International journal of scientific and technical research in engineering (IJSTRE)
www.ijstre.com Volume 1 Issue 2 Į May 2016.
Manuscript id. 534590471 www.ijstre.com Page 1
Procedure for Hazard Identification and Risk Assessment in Waste-
water Treatment Planting Saudi Arabia
Said Ali El-Quliti1)
, Refat Basarwan2
, Hasan Alzahrani3)
, SaeedAlzahrani4)
, and
FarisBadr5)
1)
Professor at Department of Industrial Engineering, King Abdulaziz University, Jeddah, Saudi Arabia, email:
saalquliti@kau.edu.sa
2)
Engineer, Health and Safety Freelancer trainer. Email: rbasarwan@gmail.com
3)
Engineer, Safety Associated, Islamic Development Bank Group, Jeddah, Saudi Arabia.
4)
Environmental Science, Safety Specialist, National Water Company, Jeddah, Saudi Arabia.
5)
Engineer, Disaster management Master Student.
Abstract : It is well known that wastewater treatment projects worldwide has become one of the most
important, vital projects and linked to civilization. Since potable water and irrigation for agriculture water
considered a very low resources in the Kingdom of Saudi Arabia - desert regions - soit is necessary to pay more
attention to these projects, which already happened, where billions of Saudi Riyals have been invested in the
sewage and industrial water treatment projects.
Wastewater treatment industryin Saudi Arabiahas expanded to include a lot of units and departments, machines
and hundreds of workers and has become a danger to staff and the areas surrounding these stations.
In this research we mention the steps and methods to be used and followed by workers in dealing with the
various hazards. We start by identifying the hazards then point out how to analyze these hazards and classified
into several degrees according totheir severity.
However it’s necessary to specify the responsibilities and roles of employees in dealing with these risks.
I. INTRODUCTION
There are two kinds of wastewater treatment plants in Saudi Arabia,industrial wastewater treatment plant
and sanitary wastewater treatment plant. The industrial wastewater treatment plant is designed to treat incoming
industrial wastewater from industries like factories and plants. The sanitary wastewater treatment plant is
designed to treat incoming sanitary wastewater from community area.
Hazard assessments and controls help build safe and healthy workplaces. They are at the core of every
organization’s occupationalhealth and safety management system. The hazard assessment and control process
provides a consistent approach for employers and workers to identify and control hazards in the workplace. It
allowseveryone to focus their efforts in the right areas, andto develop worker training, inspections,
emergencyresponse [1].
This research aims to identify the OH&S hazards of (equipment, substances and / or movements) which may
cause harms -in order to determine the level of risk associated with the hazard and its controls.
The procedurecan be implemented for:
O Routine and non-routine activities.
o Activities for all personnel having access to the work place
o Activities of contractors and/or subcontractors.
o Facilities at the workplace (Water Treatment Plant, Workshop, Buildings, electrical Substation,
warehouses for Spares and Material, labs, etc.â€Ļ..).
II. Basic Terminology:
ī‚ˇ HSEC:Health, Safety and Environment Committee.
ī‚ˇ Hazard:source, situation, or act with a potential for harm in terms of human injury or ill health, or a
combination of these.
ī‚ˇ Hazard identification: process of recognizing that a hazard exists and defining its characteristics.
ī‚ˇ Risk: combination of the likelihood of an occurrence of a hazardous event or exposure(s) and the
severity of injury or ill health that can because by the event or exposure(s).
ī‚ˇ Risk assessment: process of evaluating the risk(s) arising from a hazard(s), taking into account the
adequacy of any existing controls, and deciding whether or not the risk(s) is acceptable.
ī‚ˇ Acceptable risk: risk that has been reduced to a level that can be tolerated by the organization having
regard to its legal obligations and its own OH&S policy
Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ
Manuscript id. 534590471 www.ijstre.com Page 2
ī‚ˇ Behavior Based Safety (BBS): workplace behaviors are what one sees when observing people
conducting tasks in their workplace.
ī‚ˇ OH&S: occupational health & safety.
ī‚ˇ HSER: Health, Safety&environmental Management Representative.
ī‚ˇ IMS Management representative: A member appointed by the top management to be responsible for
certain quality, safety and environmental tasks irrespective of his other responsibilities.
III. THEWASTE WATER TREATMENT PLANT: AN OVERVIEW
Water is one of the most significant sectors in the Kingdom the National Water Company ( NWC)
established in 2008, as a Saudi joint stock company fully owned by the government (namely the Public
Investment Fund), aims to provide water and wastewater treatment services in accordance with the latest
international standards. This is achieved by the concerted efforts of national cadres in partnership with carefully
selected international operators through foreign PPP.
NWC specializes in providing the highest quality drinking water, ensuring the presence of water and wastewater
connections in all households, preserving natural water resources and the environment, using the Treated
Sewage Effluent (TSE) with maximum efficiency, and training qualified Saudi employees in accordance with
the latest international standards.
Throughout its new phase, NWC is able to implement radical changes in the water sector’s performance. This
was achieved through raising the company’s operational efficiency in line with international standards,
establishing a solid infrastructure that can accommodate the evolving demands of a growing KSA population,
providing high-quality services to clients and customers, and investing all essential efforts for preserving natural
water resources, protecting the environment, and ensuring sustainability.Figure 1.
Figure 1. Wastewater Treatment Plant
3. PROCEDURE
3.1 Hazard Identification
There are many hazards that may cause injury, illness. Hazard Identification is the basis for the risk
assessment process. (Table 1) contains questions that will lead to identifying commonly observed hazards [2]
and [3].
Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ
Manuscript id. 534590471 www.ijstre.com Page 3
Table 1: Hazard Identification Checklist
HAZARD IDENTIFICATION
A ENTANGLEMENT
A1
Can anyone's hair, clothing, gloves, neck-tie, jewellery, cleaning brushes, rags or other materials become
entangled with moving parts of the plant, or materials in motion?
B CRUSHING
B1 Can anyone be crushed due to:
a Material falling off the plant?
b Uncontrolled or unexpected movement of the plant or its load?
c Lack of capacity for the plant to be slowed, stopped or immobilized?
d The plant tipping or rolling over?
e Parts of the plant collapsing
f
Coming in contact with moving parts of the plant during testing, inspection, operation, maintenance,
cleaning or repair?
g Being thrown off or under the plant?
h Being trapped between the plant and materials or fixed structures?
i Other factors not mentioned?
C CUTTING, STABBING & PUNCTURING
C1 Can anyone be cut, stabbed or punctured due to:
a Coming in contact with sharp or flying objects?
b
Coming into contact with moving parts of the plant during testing inspection, operation,
maintenance, cleaning or repair of the plant?
c The plant, parts of the plant or working pieces disintegrating?
d Work pieces being ejected?
e The mobility of the plant?
f Uncontrolled or unexpected movement of the plant?
g Other factors not mentioned?
D. SHEARING
1
Can anyone's body parts be sheared between two parts of the plant, or between two parts of the plant,
or between a part of the plant and a work piece or structure?
E FRICTION
E1 Can anyone be burnt due to contact with moving parts or surfaces of the plant?
F STRIKING
F1 Can anyone be struck by moving objects due to:
a Uncontrolled or unexpected movement of the plant or material handled by the plant?
b The plant, parts of the plant or pieces disintegrating?
c Work pieces being ejected?
d Mobility of the plant
e Other factors not mentioned?
G HIGH PRESSURE FLUID
G1 Can anyone come into contact with fluids under high pressure, due to plant failure or misuse of the plant?
H Working at height
Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ
Manuscript id. 534590471 www.ijstre.com Page 4
H1 Guardrail systems
H2 Scaffolding system inspection and maintenance
H3 All required PPEs are in use ( helmet , safety shoes , gloves , etc....)
H4 Working at height permits
I ELECTRICAL
I1 Can anyone be injured by electrical shock or burned due to:
a The plant contacting live electrical conductors?
b The plant working in close proximity to electrical conductors?
c Overload of electrical circuits?
d Damaged or poorly maintained electrical leads & cables?
e Damaged electrical switches?
f Water near electrical equipment?
g Lack of isolation procedures?
h Other factors not mentioned?
J EXPLOSION
J1
Can anyone by injured by explosion of gases, vapours, liquids, dusts or other substances, triggered by the
operation of the plant or by material handled by the plant?
K Confined space
K1 Confined spaces Work permits
K2 Confined space safety inspection
K3 Using suitable PPEs for working at confined spaces ( helmets , safety shoes, oxygen cylinders
L SLIPPING, TRIPPING & FALLING
L1 Can anyone using the plant, or in the vicinity of the plant, slip, trip or fall due to:
a Uneven or slippery work surfaces?
b Poor housekeeping.
c Obstacles being placed in the vicinity of the plant?
d Other factors not mentioned?
L2 Can anyone fall from a height due to:
a Lack of proper work platform?
b Lack of proper stairs or ladders?
c Lack of guardrail or other suitable edge protection?
d Unprotected holes, penetrations or gaps?
e Poor floor or working surfaces, such as the lack of slip resistant surfaces?
f Steep walking surfaces?
g Collapse of the supporting structure?
h Other factors not mentioned?
M ERGONOMIC
M1 Can anyone be injured due to:
a Poorly designed seating?
b Repetitive body movement?
Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ
Manuscript id. 534590471 www.ijstre.com Page 5
c Constrained body posture or the need for excessive effort?
d Design deficiency causing mental or psychological stress?
e Inadequate or poorly placed lighting?
f Lack of consideration given to human error or human behaviour?
g Mismatch of the plant with human traits and natural limitations?
h Other factors not mentioned?
N SUFFOCATION
N1 Can anyone be suffocated due to the lack of oxygen, or atmospheric contamination?
O HIGH TEMPERATURE OR FIRE
O1 Can anyone come into contact with objects at high temperatures?
P TEMPERATURE (THERMAL COMFORT)
P1 Can anyone suffer ill health due to exposure to high or low temperature?
Q OTHER HAZARDS
Q1 Can anyone be injured or suffer ill-health from exposure to:
a Chemicals?
b Biological?
c Toxic gases, vapours or fumes?
d Dust?
R OTHER HAZARDS (Cont'd)
e Noise?
f Vibration?
g Radiation?
h Other factors not mentioned?
S ENTRAPMENT
S1 Can anyone be locked or trapped in an area of space?
3.2 Risk Assessment Team
A team approach is adopted for the risk assessments where representatives from relevant work places make
up the risk assessment team, and are actively involved in the risk assessments. Team members consist of (At
least)
ī‚ˇ One Safety department representative,
ī‚ˇ One area Section Head or supervisor
ī‚ˇ One of the HSERs members.
It should be noted that:
ī‚ˇ Team members must be trained on this risk assessment method and procedure.
ī‚ˇ TheHSEC will lead the team as the risk assessment advisor/moderator.
ī‚ˇ Risk assessment team identifies the hazards using hazard identification, Risk assessment and observation
record sheet form (HSE-HI/FR01) which reviewed by the process owner manager and approved by
HSSE Manager.
ī‚ˇ Team members can include others up to six persons if needed.
3.3 Risk Identification and Assessment
When the hazard identification is completed, the following questionsare asked:
Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ
Manuscript id. 534590471 www.ijstre.com Page 6
ī‚ˇ What is the severity or consequences of the hazard (e.g. injury, damage, spillage, business interruption,
fire, explosion, etc.)? As a rule, the most severe consequence is considered.
ī‚ˇ What is the probability of occurrence? The probability should be estimated from previous experiences
or, if possible, with the help of statistics.
ī‚ˇ Is the hazard related to any Legal Requirement? Any hazard related to legal requirement and not
compiling with it; the severity should be 5.
Using the severity and probability criteria defined below, the risk can be introduced into a Risk Matrix
based on [4] and [5].
RISK = SEVERITY × PROBABILITY
3.4 Acceptable Risks
Acceptable risks of potential and/or existing hazards will be determined per hazard after finalizing the
preparing of risk assessment sheet and applying the necessary control, which has to comply with legal
obligations, canbe tolerated by the organization & will be updated per risk assessment updating.
3.5 Behavior Based Safety (BBS)
Everybody who works to reduce accidents and improve safe performance is concerned with human
behavior. “Behavior and accidents is what it’s all about,” is a commonly heard phrase[6].
Behavior is defined as “an observable act”; i.e. workplace behaviors are what one sees when observing
people conducting tasks in their workplace. The behavior is assessed as dangerous action, dangerous condition
or positive point.
The BBS objective is improving the safety at work by privileging constructive dialogs and eliminating
hazardous working conditions and acts [7].
Since the risk assessment will include person's behaviors, which isthe base of culture change, the
following steps will be followed whenassessing employee's behavior
Announce your visit to the person to be visited and to his Supervisor (at the latest 24 hours before the visit)
ī‚ˇ Explain to him the objective of your visit
ī‚ˇ Observe the person work (10-15 minutes)
ī‚ˇ Identify: The positive points (PP) - The Dangerous Acts (DA) - The Dangerous Conditions (DC).
After the observation, engage the dialog with the visited person, starting with the positive points (PP) that the
visitors have observed.
Make him aware of the DC & DA and what are the improvements that could be done right now?
Each Process Owner is responsible for updating the hazard identification; risk assessment & observations
register on annual basis.
If a major change in the process takes place the Head of Department is responsible for updating the hazard
identification, risk assessment & observations Register and informing the department Health & Safety
Coordinator. Changes could be the following and other pertinent information:
ī‚ˇ Installation of new Equipment or new material
ī‚ˇ Asset Transfers
ī‚ˇ After Reported Accidents
ī‚ˇ Machine Acceptance of Modified Equipment
ī‚ˇ Chemical Approval Requests
ī‚ˇ Operational Reviews
ī‚ˇ Management Reviews.
Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ
Manuscript id. 534590471 www.ijstre.com Page 7
Table 2: Criteria for evaluating the severity
Severity of Consequences
Category/ Descriptive
Word
Personnel
Illness/ Injury
Equipment
Loss
($)
Down
Time
Product
Loss
($)
Environmental
Effects
5
CATASTROPHIC
Death >1M
>1
Month
>1M
Long-term
(>5yrs)
environmental
damage or
requiring >$1M to
correct and/or in
penalties
4
CRITICAL
Severe injury or
severe
occupational
illness
>2 Week
hospitalization
250K
to
1M
1 Month
to
1 week
250K
to
1M
Medium-term (1-
5 yrs)
environmental
damage or
requiring $250K -
$1M to correct
and/or in penalties
3
SIGNIFICANT
Major injury or
major
occupational
illness
<2 Week
hospitalization
50K
to
250K
3 days
to
1 week
50K
to
250K
Short-term (3 mo-
1 yr)
environmental
damage or
requiring $50K -
$250K to correct
and/or in
penalties.
2
MARGINAL
Minor injury or
minor
occupational
illness
No hospitalization
Day case
1K
to
50K
1 day
to
3 days
1K
to
50K
Brief-term (<3
mo)
environmental
damage or
requiring $1K -
$50K to correct
and/or in
penalties.
1
NEGLIGIBLE
First Aid
No injury or
illness
<1K <1 day <1K
Minor
environmental
damage, readily
repaired and/or
requiring <$1K to
correct and/or in
penalties
Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ
Manuscript id. 534590471 www.ijstre.com Page 8
Table 3: Criteria for evaluating the probability
PROBABILITY
Level
Descriptive
word
Definition
5 FREQUENT
Expected to occur in all circumstances (Once per
week)
4 PROBABLE Expected to occur in most circumstances (Once per month)
3 OCCASIONAL Will probably occur in most circumstances (Once per year)
2 REMOTE
Might occur at some time (Once
per 10 years)
1 IMPROBABLE Could occur at some time, but less possible (Once per 100 years)
Table 4: Risk Matrix
Probability
5 5 10 15 20 25
4 4 8 12 16 20
3 3 6 9 12 15
2 2 4 6 8 10
1 1 2 3 4 5
1 2 3 4 5
S e v e r i t y
Legend
â‰Ĩ20 E Extreme risk - immediate action required (Red)
>10&<20 H High risk - urgent management attention needed (Yellow)
>5 & ≤10 M Medium risk - management attention as soon as possible (Green)
≤5 L Low risk – non urgent management attention needed (White)
Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ
Manuscript id. 534590471 www.ijstre.com Page 9
Table 5: Risk assessment procedure steps.
Step Action Explanations
1 Decide to perform a
risk assessment
The risk assessment may be the result of:
ī‚ˇ New equipment being introduced or existing equipment or workplace
being modified
ī‚ˇ Significant changes being introduced to the tasks performed in the
workplace;
ī‚ˇ Safety control systems being modified;
ī‚ˇ Regulatory requirements
ī‚ˇ Equipment that is being used for another purpose
ī‚ˇ New information about the identified hazards being available
ī‚ˇ An incident investigations revealing new information regarding
workplace hazards and/or the level of risk
ī‚ˇ An accident.
2 Establish a risk
assessment team
A team of trained and appropriate people covering all domains of the projected
assessment shall conduct the risk assessment. Team to be no more than 6 people.
3 Identify the hazards Is there a hazard or issue (e.g. electricity, chemicals, thermal stress, moving
equipment, human error, external event, etc.)?
As an aid for assessors, Appendix A contains questions that will lead to
identifying commonly observed hazards.
4 Assess the risk for all
the hazards identified
in Step 3 above
The Risk Assessment Team
ī‚ˇ Evaluates what is the likely severity (consequence) of such a hazard
ī‚ˇ Evaluates what is the probability of the hazard causing injury or loss.
5 Prioritize the risk The severity and probability are introduced onto the Risk Matrix to prioritise the
risks as:
E: Extreme risk; immediate action required
H: High risk; urgent management attention needed
M: Medium risk; management attention as soon as possible
L: Low risk; longer term action may be required
6 Develop action plans Identified risks shall be prioritised for action and control measures. The following
hierarchy will apply to reduce the risk as far as practicable:
ī‚ˇ Elimination;
ī‚ˇ Substitution;
ī‚ˇ Engineering controls;
ī‚ˇ Signage/warnings and/or administrative controls;
ī‚ˇ Personal protective equipment.
7 Communicate results
and arrange training
The outcomes of risk assessments shall be communicated to all concerned people.
Existing and new staff working in the assessed workplace must be made aware of
the risks and trained on the mitigation and control measures.
3.6 Responsibility
3.6.1. The HSC in each department is responsible for maintainingthe hazard identification; risk
assessment & observations register for each area.
3.6.2. OH&S Manager is responsible to review and update this procedure.
3.6.3. OH&S Manager is responsible to coordinate or establishing of hazard identification and risk
assessment for subcontractors’ activities and setting the need of controls with the concerned
departments.
3.6.4. OH&S Manager is responsible for setting the need of controls for visitors as well as safety
training & awareness of new employees.
IV. CONCLUSIONS
The employer’s hazard assessment and management will determine, in large part which Standards and
procedure shall be used in the workplace to provide safe and healthful working conditions. Therefore, it will be
incumbent for the employer, and / or all persons involved in the hazard assessment to know which Standards
will apply to any given situation.
Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ
Manuscript id. 534590471 www.ijstre.com Page 10
References
[1.] Power and Water Utility Company for Jubail and Yanbu, MARAFIQ.
[2.] Ministry of Water and Environment,
[3.] OSHA (General Industry Standard), 29CFR 1910, Regulations (Safety requirements to be met while working).
[4.] United State Department of Labor, Occupational Safety & Health Administration.
[5.] David Vose, Risk analysis: a quantitative guide, 3rd Edition, john Wiley & Sons, 2008.
[6.] Kit Sadgrove, The Complete Guide to Business Risk Management, â€Ģ‏â€Ŧ3rd Edition, Gower Publishing, Ltd., 2015.
[7.] Cambridge Center for Behavior Studies, "Introduction to Behavioral Safety"
[8.] Dominic Cooper, Behavioral Safety: A Framework for Success, Ph.D.

More Related Content

What's hot

2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templatesDwarika Bhushan Sharma
 
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docxFIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docxDwarika Bhushan Sharma
 
313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheetPháēĄm Thành
 
Behavior-Based Safety PPT Slide Template
Behavior-Based Safety PPT Slide TemplateBehavior-Based Safety PPT Slide Template
Behavior-Based Safety PPT Slide TemplatePresentationLoad
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis soumenmakar
 
Ses safety induction
Ses safety inductionSes safety induction
Ses safety inductionadam-de
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety inductionGanesan Raju
 
Risk Assessment Example.pdf
Risk Assessment Example.pdfRisk Assessment Example.pdf
Risk Assessment Example.pdfBalamuruganD26
 
Aramco safety interview Questions .pdf
Aramco safety interview Questions .pdfAramco safety interview Questions .pdf
Aramco safety interview Questions .pdfjnanamaya Basu
 
Risk assessment-training
Risk assessment-trainingRisk assessment-training
Risk assessment-trainingIshah Khaliq
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templatesDwarika Bhushan Sharma
 
RA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe WorksRA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe WorksSajid Ali
 
Rebar cutting hazards
Rebar cutting hazardsRebar cutting hazards
Rebar cutting hazardsconstruction
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentSahil Sheikh
 
4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templates4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templatesDwarika Bhushan Sharma
 

What's hot (20)

2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates
 
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docxFIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
FIRE EXTINGUISHER INSPECTION Form # HSEQ - FEI Rev 4.docx
 
313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet313440656 crane-lifting-calculation-sheet
313440656 crane-lifting-calculation-sheet
 
BBS TRAINING.pptx
BBS TRAINING.pptxBBS TRAINING.pptx
BBS TRAINING.pptx
 
Behavior-Based Safety PPT Slide Template
Behavior-Based Safety PPT Slide TemplateBehavior-Based Safety PPT Slide Template
Behavior-Based Safety PPT Slide Template
 
Job safety analysis
Job safety analysis Job safety analysis
Job safety analysis
 
Ses safety induction
Ses safety inductionSes safety induction
Ses safety induction
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety induction
 
Near miss report
Near miss reportNear miss report
Near miss report
 
Risk Assessment Example.pdf
Risk Assessment Example.pdfRisk Assessment Example.pdf
Risk Assessment Example.pdf
 
Hse plan
Hse planHse plan
Hse plan
 
Aramco safety interview Questions .pdf
Aramco safety interview Questions .pdfAramco safety interview Questions .pdf
Aramco safety interview Questions .pdf
 
Risk assessment-training
Risk assessment-trainingRisk assessment-training
Risk assessment-training
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
 
3 emergency management risk assessment templates
3 emergency management risk assessment templates3 emergency management risk assessment templates
3 emergency management risk assessment templates
 
RA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe WorksRA- Pressure Testing Of Pipe Works
RA- Pressure Testing Of Pipe Works
 
Permit to Work Training
Permit to Work TrainingPermit to Work Training
Permit to Work Training
 
Rebar cutting hazards
Rebar cutting hazardsRebar cutting hazards
Rebar cutting hazards
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templates4 cofferdams (temporary works) risk assessment templates
4 cofferdams (temporary works) risk assessment templates
 

Similar to Hazard identification and risk assessment procedure

A Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement IndustryA Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement IndustryIRJET Journal
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard managementeSAT Publishing House
 
CHAPTER 1 Scopes of Industrial Safety Part 1 12 Feb 2020 3.pptx
CHAPTER 1 Scopes of Industrial Safety Part 1 12 Feb 2020 3.pptxCHAPTER 1 Scopes of Industrial Safety Part 1 12 Feb 2020 3.pptx
CHAPTER 1 Scopes of Industrial Safety Part 1 12 Feb 2020 3.pptxJALIMIEABDULJALIL
 
IRJET- Assessing the Workplace Risk in Food Industry
IRJET-  	  Assessing the Workplace Risk in Food IndustryIRJET-  	  Assessing the Workplace Risk in Food Industry
IRJET- Assessing the Workplace Risk in Food IndustryIRJET Journal
 
Process Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh RajputProcess Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh RajputGaurav Singh Rajput
 
PSM Process Safety Management.pdf
PSM Process Safety Management.pdfPSM Process Safety Management.pdf
PSM Process Safety Management.pdfssuser2fc67e
 
Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...
Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...
Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...IRJET Journal
 
Ehs management issues& challenges safety
Ehs management issues& challenges safetyEhs management issues& challenges safety
Ehs management issues& challenges safetyArvind Kumar
 
Environment & Industrial disasters
Environment & Industrial disastersEnvironment & Industrial disasters
Environment & Industrial disastersAnkur Sharma
 
IRJET- Risk Assessment in Automobile Assembly Shop
IRJET- Risk Assessment in Automobile Assembly ShopIRJET- Risk Assessment in Automobile Assembly Shop
IRJET- Risk Assessment in Automobile Assembly ShopIRJET Journal
 
Knowledge Based System (Expert System) : Equipment Safety Control & Management
Knowledge Based System (Expert System) : Equipment Safety Control & ManagementKnowledge Based System (Expert System) : Equipment Safety Control & Management
Knowledge Based System (Expert System) : Equipment Safety Control & ManagementAmr El-Ganainy
 
IRJET - Hazard Identification and Risk Analysis in Furnace and Panit Shop
IRJET -  	  Hazard Identification and Risk Analysis in Furnace and Panit ShopIRJET -  	  Hazard Identification and Risk Analysis in Furnace and Panit Shop
IRJET - Hazard Identification and Risk Analysis in Furnace and Panit ShopIRJET Journal
 
JIJIN UPDATED CV
JIJIN UPDATED CVJIJIN UPDATED CV
JIJIN UPDATED CVJijin Varghese
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Yuvraj Shrivastava
 
WASHEQ PPT Afternoon session 2011
WASHEQ PPT Afternoon session 2011WASHEQ PPT Afternoon session 2011
WASHEQ PPT Afternoon session 2011Ella Agbettor
 

Similar to Hazard identification and risk assessment procedure (20)

A Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement IndustryA Risk Assessment Study on Occupational Hazards in Cement Industry
A Risk Assessment Study on Occupational Hazards in Cement Industry
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
CHAPTER 1 Scopes of Industrial Safety Part 1 12 Feb 2020 3.pptx
CHAPTER 1 Scopes of Industrial Safety Part 1 12 Feb 2020 3.pptxCHAPTER 1 Scopes of Industrial Safety Part 1 12 Feb 2020 3.pptx
CHAPTER 1 Scopes of Industrial Safety Part 1 12 Feb 2020 3.pptx
 
Hse nitish
Hse nitishHse nitish
Hse nitish
 
IRJET- Assessing the Workplace Risk in Food Industry
IRJET-  	  Assessing the Workplace Risk in Food IndustryIRJET-  	  Assessing the Workplace Risk in Food Industry
IRJET- Assessing the Workplace Risk in Food Industry
 
Process Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh RajputProcess Safety | Process Safety Management | PSM | Gaurav Singh Rajput
Process Safety | Process Safety Management | PSM | Gaurav Singh Rajput
 
PSM Process Safety Management.pdf
PSM Process Safety Management.pdfPSM Process Safety Management.pdf
PSM Process Safety Management.pdf
 
Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...
Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...
Hazard Identification, Risk Assessment And Risk Control In a 250 MW Solar Pow...
 
Mdg 41 review - Gary Nauer
Mdg 41 review - Gary NauerMdg 41 review - Gary Nauer
Mdg 41 review - Gary Nauer
 
V18I06-11.pdf
V18I06-11.pdfV18I06-11.pdf
V18I06-11.pdf
 
Ehs management issues& challenges safety
Ehs management issues& challenges safetyEhs management issues& challenges safety
Ehs management issues& challenges safety
 
Environment & Industrial disasters
Environment & Industrial disastersEnvironment & Industrial disasters
Environment & Industrial disasters
 
IRJET- Risk Assessment in Automobile Assembly Shop
IRJET- Risk Assessment in Automobile Assembly ShopIRJET- Risk Assessment in Automobile Assembly Shop
IRJET- Risk Assessment in Automobile Assembly Shop
 
Knowledge Based System (Expert System) : Equipment Safety Control & Management
Knowledge Based System (Expert System) : Equipment Safety Control & ManagementKnowledge Based System (Expert System) : Equipment Safety Control & Management
Knowledge Based System (Expert System) : Equipment Safety Control & Management
 
IRJET - Hazard Identification and Risk Analysis in Furnace and Panit Shop
IRJET -  	  Hazard Identification and Risk Analysis in Furnace and Panit ShopIRJET -  	  Hazard Identification and Risk Analysis in Furnace and Panit Shop
IRJET - Hazard Identification and Risk Analysis in Furnace and Panit Shop
 
JIJIN UPDATED CV
JIJIN UPDATED CVJIJIN UPDATED CV
JIJIN UPDATED CV
 
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
Hazard identification and risk assessment(HIRA) &Safe Work method Statement.
 
WASHEQ PPT Afternoon session 2011
WASHEQ PPT Afternoon session 2011WASHEQ PPT Afternoon session 2011
WASHEQ PPT Afternoon session 2011
 
1. Resume
1. Resume1. Resume
1. Resume
 
Occupational Health & Safety
Occupational Health & SafetyOccupational Health & Safety
Occupational Health & Safety
 

More from International journal of scientific and technical research in engineering (IJSTRE)

More from International journal of scientific and technical research in engineering (IJSTRE) (20)

COVID-19 Vaccine And Problematics In Children: A Literature Review
COVID-19 Vaccine And Problematics In Children: A Literature ReviewCOVID-19 Vaccine And Problematics In Children: A Literature Review
COVID-19 Vaccine And Problematics In Children: A Literature Review
 
The Challenges of Handling Dengue Hemorrhagic Fever during the COVID-19 Pande...
The Challenges of Handling Dengue Hemorrhagic Fever during the COVID-19 Pande...The Challenges of Handling Dengue Hemorrhagic Fever during the COVID-19 Pande...
The Challenges of Handling Dengue Hemorrhagic Fever during the COVID-19 Pande...
 
Development of Measuring technique for Electric Power of Wind turbine-Solar P...
Development of Measuring technique for Electric Power of Wind turbine-Solar P...Development of Measuring technique for Electric Power of Wind turbine-Solar P...
Development of Measuring technique for Electric Power of Wind turbine-Solar P...
 
Estimation of Speed Required for Palm Nut Shell Mass-Size Particle Reduction ...
Estimation of Speed Required for Palm Nut Shell Mass-Size Particle Reduction ...Estimation of Speed Required for Palm Nut Shell Mass-Size Particle Reduction ...
Estimation of Speed Required for Palm Nut Shell Mass-Size Particle Reduction ...
 
A comprehensive review of Chronic Kidney Disease of Unknown Etiology
A comprehensive review of Chronic Kidney Disease of Unknown EtiologyA comprehensive review of Chronic Kidney Disease of Unknown Etiology
A comprehensive review of Chronic Kidney Disease of Unknown Etiology
 
EVALUATION OF HEAVY METALS IN SEDIMENT OF SOME SELECTED DAMS FROM KATSINA STA...
EVALUATION OF HEAVY METALS IN SEDIMENT OF SOME SELECTED DAMS FROM KATSINA STA...EVALUATION OF HEAVY METALS IN SEDIMENT OF SOME SELECTED DAMS FROM KATSINA STA...
EVALUATION OF HEAVY METALS IN SEDIMENT OF SOME SELECTED DAMS FROM KATSINA STA...
 
Using Partitioned Design Matrices in Analyzing Nested-Factorial Experiments
Using Partitioned Design Matrices in Analyzing Nested-Factorial ExperimentsUsing Partitioned Design Matrices in Analyzing Nested-Factorial Experiments
Using Partitioned Design Matrices in Analyzing Nested-Factorial Experiments
 
Reasons for High Life Expectancy at Birth with Males in Hambantota District i...
Reasons for High Life Expectancy at Birth with Males in Hambantota District i...Reasons for High Life Expectancy at Birth with Males in Hambantota District i...
Reasons for High Life Expectancy at Birth with Males in Hambantota District i...
 
A Study of the Refractory Properties of Selected Clay deposit in Chavakali, K...
A Study of the Refractory Properties of Selected Clay deposit in Chavakali, K...A Study of the Refractory Properties of Selected Clay deposit in Chavakali, K...
A Study of the Refractory Properties of Selected Clay deposit in Chavakali, K...
 
Cause Investigation of Failure of the Challenge to World Record of Human-Powe...
Cause Investigation of Failure of the Challenge to World Record of Human-Powe...Cause Investigation of Failure of the Challenge to World Record of Human-Powe...
Cause Investigation of Failure of the Challenge to World Record of Human-Powe...
 
Status of Geological Disasters in Jiaozuo City and Countermeasures for Preven...
Status of Geological Disasters in Jiaozuo City and Countermeasures for Preven...Status of Geological Disasters in Jiaozuo City and Countermeasures for Preven...
Status of Geological Disasters in Jiaozuo City and Countermeasures for Preven...
 
Experimental Study on Toxic Gas Produced during Pipeline Gas Explosions
Experimental Study on Toxic Gas Produced during Pipeline Gas ExplosionsExperimental Study on Toxic Gas Produced during Pipeline Gas Explosions
Experimental Study on Toxic Gas Produced during Pipeline Gas Explosions
 
The influence of the entry speed to flow field above water surface on the wat...
The influence of the entry speed to flow field above water surface on the wat...The influence of the entry speed to flow field above water surface on the wat...
The influence of the entry speed to flow field above water surface on the wat...
 
Geological Hazards in Pingdingshan Coal Mine District and Controlling Counter...
Geological Hazards in Pingdingshan Coal Mine District and Controlling Counter...Geological Hazards in Pingdingshan Coal Mine District and Controlling Counter...
Geological Hazards in Pingdingshan Coal Mine District and Controlling Counter...
 
Is There any Change from Magma Mixing in Kelud Characteristics?
Is There any Change from Magma Mixing in Kelud Characteristics? Is There any Change from Magma Mixing in Kelud Characteristics?
Is There any Change from Magma Mixing in Kelud Characteristics?
 
Improving Properties of Black Cotton Soil with Quarry Dust
Improving Properties of Black Cotton Soil with Quarry DustImproving Properties of Black Cotton Soil with Quarry Dust
Improving Properties of Black Cotton Soil with Quarry Dust
 
Study Charge the Floods Evaluated From Morphometry and Mitigasi Arau Padang C...
Study Charge the Floods Evaluated From Morphometry and Mitigasi Arau Padang C...Study Charge the Floods Evaluated From Morphometry and Mitigasi Arau Padang C...
Study Charge the Floods Evaluated From Morphometry and Mitigasi Arau Padang C...
 
Histochemical Characteristics of Ricinodedron Heudelotii (Baill, Pierre Ex Pa...
Histochemical Characteristics of Ricinodedron Heudelotii (Baill, Pierre Ex Pa...Histochemical Characteristics of Ricinodedron Heudelotii (Baill, Pierre Ex Pa...
Histochemical Characteristics of Ricinodedron Heudelotii (Baill, Pierre Ex Pa...
 
Formation Sensitivity Assessment of the Gbaran Field, Niger Delta Basin, Nigeria
Formation Sensitivity Assessment of the Gbaran Field, Niger Delta Basin, NigeriaFormation Sensitivity Assessment of the Gbaran Field, Niger Delta Basin, Nigeria
Formation Sensitivity Assessment of the Gbaran Field, Niger Delta Basin, Nigeria
 
The Optimization of Carbonitriding Process for 1022 Self-drilling Tapping Scr...
The Optimization of Carbonitriding Process for 1022 Self-drilling Tapping Scr...The Optimization of Carbonitriding Process for 1022 Self-drilling Tapping Scr...
The Optimization of Carbonitriding Process for 1022 Self-drilling Tapping Scr...
 

Recently uploaded

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 

Recently uploaded (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 

Hazard identification and risk assessment procedure

  • 1. International journal of scientific and technical research in engineering (IJSTRE) www.ijstre.com Volume 1 Issue 2 Į May 2016. Manuscript id. 534590471 www.ijstre.com Page 1 Procedure for Hazard Identification and Risk Assessment in Waste- water Treatment Planting Saudi Arabia Said Ali El-Quliti1) , Refat Basarwan2 , Hasan Alzahrani3) , SaeedAlzahrani4) , and FarisBadr5) 1) Professor at Department of Industrial Engineering, King Abdulaziz University, Jeddah, Saudi Arabia, email: saalquliti@kau.edu.sa 2) Engineer, Health and Safety Freelancer trainer. Email: rbasarwan@gmail.com 3) Engineer, Safety Associated, Islamic Development Bank Group, Jeddah, Saudi Arabia. 4) Environmental Science, Safety Specialist, National Water Company, Jeddah, Saudi Arabia. 5) Engineer, Disaster management Master Student. Abstract : It is well known that wastewater treatment projects worldwide has become one of the most important, vital projects and linked to civilization. Since potable water and irrigation for agriculture water considered a very low resources in the Kingdom of Saudi Arabia - desert regions - soit is necessary to pay more attention to these projects, which already happened, where billions of Saudi Riyals have been invested in the sewage and industrial water treatment projects. Wastewater treatment industryin Saudi Arabiahas expanded to include a lot of units and departments, machines and hundreds of workers and has become a danger to staff and the areas surrounding these stations. In this research we mention the steps and methods to be used and followed by workers in dealing with the various hazards. We start by identifying the hazards then point out how to analyze these hazards and classified into several degrees according totheir severity. However it’s necessary to specify the responsibilities and roles of employees in dealing with these risks. I. INTRODUCTION There are two kinds of wastewater treatment plants in Saudi Arabia,industrial wastewater treatment plant and sanitary wastewater treatment plant. The industrial wastewater treatment plant is designed to treat incoming industrial wastewater from industries like factories and plants. The sanitary wastewater treatment plant is designed to treat incoming sanitary wastewater from community area. Hazard assessments and controls help build safe and healthy workplaces. They are at the core of every organization’s occupationalhealth and safety management system. The hazard assessment and control process provides a consistent approach for employers and workers to identify and control hazards in the workplace. It allowseveryone to focus their efforts in the right areas, andto develop worker training, inspections, emergencyresponse [1]. This research aims to identify the OH&S hazards of (equipment, substances and / or movements) which may cause harms -in order to determine the level of risk associated with the hazard and its controls. The procedurecan be implemented for: O Routine and non-routine activities. o Activities for all personnel having access to the work place o Activities of contractors and/or subcontractors. o Facilities at the workplace (Water Treatment Plant, Workshop, Buildings, electrical Substation, warehouses for Spares and Material, labs, etc.â€Ļ..). II. Basic Terminology: ī‚ˇ HSEC:Health, Safety and Environment Committee. ī‚ˇ Hazard:source, situation, or act with a potential for harm in terms of human injury or ill health, or a combination of these. ī‚ˇ Hazard identification: process of recognizing that a hazard exists and defining its characteristics. ī‚ˇ Risk: combination of the likelihood of an occurrence of a hazardous event or exposure(s) and the severity of injury or ill health that can because by the event or exposure(s). ī‚ˇ Risk assessment: process of evaluating the risk(s) arising from a hazard(s), taking into account the adequacy of any existing controls, and deciding whether or not the risk(s) is acceptable. ī‚ˇ Acceptable risk: risk that has been reduced to a level that can be tolerated by the organization having regard to its legal obligations and its own OH&S policy
  • 2. Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ Manuscript id. 534590471 www.ijstre.com Page 2 ī‚ˇ Behavior Based Safety (BBS): workplace behaviors are what one sees when observing people conducting tasks in their workplace. ī‚ˇ OH&S: occupational health & safety. ī‚ˇ HSER: Health, Safety&environmental Management Representative. ī‚ˇ IMS Management representative: A member appointed by the top management to be responsible for certain quality, safety and environmental tasks irrespective of his other responsibilities. III. THEWASTE WATER TREATMENT PLANT: AN OVERVIEW Water is one of the most significant sectors in the Kingdom the National Water Company ( NWC) established in 2008, as a Saudi joint stock company fully owned by the government (namely the Public Investment Fund), aims to provide water and wastewater treatment services in accordance with the latest international standards. This is achieved by the concerted efforts of national cadres in partnership with carefully selected international operators through foreign PPP. NWC specializes in providing the highest quality drinking water, ensuring the presence of water and wastewater connections in all households, preserving natural water resources and the environment, using the Treated Sewage Effluent (TSE) with maximum efficiency, and training qualified Saudi employees in accordance with the latest international standards. Throughout its new phase, NWC is able to implement radical changes in the water sector’s performance. This was achieved through raising the company’s operational efficiency in line with international standards, establishing a solid infrastructure that can accommodate the evolving demands of a growing KSA population, providing high-quality services to clients and customers, and investing all essential efforts for preserving natural water resources, protecting the environment, and ensuring sustainability.Figure 1. Figure 1. Wastewater Treatment Plant 3. PROCEDURE 3.1 Hazard Identification There are many hazards that may cause injury, illness. Hazard Identification is the basis for the risk assessment process. (Table 1) contains questions that will lead to identifying commonly observed hazards [2] and [3].
  • 3. Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ Manuscript id. 534590471 www.ijstre.com Page 3 Table 1: Hazard Identification Checklist HAZARD IDENTIFICATION A ENTANGLEMENT A1 Can anyone's hair, clothing, gloves, neck-tie, jewellery, cleaning brushes, rags or other materials become entangled with moving parts of the plant, or materials in motion? B CRUSHING B1 Can anyone be crushed due to: a Material falling off the plant? b Uncontrolled or unexpected movement of the plant or its load? c Lack of capacity for the plant to be slowed, stopped or immobilized? d The plant tipping or rolling over? e Parts of the plant collapsing f Coming in contact with moving parts of the plant during testing, inspection, operation, maintenance, cleaning or repair? g Being thrown off or under the plant? h Being trapped between the plant and materials or fixed structures? i Other factors not mentioned? C CUTTING, STABBING & PUNCTURING C1 Can anyone be cut, stabbed or punctured due to: a Coming in contact with sharp or flying objects? b Coming into contact with moving parts of the plant during testing inspection, operation, maintenance, cleaning or repair of the plant? c The plant, parts of the plant or working pieces disintegrating? d Work pieces being ejected? e The mobility of the plant? f Uncontrolled or unexpected movement of the plant? g Other factors not mentioned? D. SHEARING 1 Can anyone's body parts be sheared between two parts of the plant, or between two parts of the plant, or between a part of the plant and a work piece or structure? E FRICTION E1 Can anyone be burnt due to contact with moving parts or surfaces of the plant? F STRIKING F1 Can anyone be struck by moving objects due to: a Uncontrolled or unexpected movement of the plant or material handled by the plant? b The plant, parts of the plant or pieces disintegrating? c Work pieces being ejected? d Mobility of the plant e Other factors not mentioned? G HIGH PRESSURE FLUID G1 Can anyone come into contact with fluids under high pressure, due to plant failure or misuse of the plant? H Working at height
  • 4. Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ Manuscript id. 534590471 www.ijstre.com Page 4 H1 Guardrail systems H2 Scaffolding system inspection and maintenance H3 All required PPEs are in use ( helmet , safety shoes , gloves , etc....) H4 Working at height permits I ELECTRICAL I1 Can anyone be injured by electrical shock or burned due to: a The plant contacting live electrical conductors? b The plant working in close proximity to electrical conductors? c Overload of electrical circuits? d Damaged or poorly maintained electrical leads & cables? e Damaged electrical switches? f Water near electrical equipment? g Lack of isolation procedures? h Other factors not mentioned? J EXPLOSION J1 Can anyone by injured by explosion of gases, vapours, liquids, dusts or other substances, triggered by the operation of the plant or by material handled by the plant? K Confined space K1 Confined spaces Work permits K2 Confined space safety inspection K3 Using suitable PPEs for working at confined spaces ( helmets , safety shoes, oxygen cylinders L SLIPPING, TRIPPING & FALLING L1 Can anyone using the plant, or in the vicinity of the plant, slip, trip or fall due to: a Uneven or slippery work surfaces? b Poor housekeeping. c Obstacles being placed in the vicinity of the plant? d Other factors not mentioned? L2 Can anyone fall from a height due to: a Lack of proper work platform? b Lack of proper stairs or ladders? c Lack of guardrail or other suitable edge protection? d Unprotected holes, penetrations or gaps? e Poor floor or working surfaces, such as the lack of slip resistant surfaces? f Steep walking surfaces? g Collapse of the supporting structure? h Other factors not mentioned? M ERGONOMIC M1 Can anyone be injured due to: a Poorly designed seating? b Repetitive body movement?
  • 5. Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ Manuscript id. 534590471 www.ijstre.com Page 5 c Constrained body posture or the need for excessive effort? d Design deficiency causing mental or psychological stress? e Inadequate or poorly placed lighting? f Lack of consideration given to human error or human behaviour? g Mismatch of the plant with human traits and natural limitations? h Other factors not mentioned? N SUFFOCATION N1 Can anyone be suffocated due to the lack of oxygen, or atmospheric contamination? O HIGH TEMPERATURE OR FIRE O1 Can anyone come into contact with objects at high temperatures? P TEMPERATURE (THERMAL COMFORT) P1 Can anyone suffer ill health due to exposure to high or low temperature? Q OTHER HAZARDS Q1 Can anyone be injured or suffer ill-health from exposure to: a Chemicals? b Biological? c Toxic gases, vapours or fumes? d Dust? R OTHER HAZARDS (Cont'd) e Noise? f Vibration? g Radiation? h Other factors not mentioned? S ENTRAPMENT S1 Can anyone be locked or trapped in an area of space? 3.2 Risk Assessment Team A team approach is adopted for the risk assessments where representatives from relevant work places make up the risk assessment team, and are actively involved in the risk assessments. Team members consist of (At least) ī‚ˇ One Safety department representative, ī‚ˇ One area Section Head or supervisor ī‚ˇ One of the HSERs members. It should be noted that: ī‚ˇ Team members must be trained on this risk assessment method and procedure. ī‚ˇ TheHSEC will lead the team as the risk assessment advisor/moderator. ī‚ˇ Risk assessment team identifies the hazards using hazard identification, Risk assessment and observation record sheet form (HSE-HI/FR01) which reviewed by the process owner manager and approved by HSSE Manager. ī‚ˇ Team members can include others up to six persons if needed. 3.3 Risk Identification and Assessment When the hazard identification is completed, the following questionsare asked:
  • 6. Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ Manuscript id. 534590471 www.ijstre.com Page 6 ī‚ˇ What is the severity or consequences of the hazard (e.g. injury, damage, spillage, business interruption, fire, explosion, etc.)? As a rule, the most severe consequence is considered. ī‚ˇ What is the probability of occurrence? The probability should be estimated from previous experiences or, if possible, with the help of statistics. ī‚ˇ Is the hazard related to any Legal Requirement? Any hazard related to legal requirement and not compiling with it; the severity should be 5. Using the severity and probability criteria defined below, the risk can be introduced into a Risk Matrix based on [4] and [5]. RISK = SEVERITY × PROBABILITY 3.4 Acceptable Risks Acceptable risks of potential and/or existing hazards will be determined per hazard after finalizing the preparing of risk assessment sheet and applying the necessary control, which has to comply with legal obligations, canbe tolerated by the organization & will be updated per risk assessment updating. 3.5 Behavior Based Safety (BBS) Everybody who works to reduce accidents and improve safe performance is concerned with human behavior. “Behavior and accidents is what it’s all about,” is a commonly heard phrase[6]. Behavior is defined as “an observable act”; i.e. workplace behaviors are what one sees when observing people conducting tasks in their workplace. The behavior is assessed as dangerous action, dangerous condition or positive point. The BBS objective is improving the safety at work by privileging constructive dialogs and eliminating hazardous working conditions and acts [7]. Since the risk assessment will include person's behaviors, which isthe base of culture change, the following steps will be followed whenassessing employee's behavior Announce your visit to the person to be visited and to his Supervisor (at the latest 24 hours before the visit) ī‚ˇ Explain to him the objective of your visit ī‚ˇ Observe the person work (10-15 minutes) ī‚ˇ Identify: The positive points (PP) - The Dangerous Acts (DA) - The Dangerous Conditions (DC). After the observation, engage the dialog with the visited person, starting with the positive points (PP) that the visitors have observed. Make him aware of the DC & DA and what are the improvements that could be done right now? Each Process Owner is responsible for updating the hazard identification; risk assessment & observations register on annual basis. If a major change in the process takes place the Head of Department is responsible for updating the hazard identification, risk assessment & observations Register and informing the department Health & Safety Coordinator. Changes could be the following and other pertinent information: ī‚ˇ Installation of new Equipment or new material ī‚ˇ Asset Transfers ī‚ˇ After Reported Accidents ī‚ˇ Machine Acceptance of Modified Equipment ī‚ˇ Chemical Approval Requests ī‚ˇ Operational Reviews ī‚ˇ Management Reviews.
  • 7. Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ Manuscript id. 534590471 www.ijstre.com Page 7 Table 2: Criteria for evaluating the severity Severity of Consequences Category/ Descriptive Word Personnel Illness/ Injury Equipment Loss ($) Down Time Product Loss ($) Environmental Effects 5 CATASTROPHIC Death >1M >1 Month >1M Long-term (>5yrs) environmental damage or requiring >$1M to correct and/or in penalties 4 CRITICAL Severe injury or severe occupational illness >2 Week hospitalization 250K to 1M 1 Month to 1 week 250K to 1M Medium-term (1- 5 yrs) environmental damage or requiring $250K - $1M to correct and/or in penalties 3 SIGNIFICANT Major injury or major occupational illness <2 Week hospitalization 50K to 250K 3 days to 1 week 50K to 250K Short-term (3 mo- 1 yr) environmental damage or requiring $50K - $250K to correct and/or in penalties. 2 MARGINAL Minor injury or minor occupational illness No hospitalization Day case 1K to 50K 1 day to 3 days 1K to 50K Brief-term (<3 mo) environmental damage or requiring $1K - $50K to correct and/or in penalties. 1 NEGLIGIBLE First Aid No injury or illness <1K <1 day <1K Minor environmental damage, readily repaired and/or requiring <$1K to correct and/or in penalties
  • 8. Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ Manuscript id. 534590471 www.ijstre.com Page 8 Table 3: Criteria for evaluating the probability PROBABILITY Level Descriptive word Definition 5 FREQUENT Expected to occur in all circumstances (Once per week) 4 PROBABLE Expected to occur in most circumstances (Once per month) 3 OCCASIONAL Will probably occur in most circumstances (Once per year) 2 REMOTE Might occur at some time (Once per 10 years) 1 IMPROBABLE Could occur at some time, but less possible (Once per 100 years) Table 4: Risk Matrix Probability 5 5 10 15 20 25 4 4 8 12 16 20 3 3 6 9 12 15 2 2 4 6 8 10 1 1 2 3 4 5 1 2 3 4 5 S e v e r i t y Legend â‰Ĩ20 E Extreme risk - immediate action required (Red) >10&<20 H High risk - urgent management attention needed (Yellow) >5 & ≤10 M Medium risk - management attention as soon as possible (Green) ≤5 L Low risk – non urgent management attention needed (White)
  • 9. Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ Manuscript id. 534590471 www.ijstre.com Page 9 Table 5: Risk assessment procedure steps. Step Action Explanations 1 Decide to perform a risk assessment The risk assessment may be the result of: ī‚ˇ New equipment being introduced or existing equipment or workplace being modified ī‚ˇ Significant changes being introduced to the tasks performed in the workplace; ī‚ˇ Safety control systems being modified; ī‚ˇ Regulatory requirements ī‚ˇ Equipment that is being used for another purpose ī‚ˇ New information about the identified hazards being available ī‚ˇ An incident investigations revealing new information regarding workplace hazards and/or the level of risk ī‚ˇ An accident. 2 Establish a risk assessment team A team of trained and appropriate people covering all domains of the projected assessment shall conduct the risk assessment. Team to be no more than 6 people. 3 Identify the hazards Is there a hazard or issue (e.g. electricity, chemicals, thermal stress, moving equipment, human error, external event, etc.)? As an aid for assessors, Appendix A contains questions that will lead to identifying commonly observed hazards. 4 Assess the risk for all the hazards identified in Step 3 above The Risk Assessment Team ī‚ˇ Evaluates what is the likely severity (consequence) of such a hazard ī‚ˇ Evaluates what is the probability of the hazard causing injury or loss. 5 Prioritize the risk The severity and probability are introduced onto the Risk Matrix to prioritise the risks as: E: Extreme risk; immediate action required H: High risk; urgent management attention needed M: Medium risk; management attention as soon as possible L: Low risk; longer term action may be required 6 Develop action plans Identified risks shall be prioritised for action and control measures. The following hierarchy will apply to reduce the risk as far as practicable: ī‚ˇ Elimination; ī‚ˇ Substitution; ī‚ˇ Engineering controls; ī‚ˇ Signage/warnings and/or administrative controls; ī‚ˇ Personal protective equipment. 7 Communicate results and arrange training The outcomes of risk assessments shall be communicated to all concerned people. Existing and new staff working in the assessed workplace must be made aware of the risks and trained on the mitigation and control measures. 3.6 Responsibility 3.6.1. The HSC in each department is responsible for maintainingthe hazard identification; risk assessment & observations register for each area. 3.6.2. OH&S Manager is responsible to review and update this procedure. 3.6.3. OH&S Manager is responsible to coordinate or establishing of hazard identification and risk assessment for subcontractors’ activities and setting the need of controls with the concerned departments. 3.6.4. OH&S Manager is responsible for setting the need of controls for visitors as well as safety training & awareness of new employees. IV. CONCLUSIONS The employer’s hazard assessment and management will determine, in large part which Standards and procedure shall be used in the workplace to provide safe and healthful working conditions. Therefore, it will be incumbent for the employer, and / or all persons involved in the hazard assessment to know which Standards will apply to any given situation.
  • 10. Procedure for Hazard Identification and Risk Assessment in Wastewater Treatment Plantingâ€Ļâ€Ļ Manuscript id. 534590471 www.ijstre.com Page 10 References [1.] Power and Water Utility Company for Jubail and Yanbu, MARAFIQ. [2.] Ministry of Water and Environment, [3.] OSHA (General Industry Standard), 29CFR 1910, Regulations (Safety requirements to be met while working). [4.] United State Department of Labor, Occupational Safety & Health Administration. [5.] David Vose, Risk analysis: a quantitative guide, 3rd Edition, john Wiley & Sons, 2008. [6.] Kit Sadgrove, The Complete Guide to Business Risk Management, â€Ģ‏â€Ŧ3rd Edition, Gower Publishing, Ltd., 2015. [7.] Cambridge Center for Behavior Studies, "Introduction to Behavioral Safety" [8.] Dominic Cooper, Behavioral Safety: A Framework for Success, Ph.D.