Anti-Termite Treatment
1. Scope
2. Health Hazards and Safety Measures
3. Codes and Standards
4. General requirements
5. Site Preparation
6. Materials
7. Mode of Application and Rate of Application
8. Treatment for Masonry Foundations & Basement
9. Treatment for RCC Foundation & Basement
10.Junction of Walls and Floors
11.Precautions During and After Treatment
12.Mode of Measurement
List of Contents
3. 1. All chemical used for anti-termite treatment are poisonous and hazardous
to health.
2. Keep the containers closed and secured.
3. Wear protective clothing while handling the chemicals.
4. Avoid flames in the vicinity during mixing.
5. Never allow treatment chemicals to contaminate sources of drinking water.
6. Follow instructions provided by the manufacturer in the MSDS ( Material
Safety Data Sheet ).
7. In case of poisoning take remedial measures according to the MSDS
provided by the manufacturer and as per IS 4015.
2. Health Hazards and Safety Measures
Anti-Termite Treatment
1. Scope
How to Carry out of Pre-Constructional Anti-Termite
Chemical Treatment for the Building.
4.
3. IS 6313 Part 3 – Treatment for Existing Buildings
2. IS 6313 Part 2 – Pre-Constructional Anti-Termite Measures in Buildings
1. IS 6313 Part 1 – Constructional Measures
IS 6313 - Code of practice for anti-termite measures in buildings.
3. Codes & Standards
Anti-Termite Treatment
This Presentation is Specific to IS 6313 Part 2
5.
4. Submit Material Specification and MSDS to EIC before start of work
3. Follow Indian Standard Safety Code and Site Specific Safety rules
2. Anti-termite treatment should be carried out in the early stages of
construction of buildings:- Start from substructure and up to plinth
level.
1. Anti-termite treatment is a specialist job: Use only specialized
agencies for carrying out anti-termite treatment preferably a member
of Indian Pest Control Association.
4. General Requirements
Anti-Termite Treatment
6. 1. Remove all organic matter, construction debris, rubbish etc.
2. Water logged foundations shall be treated after drying when the soil is
absorbent.
3. For low penetration and slopping sites, surface to be scarified 75mm
depth.
4. Complete all cutting, excavation, leveling & grading before starting
treatment .
5. Site Preparation
Anti-Termite Treatment
7. 1. Chloropyriphos 20% EC bearing ISI certification .
2. Dilute 1 part of Chloropyriphos 20% EC with 19 part of water to get 1%
emulsion.
3. Indian pest control association approved chemical shall be used.
4. Contractor shall submit purchase vouchers to EIC for verification.
6. Materials
Anti-Termite Treatment
8. 1. Chemical emulsion should be applied uniformly by sprayers.
2. Specified rates should be applied at each stages of treatment.
3. Pressure pumps and sprayers of adequate capacity shall be used for proper
penetration of chemical.
7. Mode of Application and Rate of Application
Anti-Termite Treatment
9.
1. Foundations shall be completely
enveloped with chemical barrier.
2. Treatment shall be from sub
structure to plinth surface
3. Apply emulsion @ 5 Ltrs/ Sqm
for normal load bearing
structures
4. Vertical surfaces @ 7.50
Ltrs/Sqm.
Legend
A - Bottom and sides of trench
B - Backfill in immediate contact
with foundation wall
C - Junction of wall and floor
D- External perimeter of building
8. Treatment for Masonry Foundations & Basement
Anti-Termite Treatment
7.50
Ltrs/Sqm
5
Ltrs/Sqm
10.
Treatment in Foundation Trenches:
In case of normal wall load bearing structures, columns
pits, wall trenches and basement, the treatment shall be at 5
litres/sqm. or surface area of the bottom and sides to a
height of at least 300mm.
After the foundation work, the sides shall be treated at 7.5
litres/sqm. of vertical surface of substructure on each side.
After the earth filling is done, treatment shall be done by
rodding the earth at 150mm centres close to wall surface
and spraying the chemical with the above dose i.e. 7.5
litres/sqm.
In case of framed structure, the treatment shall start at a
depth of 500mm below ground level. From this depth the
backfill around the columns, beams and R.C.C. basement
walls shall be treated at 7.5 litres / sqm. of the vertical and
at 5 litres / sqm. for the horizontal surface at the bottom in
the trenches / pits.
11.
9. Treatment for RCC Foundations & Basement
1. Treatment shall start at a depth of 500
mm below the ground level/FML.
2. Apply emulsion for vertical surfaces @
7.50 Ltrs/Sqm.
Legend
A - Min 500 mm below ground level/FML
B - Plinth Filling
D- FML to Grade Beam top
E - FFL to Plinth beam top
NGL - Natural Ground Level
FML - Formation Level
500 mm
below
NGL/FML
7.50
Ltrs/Sqm
Anti-Termite Treatment
12.
11. Junction of the Wall and Floors
Anti-Termite Treatment
1. Continuity of vertical chemical barrier on inner wall surface from ground level
to finished floor level is required.
2. Treatment shall be carried out by
i. Placing a channel of 30x30 mm at all junctions of wall and columns with
floor before sub grade is laid.
ii. Make holes using 12 mm dia rod@ 150mm c/c and breakup the earth up
to ground level.
iii. Pour chemical emulsion into the holes @ 7.5 Lit/Sqm.
iv. Tamp back the soil into the channel and consolidate the earth.
13.
1. Care to ensure that the chemical barrier is
complete and continuous.
2. The treatment shall not be carried out
when it is raining or when the soil is wet.
3. Treated soil surface shall not be
disturbed.
4. Take immediate steps to restore the
continuity and completeness of the barrier
system if treated soil gets disturbed.
18. Precautions During and After Treatment
Anti-Termite Treatment
SPRAYING EQUIPMENT
•A pressure pump shall be used to carry out spraying operations to facilitate proper
penetration of chemical into the earth.
The chemicals, concentration and dosage for horizontal and vertical surfaces are based
on the IS code of practice for Anti-termite measures in Buildings. IS 6313 (Part-II).
PRECAUTIONS DURING MONSOON
•No spraying shall be carried out when it rains. Treatment should be repeated in plinth
areas if it rains immediately after a spraying operation and before the emulsion has
soaked into the soil.
14.
1. Measurement shall be made in Sq.mtr on the basis of plinth area of the
building.
20. Mode of Measurement
Anti-Termite Treatment
1. Rate includes the cost of materials, labour and all tools, plants, sprayers
and safety equipments required for complete operation.