A Study in Financial Analysis of Marble Manufacturing Process
Armash Ansari1
, Hamzaa Gunawala2
, Ali Asgar Shirazi3
, Aalisha Nayakwadi4
1,2,3,4
(Civil Department, M.H. Saboo Siddik College of Engineering / Mumbai University, Maharashtra, India)
Abstract :- The motive of the work is to analyze a marble industry financially, based on the idea of Life Cycle
Cost Analysis (LCCA). LCCA is an important tool to understand the most lucrative option among different
competing alternatives to purchase, own, operate, maintain and eventually dispose of an object or process. All
the costs are discounted to a present-day value known as Net Present Value (NPV). NPV helps to choose a
better investment option or even let us understand that whether the investment is even profitable or not. The
crux of the matter is justified by taking multiple aspects under consideration viz., Owning Cost, Operating Cost,
Maintenance and repairs. The values were projected for the next 20 years considering it as the life of the
industry.
Keywords: - Life Cycle Cost Analysis, Net Present Value, Owning Cost, Operating Cost, Maintenance &
Repairs.
I. INTRODUCTION
Financial analysis is wisely known as accounting analysis. Its prime objective has been to assess or to figure out,
define and quantify certain financial traits of a business, sub-business or even project. Those financial traits can
refer to the business’ viability, stability or profitability. This basically imply that by performing financial
analysis, one can be able to predict with some degree of certainty if a business will be able to continue on it
course the same way as before or if it will be discontinued and, if so, for what reasons. And eventually, the
financial analysis allows top management to decide on the best alternative direction in which the company can
go.
II. RESEARCH METHODOLOGY
The initial cost, machine cost as well as repair and maintenance cost are evaluated. The data of
electricity rates from the year 2002 is taken into consideration and is projected for the next 20 years i.e. till
2036. The data of initial cost of machines and factory were collected from various sites i.e. the marble
industries. The cost of electricity as per rates provided by “DNH (Dadra Nagar Haveli) Power Distribution
Corporation Limited” is observed. The electricity bills provided by the factory ensures the unit consumed by
various equipments. This consumptions as per rates fluctuating in previous years is been projected till the year
2036. The repair and maintenance is collected from the industry and is projected further depending upon the
variations in market rates of materials and machines parts. The labor wages are taken as per the District
Scheduled Rates (DSR) from the year 2006 and the pattern of fluctuations is been projected till the year 2036.
The pricing of the raw materials i.e. Indian marbles, is decided as per the data from 2007 and accordingly been
carried till 2036. In the transportation department, fuel cost and transportation taxes are put together to evaluate
the total cost under transport.
2.1 Capital Cost
The capital cost includes the establishment cost, equipment cost and the cost of raw materials. These all
factors also refers to the initial cost.
2.1.1 Establishment Cost
Table 1
1 Foundation INR 700 Per Sq. Ft.
2 Machine Foundation INR 1800000 Per Unit
3 Office Bulding Foundation INR 1200 Per Sq. Ft.
4 Compound Wall INR 2500 Per Mt
5 Pavement/ Roads INR 1250 Per Sq. Mt
A Study in Financial Analysis of Marble Manufacturing Process
www.irjes.com 57 | Page
6 DRAINS INR 25 Per Sq. Ft.
7 PLUMBING INR 5 Per Sq. Ft.
8 ELECTRIC CONNECTION INR 50 Per Sq. Ft.
2.1.2 Equipments Used
 Crane – INR 3000000
 Block Turner – INR 800000
 Monoblock Dresser – INR 2200000
 Trolley – INR 800000
 Gangsaw – INR 7000000 (Per Unit)
 Resin Line – INR 7000000
 Polishing Line – INR 5500000
 Recycling Tank – INR 1800000
2.1.3 Raw Materials
Raw materials required by the industry per year is 5000 tonnes. The rate per tonne of raw materials in
2016 is INR 6500, this makes the yearly expense on raw material (i.e. for 5000 tonnes) INR 32500000. This
data of per tonne of raw materials when projected till 2036 as shown in graph below gives rate per tonne as INR
20995. This data reflects the expense for the year 2036 on raw materails as INR 104975000. This shows a
whopping increment of around 223% from 2016 to 2036 per tonne of raw material.
Fig.1 ( Rates/tonne of Raw Materials)
2.2 Operating Cost
2.2.1 Electricity
As per the rates provided by DNH Power Distribution Corporation Limited – as of 2002 the rate per
unit of electricity was INR 2.45. After the projections till the year 2036, this rate turns out to be INR 8.44 per
unit of electricity used. This totally shows a price hike of about 244.48% per unit. The number of units of
electricity consumed per month in the industry was 35000 units, as provided by the industry. This makes the
yearly consumption of 420000 units of electricity. The following graph shows the variations in the unit rate of
electricity. The dotted curve represents the projection till the 2036 and the solid line shows the rates collected
from the industry.
A Study in Financial Analysis of Marble Manufacturing Process
www.irjes.com 58 | Page
Fig.2 (Rate/unit of electricity)
2.2.2 Transport
In the transportation department multiple factors are taken into consideration viz. truck capacity, fuel
cost & road taxes. The truck capacity is 30 tonnes i.e. only 30 tonnes of raw materials can be transported in one
trip. Considering the variations in fuel cost which are provided in the graph below, the transportation charges
fluctuates. The truck vendor charges per tonne of the material transported. As per the data of 2002 cost/tonne is
INR 1110 which makes a trip of carrying 30 tonnes of raw materials of INR 33300. Similarly, in 2016 per trip
cost jumps to INR 64350 & finally as projected, in 2036 it reaches INR 100350 per trip i.e. 55.944% increase
over the years. Now, if we look at the projections of fuel cost we find that in 2016 average cost per litre of fuel
is INR 50.8 and the projection expects it to become INR 93.673 in the year 2036, which witnesses an increment
of 84.395%.
Fig.3 (Cost/litre of fuel)
2.2.3 Labours
There were 15 unskilled and 12 skilled labours required in the industry. The wages of these
labours were decided as per the data of District Schedule Rates (DSR). The wages for the year 2016 for
unskilled and skilled labours were INR 350 & INR 425 respectively. This value after projections comes out to
be INR 525 for unskiled and INR 780 for skilled labours. This totally shows an addition of 50% for unskilled
and 83.52% for skilled.
A Study in Financial Analysis of Marble Manufacturing Process
www.irjes.com 59 | Page
Fig.4 (Y-axis shows the daily wages in INR)
Fig.5 (Y-axis shows the daily wages in INR)
2.3 Maintenance & Repair Cost
2.3.1 CCI (Construction Cost Index)
Construction Cost Index is a factor which evaluates variations in overall cost of construction in various
types of projects. It is the monthly measure of Construction Cost movement for the Indian Construction Industry
provided by CIDC (Construction Industry Development Council). CIDC decides the base CCI and releases
monthly index of following years.
The CCI helps to figure out the repair and maintenance costs. As per the data of CIDC the base CCI in
October 2007 is 100. This value turns out to be 143.44 in October 2016. Taking every month data from October
2002 to October 2016 and projecting it to 2036 gives us the CCI of 249.075. This index reflects the maintenance
and repair cost as INR 500000 for a CCI of 142.83 in 2016. Similarly, the index value of 2036 i.e. 249.075
projects the repair and maintenance cost as INR 936400.
Fig.6 (CCI)
A Study in Financial Analysis of Marble Manufacturing Process
www.irjes.com 60 | Page
III. CONCLUSION
Finally, the Capital Cost, Operating Cost and & Maintenance & Repair Cost are added for the
determination of the NPV. As NPV helps to know the present value of the investment and also determines
whether a venture is lucrative or not. NPV at different rate of return is evaluated in the table below.
Table 2 (NPV)
RATE OF RETURN VALUE (INR)
4% 165649512.54
8% 112687591.49
10% 95041186.89
Another important aspect of the evaluation is the “Payback Period”. The payback period is the duration
at which the invested amount is recovered, which is simply calculated by observing the difference in the Inflows
and the Outflows. The moment at which the investment is recovered is noted as the payback period. Here the
payback period is 10 years i.e. 2026 is the recovery year. Which implies that after 2026 every penny flowed in is
the profit. The graph below shows the relationship between the Inflow, Outflow and the Net Flow.
Fig.7
Here the blue line shows inflow, grey line represents outflow & the red line represents net flow.
ACKNOWLEDGEMENTS
We sincerely appreciate Dr. Shagufta Sayed for giving us an opportunity to work on this topic. We are
grateful for her support and guidance which has helped us to expand our horizon of thoughts and experience.
REFERENCES
[1]. Sayed, Shagufta Sajid Mumtaaz, and Priyadarshi H. Sawant. "Life-cycle cost and financial analysis of energy components in
mass housing projects–A case project in sub-urban India." International Journal of Sustainable Built Environment 4.2 (2015):
202-221.
[2]. Desai, Dhruv J., et al. (2016) "ENGINEERING ECONOMICS AND LIFE CYCLE COST ANALYSIS."
[3]. Mumtaaz Sayed, Shagufta Sajid, and Priyadarshi H. Sawant. "Financial Feasibility Analysis of Water Conservation Components
in Mass Housing Projects: Suburban Indian Case Review." Journal of Architectural Engineering 22.2 (2016): 04016001.
[4]. Arpke, Angela, and Neil Hutzler. "Operational life-cycle assessment and life-cycle cost analysis for water use in multioccupant
buildings." Journal of Architectural Engineering 11.3 (2005): 99-109.
[5]. Batchelor, C., C. Fonseca, and S. Smits. "Life-cycle costs of rainwater harvesting systems." Occasional paper 46 (2011).

More Related Content

Similar to A Study in Financial Analysis of Marble Manufacturing Process

Financial performance efficiency of select cement companies in tamil nadu
Financial performance efficiency of select cement companies in tamil naduFinancial performance efficiency of select cement companies in tamil nadu
Financial performance efficiency of select cement companies in tamil nadu
IAEME Publication
 
An overview study of working condition and productivity of construction labou...
An overview study of working condition and productivity of construction labou...An overview study of working condition and productivity of construction labou...
An overview study of working condition and productivity of construction labou...
eSAT Journals
 

Similar to A Study in Financial Analysis of Marble Manufacturing Process (20)

IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
IRJET- Economic Analysis of NH-48 (Four Lanning of Hassan to Maranahally Sect...
 
Financial performance efficiency of select cement companies in tamil nadu
Financial performance efficiency of select cement companies in tamil naduFinancial performance efficiency of select cement companies in tamil nadu
Financial performance efficiency of select cement companies in tamil nadu
 
Engineering Sector Report May 2017
Engineering Sector Report May 2017Engineering Sector Report May 2017
Engineering Sector Report May 2017
 
Identification of Factors Affecting Construction Cash Flow: A Statistical Ana...
Identification of Factors Affecting Construction Cash Flow: A Statistical Ana...Identification of Factors Affecting Construction Cash Flow: A Statistical Ana...
Identification of Factors Affecting Construction Cash Flow: A Statistical Ana...
 
IIMA FILE
IIMA FILEIIMA FILE
IIMA FILE
 
Future of industrialization in india
Future of industrialization in indiaFuture of industrialization in india
Future of industrialization in india
 
ANALYSIS OF FACTORS GOVERNING THE MARKET PRICE OF SHARES FOR SELECTED COMPANI...
ANALYSIS OF FACTORS GOVERNING THE MARKET PRICE OF SHARES FOR SELECTED COMPANI...ANALYSIS OF FACTORS GOVERNING THE MARKET PRICE OF SHARES FOR SELECTED COMPANI...
ANALYSIS OF FACTORS GOVERNING THE MARKET PRICE OF SHARES FOR SELECTED COMPANI...
 
icema-annual-report-2013-14.pdf
icema-annual-report-2013-14.pdficema-annual-report-2013-14.pdf
icema-annual-report-2013-14.pdf
 
PSE Insights - May 2016
PSE Insights - May 2016PSE Insights - May 2016
PSE Insights - May 2016
 
B012530710
B012530710B012530710
B012530710
 
Engineering Sector Report - March 2017
Engineering Sector Report - March 2017Engineering Sector Report - March 2017
Engineering Sector Report - March 2017
 
Analysis of Safety Stock
Analysis of Safety StockAnalysis of Safety Stock
Analysis of Safety Stock
 
Engineering economics and life cycle cost analysis
Engineering economics and life cycle cost analysisEngineering economics and life cycle cost analysis
Engineering economics and life cycle cost analysis
 
Engineering Sector Report June 2017
Engineering Sector Report June 2017Engineering Sector Report June 2017
Engineering Sector Report June 2017
 
An overview study of working condition and productivity of construction labou...
An overview study of working condition and productivity of construction labou...An overview study of working condition and productivity of construction labou...
An overview study of working condition and productivity of construction labou...
 
Electrical Machinery Sector Report - March 2017
Electrical Machinery Sector Report - March 2017Electrical Machinery Sector Report - March 2017
Electrical Machinery Sector Report - March 2017
 
Engineering Sector Report April 2017
Engineering Sector Report April 2017 Engineering Sector Report April 2017
Engineering Sector Report April 2017
 
Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...
Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...
Financial Comparative Analysis of SPV and SPT Power Plants for a Village in R...
 
Efficiency of Working Capital Management of Selected Paint Company in India: ...
Efficiency of Working Capital Management of Selected Paint Company in India: ...Efficiency of Working Capital Management of Selected Paint Company in India: ...
Efficiency of Working Capital Management of Selected Paint Company in India: ...
 
Cement Industry Overview and Market Price Forecasting In Azerbaijan
Cement Industry Overview and Market Price Forecasting In Azerbaijan Cement Industry Overview and Market Price Forecasting In Azerbaijan
Cement Industry Overview and Market Price Forecasting In Azerbaijan
 

More from IRJESJOURNAL

Flexible Design Processes to Reduce the Early Obsolescence of Buildings
Flexible Design Processes to Reduce the Early Obsolescence of BuildingsFlexible Design Processes to Reduce the Early Obsolescence of Buildings
Flexible Design Processes to Reduce the Early Obsolescence of Buildings
IRJESJOURNAL
 
Research on The Bottom Software of Electronic Control System In Automobile El...
Research on The Bottom Software of Electronic Control System In Automobile El...Research on The Bottom Software of Electronic Control System In Automobile El...
Research on The Bottom Software of Electronic Control System In Automobile El...
IRJESJOURNAL
 

More from IRJESJOURNAL (20)

Drying of agricultural products using forced convection indirect solar dryer
Drying of agricultural products using forced convection indirect solar dryerDrying of agricultural products using forced convection indirect solar dryer
Drying of agricultural products using forced convection indirect solar dryer
 
The Problems of Constructing Optimal Onboard Colored RGB Depicting UAV Systems
The Problems of Constructing Optimal Onboard Colored RGB Depicting UAV SystemsThe Problems of Constructing Optimal Onboard Colored RGB Depicting UAV Systems
The Problems of Constructing Optimal Onboard Colored RGB Depicting UAV Systems
 
Flexible Design Processes to Reduce the Early Obsolescence of Buildings
Flexible Design Processes to Reduce the Early Obsolescence of BuildingsFlexible Design Processes to Reduce the Early Obsolescence of Buildings
Flexible Design Processes to Reduce the Early Obsolescence of Buildings
 
Study on Performance Enhancement of Solar Ejector Cooling System
Study on Performance Enhancement of Solar Ejector Cooling SystemStudy on Performance Enhancement of Solar Ejector Cooling System
Study on Performance Enhancement of Solar Ejector Cooling System
 
Flight Safety Case Study: Adi Sucipto Airport Jogjakarta - Indonesia
Flight Safety Case Study: Adi Sucipto Airport Jogjakarta - IndonesiaFlight Safety Case Study: Adi Sucipto Airport Jogjakarta - Indonesia
Flight Safety Case Study: Adi Sucipto Airport Jogjakarta - Indonesia
 
A Review of Severe Plastic Deformation
A Review of Severe Plastic DeformationA Review of Severe Plastic Deformation
A Review of Severe Plastic Deformation
 
Annealing Response of Aluminum Alloy AA6014 Processed By Severe Plastic Defor...
Annealing Response of Aluminum Alloy AA6014 Processed By Severe Plastic Defor...Annealing Response of Aluminum Alloy AA6014 Processed By Severe Plastic Defor...
Annealing Response of Aluminum Alloy AA6014 Processed By Severe Plastic Defor...
 
Evaluation of Thresholding Based Noncontact Respiration Rate Monitoring using...
Evaluation of Thresholding Based Noncontact Respiration Rate Monitoring using...Evaluation of Thresholding Based Noncontact Respiration Rate Monitoring using...
Evaluation of Thresholding Based Noncontact Respiration Rate Monitoring using...
 
Correlation of True Boiling Point of Crude Oil
Correlation of True Boiling Point of Crude OilCorrelation of True Boiling Point of Crude Oil
Correlation of True Boiling Point of Crude Oil
 
Combined Geophysical And Geotechnical Techniques For Assessment Of Foundation...
Combined Geophysical And Geotechnical Techniques For Assessment Of Foundation...Combined Geophysical And Geotechnical Techniques For Assessment Of Foundation...
Combined Geophysical And Geotechnical Techniques For Assessment Of Foundation...
 
ICT governance in Higher Education
ICT governance in Higher EducationICT governance in Higher Education
ICT governance in Higher Education
 
Gobernanzade las TIC en la Educacion Superior
Gobernanzade las TIC en la Educacion SuperiorGobernanzade las TIC en la Educacion Superior
Gobernanzade las TIC en la Educacion Superior
 
The Analysis and Perspective on Development of Chinese Automotive Heavy-duty ...
The Analysis and Perspective on Development of Chinese Automotive Heavy-duty ...The Analysis and Perspective on Development of Chinese Automotive Heavy-duty ...
The Analysis and Perspective on Development of Chinese Automotive Heavy-duty ...
 
Research on The Bottom Software of Electronic Control System In Automobile El...
Research on The Bottom Software of Electronic Control System In Automobile El...Research on The Bottom Software of Electronic Control System In Automobile El...
Research on The Bottom Software of Electronic Control System In Automobile El...
 
Evaluation of Specialized Virtual Health Libraries in Scholar Education Evalu...
Evaluation of Specialized Virtual Health Libraries in Scholar Education Evalu...Evaluation of Specialized Virtual Health Libraries in Scholar Education Evalu...
Evaluation of Specialized Virtual Health Libraries in Scholar Education Evalu...
 
Linking Ab Initio-Calphad for the Assessment of the AluminiumLutetium System
Linking Ab Initio-Calphad for the Assessment of the AluminiumLutetium SystemLinking Ab Initio-Calphad for the Assessment of the AluminiumLutetium System
Linking Ab Initio-Calphad for the Assessment of the AluminiumLutetium System
 
Thermodynamic Assessment (Suggestions) Of the Gold-Rubidium System
Thermodynamic Assessment (Suggestions) Of the Gold-Rubidium SystemThermodynamic Assessment (Suggestions) Of the Gold-Rubidium System
Thermodynamic Assessment (Suggestions) Of the Gold-Rubidium System
 
Elisa Test for Determination of Grapevine Viral Infection in Rahovec, Kosovo
Elisa Test for Determination of Grapevine Viral Infection in Rahovec, KosovoElisa Test for Determination of Grapevine Viral Infection in Rahovec, Kosovo
Elisa Test for Determination of Grapevine Viral Infection in Rahovec, Kosovo
 
Modelling of Sealing Elements Wearing
Modelling of Sealing Elements WearingModelling of Sealing Elements Wearing
Modelling of Sealing Elements Wearing
 
Determining Loss of Liquid from Different Types of Mud by Various Addictives ...
Determining Loss of Liquid from Different Types of Mud by Various Addictives ...Determining Loss of Liquid from Different Types of Mud by Various Addictives ...
Determining Loss of Liquid from Different Types of Mud by Various Addictives ...
 

Recently uploaded

Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
drjose256
 
Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...
IJECEIAES
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
benjamincojr
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
MaherOthman7
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
BalamuruganV28
 
Microkernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemMicrokernel in Operating System | Operating System
Microkernel in Operating System | Operating System
Sampad Kar
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
rahulmanepalli02
 

Recently uploaded (20)

Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
 
Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...Performance enhancement of machine learning algorithm for breast cancer diagn...
Performance enhancement of machine learning algorithm for breast cancer diagn...
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
 
electrical installation and maintenance.
electrical installation and maintenance.electrical installation and maintenance.
electrical installation and maintenance.
 
Artificial Intelligence in due diligence
Artificial Intelligence in due diligenceArtificial Intelligence in due diligence
Artificial Intelligence in due diligence
 
handbook on reinforce concrete and detailing
handbook on reinforce concrete and detailinghandbook on reinforce concrete and detailing
handbook on reinforce concrete and detailing
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
Piping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfPiping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdf
 
Software Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdfSoftware Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdf
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptx
 
Microkernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemMicrokernel in Operating System | Operating System
Microkernel in Operating System | Operating System
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Basics of Relay for Engineering Students
Basics of Relay for Engineering StudentsBasics of Relay for Engineering Students
Basics of Relay for Engineering Students
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Dynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptxDynamo Scripts for Task IDs and Space Naming.pptx
Dynamo Scripts for Task IDs and Space Naming.pptx
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 

A Study in Financial Analysis of Marble Manufacturing Process

  • 1. International Refereed Journal of Engineering and Science (IRJES) ISSN (Online) 2319-183X, (Print) 2319-1821 Volume 6, Issue 4 (April 2017), PP.56-60 www.irjes.com 56 | Page A Study in Financial Analysis of Marble Manufacturing Process Armash Ansari1 , Hamzaa Gunawala2 , Ali Asgar Shirazi3 , Aalisha Nayakwadi4 1,2,3,4 (Civil Department, M.H. Saboo Siddik College of Engineering / Mumbai University, Maharashtra, India) Abstract :- The motive of the work is to analyze a marble industry financially, based on the idea of Life Cycle Cost Analysis (LCCA). LCCA is an important tool to understand the most lucrative option among different competing alternatives to purchase, own, operate, maintain and eventually dispose of an object or process. All the costs are discounted to a present-day value known as Net Present Value (NPV). NPV helps to choose a better investment option or even let us understand that whether the investment is even profitable or not. The crux of the matter is justified by taking multiple aspects under consideration viz., Owning Cost, Operating Cost, Maintenance and repairs. The values were projected for the next 20 years considering it as the life of the industry. Keywords: - Life Cycle Cost Analysis, Net Present Value, Owning Cost, Operating Cost, Maintenance & Repairs. I. INTRODUCTION Financial analysis is wisely known as accounting analysis. Its prime objective has been to assess or to figure out, define and quantify certain financial traits of a business, sub-business or even project. Those financial traits can refer to the business’ viability, stability or profitability. This basically imply that by performing financial analysis, one can be able to predict with some degree of certainty if a business will be able to continue on it course the same way as before or if it will be discontinued and, if so, for what reasons. And eventually, the financial analysis allows top management to decide on the best alternative direction in which the company can go. II. RESEARCH METHODOLOGY The initial cost, machine cost as well as repair and maintenance cost are evaluated. The data of electricity rates from the year 2002 is taken into consideration and is projected for the next 20 years i.e. till 2036. The data of initial cost of machines and factory were collected from various sites i.e. the marble industries. The cost of electricity as per rates provided by “DNH (Dadra Nagar Haveli) Power Distribution Corporation Limited” is observed. The electricity bills provided by the factory ensures the unit consumed by various equipments. This consumptions as per rates fluctuating in previous years is been projected till the year 2036. The repair and maintenance is collected from the industry and is projected further depending upon the variations in market rates of materials and machines parts. The labor wages are taken as per the District Scheduled Rates (DSR) from the year 2006 and the pattern of fluctuations is been projected till the year 2036. The pricing of the raw materials i.e. Indian marbles, is decided as per the data from 2007 and accordingly been carried till 2036. In the transportation department, fuel cost and transportation taxes are put together to evaluate the total cost under transport. 2.1 Capital Cost The capital cost includes the establishment cost, equipment cost and the cost of raw materials. These all factors also refers to the initial cost. 2.1.1 Establishment Cost Table 1 1 Foundation INR 700 Per Sq. Ft. 2 Machine Foundation INR 1800000 Per Unit 3 Office Bulding Foundation INR 1200 Per Sq. Ft. 4 Compound Wall INR 2500 Per Mt 5 Pavement/ Roads INR 1250 Per Sq. Mt
  • 2. A Study in Financial Analysis of Marble Manufacturing Process www.irjes.com 57 | Page 6 DRAINS INR 25 Per Sq. Ft. 7 PLUMBING INR 5 Per Sq. Ft. 8 ELECTRIC CONNECTION INR 50 Per Sq. Ft. 2.1.2 Equipments Used  Crane – INR 3000000  Block Turner – INR 800000  Monoblock Dresser – INR 2200000  Trolley – INR 800000  Gangsaw – INR 7000000 (Per Unit)  Resin Line – INR 7000000  Polishing Line – INR 5500000  Recycling Tank – INR 1800000 2.1.3 Raw Materials Raw materials required by the industry per year is 5000 tonnes. The rate per tonne of raw materials in 2016 is INR 6500, this makes the yearly expense on raw material (i.e. for 5000 tonnes) INR 32500000. This data of per tonne of raw materials when projected till 2036 as shown in graph below gives rate per tonne as INR 20995. This data reflects the expense for the year 2036 on raw materails as INR 104975000. This shows a whopping increment of around 223% from 2016 to 2036 per tonne of raw material. Fig.1 ( Rates/tonne of Raw Materials) 2.2 Operating Cost 2.2.1 Electricity As per the rates provided by DNH Power Distribution Corporation Limited – as of 2002 the rate per unit of electricity was INR 2.45. After the projections till the year 2036, this rate turns out to be INR 8.44 per unit of electricity used. This totally shows a price hike of about 244.48% per unit. The number of units of electricity consumed per month in the industry was 35000 units, as provided by the industry. This makes the yearly consumption of 420000 units of electricity. The following graph shows the variations in the unit rate of electricity. The dotted curve represents the projection till the 2036 and the solid line shows the rates collected from the industry.
  • 3. A Study in Financial Analysis of Marble Manufacturing Process www.irjes.com 58 | Page Fig.2 (Rate/unit of electricity) 2.2.2 Transport In the transportation department multiple factors are taken into consideration viz. truck capacity, fuel cost & road taxes. The truck capacity is 30 tonnes i.e. only 30 tonnes of raw materials can be transported in one trip. Considering the variations in fuel cost which are provided in the graph below, the transportation charges fluctuates. The truck vendor charges per tonne of the material transported. As per the data of 2002 cost/tonne is INR 1110 which makes a trip of carrying 30 tonnes of raw materials of INR 33300. Similarly, in 2016 per trip cost jumps to INR 64350 & finally as projected, in 2036 it reaches INR 100350 per trip i.e. 55.944% increase over the years. Now, if we look at the projections of fuel cost we find that in 2016 average cost per litre of fuel is INR 50.8 and the projection expects it to become INR 93.673 in the year 2036, which witnesses an increment of 84.395%. Fig.3 (Cost/litre of fuel) 2.2.3 Labours There were 15 unskilled and 12 skilled labours required in the industry. The wages of these labours were decided as per the data of District Schedule Rates (DSR). The wages for the year 2016 for unskilled and skilled labours were INR 350 & INR 425 respectively. This value after projections comes out to be INR 525 for unskiled and INR 780 for skilled labours. This totally shows an addition of 50% for unskilled and 83.52% for skilled.
  • 4. A Study in Financial Analysis of Marble Manufacturing Process www.irjes.com 59 | Page Fig.4 (Y-axis shows the daily wages in INR) Fig.5 (Y-axis shows the daily wages in INR) 2.3 Maintenance & Repair Cost 2.3.1 CCI (Construction Cost Index) Construction Cost Index is a factor which evaluates variations in overall cost of construction in various types of projects. It is the monthly measure of Construction Cost movement for the Indian Construction Industry provided by CIDC (Construction Industry Development Council). CIDC decides the base CCI and releases monthly index of following years. The CCI helps to figure out the repair and maintenance costs. As per the data of CIDC the base CCI in October 2007 is 100. This value turns out to be 143.44 in October 2016. Taking every month data from October 2002 to October 2016 and projecting it to 2036 gives us the CCI of 249.075. This index reflects the maintenance and repair cost as INR 500000 for a CCI of 142.83 in 2016. Similarly, the index value of 2036 i.e. 249.075 projects the repair and maintenance cost as INR 936400. Fig.6 (CCI)
  • 5. A Study in Financial Analysis of Marble Manufacturing Process www.irjes.com 60 | Page III. CONCLUSION Finally, the Capital Cost, Operating Cost and & Maintenance & Repair Cost are added for the determination of the NPV. As NPV helps to know the present value of the investment and also determines whether a venture is lucrative or not. NPV at different rate of return is evaluated in the table below. Table 2 (NPV) RATE OF RETURN VALUE (INR) 4% 165649512.54 8% 112687591.49 10% 95041186.89 Another important aspect of the evaluation is the “Payback Period”. The payback period is the duration at which the invested amount is recovered, which is simply calculated by observing the difference in the Inflows and the Outflows. The moment at which the investment is recovered is noted as the payback period. Here the payback period is 10 years i.e. 2026 is the recovery year. Which implies that after 2026 every penny flowed in is the profit. The graph below shows the relationship between the Inflow, Outflow and the Net Flow. Fig.7 Here the blue line shows inflow, grey line represents outflow & the red line represents net flow. ACKNOWLEDGEMENTS We sincerely appreciate Dr. Shagufta Sayed for giving us an opportunity to work on this topic. We are grateful for her support and guidance which has helped us to expand our horizon of thoughts and experience. REFERENCES [1]. Sayed, Shagufta Sajid Mumtaaz, and Priyadarshi H. Sawant. "Life-cycle cost and financial analysis of energy components in mass housing projects–A case project in sub-urban India." International Journal of Sustainable Built Environment 4.2 (2015): 202-221. [2]. Desai, Dhruv J., et al. (2016) "ENGINEERING ECONOMICS AND LIFE CYCLE COST ANALYSIS." [3]. Mumtaaz Sayed, Shagufta Sajid, and Priyadarshi H. Sawant. "Financial Feasibility Analysis of Water Conservation Components in Mass Housing Projects: Suburban Indian Case Review." Journal of Architectural Engineering 22.2 (2016): 04016001. [4]. Arpke, Angela, and Neil Hutzler. "Operational life-cycle assessment and life-cycle cost analysis for water use in multioccupant buildings." Journal of Architectural Engineering 11.3 (2005): 99-109. [5]. Batchelor, C., C. Fonseca, and S. Smits. "Life-cycle costs of rainwater harvesting systems." Occasional paper 46 (2011).