SlideShare a Scribd company logo
1 of 4
SUPROTIM DEY
: 91-8017737734 : supro.pro.engg@gmail.com
In quest for challenging assignments in different types of Projects, Production Engineering, Quality
Assurance & Quality Control and Vendor Evaluation & Management with a reputed organization.
PROFESSIONAL SNAPSHOT
⇒ A result-focussed Engineer with more than 6 years of experience in Quality
Assurance & Quality Control, in the field of manufacturing & production,
Vendor evaluation & Management with well-known organizations contributing
to infrastructural augmentation jobs in Water system and Steel Making industry.
⇒ Experience in HVAC, Dosing systems & lubrication system.
⇒ Presently associated with Gillanders Arbuthnot & Co. Ltd. MICCO Division
since March’13.
⇒ Reporting to HOD (DGM) and Divisional Joint President. In previously held
positions, reported to the Business Head and Director.
EMPLOYMENT SCAN
Presently associated with VIKRAM SOLAR PVT.LTD as Sr. Engineer quality projects in 130MW & 50 MW
Solar Power Project.
GILLANDERS ARBUTHNOT & Co. Ltd. MICCO Division (A leading EPC/Turnkey Constructing company in
Eastern India, Part of the Kothari Group), Head Office, Kolkata, since March’13
Projects Handled
 Category 1 Capital Repair of Blast Furnace 2.
Client: RINL, Visakhapatnam Steel Plant.
Consultant: M. N. Dastur & Co. Pvt. Ltd. (Kolkata, West Bengal)
Project Description:
Balance of Plant involving Cooling water system (Capacity: 9700m3/hr) for Blast Furnace 2 in a Turnkey
module. Project comprises refurbishment, reuse and augmentation of Brownfield facilities and Greenfield
installations.
Existing facilities are 2 Pump Houses with adjacent ECR building, 2 RCC Cooling Towers (3 cells each of
Capacity: 2666m3/hr and 900m3/hr each), Waste Water Treatment Plant for reuse of Gas Cleaning Plant (GCP)
circuit water (Capacity: 2300m3/hr, 2nos Thickeners / HRSCC of 40m diameter), Ventilation Room
(120,000 m3/hr Centrifugal Fan), Soft Water Tanks (RCC), Industrial Water Tanks (RCC), Emergency Overhead
Tank (MS), Underground Pipe Tunnel, Underground Cable Trench.
Greenfield installations consisted of 2 Pump Houses, 2 RCC Cooling Towers (1 cell & 2 cell each of Capacity:
200m3/hr and 1810m3/hr each), Heat Exchanger Room (4 Plate Type Heat Exchanger), Ventilation Room
(40000 CMH Centrifugal Fan), ClO2 Preparation Unit, ECR building, Transformer Room, Soft Water Tanks (RCC),
Industrial Water Tanks (RCC).
Achievements:
 Attended 25-30 inspection Review meetings at M.N.Dastur (Kolkata) for inspection clearance of all
equipment and few structural items.
 Carried out procurement process of mechanical items starting from preparation of Quality Assurance Plan
to dispatch clearance. (Mechanical Items included: Waste Water Treatment Plant, Side stream sand
filters (5m dia.), HVAC, Pumps (Horizontal & Vertical centrifugal), Chlorine dioxide - ClO2 Dosing System.)
 Quality Assurance
 Inspection
 ISO 9001:2008 Audit
 Equipment Inspection
 Conducted meetings with respective vendors for complete technical clarification.
 Carried out inspection and managed documents of HVAC for all premises including Pump Houses,
Electrical rooms, Hydraulic cellar and Cable Cellars.
 Carried out technical evaluation of Waste Water Treatment Plant (Capacity: 2300m3/hr) for reuse of
Waste Water generated from circulation through Gas Cleaning Plant.
 Managed entire documentation and inspection clearance relating to Cooling Towers.
 Successfully carried out vendor follow-ups and chasing involving clarification of commented points and
negotiate with sub-vendors for advancing with the submission of documents as compliance in order to
meet the pre-shutdown supply schedule. (Important vendors included Kirloskar Brothers Ltd., Deltech
Controls, Anticorrosive Pumps, Flaktwoods).
----------------------------------------------------------------------------------------------------------------------------------------------
 Installation of Reheating Furnace for Universal Rail Mill (PKG 049-03).
Client: SAIL, BHILAI STEEL PLANT.
Consultant: MECON Ltd. (Ranchi, Jharkhand)
Project Description:
Balance of Plant involving Cooling water system (Capacity: 389m3/hr) for Reheating Furnace in a Turnkey
module. A Greenfield project consisting of Pump House, RCC Cooling Tower (2 cell Capacity: 720m3/hr each),
Heat Exchanger Room (3 Plate Type Heat Exchanger), Soft water Plant (10m3/hr), Ventilation Room (80000 CMH
Centrifugal Fan), Soft Water Tanks (RCC), Industrial Water Tanks (RCC), Emergency Overhead Tank (353 m3 RCC),
Underground Pipe Tunnel (96 m).
Achievements:
 Successfully carried out inspection and testing of valves and other various equipments as per the MECON
approved QAP.
 Single headedly carried out internal audit onsite for the preparation of re-certification audit to the standard
ISO 9001:2008.
 Successfully carried out inspection of entire Ventilation System for Pump House .
----------------------------------------------------------------------------------------------------------------------------------------------
 Bokaro ID Fan Complex for SMS II.
Client: SAIL, BOKARO STEEL PLANT.
Consultant: MECON Ltd. (Ranchi, Jharkhand)
Project Description:
Design, engineering, manufacture / fabrication, supply, transportation, unloading, storage, transportation to
site, erection, testing and commissioning of a new gas discharge / recovery system for each converter consisting
of ID Fan, Seal sump, Interconnecting gas piping, utility piping etc. for both the converters, including common
interconnecting piping, sump along its pump etc., termed as ID Fan Complex.
Achievements:
 Carried out inspection on grease lubrication system in M/s. Lincoln Helios Ltd. As per QAP and
successfully cleared the item from MECON based on the inspection witness report and review of other
relevant documents.
 Successfully carried out entire documentation and inspection clearance of Ventilation System for ECR
building.
----------------------------------------------------------------------------------------------------------------------------------------------
Additional Achievements:
 Attended 3 internal training on welding technology and certified internal auditor course as per the standard
ISO 9001:2008
 Development of excellent relationships with leading consultants in Steelmaking sector namely, MECON
(Ranchi) and M.N.Dastur (Kolkata, Mumbai) and Client like Visakhapatnam Steel Plant
----------------------------------------------------------------------------------------------------------------------------------------------
Was previously associated with LAGAN ENGINEERING CO. LTD. Bhadreswar, West Bengal
Since June’11- Feb’13 As Executive Engineer
Core Competencies:
 Supervision of CNC M/C Dept.
• Machine Loading Plan.
• Maintenance of Air compressor. (CNC Machines).
• Job Marking & Measurement
• Material Inspection (Steel & Casting)
 Construction, Fabrication, Restructuring shop floor Plan.
• Dealing with Bills, Work Order, Quotation & scheduling of different expansion projects.
 Foundry Division
• Cupola Furnace Erection & supervision of pattern making, mould making etc.
----------------------------------------------------------------------------------------------------------------------------------------------
Began professional career in SUNIL HI-TECH ENGINEERS LTD. Koradi, Nagpur: Since Aug’10- June’11
Core Competences:
 Fabrication, Execution & Erection
 QA/QC - (NDT - Dye Penetrant Testing, Ultrasonic Testing, Radiographic Testing, Magnetic Particle
Testing)
Project Handled:
 Larsen & Toubro Power – Koradi Project – 3x660 MW Thermal Power Station – TG Building Area (Expansion
Project)
SCHOLASTICS
B.Tech (Mechanical) from Mallabhum Institute of Technology, Bishnupur in 2010 with CGPA 7.44.
Class XII from Patha Bhavan, Kolkata in 2006
Class X from Hartley’s High School, Kolkata in 2004
TECHNICAL SKILLS
 Material Inspection and review of documents.
 Review of Welder Procedure Qualification, Welder Qualification Test.
 Preparing of procedure & quality assurance plan & different testing methods & inspection.
 Fabrication of critical structures (tie-beams, columns etc).
 Review and comment on drawings.
 Visual & stage inspection of welding.
 Non-Destructive Testing (LPT, MPT, UT, RT).
 Provide direction in developing inspection plans, In-Process and Final inspection.
 Computer Skills: Well versed with MS Office & Internet Applications
SKILL ENHANCEMENT SCHEDULE
Certified Internal Auditor on ISO 9001: 2008 from TUV Nord.
COMPANY: BRITANNIA ENGG. LTD. ((MANUFACTURING OF ROAD ROLLER & TEA MACHINERY)MANUFACTURING OF ROAD ROLLER & TEA MACHINERY)
COMPANY: WESMAN ENGG.CO.PVT.LTD. ( MANUFACTURING OF BLOWERS, BURNERS, FURNACE,MANUFACTURING OF BLOWERS, BURNERS, FURNACE,
ROLLERS)ROLLERS)
Have pursued training in AUTOCAD.
Level II certified training in NON DESTRUCTIVE TESTING [Dye Penetrant Testing (Dye detects cracks on the
surface), Ultrasonic Testing (Sound waves detect internal discontinuities), Radiographic Testing (Radioactive Isotope
detect both surface & internal discontinuities), Magnetic particle Testing (Magnetic particle detect surface and
subsurface discontinuities)].
ACCOLADES
EXHIBITION
Model of a Dam & production of electricity by the help of water turbine
BEYOND ACADEMIA
 Selected for the OLYMPICS, ATHENS as the escort runner for the first round selection process from the
school level, competition held in Kolkata.
 Participated in debate and extempore.
 Played role in the Event Management in school & college fest.
 Represented Gillanders Arbuthnot & Co. Ltd. in inter-office rowing championship.
PERSONAL DOSSIER
DATE OF BIRTH : 12 Sept 1987
FATHER’S NAME : Mr. P.DEY
ADDRESS : 16 D, Benia Para Lane, Kolkata – 700014
SEX : Male. & MARTIAL STATUS: Married
DECLARATION: I hereby, declare that all the above information is correct and true to the best of my
knowledge and belief.
S
UPROTIM DEY

More Related Content

What's hot

Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015Brandon Rhodes
 
resume . doc rev 6mb aug 16 ) - no adress
resume . doc rev 6mb aug 16 ) - no adressresume . doc rev 6mb aug 16 ) - no adress
resume . doc rev 6mb aug 16 ) - no adressMichael Bartlett
 
Case Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent SolventsCase Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent SolventsKoch Modular Process Systems, LLC.
 
CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )Ganesan Sivam
 
Coating Insulation Inspector-NACE Level 2
Coating Insulation Inspector-NACE Level 2Coating Insulation Inspector-NACE Level 2
Coating Insulation Inspector-NACE Level 2Sundar Rajan
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completionRonie Chu
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerTarun Sharna
 

What's hot (20)

ME_CV1
ME_CV1ME_CV1
ME_CV1
 
Jayadevan_Pattali
Jayadevan_PattaliJayadevan_Pattali
Jayadevan_Pattali
 
Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015Resume-Brandon Rhodes-May 2015
Resume-Brandon Rhodes-May 2015
 
resume . doc rev 6mb aug 16 ) - no adress
resume . doc rev 6mb aug 16 ) - no adressresume . doc rev 6mb aug 16 ) - no adress
resume . doc rev 6mb aug 16 ) - no adress
 
Waseem CV
Waseem CVWaseem CV
Waseem CV
 
Case Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent SolventsCase Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent Solvents
 
Senthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress EngineerSenthil Nathan Senior Piping Stress Engineer
Senthil Nathan Senior Piping Stress Engineer
 
RAJENDRA SHARMA CV
RAJENDRA SHARMA CVRAJENDRA SHARMA CV
RAJENDRA SHARMA CV
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )CV : Inspection Engineer ( With SABIC Experience )
CV : Inspection Engineer ( With SABIC Experience )
 
Coating Insulation Inspector-NACE Level 2
Coating Insulation Inspector-NACE Level 2Coating Insulation Inspector-NACE Level 2
Coating Insulation Inspector-NACE Level 2
 
Resume - Anirvan
Resume - AnirvanResume - Anirvan
Resume - Anirvan
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
Mechanical completion
Mechanical completionMechanical completion
Mechanical completion
 
Moving To Modular: CHEMICAL ENGINEERING, January 2015
Moving To Modular: CHEMICAL ENGINEERING, January 2015Moving To Modular: CHEMICAL ENGINEERING, January 2015
Moving To Modular: CHEMICAL ENGINEERING, January 2015
 
Saurav Rawat CV
Saurav Rawat CVSaurav Rawat CV
Saurav Rawat CV
 
Resume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineerResume - Tarun Sharma - Pipe stress engineer
Resume - Tarun Sharma - Pipe stress engineer
 
Qa QC SEPL NOV 2017
Qa QC SEPL NOV  2017Qa QC SEPL NOV  2017
Qa QC SEPL NOV 2017
 
Stephen Murphy Resume
Stephen Murphy ResumeStephen Murphy Resume
Stephen Murphy Resume
 
CV Mohsen Maddahi
CV Mohsen Maddahi CV Mohsen Maddahi
CV Mohsen Maddahi
 

Viewers also liked

Entrega final Bustop
Entrega final BustopEntrega final Bustop
Entrega final BustopDavid Santa
 
Reporte de lectura
Reporte de lecturaReporte de lectura
Reporte de lecturaMagda9109
 
Code Security Systems Ltd
Code Security Systems LtdCode Security Systems Ltd
Code Security Systems LtdLee Dorman (Dr)
 
ICT&Logistiek Beurs: Leiden webwinkels tot files in de woonwijken?
ICT&Logistiek Beurs: Leiden webwinkels tot files in de woonwijken?ICT&Logistiek Beurs: Leiden webwinkels tot files in de woonwijken?
ICT&Logistiek Beurs: Leiden webwinkels tot files in de woonwijken?Walther Ploos van Amstel
 
Tiin 1041 clase 2
Tiin 1041 clase 2Tiin 1041 clase 2
Tiin 1041 clase 2jmortiz72
 
14505 la chambre_du_presbytre1211
14505 la chambre_du_presbytre121114505 la chambre_du_presbytre1211
14505 la chambre_du_presbytre1211Renée Bukay
 
Role of Nuclear Medicine in Carcinoma breast
Role of Nuclear Medicine in Carcinoma breastRole of Nuclear Medicine in Carcinoma breast
Role of Nuclear Medicine in Carcinoma breastAmir Bahadur
 
Actividad intermedia fase 2
Actividad intermedia   fase 2Actividad intermedia   fase 2
Actividad intermedia fase 2Stephany Cabezas
 
IT-Sicherheit in der Wasserversorgung 4.0
IT-Sicherheit in der Wasserversorgung 4.0IT-Sicherheit in der Wasserversorgung 4.0
IT-Sicherheit in der Wasserversorgung 4.0Dr. Michael Neupert
 
Leyes de la educación en colombia
Leyes de la educación en colombiaLeyes de la educación en colombia
Leyes de la educación en colombiaUPTC
 
Purpose of documentaries
Purpose of documentariesPurpose of documentaries
Purpose of documentariesasmediae15
 
Anna Lasmanowicz, Hypermedia – linked by Isobar "Gdzie jest miejsce dla conte...
Anna Lasmanowicz, Hypermedia – linked by Isobar "Gdzie jest miejsce dla conte...Anna Lasmanowicz, Hypermedia – linked by Isobar "Gdzie jest miejsce dla conte...
Anna Lasmanowicz, Hypermedia – linked by Isobar "Gdzie jest miejsce dla conte...Monika Witoń
 

Viewers also liked (20)

Entrega final Bustop
Entrega final BustopEntrega final Bustop
Entrega final Bustop
 
Reporte de lectura
Reporte de lecturaReporte de lectura
Reporte de lectura
 
elasticity of demand
elasticity of demandelasticity of demand
elasticity of demand
 
Code Security Systems Ltd
Code Security Systems LtdCode Security Systems Ltd
Code Security Systems Ltd
 
Photographic Storyboard
Photographic StoryboardPhotographic Storyboard
Photographic Storyboard
 
ICT&Logistiek Beurs: Leiden webwinkels tot files in de woonwijken?
ICT&Logistiek Beurs: Leiden webwinkels tot files in de woonwijken?ICT&Logistiek Beurs: Leiden webwinkels tot files in de woonwijken?
ICT&Logistiek Beurs: Leiden webwinkels tot files in de woonwijken?
 
Open access algeria
Open access algeria Open access algeria
Open access algeria
 
البورصة المصرية | شركة عربية اون لاين | التحليل الفني | 3-11-2016 | بورصة | ا...
البورصة المصرية | شركة عربية اون لاين | التحليل الفني | 3-11-2016 | بورصة | ا...البورصة المصرية | شركة عربية اون لاين | التحليل الفني | 3-11-2016 | بورصة | ا...
البورصة المصرية | شركة عربية اون لاين | التحليل الفني | 3-11-2016 | بورصة | ا...
 
Tiin 1041 clase 2
Tiin 1041 clase 2Tiin 1041 clase 2
Tiin 1041 clase 2
 
14505 la chambre_du_presbytre1211
14505 la chambre_du_presbytre121114505 la chambre_du_presbytre1211
14505 la chambre_du_presbytre1211
 
Role of Nuclear Medicine in Carcinoma breast
Role of Nuclear Medicine in Carcinoma breastRole of Nuclear Medicine in Carcinoma breast
Role of Nuclear Medicine in Carcinoma breast
 
Actividad intermedia fase 2
Actividad intermedia   fase 2Actividad intermedia   fase 2
Actividad intermedia fase 2
 
Educar no. 35 competencias
Educar no. 35 competenciasEducar no. 35 competencias
Educar no. 35 competencias
 
IT-Sicherheit in der Wasserversorgung 4.0
IT-Sicherheit in der Wasserversorgung 4.0IT-Sicherheit in der Wasserversorgung 4.0
IT-Sicherheit in der Wasserversorgung 4.0
 
Leyes de la educación en colombia
Leyes de la educación en colombiaLeyes de la educación en colombia
Leyes de la educación en colombia
 
Purpose of documentaries
Purpose of documentariesPurpose of documentaries
Purpose of documentaries
 
Anna Lasmanowicz, Hypermedia – linked by Isobar "Gdzie jest miejsce dla conte...
Anna Lasmanowicz, Hypermedia – linked by Isobar "Gdzie jest miejsce dla conte...Anna Lasmanowicz, Hypermedia – linked by Isobar "Gdzie jest miejsce dla conte...
Anna Lasmanowicz, Hypermedia – linked by Isobar "Gdzie jest miejsce dla conte...
 
Webquest numero de oro
Webquest numero de oroWebquest numero de oro
Webquest numero de oro
 
Code Values
Code ValuesCode Values
Code Values
 
Dr. Prabhakar Singh SEM-III_amino acids
Dr. Prabhakar Singh  SEM-III_amino acidsDr. Prabhakar Singh  SEM-III_amino acids
Dr. Prabhakar Singh SEM-III_amino acids
 

Similar to Suprotim dey LATEST CV

Similar to Suprotim dey LATEST CV (20)

Sundar Resume
Sundar ResumeSundar Resume
Sundar Resume
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
tausif alam resume
tausif alam resumetausif alam resume
tausif alam resume
 
RESUME.pdf
RESUME.pdfRESUME.pdf
RESUME.pdf
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
QC Supervisor Saji M
QC Supervisor Saji MQC Supervisor Saji M
QC Supervisor Saji M
 
Skatiyar CV latest date 02.05.2015.doc
Skatiyar CV latest date 02.05.2015.docSkatiyar CV latest date 02.05.2015.doc
Skatiyar CV latest date 02.05.2015.doc
 
CV
CVCV
CV
 
Amar Resume
Amar ResumeAmar Resume
Amar Resume
 
rajpanday
rajpandayrajpanday
rajpanday
 
Resume 1 (1)
Resume 1 (1)Resume 1 (1)
Resume 1 (1)
 
Turbine and Auxillaries
Turbine and AuxillariesTurbine and Auxillaries
Turbine and Auxillaries
 
Elvis joy cv- mechanical engineer, primavera p6 hvac
Elvis joy  cv- mechanical engineer, primavera p6 hvacElvis joy  cv- mechanical engineer, primavera p6 hvac
Elvis joy cv- mechanical engineer, primavera p6 hvac
 
Resume iif 2020
Resume iif 2020Resume iif 2020
Resume iif 2020
 
Resume 1 (1)
Resume 1 (1)Resume 1 (1)
Resume 1 (1)
 
Standard Quality@CIL
Standard Quality@CILStandard Quality@CIL
Standard Quality@CIL
 
A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)A.H.K.C.V.NEW (2)
A.H.K.C.V.NEW (2)
 
Resume
ResumeResume
Resume
 
Project _TQR_Manager
Project _TQR_ManagerProject _TQR_Manager
Project _TQR_Manager
 

Suprotim dey LATEST CV

  • 1. SUPROTIM DEY : 91-8017737734 : supro.pro.engg@gmail.com In quest for challenging assignments in different types of Projects, Production Engineering, Quality Assurance & Quality Control and Vendor Evaluation & Management with a reputed organization. PROFESSIONAL SNAPSHOT ⇒ A result-focussed Engineer with more than 6 years of experience in Quality Assurance & Quality Control, in the field of manufacturing & production, Vendor evaluation & Management with well-known organizations contributing to infrastructural augmentation jobs in Water system and Steel Making industry. ⇒ Experience in HVAC, Dosing systems & lubrication system. ⇒ Presently associated with Gillanders Arbuthnot & Co. Ltd. MICCO Division since March’13. ⇒ Reporting to HOD (DGM) and Divisional Joint President. In previously held positions, reported to the Business Head and Director. EMPLOYMENT SCAN Presently associated with VIKRAM SOLAR PVT.LTD as Sr. Engineer quality projects in 130MW & 50 MW Solar Power Project. GILLANDERS ARBUTHNOT & Co. Ltd. MICCO Division (A leading EPC/Turnkey Constructing company in Eastern India, Part of the Kothari Group), Head Office, Kolkata, since March’13 Projects Handled  Category 1 Capital Repair of Blast Furnace 2. Client: RINL, Visakhapatnam Steel Plant. Consultant: M. N. Dastur & Co. Pvt. Ltd. (Kolkata, West Bengal) Project Description: Balance of Plant involving Cooling water system (Capacity: 9700m3/hr) for Blast Furnace 2 in a Turnkey module. Project comprises refurbishment, reuse and augmentation of Brownfield facilities and Greenfield installations. Existing facilities are 2 Pump Houses with adjacent ECR building, 2 RCC Cooling Towers (3 cells each of Capacity: 2666m3/hr and 900m3/hr each), Waste Water Treatment Plant for reuse of Gas Cleaning Plant (GCP) circuit water (Capacity: 2300m3/hr, 2nos Thickeners / HRSCC of 40m diameter), Ventilation Room (120,000 m3/hr Centrifugal Fan), Soft Water Tanks (RCC), Industrial Water Tanks (RCC), Emergency Overhead Tank (MS), Underground Pipe Tunnel, Underground Cable Trench. Greenfield installations consisted of 2 Pump Houses, 2 RCC Cooling Towers (1 cell & 2 cell each of Capacity: 200m3/hr and 1810m3/hr each), Heat Exchanger Room (4 Plate Type Heat Exchanger), Ventilation Room (40000 CMH Centrifugal Fan), ClO2 Preparation Unit, ECR building, Transformer Room, Soft Water Tanks (RCC), Industrial Water Tanks (RCC). Achievements:  Attended 25-30 inspection Review meetings at M.N.Dastur (Kolkata) for inspection clearance of all equipment and few structural items.  Carried out procurement process of mechanical items starting from preparation of Quality Assurance Plan to dispatch clearance. (Mechanical Items included: Waste Water Treatment Plant, Side stream sand filters (5m dia.), HVAC, Pumps (Horizontal & Vertical centrifugal), Chlorine dioxide - ClO2 Dosing System.)  Quality Assurance  Inspection  ISO 9001:2008 Audit  Equipment Inspection
  • 2.  Conducted meetings with respective vendors for complete technical clarification.  Carried out inspection and managed documents of HVAC for all premises including Pump Houses, Electrical rooms, Hydraulic cellar and Cable Cellars.  Carried out technical evaluation of Waste Water Treatment Plant (Capacity: 2300m3/hr) for reuse of Waste Water generated from circulation through Gas Cleaning Plant.  Managed entire documentation and inspection clearance relating to Cooling Towers.  Successfully carried out vendor follow-ups and chasing involving clarification of commented points and negotiate with sub-vendors for advancing with the submission of documents as compliance in order to meet the pre-shutdown supply schedule. (Important vendors included Kirloskar Brothers Ltd., Deltech Controls, Anticorrosive Pumps, Flaktwoods). ----------------------------------------------------------------------------------------------------------------------------------------------  Installation of Reheating Furnace for Universal Rail Mill (PKG 049-03). Client: SAIL, BHILAI STEEL PLANT. Consultant: MECON Ltd. (Ranchi, Jharkhand) Project Description: Balance of Plant involving Cooling water system (Capacity: 389m3/hr) for Reheating Furnace in a Turnkey module. A Greenfield project consisting of Pump House, RCC Cooling Tower (2 cell Capacity: 720m3/hr each), Heat Exchanger Room (3 Plate Type Heat Exchanger), Soft water Plant (10m3/hr), Ventilation Room (80000 CMH Centrifugal Fan), Soft Water Tanks (RCC), Industrial Water Tanks (RCC), Emergency Overhead Tank (353 m3 RCC), Underground Pipe Tunnel (96 m). Achievements:  Successfully carried out inspection and testing of valves and other various equipments as per the MECON approved QAP.  Single headedly carried out internal audit onsite for the preparation of re-certification audit to the standard ISO 9001:2008.  Successfully carried out inspection of entire Ventilation System for Pump House . ----------------------------------------------------------------------------------------------------------------------------------------------  Bokaro ID Fan Complex for SMS II. Client: SAIL, BOKARO STEEL PLANT. Consultant: MECON Ltd. (Ranchi, Jharkhand) Project Description: Design, engineering, manufacture / fabrication, supply, transportation, unloading, storage, transportation to site, erection, testing and commissioning of a new gas discharge / recovery system for each converter consisting of ID Fan, Seal sump, Interconnecting gas piping, utility piping etc. for both the converters, including common interconnecting piping, sump along its pump etc., termed as ID Fan Complex. Achievements:  Carried out inspection on grease lubrication system in M/s. Lincoln Helios Ltd. As per QAP and successfully cleared the item from MECON based on the inspection witness report and review of other relevant documents.  Successfully carried out entire documentation and inspection clearance of Ventilation System for ECR building. ---------------------------------------------------------------------------------------------------------------------------------------------- Additional Achievements:  Attended 3 internal training on welding technology and certified internal auditor course as per the standard ISO 9001:2008  Development of excellent relationships with leading consultants in Steelmaking sector namely, MECON (Ranchi) and M.N.Dastur (Kolkata, Mumbai) and Client like Visakhapatnam Steel Plant ---------------------------------------------------------------------------------------------------------------------------------------------- Was previously associated with LAGAN ENGINEERING CO. LTD. Bhadreswar, West Bengal Since June’11- Feb’13 As Executive Engineer
  • 3. Core Competencies:  Supervision of CNC M/C Dept. • Machine Loading Plan. • Maintenance of Air compressor. (CNC Machines). • Job Marking & Measurement • Material Inspection (Steel & Casting)  Construction, Fabrication, Restructuring shop floor Plan. • Dealing with Bills, Work Order, Quotation & scheduling of different expansion projects.  Foundry Division • Cupola Furnace Erection & supervision of pattern making, mould making etc. ---------------------------------------------------------------------------------------------------------------------------------------------- Began professional career in SUNIL HI-TECH ENGINEERS LTD. Koradi, Nagpur: Since Aug’10- June’11 Core Competences:  Fabrication, Execution & Erection  QA/QC - (NDT - Dye Penetrant Testing, Ultrasonic Testing, Radiographic Testing, Magnetic Particle Testing) Project Handled:  Larsen & Toubro Power – Koradi Project – 3x660 MW Thermal Power Station – TG Building Area (Expansion Project) SCHOLASTICS B.Tech (Mechanical) from Mallabhum Institute of Technology, Bishnupur in 2010 with CGPA 7.44. Class XII from Patha Bhavan, Kolkata in 2006 Class X from Hartley’s High School, Kolkata in 2004 TECHNICAL SKILLS  Material Inspection and review of documents.  Review of Welder Procedure Qualification, Welder Qualification Test.  Preparing of procedure & quality assurance plan & different testing methods & inspection.  Fabrication of critical structures (tie-beams, columns etc).  Review and comment on drawings.  Visual & stage inspection of welding.  Non-Destructive Testing (LPT, MPT, UT, RT).  Provide direction in developing inspection plans, In-Process and Final inspection.  Computer Skills: Well versed with MS Office & Internet Applications SKILL ENHANCEMENT SCHEDULE
  • 4. Certified Internal Auditor on ISO 9001: 2008 from TUV Nord. COMPANY: BRITANNIA ENGG. LTD. ((MANUFACTURING OF ROAD ROLLER & TEA MACHINERY)MANUFACTURING OF ROAD ROLLER & TEA MACHINERY) COMPANY: WESMAN ENGG.CO.PVT.LTD. ( MANUFACTURING OF BLOWERS, BURNERS, FURNACE,MANUFACTURING OF BLOWERS, BURNERS, FURNACE, ROLLERS)ROLLERS) Have pursued training in AUTOCAD. Level II certified training in NON DESTRUCTIVE TESTING [Dye Penetrant Testing (Dye detects cracks on the surface), Ultrasonic Testing (Sound waves detect internal discontinuities), Radiographic Testing (Radioactive Isotope detect both surface & internal discontinuities), Magnetic particle Testing (Magnetic particle detect surface and subsurface discontinuities)]. ACCOLADES EXHIBITION Model of a Dam & production of electricity by the help of water turbine BEYOND ACADEMIA  Selected for the OLYMPICS, ATHENS as the escort runner for the first round selection process from the school level, competition held in Kolkata.  Participated in debate and extempore.  Played role in the Event Management in school & college fest.  Represented Gillanders Arbuthnot & Co. Ltd. in inter-office rowing championship. PERSONAL DOSSIER DATE OF BIRTH : 12 Sept 1987 FATHER’S NAME : Mr. P.DEY ADDRESS : 16 D, Benia Para Lane, Kolkata – 700014 SEX : Male. & MARTIAL STATUS: Married DECLARATION: I hereby, declare that all the above information is correct and true to the best of my knowledge and belief. S UPROTIM DEY