SlideShare a Scribd company logo
1 of 14
Download to read offline

Anti-Termite Treatment

Anti-Termite Treatment
1. Scope
2. Health Hazards and Safety Measures
3. Codes and Standards
4. General requirements
5. Site Preparation
6. Materials
7. Mode of Application and Rate of Application
8. Treatment for Masonry Foundations & Basement
9. Treatment for RCC Foundation & Basement
10.Junction of Walls and Floors
11.Precautions During and After Treatment
12.Mode of Measurement
List of Contents
1. All chemical used for anti-termite treatment are poisonous and hazardous
to health.
2. Keep the containers closed and secured.
3. Wear protective clothing while handling the chemicals.
4. Avoid flames in the vicinity during mixing.
5. Never allow treatment chemicals to contaminate sources of drinking water.
6. Follow instructions provided by the manufacturer in the MSDS ( Material
Safety Data Sheet ).
7. In case of poisoning take remedial measures according to the MSDS
provided by the manufacturer and as per IS 4015.
2. Health Hazards and Safety Measures
Anti-Termite Treatment
1. Scope
How to Carry out of Pre-Constructional Anti-Termite
Chemical Treatment for the Building.

3. IS 6313 Part 3 – Treatment for Existing Buildings
2. IS 6313 Part 2 – Pre-Constructional Anti-Termite Measures in Buildings
1. IS 6313 Part 1 – Constructional Measures
IS 6313 - Code of practice for anti-termite measures in buildings.
3. Codes & Standards
Anti-Termite Treatment
This Presentation is Specific to IS 6313 Part 2

4. Submit Material Specification and MSDS to EIC before start of work
3. Follow Indian Standard Safety Code and Site Specific Safety rules
2. Anti-termite treatment should be carried out in the early stages of
construction of buildings:- Start from substructure and up to plinth
level.
1. Anti-termite treatment is a specialist job: Use only specialized
agencies for carrying out anti-termite treatment preferably a member
of Indian Pest Control Association.
4. General Requirements
Anti-Termite Treatment
1. Remove all organic matter, construction debris, rubbish etc.
2. Water logged foundations shall be treated after drying when the soil is
absorbent.
3. For low penetration and slopping sites, surface to be scarified 75mm
depth.
4. Complete all cutting, excavation, leveling & grading before starting
treatment .
5. Site Preparation
Anti-Termite Treatment
1. Chloropyriphos 20% EC bearing ISI certification .
2. Dilute 1 part of Chloropyriphos 20% EC with 19 part of water to get 1%
emulsion.
3. Indian pest control association approved chemical shall be used.
4. Contractor shall submit purchase vouchers to EIC for verification.
6. Materials
Anti-Termite Treatment
1. Chemical emulsion should be applied uniformly by sprayers.
2. Specified rates should be applied at each stages of treatment.
3. Pressure pumps and sprayers of adequate capacity shall be used for proper
penetration of chemical.
7. Mode of Application and Rate of Application
Anti-Termite Treatment

1. Foundations shall be completely
enveloped with chemical barrier.
2. Treatment shall be from sub
structure to plinth surface
3. Apply emulsion @ 5 Ltrs/ Sqm
for normal load bearing
structures
4. Vertical surfaces @ 7.50
Ltrs/Sqm.
Legend
A - Bottom and sides of trench
B - Backfill in immediate contact
with foundation wall
C - Junction of wall and floor
D- External perimeter of building
8. Treatment for Masonry Foundations & Basement
Anti-Termite Treatment
7.50
Ltrs/Sqm
5
Ltrs/Sqm

Treatment in Foundation Trenches:
 In case of normal wall load bearing structures, columns
pits, wall trenches and basement, the treatment shall be at 5
litres/sqm. or surface area of the bottom and sides to a
height of at least 300mm.
 After the foundation work, the sides shall be treated at 7.5
litres/sqm. of vertical surface of substructure on each side.
 After the earth filling is done, treatment shall be done by
rodding the earth at 150mm centres close to wall surface
and spraying the chemical with the above dose i.e. 7.5
litres/sqm.
 In case of framed structure, the treatment shall start at a
depth of 500mm below ground level. From this depth the
backfill around the columns, beams and R.C.C. basement
walls shall be treated at 7.5 litres / sqm. of the vertical and
at 5 litres / sqm. for the horizontal surface at the bottom in
the trenches / pits.

9. Treatment for RCC Foundations & Basement
1. Treatment shall start at a depth of 500
mm below the ground level/FML.
2. Apply emulsion for vertical surfaces @
7.50 Ltrs/Sqm.
Legend
A - Min 500 mm below ground level/FML
B - Plinth Filling
D- FML to Grade Beam top
E - FFL to Plinth beam top
NGL - Natural Ground Level
FML - Formation Level
500 mm
below
NGL/FML
7.50
Ltrs/Sqm
Anti-Termite Treatment

11. Junction of the Wall and Floors
Anti-Termite Treatment
1. Continuity of vertical chemical barrier on inner wall surface from ground level
to finished floor level is required.
2. Treatment shall be carried out by
i. Placing a channel of 30x30 mm at all junctions of wall and columns with
floor before sub grade is laid.
ii. Make holes using 12 mm dia rod@ 150mm c/c and breakup the earth up
to ground level.
iii. Pour chemical emulsion into the holes @ 7.5 Lit/Sqm.
iv. Tamp back the soil into the channel and consolidate the earth.

1. Care to ensure that the chemical barrier is
complete and continuous.
2. The treatment shall not be carried out
when it is raining or when the soil is wet.
3. Treated soil surface shall not be
disturbed.
4. Take immediate steps to restore the
continuity and completeness of the barrier
system if treated soil gets disturbed.
18. Precautions During and After Treatment
Anti-Termite Treatment
SPRAYING EQUIPMENT
•A pressure pump shall be used to carry out spraying operations to facilitate proper
penetration of chemical into the earth.
The chemicals, concentration and dosage for horizontal and vertical surfaces are based
on the IS code of practice for Anti-termite measures in Buildings. IS 6313 (Part-II).
PRECAUTIONS DURING MONSOON
•No spraying shall be carried out when it rains. Treatment should be repeated in plinth
areas if it rains immediately after a spraying operation and before the emulsion has
soaked into the soil.

1. Measurement shall be made in Sq.mtr on the basis of plinth area of the
building.
20. Mode of Measurement
Anti-Termite Treatment
1. Rate includes the cost of materials, labour and all tools, plants, sprayers
and safety equipments required for complete operation.

More Related Content

What's hot

Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequenceRanjith Kumar
 
Safety management for construction machines & equipments
 Safety management for construction machines & equipments Safety management for construction machines & equipments
Safety management for construction machines & equipmentsSelva Prakash
 
Scaffold safety Procedure
Scaffold safety ProcedureScaffold safety Procedure
Scaffold safety ProcedureBineesh Babu
 
Method of Statement - Road furniture works
Method of Statement - Road furniture worksMethod of Statement - Road furniture works
Method of Statement - Road furniture worksMohd Nizam Mohd Zan
 
Airport Runway Construction
Airport Runway ConstructionAirport Runway Construction
Airport Runway ConstructionHafizullah Sadat
 
How to prevent accidents in construction sites
How to prevent accidents in construction sitesHow to prevent accidents in construction sites
How to prevent accidents in construction sitesGeorge W. Ganim, Jr.
 
DEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKDEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKKHUSHBU SHAH
 
Demolition of a building
Demolition of a buildingDemolition of a building
Demolition of a buildingAbhishekKadve
 
Excavation & Trenching Safety
Excavation & Trenching Safety Excavation & Trenching Safety
Excavation & Trenching Safety Reliance
 
Site specific safety plan dib
Site specific safety plan dibSite specific safety plan dib
Site specific safety plan dibDARIUSADE
 
Demolition Hazards and Controls
Demolition Hazards and ControlsDemolition Hazards and Controls
Demolition Hazards and ControlsAbbas Tahir
 
Site visit report
Site visit reportSite visit report
Site visit reportWen Crystal
 
Scaffolding
ScaffoldingScaffolding
Scaffoldingstooty s
 
Construction Safety Management
Construction Safety ManagementConstruction Safety Management
Construction Safety ManagementGAURAV. H .TANDON
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training pptSumit Singh
 

What's hot (20)

Demolition methods and its sequence
Demolition methods and its sequenceDemolition methods and its sequence
Demolition methods and its sequence
 
Safety management for construction machines & equipments
 Safety management for construction machines & equipments Safety management for construction machines & equipments
Safety management for construction machines & equipments
 
Scaffold safety Procedure
Scaffold safety ProcedureScaffold safety Procedure
Scaffold safety Procedure
 
Method of Statement - Road furniture works
Method of Statement - Road furniture worksMethod of Statement - Road furniture works
Method of Statement - Road furniture works
 
Airport Runway Construction
Airport Runway ConstructionAirport Runway Construction
Airport Runway Construction
 
Safety in Construction
Safety in ConstructionSafety in Construction
Safety in Construction
 
How to prevent accidents in construction sites
How to prevent accidents in construction sitesHow to prevent accidents in construction sites
How to prevent accidents in construction sites
 
Haad height aware - eng
Haad   height aware - engHaad   height aware - eng
Haad height aware - eng
 
DEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORKDEMOLITION & DISMANTLING OF WORK
DEMOLITION & DISMANTLING OF WORK
 
Demolition of a building
Demolition of a buildingDemolition of a building
Demolition of a building
 
Excavation & Trenching Safety
Excavation & Trenching Safety Excavation & Trenching Safety
Excavation & Trenching Safety
 
Site specific safety plan dib
Site specific safety plan dibSite specific safety plan dib
Site specific safety plan dib
 
Demolition Hazards and Controls
Demolition Hazards and ControlsDemolition Hazards and Controls
Demolition Hazards and Controls
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Construction Safety Management
Construction Safety ManagementConstruction Safety Management
Construction Safety Management
 
Construction of residential building summer training ppt
 Construction of residential building summer training ppt Construction of residential building summer training ppt
Construction of residential building summer training ppt
 
Demolition of building
Demolition of building Demolition of building
Demolition of building
 
Anti termite treatment in foundation
Anti termite treatment in foundationAnti termite treatment in foundation
Anti termite treatment in foundation
 
BCT Mod 4 demolition of structure
BCT Mod 4 demolition of structureBCT Mod 4 demolition of structure
BCT Mod 4 demolition of structure
 

Similar to Anti termite treatment

Special Treatments for Building construction
Special Treatments for Building construction Special Treatments for Building construction
Special Treatments for Building construction Er.Karan Chauhan
 
Special Treatments required for building construction
Special Treatments required for building constructionSpecial Treatments required for building construction
Special Treatments required for building constructionUjasPandya2
 
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...musadoto
 
Enlio Sports Flooring installation
Enlio Sports Flooring installationEnlio Sports Flooring installation
Enlio Sports Flooring installationFeng Jack
 
Pamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdfPamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdfpanchalt755
 
A Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingA Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingIRJET Journal
 
RIW Cementflex Datasheet
RIW Cementflex DatasheetRIW Cementflex Datasheet
RIW Cementflex DatasheetRIW Ltd
 
Epoxy Flooring Procedure
Epoxy Flooring ProcedureEpoxy Flooring Procedure
Epoxy Flooring ProcedureKalpesh Satpute
 
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...Kiran Shinde
 
Method statement honycomb repairing
Method statement  honycomb repairingMethod statement  honycomb repairing
Method statement honycomb repairingBharatha Rathnayke
 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxHirenThakkar31
 

Similar to Anti termite treatment (20)

03 anti-termite treatment
03 anti-termite treatment03 anti-termite treatment
03 anti-termite treatment
 
Anti termite
Anti termiteAnti termite
Anti termite
 
Control on termites (white ants)in buildings
Control on termites (white ants)in buildingsControl on termites (white ants)in buildings
Control on termites (white ants)in buildings
 
TERMITES CONTROL SERVICES IN KENYA
TERMITES CONTROL SERVICES IN KENYATERMITES CONTROL SERVICES IN KENYA
TERMITES CONTROL SERVICES IN KENYA
 
Special Treatments for Building construction
Special Treatments for Building construction Special Treatments for Building construction
Special Treatments for Building construction
 
Special Treatments required for building construction
Special Treatments required for building constructionSpecial Treatments required for building construction
Special Treatments required for building construction
 
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
CONSTRUCTION [soil treatment, foundation backfill, Damp Proof Membrane[DPM] a...
 
Enlio Sports Flooring installation
Enlio Sports Flooring installationEnlio Sports Flooring installation
Enlio Sports Flooring installation
 
ioc_2
ioc_2ioc_2
ioc_2
 
Pamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdfPamphlet on Anti Termite Treatment.pdf
Pamphlet on Anti Termite Treatment.pdf
 
A Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingA Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment Building
 
Introduction to linings
Introduction to liningsIntroduction to linings
Introduction to linings
 
RIW Cementflex Datasheet
RIW Cementflex DatasheetRIW Cementflex Datasheet
RIW Cementflex Datasheet
 
Column & beam
Column & beamColumn & beam
Column & beam
 
Epoxy Flooring Procedure
Epoxy Flooring ProcedureEpoxy Flooring Procedure
Epoxy Flooring Procedure
 
Epoxy Flooring
Epoxy FlooringEpoxy Flooring
Epoxy Flooring
 
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
Aseptic Area and Microbial Control. - Pharmaceutical Microbiology (SYBpharm) ...
 
sample.pptx
sample.pptxsample.pptx
sample.pptx
 
Method statement honycomb repairing
Method statement  honycomb repairingMethod statement  honycomb repairing
Method statement honycomb repairing
 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptx
 

Recently uploaded

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 

Recently uploaded (20)

DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 

Anti termite treatment

  • 2.  Anti-Termite Treatment 1. Scope 2. Health Hazards and Safety Measures 3. Codes and Standards 4. General requirements 5. Site Preparation 6. Materials 7. Mode of Application and Rate of Application 8. Treatment for Masonry Foundations & Basement 9. Treatment for RCC Foundation & Basement 10.Junction of Walls and Floors 11.Precautions During and After Treatment 12.Mode of Measurement List of Contents
  • 3. 1. All chemical used for anti-termite treatment are poisonous and hazardous to health. 2. Keep the containers closed and secured. 3. Wear protective clothing while handling the chemicals. 4. Avoid flames in the vicinity during mixing. 5. Never allow treatment chemicals to contaminate sources of drinking water. 6. Follow instructions provided by the manufacturer in the MSDS ( Material Safety Data Sheet ). 7. In case of poisoning take remedial measures according to the MSDS provided by the manufacturer and as per IS 4015. 2. Health Hazards and Safety Measures Anti-Termite Treatment 1. Scope How to Carry out of Pre-Constructional Anti-Termite Chemical Treatment for the Building.
  • 4.  3. IS 6313 Part 3 – Treatment for Existing Buildings 2. IS 6313 Part 2 – Pre-Constructional Anti-Termite Measures in Buildings 1. IS 6313 Part 1 – Constructional Measures IS 6313 - Code of practice for anti-termite measures in buildings. 3. Codes & Standards Anti-Termite Treatment This Presentation is Specific to IS 6313 Part 2
  • 5.  4. Submit Material Specification and MSDS to EIC before start of work 3. Follow Indian Standard Safety Code and Site Specific Safety rules 2. Anti-termite treatment should be carried out in the early stages of construction of buildings:- Start from substructure and up to plinth level. 1. Anti-termite treatment is a specialist job: Use only specialized agencies for carrying out anti-termite treatment preferably a member of Indian Pest Control Association. 4. General Requirements Anti-Termite Treatment
  • 6. 1. Remove all organic matter, construction debris, rubbish etc. 2. Water logged foundations shall be treated after drying when the soil is absorbent. 3. For low penetration and slopping sites, surface to be scarified 75mm depth. 4. Complete all cutting, excavation, leveling & grading before starting treatment . 5. Site Preparation Anti-Termite Treatment
  • 7. 1. Chloropyriphos 20% EC bearing ISI certification . 2. Dilute 1 part of Chloropyriphos 20% EC with 19 part of water to get 1% emulsion. 3. Indian pest control association approved chemical shall be used. 4. Contractor shall submit purchase vouchers to EIC for verification. 6. Materials Anti-Termite Treatment
  • 8. 1. Chemical emulsion should be applied uniformly by sprayers. 2. Specified rates should be applied at each stages of treatment. 3. Pressure pumps and sprayers of adequate capacity shall be used for proper penetration of chemical. 7. Mode of Application and Rate of Application Anti-Termite Treatment
  • 9.  1. Foundations shall be completely enveloped with chemical barrier. 2. Treatment shall be from sub structure to plinth surface 3. Apply emulsion @ 5 Ltrs/ Sqm for normal load bearing structures 4. Vertical surfaces @ 7.50 Ltrs/Sqm. Legend A - Bottom and sides of trench B - Backfill in immediate contact with foundation wall C - Junction of wall and floor D- External perimeter of building 8. Treatment for Masonry Foundations & Basement Anti-Termite Treatment 7.50 Ltrs/Sqm 5 Ltrs/Sqm
  • 10.  Treatment in Foundation Trenches:  In case of normal wall load bearing structures, columns pits, wall trenches and basement, the treatment shall be at 5 litres/sqm. or surface area of the bottom and sides to a height of at least 300mm.  After the foundation work, the sides shall be treated at 7.5 litres/sqm. of vertical surface of substructure on each side.  After the earth filling is done, treatment shall be done by rodding the earth at 150mm centres close to wall surface and spraying the chemical with the above dose i.e. 7.5 litres/sqm.  In case of framed structure, the treatment shall start at a depth of 500mm below ground level. From this depth the backfill around the columns, beams and R.C.C. basement walls shall be treated at 7.5 litres / sqm. of the vertical and at 5 litres / sqm. for the horizontal surface at the bottom in the trenches / pits.
  • 11.  9. Treatment for RCC Foundations & Basement 1. Treatment shall start at a depth of 500 mm below the ground level/FML. 2. Apply emulsion for vertical surfaces @ 7.50 Ltrs/Sqm. Legend A - Min 500 mm below ground level/FML B - Plinth Filling D- FML to Grade Beam top E - FFL to Plinth beam top NGL - Natural Ground Level FML - Formation Level 500 mm below NGL/FML 7.50 Ltrs/Sqm Anti-Termite Treatment
  • 12.  11. Junction of the Wall and Floors Anti-Termite Treatment 1. Continuity of vertical chemical barrier on inner wall surface from ground level to finished floor level is required. 2. Treatment shall be carried out by i. Placing a channel of 30x30 mm at all junctions of wall and columns with floor before sub grade is laid. ii. Make holes using 12 mm dia rod@ 150mm c/c and breakup the earth up to ground level. iii. Pour chemical emulsion into the holes @ 7.5 Lit/Sqm. iv. Tamp back the soil into the channel and consolidate the earth.
  • 13.  1. Care to ensure that the chemical barrier is complete and continuous. 2. The treatment shall not be carried out when it is raining or when the soil is wet. 3. Treated soil surface shall not be disturbed. 4. Take immediate steps to restore the continuity and completeness of the barrier system if treated soil gets disturbed. 18. Precautions During and After Treatment Anti-Termite Treatment SPRAYING EQUIPMENT •A pressure pump shall be used to carry out spraying operations to facilitate proper penetration of chemical into the earth. The chemicals, concentration and dosage for horizontal and vertical surfaces are based on the IS code of practice for Anti-termite measures in Buildings. IS 6313 (Part-II). PRECAUTIONS DURING MONSOON •No spraying shall be carried out when it rains. Treatment should be repeated in plinth areas if it rains immediately after a spraying operation and before the emulsion has soaked into the soil.
  • 14.  1. Measurement shall be made in Sq.mtr on the basis of plinth area of the building. 20. Mode of Measurement Anti-Termite Treatment 1. Rate includes the cost of materials, labour and all tools, plants, sprayers and safety equipments required for complete operation.