1. SUNDARRAJAN K
E-Mail # mekhanicalengineer@gmail.com
Mobile # +91 9894422617
WORKEXPERIENCE
8.7 years of experience in Mechanical Maintenance on Steel Plant. And, sound knowledge in hydraulic
equipments, pneumatic equipments, belt conveyors, pulleys & gear box, fan & blowers, EOT Cranes,
cooling towers.
Solid design and development experience in AutoCAD drawing works.
Experience in ISO/TS, SAP, TQM, TPM, 5S, Kaizen, Six sigma and QC processes.
Organization: JSW Steel LTD, Salem works
Duration: From 03 June 2008 to till date
Role: Assistant Manager (Mechanical)
Job Description:
JSW Steel LTD is an only ISO 9000:14001 integrated steel plant capacity of 1.2MTPA in South India
which enables to produce various types of steel (Billet, Bloom caster, leaf springs flat bar, TMT bar) as per
the customer requirements with quality.
I am working in a mechanical maintenance department in Blast Furnace (BLT) which can produce
3000MTPD and PCI can produce 600MTPD
Reporting to: General Manger
RESPONSIBILITY
(As Management)
Preventive & Predictive maintenance of various equipment’s on scheduled time.
Planning - Spares Planning, Store Inventory Control, Budget Planning & cost control.
Execution - Installation of equipment for Fans, Main and Auxiliary Gear drive, Hydraulic and
Pneumatic Cylinders, Filter-Regulator-Lubricator Unit, Hydraulic Power Pack and overhead cranes.
Design & development – Following drawing works (AutoCAD 2013) for material to be purchased
as per required measurements.
Procurement - Material indenting and purchasing within the time frame as scheduled.
Documents -ISO/T.S documents, delay analyzing, MTBF, MTTR and maintenance cost analysis
work and EMS / OHSAS
Hands on experience in SAP
Knowledge in TQM – 5S, Kaizen, QC, Innovation, Poka-Yoke, Six Sigma
2. Training - Educating subordinates about equipments & process to avoid breakdown maintenance.
Dupont safety management – SOP, JSA, PTW, LOTO
Hands on experience in Microsoft Project management and Microsoft office tools for project
management and document preparation.
(As Maintenance)
Following maintenance activities through by shifts.
Maintenance of Belts, Vibrating Screens, Pulleys, Motor & Gearbox alignment etc.
Manpower distribution and Job Allocation to Subordinates
Daily Planning & Execution Scheduling with contractors
Certification of Running Account Bills for contractors and Material Reconciliation with contractors
Responsible for Erection supervision & Alignment of various structures and Equipment
Inspection & Testing of equipment at Vendors premises
Running and Shutdown Maintenance of 1200MTPD Pig Iron Plant.
PROJECTS
1. Blooming Mill (Phase-II):
Technical support drawings verification and approval.
Erection of equipments of finishing section in blooming mill.
Equipments comprising of Motor, Gearbox, Clutch units, Follower and Rolling bed.
Erection of hydraulic power packs equipped for finishing section.
Duration – 3months
Cost of project – 44Crs
Cost of finishing section with hydraulics – 10Crs
2. Blast Furnace (I & II) Cast House De dusting System:
Technical support drawings verification and approval.
Fabrication & Erection of rolled ducts & structural supports.
Bag filters erection.
Equipments erection. Equipments comprising of Motor, Fan, Actuators, Cylinders, Dampers,
Expansion bellows, Pulse valves, Compressed air lines and valves.
Duration – 10months
Cost of project – 20Crs
3. 3. Blast Furnace (I & II) Revamping projects:
Technical support drawings verification and approval.
Fabrication & Erection of rolled ducts & structural for stove.
BLT, stave & tuyere equipment erection.
Equipments erection. Equipments comprising of Motor, Fan, Actuators, Cylinders, Dampers,
Hydraulic system, Expansion bellows and valves.
Duration – BF1-45 days, BF2-72days
Cost of project – BF1-40Crs, BF2-100Crs
4. Hot metal handling EOT crane-Capacity-115T/35T, Qty-2nos:
Technical support drawings verification and approval.
Periodical inspection at vendor site while manufacturing.
Dismantling of old crane and rail girders.
Fabrication and erection of new rail girder and alignment.
Assembling of new EOT crane and erection.
Duration –60days
Cost of project – 12Crs
ACADEMICQUALIFICATION
B.E: Graduation in Mechanical Engineering from Government College of Engineering, Salem
affiliated to Anna University, India. Securing first class with overall 66.6% in 2008.
HSC: Higher Secondary schooling in Bio-Maths from G.S.Hindu Higher secondary School,
Srivilliputtur, India. Securing first class with overall 89.33% in year 2004
PERSONALDETAILS
Date of Birth : 26th
October 1985
Marital Status : Married and one Child
Permanent Address : 193/101,102, Kammapatti East Street,
Srivilliputtur, Tamilnadu, India-626125
Passport No : K8965694
Nationality : Indian
Notice Period : 30days
Relocation : Yes