SlideShare a Scribd company logo
1 of 13
ILVEN C. SAMONTE (Updated: 2012-05-19)
# 59 - 6440 Centre Street, N.E. Calgary, T2K 0V4, AB, Canada
Home Tel # 587-3526468
Mobile # 4038916295
ACCOMPLISHMENTS / ACHIEVEMENTS:
- Delivered multi discipline projects (On Time, On Budget, and Quality) as the Lead
Team Manager reports all actual accomplishments, cash flow, and lead the weekly
site meeting for and in behalf of the Owner including coordination with
Purchasing and Legal department as support for contract administration.
- A Total 100 Million CAD (4.5 Billion pesos) of projects delivered ranging from
Construction of Office Building with LEED Gold Certification, Warehouses, Parking
Building, Electrical Power Savings Projects such as installation of Capacitor Banks
for power factor correction, using oil less Air con compressors for energy
efficiency.
- Controlled 250 personnel ranging from technical to housekeeping works
- Implemented Landscaping and Water Supply project, STP project, LAN / Tel
backbone contractors coordination, and land development projects such as road
concreting works, drainage, electrical perimeter fence and other Facilities upkeep.
- Manages third party maintenance contractors and addressing calculated risk
management or pro active maintenance.
- A multi discipline achiever.
- 4 Time Top’s Awardee (Individual)
- 1 Time Tops Awardee (Team)
Current Specialization : Civil/Construction (Project & Property/ Facilities
Management)
Highest Education : Bachelors Degree in Civil Engineering / Associate Diploma in
Facilities Management (National Eng‘g. Center, University of the Philippines)
Years of Experiences : 25 years
Expected Salary : OPEN
Employment History :
Inclusive Date : 2001 - Present
Company : United Laboratories Incorporated (UNILAB)
Address : 66 United Street, Mandaluyong City, Metro Manila, Philippines
Position Title : Senior Manager
Experience : Project Management & Facilities Management : Construction /
Building / Engineering
Work Description :
1.Property / Facilities Maintenance and Project Management of Corporate Special
Projects. Direct reports to the Vice President for Corporate Property Services
Group.
2. Implement construction management, renovation and maintenance of existing
office buildings warehouses, parking building, playground including performance of
works engineering (quality, quantity, cost controls) Project Documentation,
Contracts Administration, and periodic inspection of facilities and asset
management. Handles property maintenance services of owned commercial
building, office building, warehouse, car parks, and open spaces including utilities
(water, electric, telephone and LAN) and civil, electrical, mechanical, sprinklers
system, garbage disposal, pest control, safety and coordinates with security)
3. Hands on management of Corporate Special Projects from site inspection, design,
space calculation, drafting, and cost estimates, preparation of bid documents &
coordination with consultants including LEED (Green Building Gold Certification) ,
pre bid conference, e bidding, pre construction meeting, project implementation,
change orders and variations, accomplishment billings, weekly contractors
coordination meeting, punch list and turnover works, certificate of completion, and
project documentations.
4. Review contracts and recommend catch up plans for negative slippage projects.
5. Prepares annual budget and keep track/monitor expenditures versus targeted
budget.
6. Manages Housekeeping and Pest Control operation from third party contract.
7. Implement and supports cGMP or good manufacturing practice for
pharmaceutical/ WHO requirements for hospitality environment.
Inclusive Date : February 05, 2001 to Present
Company : Guevent Industrial Development Corporation
Address : 49 Libertad Street, Mandaluyong City, Philippines
Position : Operations Manager/Facilities & Maintenance Manager
Job Description :
1. Technical Assistant to the President in the Company‘s Operation
2. Implemented renovation and maintenance of existing warehouses, Commercial
building, Office Building, Townhouse, clubhouse, parking and A & R Facilities
including performance of works engineering (quality, quantity, cost and controls)
Project Documentation, Contracts Administration, and periodic inspection of
facilities and assets management. Handles property maintenance services of owned
commercial building, office building, warehouse, car parks, landscaping/water
system, open spaces maintenance, including utilities (water, electric, telephone and
cable TV) . Engineering includes architectural, civil, MEPFS (Mechanical, electrical,
plumbing, Fire sprinklers system, sanitary), garbage disposal, pest control, safety
and coordination with /security
3. Building inspection through prepared checklist to address property maintenance
request fighter cyclic or inspection
SKILLS:
1. MS Office Softwares such as:
- MS Word ( Prof level - 9)
- MS Excel ( Prof Level -9)
- MS Powerpoint (Prof Level -8)
- WYSWIG (What You See is What You Get)
2. P.C. BASIC TROUBLE SHOOTING:
3. OPERATES OFFICE MACHINE: Fax Machine Photocopy Machine
Graduation Date : 1985 Bachelor‘s Degree of Engineering (Civil)
Institute/University : Cebu Institue of Technology, Philippines CGPA : 86/100
GOVT. EXAMINATION :
1. Civil Engineering Board Licensure Exam. Manila, Philippines (May 28-29 1986)
2. Civil Service Professional Eligibility (R.A. 1080) - Passed
TRAINING/SEMINARS :
1. ADVANCE PROJECT MANAGEMENT
Inclusive Date : August 10 - 11, 1998
Place : ASIAN INSTITUTE OF MANAGEMENT, AIM, Makati City
Topic : Advance Project Management
Conducted by: : Prof. Steven Leisser - Australian Management Consultant
2. COMPUTER-AIDED CONSTRUCTION PROJECT MANAGEMENT:
Inclusive Date : June 13, 1994 -July 11, 1994
Place : Espana, Manila
Topic : Vertical/Horizontal Estimate, Bid Generation, Reporting/Billing,
Architectural Estimates, Water Supply System, Lot Subdivision,
Cost Monitoring/Control, Personnel System and Bidding.
Conducted by: : QCSI - Engr. Rolando Cruz, A.S.E.P.
3. CONSTRUCTION METHODS & SUPERVISION:
Inclusive Date : June 20, 1996 - June 22, 1996
Place : DPWH, Region VIII, Tacloban City
Topic : Materials, Manpower and Equipment Control Conducted by: :
Phil. Institute of Civil Engineers. Region 8
4. PRIMAVERA (Version 5.0) / COMPUTERIZED PERT/CPM:
Inclusive Date : July 19, 1994 - August 20, 1994
Place : Isabel Building, Espana, Manila, Philippines
Topic : Project Evaluation Review Technique / Critical Path Method
by ADM / PDM Tabular Data
Conducted by : QCSI - Engr. De Asis.
5. PRINCIPLE OF REFLECTIVE INSULATION:
Inclusive Date : November 03 - 04, 1996
Place : Prime Sales, Inc, 19th Floor, Metrobank Plaza Building, Sen. Gil
Puyat Ave., Makati City.
Topic : Thermal Resistance, Nature of Heat / Cold Insulation, Airspace,
Reflectivity and Emissivity, Conductance, Convection, Radiation, of Materials,
Condensation and Cold storage /Refrigeration/ Roofing Insulation Materials.
Conducted by : Prime Sales - .Mr. Bert Irosido- V.P.
6. CIVIL ENGINEERS; MEETING THE CHALLENGES ON NEW MILLENIUM:
Inclusive Date : March 05 - 06, 1999
Place : N.I.A. Auditorium, NIA ENGINEERING CENTER, NIA Complex,
EDSA, Quezon City, Philippines
Topic :Building Exploration and Analysis, Grouting, Compaction,
Remediation and Testing, Geosynthetics for Soil Improvement & Erosion Control,
Geotextiles in Filtration and Drainage with Sanitary Landfill, Geosynthetics in Road
Construction and Coastal Protection, Geo synthetic in Soil Reinforcement and
Testing Procedure, Bridge Design and Structural Analysis, Bridge Construction and
Project Management, Drainage Design and Construction.
Conducted by : Phil. Institute of Civil Engineers Quezon City Chapter
7. INSIGHTS IN 2 OF CONSTRUCTION (SCHEDULING & SAFETY)
Inclusive Date : July 16 - 17, 1999
Place : YMCA Auditorium, YMCA INTERNATIONAL HOTEL Villegas St.
Arrocerros, Manila, Philippines
Topic : Project Scheduling , Project Crashing and Project Monitoring
Safety Program in Workplaces and in Construction
Conducted by: : Phil. Institute of Civil Engineers -Manila Chapter
8. THE LEGAL AND MANAGEMENT CONCERNS IN CONSTRUCTION:
Inclusive Date : October 01 - 02, 1999
Place : YMCA Auditorium, YMCA I HOTEL Villegas St.
Arrocerros, Manila, Philippines
Topic : Contracts Management and Administration, Contract
Const. Industry Authority of the Philippines.
Conducted by : Phil. Institute of Civil Engineers - Manila Chapter
9. PRE-FAB INSULATED PANEL SYSTEM (BONDOR PHILS./James Hardie- Australia)
Inclusive Date : November 04 - 05, 1996
Place : Prime Sales, Inc, 19th Floor, Metrobank Plaza Building, Sen.
Gil Puyat Ave., Makati City, Philippines
Topic : Design of Insulated Panel for Cold storage, Basic Refrigeration
Cycle, Cleanrooms, Application & Construction of Cold Storage,
Cold Insulation, Insulation of Freezers, Chillers, Construction
of Internal Partitions, External cladding, Equipment Shelter &
other Architectural Applications of Insulation Materials.
Conducted by: : Prime Sales - .Mr. Bert Irosido- V.P.
10. REAL ESTATE SEMINAR :
Inclusive Date : September 10 - 21, 1995
Place : Aristocrat Restaurant, Quezon Circle, Diliman, Quezon City
Topic : Real Estate Brokerage and Licensing
Conducted by: : REBAP - Atty. Tala-Tala
OTHER WORK EXPERIENCES:
Inclusive Date : October 14, 1996 - September 15, 2000
Company : PRIME SALES, INC.
Address : 19th Floor, Metrobank Plaza Building, Sen. Gil Puyat, Makati,
Phils.
Position : Engineering Manager
Job Description :
1. Plan, identify scope and methods of works, checks and approves all manpower /
equipment cost estimates. Keep track time & motion, manpower utilization
productivity rate and continually update /monitor to keep a competitive edge in
cost.
2. Computerized the estimating work from the existing manual estimate thus
establishing benchmark in unit cost and faster response time using spreadsheet
application.
3. Site productivity monitoring and updating productivity data records.
Manage Construction Section:
1. Call up pre-construction meeting prior to project execution to establish logistics /
manpower procurement considering Just In Time factor, check specification details
and methodology, and recheck if all system is ready.
2. Weekly project coordination meeting to monitor and keep track on the progress
and problems encountered and will be encountered during project implementation.
3. Oversee project management, logistics support, brainstorm how to approach and
go about the early completion methods.
4. Prepares Bar / Gantt Chart, Cash Flow Schedules, allocate petty cash fund,
manpower / tool & approval of project daily time sheets.
5. Monitor & evaluate individual & physical accomplishment of the project. Suggest
solution or rectification applicable to site condition.
6. Issue guidelines, memos, site instructions, require manpower report to all site
supervisors/engineers.
7. Conduct seminar on safety at workplaces and require all workers to adhere safety
and use safety gadgets at site.
8. Contract administration and documentation
9. Support and induce proper attitude and behavior to supervisors through
coaching, setting an example listening to suggestion, & situational leadership
management.
Maintenance Service Section:
1. Handles companys building renovation and maintenance including new
warehouse construction requirement / improvement.
2. Monitor building utilities including companys aircon repair and maintenance,
Meralco Electric consumption, painting, and other repair works.
3. Design and do steel fabrication for signage advertisement, lighting poles, car park
cover truss, roofing and other office requirement.
Inclusive Date : October 16, 1996 - July 15, 1995
Company : BORLAND DEVELOPMENT CORPORATION
Address : 1039 E & V Building Quirino Highway, Novaliches, Q.C.
Position : Assistant Project Manager/ Site Devt. Engineer
Job Description :
1. In charge of land development, earthworks, checks design elevation and profile to
minimize import and export of materials. Checks bearing and distances of road
centerlines, Hauling and backfill, Grading and proper compaction of filling materials.
2. Construction of drainage and sewage system (Across/along roads), Checks invert
elevation of RCPC, Construction of waterlines, Preparation of sub base and base
course, Form works and dowels installation, Concreting / asphalt overlay of roads,
Site testing of concrete mixture by slump test and sampling for compression testing.
Construction of cubs and gutters, catch inlet and manholes. Construction of
deepwell and elevated water tank, construction of grouted riprap, perimeter fence,
Construction of multi-purpose clubhouse, entrance gate, landscaping and the like.
3. Site inspection and ocular survey of proposed raw land to be acquired and
developed. Checks existing topographic profile, adjacent lot, right of way existing
creeks, drainage outfall, security and squatter issue, and other appertaining or
directly affect the cost of development and viability of the project Prepares program
of work, materials quantity take off and cost estimate. Monitor, record and report
heavy equipment productivity, fuel, and oil for land development works.
4. Prepare work schedule (Bar / Gantt Chart) reflecting target versus actual
accomplishment, variance / slippage, and cash flow.
5. Assist Project Manager in the filing of application for License to Sell Development
Permit, Electric Power application, Environmental Clearance Certificate from Dept.
of Environment. natural Resources, and other legal documents pertaining to
Subdivision development.
6. Provides and furnish contractors with Notice to Proceed, Memos, Job site
Instructions, penalties under the contract provisions, request for inspection, request
for concrete pouring, and other forms to control and monitor works.
7. Call up pre- construction meeting for detail of work coverage. Call weekly site
coordination meeting with contractor to thresh out problems encountered, evaluate
each contractor performance and discuss matter of concern.
8. Assign Heavy Equipment Operators their daily task and job instructions. Instruct
and require Chief Mechanic on the proper care and maintenance of the company‘s
equipment. Submit regular weekly report of Heavy Equipment operation time, idle
time, and bar down, fuel and oil consumption.
9. Delegates In- House workers daily assignment. Review, evaluates, and commends
individual performance. Recommends salary increases, suspension or termination if
so warrant.
Inclusive Date : March 15, 1990 - May 01, 1991
Company : A.P. ABIERTAS ENG‘G. & CONSTRUCTION
Address : Munoz District, Catbalogan W. Samar
Position : Project Engineer
Job Description :
1. Assist Gen. Manager in the preparation of Bid /Tender Documents for
Government Contracts such as Cost Estimates, Bar Chart / C.P.M. Cash Flow,
Facilitation of Performance Bond, Bidders Bond, Company Profile, Licenses, List of
previous project accomplishment, and Table of Organization.
2. Supervise concreting of road pavement, preparation of previously constructed
road, Spreading of Item 200 (base course) and other road rehabilitation works.
Constructions of five stories commercial building, warehouse, asphalt overlay, and
open drainage canals.
3. Prepare material quantity take -off, labor cost and handles labor force and
equipment mobilization.
Inclusive Date : September 16, 1989 - September 31, 1990
Company : DEPT. OF PUBLIC WORKS & HIGHWAYS
Address : Region VIII, Catbalogan, Samar, Philippines
Position : Civil Engineer
Job Description :
1. Prepares Program of Work, Bill of materials, Labor Cost and other Technical data.
2. Site Inspection and supervision of various government like the construction of
highways, multi - purpose pavement, barangay roads, school buildings, seawalls and
stone masonry.
3. Prepares as - built plans and computation.
Inclusive Date : July 06, 1987 - June 30, 1988
Company : DODI C. PICZON CONSTRUCTION
Address : Brgy. Tomalistis Catbalogan Samar
Position : Field Engineer
Job Description :
1. Site supervision of government projects such as Rehab. of Samar Provincial
Hospital, Farm to market roads, and Public Market.
2. Assist Gen. Manager in the preparation of Bid Documents for government
contracts. 3. In charge of construction work schedule, skilled / unskilled pooling
and deployment, equipment mobilization, handles construction workers time
records and assigns daily work task to accomplish.
4. Repreparation of Samar Airport Runway, Construction of Two Story School
Building and Rehabilitation of Barangay Roads.
Inclusive Date : June 20, 1983 - May 02, 1984
Company : B.U.A.D. CONSTRUCTION
Address : Brgy. Canlapwas, Catbalogan, Samar
Position : Const. Foreman / Cadet Engr
Job Description :
1. Directs, reads, and interprets plans, drawing details and to the skilled and semi-
skilled workers. Submit weekly reports of actual work accomplishment Responsible
in the deliveries of requested materials and its procurement.
2. Assist Project Architect in the construction of residential houses, warehouse and
School Buildings
3. Monitor daily productivity of carpenters, mason, electricians, plumber and steel
men works and check the quality of works.
4. Provide daily activity reports at site.
Inclusive Date : June 20, 1983 - May 02, 1984
Company : MINISTRY OF PUBLIC WORKS & HIGHWAYS
Address : Region VIII, Catbalogan, Samar
Position : C. E. Aide II
Job Description :
1. Assist Project Engineer in the preparation of project estimate
2. Assist in the price quotation of materials from the suppliers.
3. Assist in the drafting activities.
4. Assist in the survey teams data gathering.
REFERENCES :
Available upon request.
SIGNED:
ILVEN C. SAMONTE

More Related Content

What's hot

Tracy Brooks - Manufacturing Engineer
Tracy Brooks - Manufacturing EngineerTracy Brooks - Manufacturing Engineer
Tracy Brooks - Manufacturing EngineerTracy Brooks
 
Tracy Brooks - Plant Maintenance Engineer
Tracy Brooks - Plant Maintenance EngineerTracy Brooks - Plant Maintenance Engineer
Tracy Brooks - Plant Maintenance EngineerTracy Brooks
 
Tracy Brooks - Aerospace Manufacturing Engineer
Tracy Brooks - Aerospace Manufacturing EngineerTracy Brooks - Aerospace Manufacturing Engineer
Tracy Brooks - Aerospace Manufacturing EngineerTracy Brooks
 
Tracy Brooks - Mechanical Engineer
Tracy Brooks - Mechanical EngineerTracy Brooks - Mechanical Engineer
Tracy Brooks - Mechanical EngineerTracy Brooks
 
constructionresumeasof02102015long4page
constructionresumeasof02102015long4pageconstructionresumeasof02102015long4page
constructionresumeasof02102015long4pageFred Thompson
 
Resume of Eric Garvin
Resume of Eric GarvinResume of Eric Garvin
Resume of Eric GarvinEric Garvin
 
Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Ray Freiha
 
RFI_RodnyBrown 2015
RFI_RodnyBrown 2015RFI_RodnyBrown 2015
RFI_RodnyBrown 2015Rodney Brown
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian Akl
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typChristian Akl
 
PMR Career Experience 2016
PMR Career Experience 2016PMR Career Experience 2016
PMR Career Experience 2016Pedro Rosario
 
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-ioshSite supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-ioshPavel Babincak
 
Thomas Ripberger_Resume_10-13-16
Thomas Ripberger_Resume_10-13-16Thomas Ripberger_Resume_10-13-16
Thomas Ripberger_Resume_10-13-16Thomas Ripberger
 
JSModafferiResume 07.29.15
JSModafferiResume 07.29.15JSModafferiResume 07.29.15
JSModafferiResume 07.29.15James Modafferi
 
piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15Pieter Manders
 

What's hot (20)

Tracy Brooks - Manufacturing Engineer
Tracy Brooks - Manufacturing EngineerTracy Brooks - Manufacturing Engineer
Tracy Brooks - Manufacturing Engineer
 
Tracy Brooks - Plant Maintenance Engineer
Tracy Brooks - Plant Maintenance EngineerTracy Brooks - Plant Maintenance Engineer
Tracy Brooks - Plant Maintenance Engineer
 
Tracy Brooks - Aerospace Manufacturing Engineer
Tracy Brooks - Aerospace Manufacturing EngineerTracy Brooks - Aerospace Manufacturing Engineer
Tracy Brooks - Aerospace Manufacturing Engineer
 
Tracy Brooks - Mechanical Engineer
Tracy Brooks - Mechanical EngineerTracy Brooks - Mechanical Engineer
Tracy Brooks - Mechanical Engineer
 
INDIAZI CV
INDIAZI CVINDIAZI CV
INDIAZI CV
 
constructionresumeasof02102015long4page
constructionresumeasof02102015long4pageconstructionresumeasof02102015long4page
constructionresumeasof02102015long4page
 
Resume of Eric Garvin
Resume of Eric GarvinResume of Eric Garvin
Resume of Eric Garvin
 
Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016Reda Freiha Final Draft.doc28-Nov. 2016
Reda Freiha Final Draft.doc28-Nov. 2016
 
M.Salah cv1
M.Salah cv1M.Salah cv1
M.Salah cv1
 
RFI_RodnyBrown 2015
RFI_RodnyBrown 2015RFI_RodnyBrown 2015
RFI_RodnyBrown 2015
 
Resume1
Resume1Resume1
Resume1
 
Christian AKL CV-typ.DOC
Christian AKL CV-typ.DOCChristian AKL CV-typ.DOC
Christian AKL CV-typ.DOC
 
Christian akl cv typ
Christian akl cv typChristian akl cv typ
Christian akl cv typ
 
PMR Career Experience 2016
PMR Career Experience 2016PMR Career Experience 2016
PMR Career Experience 2016
 
CV-EBSantos
CV-EBSantosCV-EBSantos
CV-EBSantos
 
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-ioshSite supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
Site supervisor-agent-manager-pts-cpcs-cscs-smsts-iosh
 
SchleeK
SchleeKSchleeK
SchleeK
 
Thomas Ripberger_Resume_10-13-16
Thomas Ripberger_Resume_10-13-16Thomas Ripberger_Resume_10-13-16
Thomas Ripberger_Resume_10-13-16
 
JSModafferiResume 07.29.15
JSModafferiResume 07.29.15JSModafferiResume 07.29.15
JSModafferiResume 07.29.15
 
piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15piete resume and list of projects.2 Dec 15
piete resume and list of projects.2 Dec 15
 

Similar to Property management & project mgt

Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)Mark Rodas
 
Steven Castellano.resume.2016
Steven Castellano.resume.2016Steven Castellano.resume.2016
Steven Castellano.resume.2016steven castellano
 
Steven Castellano.resume.2016
Steven Castellano.resume.2016Steven Castellano.resume.2016
Steven Castellano.resume.2016steven castellano
 
Utilipath Company Overview
Utilipath Company OverviewUtilipath Company Overview
Utilipath Company Overviewminerlawrence
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Robert Dimanawa
 
Building Plan Approvals.pptx
Building Plan Approvals.pptxBuilding Plan Approvals.pptx
Building Plan Approvals.pptxJIT KUMAR GUPTA
 
UPDATE in BIAS Shortform
UPDATE in BIAS ShortformUPDATE in BIAS Shortform
UPDATE in BIAS Shortformbrian williams
 
C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...
C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...
C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...james espiritu
 
Workshop8_Mumme.pptx
Workshop8_Mumme.pptxWorkshop8_Mumme.pptx
Workshop8_Mumme.pptxbambang819101
 
Carnegie BP Objective - Buildings
Carnegie BP Objective - BuildingsCarnegie BP Objective - Buildings
Carnegie BP Objective - BuildingsNick Sloan
 
Amir Nan Resume - QC & Project Manager
Amir Nan Resume - QC & Project ManagerAmir Nan Resume - QC & Project Manager
Amir Nan Resume - QC & Project ManagerAmir Nan
 
Donald Fleeger Resume Nov 2016
Donald Fleeger Resume Nov 2016Donald Fleeger Resume Nov 2016
Donald Fleeger Resume Nov 2016Donald Fleeger
 
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental  & Sustainability EngineerANGELA LOPEZ - CV - Civil, Environmental  & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability EngineerAngela Lopez
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammedahmed ali
 

Similar to Property management & project mgt (20)

Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
Resume _ Engr. Mark Joseph R. Rodas _ April 2015 (1)
 
Steven Castellano.resume.2016
Steven Castellano.resume.2016Steven Castellano.resume.2016
Steven Castellano.resume.2016
 
Steven Castellano.resume.2016
Steven Castellano.resume.2016Steven Castellano.resume.2016
Steven Castellano.resume.2016
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
Utilipath Company Overview
Utilipath Company OverviewUtilipath Company Overview
Utilipath Company Overview
 
Damian Trevor - Materials and Methods of Construction
Damian Trevor - Materials and Methods  of ConstructionDamian Trevor - Materials and Methods  of Construction
Damian Trevor - Materials and Methods of Construction
 
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
Resume-Robert D Demanawa 20140225 (2) (2016_08_30 04_39_44 UTC)
 
Building Plan Approvals.pptx
Building Plan Approvals.pptxBuilding Plan Approvals.pptx
Building Plan Approvals.pptx
 
UPDATE in BIAS Shortform
UPDATE in BIAS ShortformUPDATE in BIAS Shortform
UPDATE in BIAS Shortform
 
C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...
C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...
C:\Documents And Settings\User\My Documents\Log Jne\Feeling Lucky Cv\Jaime N ...
 
Workshop8_Mumme.pptx
Workshop8_Mumme.pptxWorkshop8_Mumme.pptx
Workshop8_Mumme.pptx
 
Carnegie BP Objective - Buildings
Carnegie BP Objective - BuildingsCarnegie BP Objective - Buildings
Carnegie BP Objective - Buildings
 
Amir Nan Resume - QC & Project Manager
Amir Nan Resume - QC & Project ManagerAmir Nan Resume - QC & Project Manager
Amir Nan Resume - QC & Project Manager
 
Ahmed abd elazim c.v
Ahmed abd elazim c.vAhmed abd elazim c.v
Ahmed abd elazim c.v
 
Donald Fleeger Resume Nov 2016
Donald Fleeger Resume Nov 2016Donald Fleeger Resume Nov 2016
Donald Fleeger Resume Nov 2016
 
DKSHAH RESUME
DKSHAH RESUMEDKSHAH RESUME
DKSHAH RESUME
 
cv resume
cv resumecv resume
cv resume
 
randy san andres resume
randy san andres resumerandy san andres resume
randy san andres resume
 
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental  & Sustainability EngineerANGELA LOPEZ - CV - Civil, Environmental  & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammed
 

Recently uploaded

Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 

Recently uploaded (20)

Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 

Property management & project mgt

  • 1. ILVEN C. SAMONTE (Updated: 2012-05-19) # 59 - 6440 Centre Street, N.E. Calgary, T2K 0V4, AB, Canada Home Tel # 587-3526468 Mobile # 4038916295 ACCOMPLISHMENTS / ACHIEVEMENTS: - Delivered multi discipline projects (On Time, On Budget, and Quality) as the Lead Team Manager reports all actual accomplishments, cash flow, and lead the weekly site meeting for and in behalf of the Owner including coordination with Purchasing and Legal department as support for contract administration. - A Total 100 Million CAD (4.5 Billion pesos) of projects delivered ranging from Construction of Office Building with LEED Gold Certification, Warehouses, Parking Building, Electrical Power Savings Projects such as installation of Capacitor Banks for power factor correction, using oil less Air con compressors for energy efficiency. - Controlled 250 personnel ranging from technical to housekeeping works - Implemented Landscaping and Water Supply project, STP project, LAN / Tel backbone contractors coordination, and land development projects such as road concreting works, drainage, electrical perimeter fence and other Facilities upkeep. - Manages third party maintenance contractors and addressing calculated risk management or pro active maintenance. - A multi discipline achiever. - 4 Time Top’s Awardee (Individual) - 1 Time Tops Awardee (Team)
  • 2. Current Specialization : Civil/Construction (Project & Property/ Facilities Management) Highest Education : Bachelors Degree in Civil Engineering / Associate Diploma in Facilities Management (National Eng‘g. Center, University of the Philippines) Years of Experiences : 25 years Expected Salary : OPEN Employment History : Inclusive Date : 2001 - Present Company : United Laboratories Incorporated (UNILAB) Address : 66 United Street, Mandaluyong City, Metro Manila, Philippines Position Title : Senior Manager Experience : Project Management & Facilities Management : Construction / Building / Engineering Work Description : 1.Property / Facilities Maintenance and Project Management of Corporate Special Projects. Direct reports to the Vice President for Corporate Property Services Group. 2. Implement construction management, renovation and maintenance of existing office buildings warehouses, parking building, playground including performance of works engineering (quality, quantity, cost controls) Project Documentation, Contracts Administration, and periodic inspection of facilities and asset management. Handles property maintenance services of owned commercial building, office building, warehouse, car parks, and open spaces including utilities (water, electric, telephone and LAN) and civil, electrical, mechanical, sprinklers system, garbage disposal, pest control, safety and coordinates with security)
  • 3. 3. Hands on management of Corporate Special Projects from site inspection, design, space calculation, drafting, and cost estimates, preparation of bid documents & coordination with consultants including LEED (Green Building Gold Certification) , pre bid conference, e bidding, pre construction meeting, project implementation, change orders and variations, accomplishment billings, weekly contractors coordination meeting, punch list and turnover works, certificate of completion, and project documentations. 4. Review contracts and recommend catch up plans for negative slippage projects. 5. Prepares annual budget and keep track/monitor expenditures versus targeted budget. 6. Manages Housekeeping and Pest Control operation from third party contract. 7. Implement and supports cGMP or good manufacturing practice for pharmaceutical/ WHO requirements for hospitality environment. Inclusive Date : February 05, 2001 to Present Company : Guevent Industrial Development Corporation Address : 49 Libertad Street, Mandaluyong City, Philippines Position : Operations Manager/Facilities & Maintenance Manager Job Description : 1. Technical Assistant to the President in the Company‘s Operation 2. Implemented renovation and maintenance of existing warehouses, Commercial building, Office Building, Townhouse, clubhouse, parking and A & R Facilities including performance of works engineering (quality, quantity, cost and controls) Project Documentation, Contracts Administration, and periodic inspection of facilities and assets management. Handles property maintenance services of owned commercial building, office building, warehouse, car parks, landscaping/water system, open spaces maintenance, including utilities (water, electric, telephone and cable TV) . Engineering includes architectural, civil, MEPFS (Mechanical, electrical, plumbing, Fire sprinklers system, sanitary), garbage disposal, pest control, safety and coordination with /security 3. Building inspection through prepared checklist to address property maintenance request fighter cyclic or inspection
  • 4. SKILLS: 1. MS Office Softwares such as: - MS Word ( Prof level - 9) - MS Excel ( Prof Level -9) - MS Powerpoint (Prof Level -8) - WYSWIG (What You See is What You Get) 2. P.C. BASIC TROUBLE SHOOTING: 3. OPERATES OFFICE MACHINE: Fax Machine Photocopy Machine Graduation Date : 1985 Bachelor‘s Degree of Engineering (Civil) Institute/University : Cebu Institue of Technology, Philippines CGPA : 86/100 GOVT. EXAMINATION : 1. Civil Engineering Board Licensure Exam. Manila, Philippines (May 28-29 1986) 2. Civil Service Professional Eligibility (R.A. 1080) - Passed TRAINING/SEMINARS : 1. ADVANCE PROJECT MANAGEMENT Inclusive Date : August 10 - 11, 1998 Place : ASIAN INSTITUTE OF MANAGEMENT, AIM, Makati City Topic : Advance Project Management Conducted by: : Prof. Steven Leisser - Australian Management Consultant
  • 5. 2. COMPUTER-AIDED CONSTRUCTION PROJECT MANAGEMENT: Inclusive Date : June 13, 1994 -July 11, 1994 Place : Espana, Manila Topic : Vertical/Horizontal Estimate, Bid Generation, Reporting/Billing, Architectural Estimates, Water Supply System, Lot Subdivision, Cost Monitoring/Control, Personnel System and Bidding. Conducted by: : QCSI - Engr. Rolando Cruz, A.S.E.P. 3. CONSTRUCTION METHODS & SUPERVISION: Inclusive Date : June 20, 1996 - June 22, 1996 Place : DPWH, Region VIII, Tacloban City Topic : Materials, Manpower and Equipment Control Conducted by: : Phil. Institute of Civil Engineers. Region 8 4. PRIMAVERA (Version 5.0) / COMPUTERIZED PERT/CPM: Inclusive Date : July 19, 1994 - August 20, 1994 Place : Isabel Building, Espana, Manila, Philippines Topic : Project Evaluation Review Technique / Critical Path Method by ADM / PDM Tabular Data Conducted by : QCSI - Engr. De Asis. 5. PRINCIPLE OF REFLECTIVE INSULATION: Inclusive Date : November 03 - 04, 1996 Place : Prime Sales, Inc, 19th Floor, Metrobank Plaza Building, Sen. Gil Puyat Ave., Makati City. Topic : Thermal Resistance, Nature of Heat / Cold Insulation, Airspace, Reflectivity and Emissivity, Conductance, Convection, Radiation, of Materials,
  • 6. Condensation and Cold storage /Refrigeration/ Roofing Insulation Materials. Conducted by : Prime Sales - .Mr. Bert Irosido- V.P. 6. CIVIL ENGINEERS; MEETING THE CHALLENGES ON NEW MILLENIUM: Inclusive Date : March 05 - 06, 1999 Place : N.I.A. Auditorium, NIA ENGINEERING CENTER, NIA Complex, EDSA, Quezon City, Philippines Topic :Building Exploration and Analysis, Grouting, Compaction, Remediation and Testing, Geosynthetics for Soil Improvement & Erosion Control, Geotextiles in Filtration and Drainage with Sanitary Landfill, Geosynthetics in Road Construction and Coastal Protection, Geo synthetic in Soil Reinforcement and Testing Procedure, Bridge Design and Structural Analysis, Bridge Construction and Project Management, Drainage Design and Construction. Conducted by : Phil. Institute of Civil Engineers Quezon City Chapter 7. INSIGHTS IN 2 OF CONSTRUCTION (SCHEDULING & SAFETY) Inclusive Date : July 16 - 17, 1999 Place : YMCA Auditorium, YMCA INTERNATIONAL HOTEL Villegas St. Arrocerros, Manila, Philippines Topic : Project Scheduling , Project Crashing and Project Monitoring Safety Program in Workplaces and in Construction Conducted by: : Phil. Institute of Civil Engineers -Manila Chapter 8. THE LEGAL AND MANAGEMENT CONCERNS IN CONSTRUCTION: Inclusive Date : October 01 - 02, 1999 Place : YMCA Auditorium, YMCA I HOTEL Villegas St. Arrocerros, Manila, Philippines
  • 7. Topic : Contracts Management and Administration, Contract Const. Industry Authority of the Philippines. Conducted by : Phil. Institute of Civil Engineers - Manila Chapter 9. PRE-FAB INSULATED PANEL SYSTEM (BONDOR PHILS./James Hardie- Australia) Inclusive Date : November 04 - 05, 1996 Place : Prime Sales, Inc, 19th Floor, Metrobank Plaza Building, Sen. Gil Puyat Ave., Makati City, Philippines Topic : Design of Insulated Panel for Cold storage, Basic Refrigeration Cycle, Cleanrooms, Application & Construction of Cold Storage, Cold Insulation, Insulation of Freezers, Chillers, Construction of Internal Partitions, External cladding, Equipment Shelter & other Architectural Applications of Insulation Materials. Conducted by: : Prime Sales - .Mr. Bert Irosido- V.P. 10. REAL ESTATE SEMINAR : Inclusive Date : September 10 - 21, 1995 Place : Aristocrat Restaurant, Quezon Circle, Diliman, Quezon City Topic : Real Estate Brokerage and Licensing Conducted by: : REBAP - Atty. Tala-Tala OTHER WORK EXPERIENCES: Inclusive Date : October 14, 1996 - September 15, 2000 Company : PRIME SALES, INC. Address : 19th Floor, Metrobank Plaza Building, Sen. Gil Puyat, Makati,
  • 8. Phils. Position : Engineering Manager Job Description : 1. Plan, identify scope and methods of works, checks and approves all manpower / equipment cost estimates. Keep track time & motion, manpower utilization productivity rate and continually update /monitor to keep a competitive edge in cost. 2. Computerized the estimating work from the existing manual estimate thus establishing benchmark in unit cost and faster response time using spreadsheet application. 3. Site productivity monitoring and updating productivity data records. Manage Construction Section: 1. Call up pre-construction meeting prior to project execution to establish logistics / manpower procurement considering Just In Time factor, check specification details and methodology, and recheck if all system is ready. 2. Weekly project coordination meeting to monitor and keep track on the progress and problems encountered and will be encountered during project implementation. 3. Oversee project management, logistics support, brainstorm how to approach and go about the early completion methods. 4. Prepares Bar / Gantt Chart, Cash Flow Schedules, allocate petty cash fund, manpower / tool & approval of project daily time sheets. 5. Monitor & evaluate individual & physical accomplishment of the project. Suggest solution or rectification applicable to site condition. 6. Issue guidelines, memos, site instructions, require manpower report to all site supervisors/engineers. 7. Conduct seminar on safety at workplaces and require all workers to adhere safety and use safety gadgets at site. 8. Contract administration and documentation 9. Support and induce proper attitude and behavior to supervisors through coaching, setting an example listening to suggestion, & situational leadership management.
  • 9. Maintenance Service Section: 1. Handles companys building renovation and maintenance including new warehouse construction requirement / improvement. 2. Monitor building utilities including companys aircon repair and maintenance, Meralco Electric consumption, painting, and other repair works. 3. Design and do steel fabrication for signage advertisement, lighting poles, car park cover truss, roofing and other office requirement. Inclusive Date : October 16, 1996 - July 15, 1995 Company : BORLAND DEVELOPMENT CORPORATION Address : 1039 E & V Building Quirino Highway, Novaliches, Q.C. Position : Assistant Project Manager/ Site Devt. Engineer Job Description : 1. In charge of land development, earthworks, checks design elevation and profile to minimize import and export of materials. Checks bearing and distances of road centerlines, Hauling and backfill, Grading and proper compaction of filling materials. 2. Construction of drainage and sewage system (Across/along roads), Checks invert elevation of RCPC, Construction of waterlines, Preparation of sub base and base course, Form works and dowels installation, Concreting / asphalt overlay of roads, Site testing of concrete mixture by slump test and sampling for compression testing. Construction of cubs and gutters, catch inlet and manholes. Construction of deepwell and elevated water tank, construction of grouted riprap, perimeter fence, Construction of multi-purpose clubhouse, entrance gate, landscaping and the like. 3. Site inspection and ocular survey of proposed raw land to be acquired and developed. Checks existing topographic profile, adjacent lot, right of way existing creeks, drainage outfall, security and squatter issue, and other appertaining or directly affect the cost of development and viability of the project Prepares program of work, materials quantity take off and cost estimate. Monitor, record and report heavy equipment productivity, fuel, and oil for land development works.
  • 10. 4. Prepare work schedule (Bar / Gantt Chart) reflecting target versus actual accomplishment, variance / slippage, and cash flow. 5. Assist Project Manager in the filing of application for License to Sell Development Permit, Electric Power application, Environmental Clearance Certificate from Dept. of Environment. natural Resources, and other legal documents pertaining to Subdivision development. 6. Provides and furnish contractors with Notice to Proceed, Memos, Job site Instructions, penalties under the contract provisions, request for inspection, request for concrete pouring, and other forms to control and monitor works. 7. Call up pre- construction meeting for detail of work coverage. Call weekly site coordination meeting with contractor to thresh out problems encountered, evaluate each contractor performance and discuss matter of concern. 8. Assign Heavy Equipment Operators their daily task and job instructions. Instruct and require Chief Mechanic on the proper care and maintenance of the company‘s equipment. Submit regular weekly report of Heavy Equipment operation time, idle time, and bar down, fuel and oil consumption. 9. Delegates In- House workers daily assignment. Review, evaluates, and commends individual performance. Recommends salary increases, suspension or termination if so warrant. Inclusive Date : March 15, 1990 - May 01, 1991 Company : A.P. ABIERTAS ENG‘G. & CONSTRUCTION Address : Munoz District, Catbalogan W. Samar Position : Project Engineer Job Description : 1. Assist Gen. Manager in the preparation of Bid /Tender Documents for Government Contracts such as Cost Estimates, Bar Chart / C.P.M. Cash Flow, Facilitation of Performance Bond, Bidders Bond, Company Profile, Licenses, List of previous project accomplishment, and Table of Organization. 2. Supervise concreting of road pavement, preparation of previously constructed road, Spreading of Item 200 (base course) and other road rehabilitation works. Constructions of five stories commercial building, warehouse, asphalt overlay, and open drainage canals. 3. Prepare material quantity take -off, labor cost and handles labor force and
  • 11. equipment mobilization. Inclusive Date : September 16, 1989 - September 31, 1990 Company : DEPT. OF PUBLIC WORKS & HIGHWAYS Address : Region VIII, Catbalogan, Samar, Philippines Position : Civil Engineer Job Description : 1. Prepares Program of Work, Bill of materials, Labor Cost and other Technical data. 2. Site Inspection and supervision of various government like the construction of highways, multi - purpose pavement, barangay roads, school buildings, seawalls and stone masonry. 3. Prepares as - built plans and computation. Inclusive Date : July 06, 1987 - June 30, 1988 Company : DODI C. PICZON CONSTRUCTION Address : Brgy. Tomalistis Catbalogan Samar Position : Field Engineer Job Description : 1. Site supervision of government projects such as Rehab. of Samar Provincial Hospital, Farm to market roads, and Public Market. 2. Assist Gen. Manager in the preparation of Bid Documents for government contracts. 3. In charge of construction work schedule, skilled / unskilled pooling and deployment, equipment mobilization, handles construction workers time records and assigns daily work task to accomplish.
  • 12. 4. Repreparation of Samar Airport Runway, Construction of Two Story School Building and Rehabilitation of Barangay Roads. Inclusive Date : June 20, 1983 - May 02, 1984 Company : B.U.A.D. CONSTRUCTION Address : Brgy. Canlapwas, Catbalogan, Samar Position : Const. Foreman / Cadet Engr Job Description : 1. Directs, reads, and interprets plans, drawing details and to the skilled and semi- skilled workers. Submit weekly reports of actual work accomplishment Responsible in the deliveries of requested materials and its procurement. 2. Assist Project Architect in the construction of residential houses, warehouse and School Buildings 3. Monitor daily productivity of carpenters, mason, electricians, plumber and steel men works and check the quality of works. 4. Provide daily activity reports at site. Inclusive Date : June 20, 1983 - May 02, 1984 Company : MINISTRY OF PUBLIC WORKS & HIGHWAYS Address : Region VIII, Catbalogan, Samar Position : C. E. Aide II Job Description : 1. Assist Project Engineer in the preparation of project estimate 2. Assist in the price quotation of materials from the suppliers. 3. Assist in the drafting activities. 4. Assist in the survey teams data gathering.
  • 13. REFERENCES : Available upon request. SIGNED: ILVEN C. SAMONTE