Monitored and controlsallcharges against theprojectbudget.
 Produced and negotiated $12+million dollarsin changeorders forfiveindividualcontracts simultaneously,
increasingtheoverallprojectprofitability.
 Wrote, negotiated, managed, and billed customerfor alllower-tiersub-contracted services.
 Ensured thatthecustomer hasbeen accurately billed accordingto thenegotiated contractagreements.
Estimator  Estimation of 31+ Million Dollars in Electrical Bid Proposals - Ju ne 2 013-Sept. 2 013
 Estimator Marta Generator and ATS Replacement-$200,000.00
 Estimator Baxter [East Bid Package]-6,500,000.00
 Estimator Baxter [North Bid Package] -$17,000,000.00
 Estimator Clayton State University New Science Building Site Temporary-$80,000.00
 Estimator Waste Management CNG Time Fill Expansion-$70,000.00
 Estimator Hartsfield-Jackson Int. Airport Terminal HVAC Upgrade-$3,300,000.00
 Estimator Gordon Hospital ED & ICU Expansion Renovation -$3,600,000.00
 Estimator Kaiser Permanente-Gwinnett CMC Radiology Suite-$70,000.00
 Estimator Kaiser Permanente-Town Park CMC Radiology Suite-$60,000.00
 Estimator CNN 12SE TBS INT'L Finance Consolidation Project-$180,000.00
 Estimator Georgia State Humanities Law Building Site Temporary-$125,000.00
Position Objective Achievements
Executed theestimation of electrical bid projects and prepared various estimate delivery methods for electrical
contract proposals, including the determination of applicable project plans and specifications; compiling costs of
goods, sub-contracted services, general conditions, as well as jobsite staff and field labor force projections.
EssentialDutiesandResponsibilities
 Familiarizemyselfwith thebid invitation criteria,preliminary constructionschedules,bid proposalsubmission
dates, bid drawings,specifications, RFI’s, contractualobligations,as wellas other pertinentdocumentation
received through theinvitationto bid.
 Organization of documentationfiling, coordination, and trackingof thosetransmittedfromthereception of the
bid invitation through thebid recap and projecthand-off meeting.
 Actingand appointed executivecontactliaison forassociated customer personnelduringthebid cycleprocess.
 Developmentof estimatingprocedureand structureof bid proposals, ensured estimatewascompliantwith
customers’requirements forbid submission.
 Solely responsibleto producean accuratetake-off of itemizedunits derived fromalldocumentation received
duringthebid cycleprocess.
 Initiation and processingof purchaseinquiries,tabulatingand analyzingquotationsas to price,terms, delivery,
and general conformity withrequirements of theinquiry and specifications.
Page 3 of 5  jhiggins3315@gmail.com
Josh Higgins
Continued
 Administrator over thefinaltabulationof quantifiedtake-offdata,pricingquotationsfor materialsand/or sub-
contracted services, required projectoverhead costs,marginalprofitdividends,and adjustmentof labor units
based upon thedetermined levelsof installationdifficultyand historicalcompany performancedatafrom
similar project scopesizesand complexities.
 Administrator and executer overthefinalbid proposalspreparation and submissionof customers bond
requirements,contractdocuments,and theexecutivestatementoutliningscopeof workassumptions and
clarifications on company letterhead.
Project Engineer/B.I.M. Coordinator  M a rch 2 012-June 2 013
 Northeast Georgia Medical Center – Braselton, Georgia-New Campus-$18,000,000.00
 University Medical Center – New Orleans, Louisiana-New Campus-$40,000,000.00
Position Objective Achievements
Coordinator of the complete project electrical systeminstallation through the utilization of latest version of the
Building Integration Modeling (B.I.M.) Autodesk Software; and assist the electrical field personnelto understand the
job drawings from an electrical standpoint and help to explain, by providing additional or more detailed drawings, how
the work can be done most efficiently and/or cost effectively to meet the customer specifications.
 EssentialDutiesandResponsibilities
 Collaborated with othertradecontracted servicesand thecustomers’ engineeringpersonnelto develop a
comprehensive, coordinated,and precisefully interactivedigitalmodelof thevariousbuildingstructuresand
systems contained withinperthecustomersspecified materialand installationcriteria.
 Facilitateand hosted“realtime”design conflictresolutionmeetings withtheotherprojectmodeling
collaborators, by theutilization of theNavisworksviewerinteraction and clashdetection software.
 Accuratedepiction and clear articulation of specified materialsand installationmethodsbased upon an
implementation of accuratefield generated look ahead work flowschedulesof upcomingactivities, through the
production of specialized and detailed shop drawings for coordinatingtheprogressivenatureby which
electricalsystemsareinstalled.
 Actively engaged withinagroup of selectindividualstasked to collectively develop and implementa
standardizationof internalcompany proceduralmethodsfor theutilization of pre-fabrication effortsthrough the
B.I.M. coordination process, by identifyingand maximizepotentialvalueengineeringopportunitiestocontrol
and monitor theexpenditureof repetitivelabor activities which significantly limited costimpactsbeing
encountered duetoundesirablefield conditionsand labor productivity inefficiencies.
 Produced accurate translations of field generated red-lined drawings of any recorded installation
deviations, into a comprehensive set of as-built drawings.
Field Engineer/Project Coordinator  Ja n . 2 012 - M arch 2 012
 Holder Construction – Hartsfield-Jackson Int. Airport Concourse “E” GIDS-$50,000.00
 Holder Construction – Hartsfield-Jackson Int. Airport Concourse “D” Mid-point Expansion-$3,500,000.00
Position Objective Achievements
Coordinator of the existing project electrical conditions through the utilization of latest version of Autodesk Software
remotely on-site, engaged in theimplementation and compatibility of the conceptual design intent of new and required
expansions to existing electrical systeminfrastructures;as well as producing and presenting detailed procedural actions
plans explaining how to safely and effectively execute critical field work activities.
 EssentialDutiesandResponsibilities
 Coordinationof theprojectconditions and intimatedetails as itpertainsto theelectricalscopeof work,and the
participatingcompany representativefor allcollaborativeprojectcoordinationefforts.
 Facilitateand hostedallinternalprojectcoordination meetings, effectively packagingand communicatingthe
latest progressions coordination developmentsto allprojectand field management officials.
 Collaboration withvendorpartnersand Clevelandpurchasingofficialsto accurately packageand submitall
specified materialproductdata, budgeted materialexpenseand actualcostanalysis reporting, and theexecution
of purchaseordertrackingprocedures.
 Coordinatorand scheduler of allfunctionsassociated withquality engineering, electricalsystemstesting, and
Page 4 of 5  jhiggins3315@gmail.com
Josh Higgins
Continued
finalcommissioningactivities and procedures.
 Responsiblefor monitoringand updatingalltransmitted projectdocumentation, as wellas thedrafting
submission of allinformationalrequeststo thecustomers’ A&Erepresentatives.
Assistant Project Manager  Ju n e 2 011 – Jan. 2 012
 Holder Construction – Hewlett Packard Site 6 Alpharetta Cell 3 Expansion and Ecopod Deployment -
$14,500,000.00
Position Objective Achievements
Assists and shares in thejob duties and responsibilities that are delegated and overseen by the acting senior project
management official.
 EssentialDutiesandResponsibilities
 Executed and reported theweekly sitepersonnelpayroll and monthly customer billingduties.
 Coordinated theorientation for newemployeesarrivingon-siteto thecustomer’sas wellas thecompany
standardsand expectationspertainingto thesitespecificsafetyworkpractices and overallsafety compliance.
 Produced and transmitted daily,weekly,and monthly reportsfor clients/customers.
 Reviewed and processedpricingquotationsrequested fromvendors or potentialsub-contracted service
providers.
Working Field Installation Associate  No v. 2 008 – June 2 011
 Rubicon @ Internap Data Center
 Georgia Tech Clough Building
 Westin Peachtree Plaza – Central Plant Renovation
 Hartsfield Jackson Atlanta Airport New International Terminal
 Project Walsh Data Center
 CNN Center Normal Power Distribution Upgrade Phase 6 of 9
Position Objective Achievements
Performed field installations of electrical systems and associated equipment in commercial and industrial applications.
2005 - 2008 Advantech Electrical Solutions, L.L.C. Dacula, GA
Owner/Operator  S ep t. 2 005 – Nov. 2 008
Position Objective Achievements
As the Senior Officer of this primarily residential and small commercial Electrical Contracting Company, I was
responsible for theinitial inception of the company;the generation of a core clientele base and theoverall growth
thereof; and theoverall company performance.
EssentialDutiesandResponsibilities
 Executed company visionand direction through strategicplanningand overallbudget planningprojections.
 Monitored and tooknecessary actionstoensurethe“highestand bestuse”of company resources.
 Acts as thefinalarbiter forwork-relateddisputes between field personnel.
 Directly monitored theperformanceof allfield personnel.
 Continualassessment of theretention or eliminationof field personnel.
 Continualassessment of theprocurementor elimination of company assets and liabilities.
 Prepared allbid proposals, project budgets, and monitoringof allproposedcosts.
 Established and maintainedclient relations
 Coordinated and prepared allend of fiscalyear financialreportingand taxablerevenueassessments,
developmentand implementation of new-yearshorttermobjectives,and theprojection of financialgoals.
 Reportingprojectstatus trackingresults to clients and field managementpersonnelregularly.
 Approvedallinvoiced or documentedexpendituresmadeby field managementpersonnel.
 Takes stepsreasonably calculatedto improveoperatingmargins.
2000 - 2005 T.A.S. Electric Company Buford, GA
Page 5 of 5  jhiggins3315@gmail.com
Josh Higgins
Continued
Working Field Installation Associate  Ju l y 2 000 – S ept. 2 005
Position Objective Achievements
Performed field installations of electrical systems and associated equipment in residential and commercial
applications.
PROFESSIONAL DEVELOPMENT AND CERTIFICATIONS
 Fluently trainedin theoperationaluse of manyindustry recognizedcomputerprograms
 Accubid Estimating Software
 Accubid Change Order Software
 AutoDesk - AutoCad MEP
 AutoDesk - Revit MEP
 AutoDesk - Navisworks 3D
 AutoDesk - BIM360 Software
 Bluebeam - PDF Converter
 Bluebeam - Revu Software
 Bluebeam - Studio Software
 Citrix GoToMeetingSoftware
 DataMagine Client Software
 Microsoft Excel
 Microsoft Dynamics SL
 Microsoft InfoPath
 Microsoft OneNote
 Microsoft Outlook
 Microsoft PowerPoint
 Microsoft Project
 Microsoft Word
 NECA MLU Software
 P6 Primavera Software
 SharePoint
 Tremble Point Creator Software
 Windows Explorer
 NECAAtlanta ChapterEducationProgram
 Significant Changes to the N.E.C.-2014
 Comprehensive Approach to Project Management-2013
 Integration of Office and Field Operations for Electrical Contractors-2013
 IBEW/NECA J.A.T.C. Education Program
 Inside Journeyman Wireman Certification-2011
 Georgia ProfessionalLicensingBoard
 Electrical Class-1 License – ER102078

More Related Content

What's hot

Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkDaniel Ross
 
Cost Estimator and Consultant
Cost Estimator and ConsultantCost Estimator and Consultant
Cost Estimator and ConsultantRalph Abagis
 
design bid build or Traditional contract shortcomings and alternative method,...
design bid build or Traditional contract shortcomings and alternative method,...design bid build or Traditional contract shortcomings and alternative method,...
design bid build or Traditional contract shortcomings and alternative method,...Tehmas Saeed
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment마 이환
 
SWTate resume 2015
SWTate resume 2015SWTate resume 2015
SWTate resume 2015Steve Tate
 
Zulfadli Bin Jantan (2015)
Zulfadli Bin Jantan (2015)Zulfadli Bin Jantan (2015)
Zulfadli Bin Jantan (2015)Zulfadli Jantan
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - siteAbdulaziz Kaya
 
PP1 presentation slide.
PP1 presentation slide.PP1 presentation slide.
PP1 presentation slide.lucaschinsheng
 
Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14마 이환
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiMd Mehadi Hasan
 
Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management ContractingKai Yun Pang
 
Gregory J Krall Resume Master
Gregory J Krall Resume MasterGregory J Krall Resume Master
Gregory J Krall Resume MasterGreg Krall
 
Eric Bermudez Construction Project Mgr. Resume
Eric Bermudez Construction  Project Mgr. ResumeEric Bermudez Construction  Project Mgr. Resume
Eric Bermudez Construction Project Mgr. ResumeEric Bermudez
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - ReportKai Yun Pang
 
Resume of Maximo M. Aton Jr. 160508
Resume of Maximo M. Aton Jr. 160508Resume of Maximo M. Aton Jr. 160508
Resume of Maximo M. Aton Jr. 160508Maximo Aton
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 

What's hot (20)

Estimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction WorkEstimating and Tendering methods for Construction Work
Estimating and Tendering methods for Construction Work
 
Cost Estimator and Consultant
Cost Estimator and ConsultantCost Estimator and Consultant
Cost Estimator and Consultant
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
 
design bid build or Traditional contract shortcomings and alternative method,...
design bid build or Traditional contract shortcomings and alternative method,...design bid build or Traditional contract shortcomings and alternative method,...
design bid build or Traditional contract shortcomings and alternative method,...
 
Building Economics:Individual Assessment
Building Economics:Individual AssessmentBuilding Economics:Individual Assessment
Building Economics:Individual Assessment
 
SWTate resume 2015
SWTate resume 2015SWTate resume 2015
SWTate resume 2015
 
Zulfadli Bin Jantan (2015)
Zulfadli Bin Jantan (2015)Zulfadli Bin Jantan (2015)
Zulfadli Bin Jantan (2015)
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
 
PP1 presentation slide.
PP1 presentation slide.PP1 presentation slide.
PP1 presentation slide.
 
Yam yih hwan pp1 assignment aug 14
Yam yih hwan   pp1 assignment aug 14Yam yih hwan   pp1 assignment aug 14
Yam yih hwan pp1 assignment aug 14
 
Senior Subcontracts officer-Mehadi
Senior Subcontracts officer-MehadiSenior Subcontracts officer-Mehadi
Senior Subcontracts officer-Mehadi
 
Homer CV - CA2
Homer CV - CA2Homer CV - CA2
Homer CV - CA2
 
Assignment - Management Contracting
Assignment - Management ContractingAssignment - Management Contracting
Assignment - Management Contracting
 
Pp1 final
Pp1 finalPp1 final
Pp1 final
 
Gregory J Krall Resume Master
Gregory J Krall Resume MasterGregory J Krall Resume Master
Gregory J Krall Resume Master
 
Eric Bermudez Construction Project Mgr. Resume
Eric Bermudez Construction  Project Mgr. ResumeEric Bermudez Construction  Project Mgr. Resume
Eric Bermudez Construction Project Mgr. Resume
 
Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021Fundamentals of Construction Contracts - English, ver. 2021
Fundamentals of Construction Contracts - English, ver. 2021
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Resume of Maximo M. Aton Jr. 160508
Resume of Maximo M. Aton Jr. 160508Resume of Maximo M. Aton Jr. 160508
Resume of Maximo M. Aton Jr. 160508
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 

Viewers also liked

Lynn Coleman IT Professional Resume
Lynn Coleman IT Professional ResumeLynn Coleman IT Professional Resume
Lynn Coleman IT Professional ResumeLynn Coleman
 
Top 8 physical scientist resume samples
Top 8 physical scientist resume samplesTop 8 physical scientist resume samples
Top 8 physical scientist resume samplesPeaboBryson666
 
MSG Resume_Kalabat, Iden_2015
MSG Resume_Kalabat, Iden_2015MSG Resume_Kalabat, Iden_2015
MSG Resume_Kalabat, Iden_2015Iden Kalabat
 
Bruce E Wood Visual Resume 5 Jan12
Bruce E Wood Visual Resume 5 Jan12Bruce E Wood Visual Resume 5 Jan12
Bruce E Wood Visual Resume 5 Jan12BEWOOD
 
Top 8 advertising manager resume samples
Top 8 advertising manager resume samplesTop 8 advertising manager resume samples
Top 8 advertising manager resume samplesDemiLovato999
 
PeterTalavera-Resume.docx
PeterTalavera-Resume.docxPeterTalavera-Resume.docx
PeterTalavera-Resume.docxPeter Talavera
 
Ahmed Fahmy_resume
Ahmed Fahmy_resumeAhmed Fahmy_resume
Ahmed Fahmy_resumeAhmed Fahmy
 
Top 8 legal collector resume samples
Top 8 legal collector resume samplesTop 8 legal collector resume samples
Top 8 legal collector resume samplesMichaelLearns012
 
Sindhuri 4 plus Testing Resume
Sindhuri 4 plus Testing ResumeSindhuri 4 plus Testing Resume
Sindhuri 4 plus Testing ResumeSindhuri Maram
 
Amy Calliss - Resume
Amy Calliss - ResumeAmy Calliss - Resume
Amy Calliss - ResumeAmy Calliss
 
Resume of Argha Roy
Resume of Argha RoyResume of Argha Roy
Resume of Argha RoyArgha Roy
 
Andrew phillips resume february 2016
Andrew phillips resume february 2016Andrew phillips resume february 2016
Andrew phillips resume february 2016parsigma
 

Viewers also liked (20)

Lynn Coleman IT Professional Resume
Lynn Coleman IT Professional ResumeLynn Coleman IT Professional Resume
Lynn Coleman IT Professional Resume
 
Anand_Mahendra_Resume
Anand_Mahendra_ResumeAnand_Mahendra_Resume
Anand_Mahendra_Resume
 
Top 8 physical scientist resume samples
Top 8 physical scientist resume samplesTop 8 physical scientist resume samples
Top 8 physical scientist resume samples
 
Resume - RK
Resume - RKResume - RK
Resume - RK
 
MSG Resume_Kalabat, Iden_2015
MSG Resume_Kalabat, Iden_2015MSG Resume_Kalabat, Iden_2015
MSG Resume_Kalabat, Iden_2015
 
Bruce E Wood Visual Resume 5 Jan12
Bruce E Wood Visual Resume 5 Jan12Bruce E Wood Visual Resume 5 Jan12
Bruce E Wood Visual Resume 5 Jan12
 
Top 8 advertising manager resume samples
Top 8 advertising manager resume samplesTop 8 advertising manager resume samples
Top 8 advertising manager resume samples
 
Trainer's Resume
Trainer's ResumeTrainer's Resume
Trainer's Resume
 
PeterTalavera-Resume.docx
PeterTalavera-Resume.docxPeterTalavera-Resume.docx
PeterTalavera-Resume.docx
 
Amin-Shahrokhi-Resume
Amin-Shahrokhi-ResumeAmin-Shahrokhi-Resume
Amin-Shahrokhi-Resume
 
Ahmed Fahmy_resume
Ahmed Fahmy_resumeAhmed Fahmy_resume
Ahmed Fahmy_resume
 
Resume_hdesai_v3
Resume_hdesai_v3Resume_hdesai_v3
Resume_hdesai_v3
 
Top 8 legal collector resume samples
Top 8 legal collector resume samplesTop 8 legal collector resume samples
Top 8 legal collector resume samples
 
Sindhuri 4 plus Testing Resume
Sindhuri 4 plus Testing ResumeSindhuri 4 plus Testing Resume
Sindhuri 4 plus Testing Resume
 
Phyllis Shulman Resume
Phyllis Shulman Resume Phyllis Shulman Resume
Phyllis Shulman Resume
 
Amy Calliss - Resume
Amy Calliss - ResumeAmy Calliss - Resume
Amy Calliss - Resume
 
Wicha_resume_September2016
Wicha_resume_September2016Wicha_resume_September2016
Wicha_resume_September2016
 
Resume of Argha Roy
Resume of Argha RoyResume of Argha Roy
Resume of Argha Roy
 
Farag- Resume
Farag- ResumeFarag- Resume
Farag- Resume
 
Andrew phillips resume february 2016
Andrew phillips resume february 2016Andrew phillips resume february 2016
Andrew phillips resume february 2016
 

Similar to Josh Higgins Resume

Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar
 
Allman Alexis Resume Copy
Allman Alexis Resume CopyAllman Alexis Resume Copy
Allman Alexis Resume CopyLori Mitchell
 
Quantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AMQuantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AMMohamed Riyaz
 
DJ's Corporate Experience & Performance Package (Complete-2014)
DJ's Corporate Experience & Performance Package (Complete-2014)DJ's Corporate Experience & Performance Package (Complete-2014)
DJ's Corporate Experience & Performance Package (Complete-2014)Daniel J Fernandez II
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneeringAbdo Jamous El Jamous
 
Christopher_Walsh_Resume 9-20-016
Christopher_Walsh_Resume 9-20-016Christopher_Walsh_Resume 9-20-016
Christopher_Walsh_Resume 9-20-016Christopher Walsh
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016L Douglas Sargent Jr
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016Chris Nash
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Gregoire Lesecq
 
Project Management Control
Project Management ControlProject Management Control
Project Management ControlVinay Mangrulkar
 
03 CONSTRUCTION OWNERS REP INFORMATION
03 CONSTRUCTION OWNERS REP INFORMATION03 CONSTRUCTION OWNERS REP INFORMATION
03 CONSTRUCTION OWNERS REP INFORMATIONJoe Trujillo
 

Similar to Josh Higgins Resume (20)

Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
Allman Alexis Resume Copy
Allman Alexis Resume CopyAllman Alexis Resume Copy
Allman Alexis Resume Copy
 
Quantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AMQuantity Surveyor - Riyas AM
Quantity Surveyor - Riyas AM
 
MEP procurement engineer
MEP procurement engineerMEP procurement engineer
MEP procurement engineer
 
DJ's Corporate Experience & Performance Package (Complete-2014)
DJ's Corporate Experience & Performance Package (Complete-2014)DJ's Corporate Experience & Performance Package (Complete-2014)
DJ's Corporate Experience & Performance Package (Complete-2014)
 
professional services and value engeneering
professional services and value engeneeringprofessional services and value engeneering
professional services and value engeneering
 
Robin CV 2015
Robin CV 2015Robin CV 2015
Robin CV 2015
 
Christopher_Walsh_Resume 9-20-016
Christopher_Walsh_Resume 9-20-016Christopher_Walsh_Resume 9-20-016
Christopher_Walsh_Resume 9-20-016
 
Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016Resume Short Version with Project List 07252016
Resume Short Version with Project List 07252016
 
Ahmad Haddad
Ahmad HaddadAhmad Haddad
Ahmad Haddad
 
pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016pdf 25 NCON Brochure 1.19.2016
pdf 25 NCON Brochure 1.19.2016
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
Edg resume 06.2016
Edg resume 06.2016Edg resume 06.2016
Edg resume 06.2016
 
EDG Resume 06.2016
EDG Resume 06.2016EDG Resume 06.2016
EDG Resume 06.2016
 
Bellwether profile
Bellwether profileBellwether profile
Bellwether profile
 
Van herrera cv
Van herrera   cvVan herrera   cv
Van herrera cv
 
Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016Project management in practice - world cement magazine nov 2016
Project management in practice - world cement magazine nov 2016
 
Project Management Control
Project Management ControlProject Management Control
Project Management Control
 
New Updated 7.62 Resume8
New Updated 7.62 Resume8New Updated 7.62 Resume8
New Updated 7.62 Resume8
 
03 CONSTRUCTION OWNERS REP INFORMATION
03 CONSTRUCTION OWNERS REP INFORMATION03 CONSTRUCTION OWNERS REP INFORMATION
03 CONSTRUCTION OWNERS REP INFORMATION
 

Josh Higgins Resume

  • 1. Page 1 of 5 Josh Higgins 56 Fred Bush Rd., Hazlehurst GA, 31539  912-375-9031  jhiggins3315@gmail.com JOB OBJECTIVE Project Manager of Large Scale Commercial and Industrial Electrical Construction Projects (Providing marketable experience and relevant skill sets that can be effectively utilized within any job market) SUMMARY OF QUALIFICATIONS  Three (+) y ears’ Project Management of new and add to existing major commercial, industrial, data center/mission critical, and p harmaceutical/healthcare electrical constr uction projects.  Served fifteen (+) y ears’ in the Electrical Contracting/Construction industry overall.  Thoroughly trained and exp erienced at nearly all job duties and responsibilities p ertaining to the p rogression of a major commercial/industrial electrical construction p roject; from the reception of the bid invitation, to a p roject’s close-out.  Excep tional team management and critical task recognition/delegation skill set s.  Robust record of career achievements and successes in the pursuit of p rofessional goals, p erformance of tasked objectives in high p ressure situations, and efficiently operating within pre- determined timeline.  Resp onsible and tenacious about monthly billing and invoicing; “Cash Is King” is a mission statement I have adopted when referencing p roject cash flow. PROFESSIONAL EXPERIENCE 2008-Present Cleveland Electric Company Atlanta, GA Project Manager  Baxter Healthcare Corp. - P rogram Covington P lasma P rotein M anufacturing F acili ty, S ept. 2 013-Pres.  Turner Construction Co. [East Bid Package] Base Contract Value of - $6.5 Million  Turner Construction Co. [North Bid Package] Base Contract Value of - $17 Million Position Objective Achievements Administrator, in collaboration with the project’s Field Labor Superintendent, over the daily operations of all general project site logistics and activities; successfully managing five individual contracts simultaneously and a diverse work force comprised of: (10) Individual Sub-contractor accounts (8) In-house Project Engineers (3) In-house Quality Control Professionals (6) Field Labor General Foremen (35) Field Labor Foremen (251) Field Labor Craftsmen (1) Administrative Assistant. Essential Duties andResponsibilities  Pre-Project Mobilization Execution  Familiarized myself with thestructureand contextthateach awarded bid packageproposalwascomposed and written. o Competently reviewedallprojectspecifications,drawings, and transmitted bid documents. o Coordinated bid proposaland scopereview hand-off meetingwith theassociated pre-construction teamand estimators,ensuringthattheawardedproposalvaluesare unambiguousand clearly expressed to adequately supportthecontractualterms and conditions. o Identified and coordinated opportunities forpre-fabricationinvolvement, materialsubstitutions, and valueengineering changes designed to improveefficiency or increasejob profitability.  Established and maintainedcustomerrelationsas theprimary channelof communication between Cleveland and thecustomer on allcontractualand financialmatters. o Engaged in contract negotiationswith customer to establish monthly billingcriteria,coordination of a billablescheduleof values, and changeorder ratecoordination withtheobjectiveof attainingthe highest feasiblemargin. o Coordinated,prepared, and approved theprojectbudget and detailed engineering, procurement, and constructionschedules. o Co-coordinated and established a hierarchy of field labor managers, and the development of a
  • 2. Page 2 of 5  jhiggins3315@gmail.com Josh Higgins Continued multi-tiered organization chart featuring the projects chain of command.  Day to Day Operations  Overseer of field engineering, labor production, and on-sitemanagementofficials.  Worked closely with theField LaborSuperintendenttomaximizelabor productivity and reduceinefficiency.  Kept and completed allnecessary recordsand reportsrequired by Clevelandupper managementincluding:job statusreports, budgeting/trackingreports,and A/R trackingreports.  Prepared and approved allapplicableinvoicesand amresponsiblefor promptpaymentby thecustomer, includingany retention.  Ensured thatappropriateprojectpersonnelarethoroughly familiar with thescopeof thework, thebasisof the estimate, theprojectbudgetand schedules,and thecontractterms. o Coordinated informationflow fromthecustomer and fromvendors. o Monitored engineering, procurement,and constructionprogressagainstscheduleand initiatesany necessary action whererequired. o Responsiblefor ensuringthatfield supervisory personnelallowsufficientlead timewhenordering materials for delivery tothejob site.  Prepares and maintainsO&M manuals forclient atprojectcompletion.  At completion of contract, obtainscustomer acceptance, closes contract, obtainsany waivers of liensthatmay berequired, and continuestoberesponsiblefor ensuringthatCleveland is fully and timely paid for allwork performed.  Assumesresponsibility fortheprofitability of contracts forwhichIam responsible  Monitored and controlsallcharges against theprojectbudget.  Produced and negotiated $12+million dollarsin changeorders forfiveindividualcontracts simultaneously, increasingtheoverallprojectprofitability.  Wrote, negotiated, managed, and billed customerfor alllower-tiersub-contracted services.  Ensured thatthecustomer hasbeen accurately billed accordingto thenegotiated contractagreements. Estimator  Estimation of 31+ Million Dollars in Electrical Bid Proposals - Ju ne 2 013-Sept. 2 013  Estimator Marta Generator and ATS Replacement-$200,000.00  Estimator Baxter [East Bid Package]-6,500,000.00  Estimator Baxter [North Bid Package] -$17,000,000.00  Estimator Clayton State University New Science Building Site Temporary-$80,000.00  Estimator Waste Management CNG Time Fill Expansion-$70,000.00  Estimator Hartsfield-Jackson Int. Airport Terminal HVAC Upgrade-$3,300,000.00  Estimator Gordon Hospital ED & ICU Expansion Renovation -$3,600,000.00  Estimator Kaiser Permanente-Gwinnett CMC Radiology Suite-$70,000.00  Estimator Kaiser Permanente-Town Park CMC Radiology Suite-$60,000.00  Estimator CNN 12SE TBS INT'L Finance Consolidation Project-$180,000.00  Estimator Georgia State Humanities Law Building Site Temporary-$125,000.00 Position Objective Achievements Executed theestimation of electrical bid projects and prepared various estimate delivery methods for electrical contract proposals, including the determination of applicable project plans and specifications; compiling costs of goods, sub-contracted services, general conditions, as well as jobsite staff and field labor force projections. EssentialDutiesandResponsibilities  Familiarizemyselfwith thebid invitation criteria,preliminary constructionschedules,bid proposalsubmission dates, bid drawings,specifications, RFI’s, contractualobligations,as wellas other pertinentdocumentation received through theinvitationto bid.  Organization of documentationfiling, coordination, and trackingof thosetransmittedfromthereception of the bid invitation through thebid recap and projecthand-off meeting.  Actingand appointed executivecontactliaison forassociated customer personnelduringthebid cycleprocess.  Developmentof estimatingprocedureand structureof bid proposals, ensured estimatewascompliantwith customers’requirements forbid submission.  Solely responsibleto producean accuratetake-off of itemizedunits derived fromalldocumentation received duringthebid cycleprocess.  Initiation and processingof purchaseinquiries,tabulatingand analyzingquotationsas to price,terms, delivery, and general conformity withrequirements of theinquiry and specifications.
  • 3. Page 3 of 5  jhiggins3315@gmail.com Josh Higgins Continued  Administrator over thefinaltabulationof quantifiedtake-offdata,pricingquotationsfor materialsand/or sub- contracted services, required projectoverhead costs,marginalprofitdividends,and adjustmentof labor units based upon thedetermined levelsof installationdifficultyand historicalcompany performancedatafrom similar project scopesizesand complexities.  Administrator and executer overthefinalbid proposalspreparation and submissionof customers bond requirements,contractdocuments,and theexecutivestatementoutliningscopeof workassumptions and clarifications on company letterhead. Project Engineer/B.I.M. Coordinator  M a rch 2 012-June 2 013  Northeast Georgia Medical Center – Braselton, Georgia-New Campus-$18,000,000.00  University Medical Center – New Orleans, Louisiana-New Campus-$40,000,000.00 Position Objective Achievements Coordinator of the complete project electrical systeminstallation through the utilization of latest version of the Building Integration Modeling (B.I.M.) Autodesk Software; and assist the electrical field personnelto understand the job drawings from an electrical standpoint and help to explain, by providing additional or more detailed drawings, how the work can be done most efficiently and/or cost effectively to meet the customer specifications.  EssentialDutiesandResponsibilities  Collaborated with othertradecontracted servicesand thecustomers’ engineeringpersonnelto develop a comprehensive, coordinated,and precisefully interactivedigitalmodelof thevariousbuildingstructuresand systems contained withinperthecustomersspecified materialand installationcriteria.  Facilitateand hosted“realtime”design conflictresolutionmeetings withtheotherprojectmodeling collaborators, by theutilization of theNavisworksviewerinteraction and clashdetection software.  Accuratedepiction and clear articulation of specified materialsand installationmethodsbased upon an implementation of accuratefield generated look ahead work flowschedulesof upcomingactivities, through the production of specialized and detailed shop drawings for coordinatingtheprogressivenatureby which electricalsystemsareinstalled.  Actively engaged withinagroup of selectindividualstasked to collectively develop and implementa standardizationof internalcompany proceduralmethodsfor theutilization of pre-fabrication effortsthrough the B.I.M. coordination process, by identifyingand maximizepotentialvalueengineeringopportunitiestocontrol and monitor theexpenditureof repetitivelabor activities which significantly limited costimpactsbeing encountered duetoundesirablefield conditionsand labor productivity inefficiencies.  Produced accurate translations of field generated red-lined drawings of any recorded installation deviations, into a comprehensive set of as-built drawings. Field Engineer/Project Coordinator  Ja n . 2 012 - M arch 2 012  Holder Construction – Hartsfield-Jackson Int. Airport Concourse “E” GIDS-$50,000.00  Holder Construction – Hartsfield-Jackson Int. Airport Concourse “D” Mid-point Expansion-$3,500,000.00 Position Objective Achievements Coordinator of the existing project electrical conditions through the utilization of latest version of Autodesk Software remotely on-site, engaged in theimplementation and compatibility of the conceptual design intent of new and required expansions to existing electrical systeminfrastructures;as well as producing and presenting detailed procedural actions plans explaining how to safely and effectively execute critical field work activities.  EssentialDutiesandResponsibilities  Coordinationof theprojectconditions and intimatedetails as itpertainsto theelectricalscopeof work,and the participatingcompany representativefor allcollaborativeprojectcoordinationefforts.  Facilitateand hostedallinternalprojectcoordination meetings, effectively packagingand communicatingthe latest progressions coordination developmentsto allprojectand field management officials.  Collaboration withvendorpartnersand Clevelandpurchasingofficialsto accurately packageand submitall specified materialproductdata, budgeted materialexpenseand actualcostanalysis reporting, and theexecution of purchaseordertrackingprocedures.  Coordinatorand scheduler of allfunctionsassociated withquality engineering, electricalsystemstesting, and
  • 4. Page 4 of 5  jhiggins3315@gmail.com Josh Higgins Continued finalcommissioningactivities and procedures.  Responsiblefor monitoringand updatingalltransmitted projectdocumentation, as wellas thedrafting submission of allinformationalrequeststo thecustomers’ A&Erepresentatives. Assistant Project Manager  Ju n e 2 011 – Jan. 2 012  Holder Construction – Hewlett Packard Site 6 Alpharetta Cell 3 Expansion and Ecopod Deployment - $14,500,000.00 Position Objective Achievements Assists and shares in thejob duties and responsibilities that are delegated and overseen by the acting senior project management official.  EssentialDutiesandResponsibilities  Executed and reported theweekly sitepersonnelpayroll and monthly customer billingduties.  Coordinated theorientation for newemployeesarrivingon-siteto thecustomer’sas wellas thecompany standardsand expectationspertainingto thesitespecificsafetyworkpractices and overallsafety compliance.  Produced and transmitted daily,weekly,and monthly reportsfor clients/customers.  Reviewed and processedpricingquotationsrequested fromvendors or potentialsub-contracted service providers. Working Field Installation Associate  No v. 2 008 – June 2 011  Rubicon @ Internap Data Center  Georgia Tech Clough Building  Westin Peachtree Plaza – Central Plant Renovation  Hartsfield Jackson Atlanta Airport New International Terminal  Project Walsh Data Center  CNN Center Normal Power Distribution Upgrade Phase 6 of 9 Position Objective Achievements Performed field installations of electrical systems and associated equipment in commercial and industrial applications. 2005 - 2008 Advantech Electrical Solutions, L.L.C. Dacula, GA Owner/Operator  S ep t. 2 005 – Nov. 2 008 Position Objective Achievements As the Senior Officer of this primarily residential and small commercial Electrical Contracting Company, I was responsible for theinitial inception of the company;the generation of a core clientele base and theoverall growth thereof; and theoverall company performance. EssentialDutiesandResponsibilities  Executed company visionand direction through strategicplanningand overallbudget planningprojections.  Monitored and tooknecessary actionstoensurethe“highestand bestuse”of company resources.  Acts as thefinalarbiter forwork-relateddisputes between field personnel.  Directly monitored theperformanceof allfield personnel.  Continualassessment of theretention or eliminationof field personnel.  Continualassessment of theprocurementor elimination of company assets and liabilities.  Prepared allbid proposals, project budgets, and monitoringof allproposedcosts.  Established and maintainedclient relations  Coordinated and prepared allend of fiscalyear financialreportingand taxablerevenueassessments, developmentand implementation of new-yearshorttermobjectives,and theprojection of financialgoals.  Reportingprojectstatus trackingresults to clients and field managementpersonnelregularly.  Approvedallinvoiced or documentedexpendituresmadeby field managementpersonnel.  Takes stepsreasonably calculatedto improveoperatingmargins. 2000 - 2005 T.A.S. Electric Company Buford, GA
  • 5. Page 5 of 5  jhiggins3315@gmail.com Josh Higgins Continued Working Field Installation Associate  Ju l y 2 000 – S ept. 2 005 Position Objective Achievements Performed field installations of electrical systems and associated equipment in residential and commercial applications. PROFESSIONAL DEVELOPMENT AND CERTIFICATIONS  Fluently trainedin theoperationaluse of manyindustry recognizedcomputerprograms  Accubid Estimating Software  Accubid Change Order Software  AutoDesk - AutoCad MEP  AutoDesk - Revit MEP  AutoDesk - Navisworks 3D  AutoDesk - BIM360 Software  Bluebeam - PDF Converter  Bluebeam - Revu Software  Bluebeam - Studio Software  Citrix GoToMeetingSoftware  DataMagine Client Software  Microsoft Excel  Microsoft Dynamics SL  Microsoft InfoPath  Microsoft OneNote  Microsoft Outlook  Microsoft PowerPoint  Microsoft Project  Microsoft Word  NECA MLU Software  P6 Primavera Software  SharePoint  Tremble Point Creator Software  Windows Explorer  NECAAtlanta ChapterEducationProgram  Significant Changes to the N.E.C.-2014  Comprehensive Approach to Project Management-2013  Integration of Office and Field Operations for Electrical Contractors-2013  IBEW/NECA J.A.T.C. Education Program  Inside Journeyman Wireman Certification-2011  Georgia ProfessionalLicensingBoard  Electrical Class-1 License – ER102078