SlideShare a Scribd company logo
1 of 9
Download to read offline
IOSR Journal of Engineering (IOSRJEN) www.iosrjen.org
ISSN (e): 2250-3021, ISSN (p): 2278-8719
Vol. 05, Issue 01 (January. 2015), ||V1|| PP 10-18
International organization of Scientific Research 10 | P a g e
Assessment of Waste Stabilization Ponds for The Treatment of
Municipal Wastewater in Upper Egypt.
A. M. AbdEL-rahman,1
Ahmed. AbdEL-halim2
, Ali. A. M. Gad2
, M. Hashem2
.
1 M.SC. Researcher, Civil Engineering Department, Faculty of Engineering, Assiut University, Egypt.
2Associate Professor, Civil Engineering Department, Faculty of Engineering, Assiut University, Egypt.
Abstract: - Sewage can be defined as discharges from domestic and sanitary appliances or simply a complex
mixture of materials from varied sources. This complex mixture contains both soluble and insoluble materials.
Waste stabilization ponds are recognized as the solution to domestic wastewater treatment in developing
countries. The use of such natural systems is considered to be very important. This is because it is cheap, easy
to construct and they do not require high skilled laborite. In this study, samples were taken from the raw
wastewater and effluents of treatment ponds of Elzaraby waste stabilization ponds over a period of one year.
The treated effluent is either discharged into surface waters or reused for agricultural irrigation. The samples
were analyzed according to the standard methods. The results obtained from the samples taken in different
seasons showed the maximum wastewater temperature were in the influent (350
C) in summer season, and the
minimum were (180
C) in winter season. The values of hydrogen power (pH) and dissolved oxygen (DO) is
increased along the ponds series. The average annual overall removal efficiency of TSS and TDS were 70%
and 26%, while the maximum overall efficiency of BOD5 was in summer (88%) and minimum efficiency was
(73%) in winter season.
I. INTRODUCTION
The increasing demands for domestic wastewater due to population growth, improvement in living
standards and the growing industrial sector will increase the total amount of wastewater available for reuse as
an important source. The major issues include public health and environmental hazards as well as technical,
institutional, socio-cultural and sustainability aspects. Waste stabilization ponds (WSP) are large shallow basins
enclosed by earth embankments in which raw wastewater is treated by entirely natural processes involving both
algae and bacteria[1], WSPs are usually the most appropriate method for domestic and municipal wastewater
treatment in developing countries, where the climate is most favorable for their operation. WSPs are low-cost,
low-maintenance, highly efficient. The only energy they use is direct solar energy, so they do not need any
electromechanical equipment, saving expenditure on electricity and more skilled operation. WSPs can be
classified with respect to the types of biological activity occurring in a pond. Three types are distinguished;
anaerobic, facultative and maturation ponds. Usually WSPs system comprises a single series of the
aforementioned three ponds types or several such series in parallel [2].
Sanitation services in Egypt are less developed than water supply services. At present, there are more
than 323 wastewater treatment plants in the country. The capacity of wastewater treatment plants has increased
by 10 times in the last two decades. The existing capacity is 12 million m3/day. Length of wastewater collection
networks / sanitation pipelines increased from 28,000 km in 2005 to 34,000 km in 2010 [3]. Urban coverage
with improved sanitation gradually increased from 45% in 1993 to 56% in 2004, reaching 100% in urban and
40% in rural areas by the end of 2012. The low coverage in rural sanitation results in serious problems of water
pollution and health conditions due to the discharge raw domestic wastewater directly into
the waterways [4].
The main objectives of this study is to evaluate the performance of waste stabilization ponds (WSPs) in
Elzaraby village, Abutig, Assiut governorate Egypt. some physical and biological characteristics of the waste
water through the treatment plant are investigated.
II. MATERIAL AND METHODS
2.1. Description of wastewater treatment plant
A recent full-scale system of WSPs was constructed in 2009 in Elzaraby village in Upper Egypt (Fig.1).
Elzaraby WSPs are designed to treat domestic waste water from Abutig city, with mean daily design flow rate
of 16500 m3
/day.
Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt.
International organization of Scientific Research 11 | P a g e
Fig. 1. Elzaraby Waste stabilization ponds.
The physical characteristics of the ponds are given in (Table. 1). The wastewater after screening is
used to feed two parallel anaerobic ponds (A1~A2). The two effluent of the anaerobic ponds is used to feed two
facultative ponds (F1~F2), the effluent from the facultative ponds passes through two parallel lines of
maturation ponds. Each line comprising a first, second and third maturation pond, (M1~M6). The treated
effluent is either discharged into surface water or reused for agriculture irrigation.
Table 1. Design basis for physical and operational characteristic of Elzaraby WSPs.
Ponds
Dimensions (m)of the water body Design basis
Bottom/top
Length
(m)
Bottom/top
Width
(m)
Water
Depth
(m)
Water
Volume
(m3)
Flow rate
(m3/day)
HRT
(day)
A1-A2 146/163.6 45.4/63 4.4 37257 8250 4.5
F1-F2 277.8/288.8 154/164 2.5 112680 8250 14
M1-M2 158/164 104/110 1.5 25854 8250 3.0
M3-M4 158/164 104/110 1.5 25854 8250 3.0
M5-M6 158/164 104/110 1.5 25854 8250 3.0
Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt.
International organization of Scientific Research 12 | P a g e
2.2 Wastewater sampling
Wastewater samples were collected monthly from the plant through a period of one years, from Spt.
2011 to Aug. 2012 to study the seasonal removal efficiency of LAS in natural WSPs, Monthly-samples of raw
wastewater after screening and effluents from each type ponds were collected (S1to S5) as shown in ( Fig. 2) of
the sampling points. The samples were collected in plastic containers of 2 liter capacity.
Fig. 2. The layout of Elzaraby WSPs
The following parameter were studied; water temperature (T), (pH) value, dissolved oxygen (DO), biochemical
oxygen demand (BOD5), total suspended solid (T.S.S), total dissolved solids (T.D.S), electrical conductivity
(EC),Turbidity(FTU)as in (table.2). All analysis have been carried out according to standard methods for
examination of water and waste water (APHA, 2005) [5].
Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt.
International organization of Scientific Research 13 | P a g e
III. RESULTS AND DISCUSSIONS
In this study, a complete one year monthly samples of wastewater were taken from WSPs of Elzaraby plant
from locations S1~S5 totally 60 samples. The average seasonal values of T, pH, DO, TSS, TDS,EC, BOD5 and
Tur through the ponds were calculated.
3.1 Wastewater temperatures in the ponds
The wastewater temperature for the four season of the year from (Spt. 2011 to Aug. 2012) through the water
pass in WSPs are illustrated in (Fig. 3). Measured temperatures of wastewater through the ponds were ranged
between 18 0
C and 35 0
C. The maximum wastewater temperature in anaerobic ponds was 31.8 0
C in summer
season while the minimum was 22.1 0
C in winter season. In facultative ponds, the temperature were ranged
between 20.1 0
C to 30.6 0
C in winter and summer, respectively. In the last maturation ponds the minimum and
maximum temperature were 18 0
C in winter and 27 0
C in summer season.
Fig. 3. Wastewater temperature for different season through the wastewater pass in Elzaraby WSPs.
15.00
18.00
21.00
24.00
27.00
30.00
33.00
36.00
Raw waste water(s1)Anaerobic pond(s2)Facultative pond(s3)Maturation pond(s4)Maturation pond(s5)
Wastewatertemperature0C
Autumn
winter
Spring
Summer
Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt.
International organization of Scientific Research 14 | P a g e
As shown in (Fig. 3), it is clear that the wastewater temperature decreases along the pass of the ponds and
maximum temperature occurs in summer season[6]. The decreasing rate is find to be much higher in the
summer season (80
C) than that in the winter season (4.40
C), this due to the higher evaporation rate from the
surface of the ponds which accomplished with higher latent heat in summer compared with that in winter
season.
3.2 pH variations along the pond series
The average seasonal variation of the measured pH value for the raw sewage and effluent from each
type of ponds in the period from Spt. 2011 to Aug. 2012 are presented in (Fig. 4). The average pH value of raw
wastewater ranged between 6.63~7.4, while increased in anaerobic ponds to be 6.75 and 7.8 as minimum and
maximum values in winter and summer seasons, respectively. In maturation ponds the measured pH recorded a
maximum value in summer 8.8 and a minimum value in winter was 7.7. As shown in Figure, the pH values of
the ponds’
wastewater has it’
s higher values in the summer season, and it increases along the wastewater pass
with the highest values in the last maturation ponds. The increased of pH value in maturation ponds is due to
rapid photosynthesis by the pond algae, which consumes Carbon dioxide (CO2 )faster than it can be replaced by
bacterial respiration; as a result carbonate and bicarbonate ions dissociate. Algae fix the resulting CO2 from the
dissociation while hydroxyl ions (OH-
) accumulate so raising the pH value. Similar results were found by[7].
3.3 DO concentration along the ponds series
From (Fig -5) it is clear that the DO average concentration values for four season along Elzaraby WSPs series
were increased along the ponds and recorded a maximum values in summer season and minimum values in
winter season (ranged from 0.0 to 6 mg/l), while the mean values in the ponds during autumn and spring season
are located in the intermediate range between summer and winter season. It is clear that the value of DO in the
summer season increases relative to the winter season, because the rate of algae photosynthesis and the cellular
metabolism of microorganisms in the ponds are enhanced by high temperatures and retarded by low
temperatures. Algal oxygen production is directly related to photosynthesis, which depends on temperature
variations. From the figure [8].
Fig. 4. Seasonal variation of pH value measured along Elzaraby WSPs.
6.00
6.50
7.00
7.50
8.00
8.50
9.00
Raw waste
water(s1)
Anaerobic
pond(s2)
facultative
pond(s3)
maturation
pond(s4)
maturation
pond(s5)
pHvalue
Autumn
winter
Spring
Summer
Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt.
International organization of Scientific Research 15 | P a g e
Fig. 5. Seasonal concentration value of DO measured along Elzaraby WSPs.
3-4 T.S.S values along the ponds series
For a comparison between the mean values of the measured T.S.S in the different four seasons of the
year are plotted as shown in (Fig. 6 ). The average T.S.S values in raw wastewater recorded 202, 153, 227 and
326 mg/l in Autumn, winter, Spring and summer seasons respectively, while they recorded in the effluent in last
maturation ponds 74,75, 105 and 110 mg/l in Autumn, winter, Spring and summer seasons respectively. From
the figure it is clear that T.S.S concentration values increased in hot seasons and decreased in cold seasons. The
reason of these phenomena is that high wastewater in hot season accomplished with high photosynthesis and
evaporation rates. High rate of photosynthesis generates many new cells of algae which increases the values of
the T.S.S in the ponds. Also, a high evaporation rate in the summer tends to increase the T.S.S concentration in
the ponds and T.S.S concentration values is decreased along the ponds series [9].
Fig. 6. Average Seasonal variation values of measured T.S.S along the ponds series at Elzaraby WSPs.
0.00
1.00
2.00
3.00
4.00
5.00
6.00
Raw waste
water(s1)
Anaerobic
pond(s2)
Facultative
pond(s3)
Maturation
pond(s4)
Maturation
pond(s5)
DOconcentrationmg/l
Autumn
winter
Spring
Summer
60
80
100
120
140
160
180
200
220
240
260
280
300
320
Raw waste
water(s1)
Anaerobic
pond(s2)
Facultative
pond(s3)
Maturation
pond(s4)
Maturation
pond(s5)
Autumn
winter
Spring
Summer
Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt.
International organization of Scientific Research 16 | P a g e
3-5 T.D.S values along the ponds series
For comparison the mean annual values of the measured T.D.S in the different four seasons of the year are
plotted as shown in (Fig. 7), from the figure it is clear that T.D.S concentration values decreased along the
ponds series [ 10]. From the it is clear that the overall removal efficiency of T.D.S increased in hot seasons and
decreased in cold seasons. The reason of these phenomena is that high wastewater temperature in hot season
accomplished with high photosynthesis and high evaporation rates, the result showed higher removal efficiency
of TDS than other study in Ethiopia the avarege annual removal efficiency of the ponds was 26%.
Fig. 7. Average Seasonal variation values of measured T.D.S along the ponds series at Elzaraby WSPs.
3-6 Average Turbidity values along the ponds series.
As shown in (Fig.8), in the period of investigation turbidity concentration values increased in hot seasons and
decreased in cold seasons, and the overall removal efficiency of turbidity from Elzaraby WSPs in summer
menthes is higher than other menthes. The reason of these phenomena is that high wastewater temperature in
hot season [11] .
Fig. 8. Average Seasonal variation values of measured Turbidity along the ponds series at Elzaraby WSPs.
3-7 Average values of measured conductivity along the ponds series for the four seasons.
For comparison the mean values of the measured EC in different four seasons of the year are plotted as
shown in (Fig. 9). The average EC values in raw wastewater recorded 1260, 1169, 1285 and 1553 μs/cm in
Autumn, winter, Spring and summer seasons respectively, while they recorded in the effluent in last maturation
ponds 1070, 855, 1121 and 1249 μs/cm in Autumn, winter, Spring and summer seasons respectively. From the
250
300
350
400
450
500
550
600
Raw waste
water(s1)
Anaerobic
pond(s2)
Facultative
pond(s3)
Maturation
pond(s4)
Maturation
pond(s5)
Autumn
winter
Spring
Summer
0
50
100
150
200
250
300
350
400
450
Raw waste
water(s1)
Anaerobic
pond(s2)
Facultative
pond(s3)
Maturation
pond(s4)
Maturation
pond(s5)
Autumn
winter
Spring
Summer
Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt.
International organization of Scientific Research 17 | P a g e
figuer It is clear that the maximum EC values occur in the summer season, while the minimum EC values are in
the winter season because high air and water temperature and high evaporation rate occurs in summer season
relative to other seasons[8].
Fig. 9. Average Seasonal variation values of measured EC along the ponds series at Elzaraby WSPs.
3-8 BOD average seasonal concentration value
For comparison the mean values of the measured unfiltered BOD5 in different four seasons of the year
are plotted as shown in (Fig. 10). The average concentration of BOD5 values in raw wastewater were ranged
between 426.3 mg /l to 305 mg/l in summer and winter seasons respectively, while they recorded in anaerobic
ponds 314~167.5 mg/l as a maximum and a minimum values. In facultative ponds BOD5 concentrations were
found to be ranged between 275~111 mg/l, while the effluent of the last maturation ponds has BOD5
concentrations of 43.5, 51.5, 55 and 73.3 mg/l in autumn, winter, spring and summer seasons, respectively.
Fig. 10. Seasonal concentration value of BOD measured along Elzaraby WSPs.
From (Fig. 10). It is clear that the maximum BOD5 values occur in the summer season, while the minimum
BOD5 values are in the winter season. The reason of this phenomenon is that high air and water temperature and
sun light intensity occurs in summer season relative to other seasons, which increased algal grow [12].
700
800
900
1000
1100
1200
1300
1400
1500
1600
Raw waste
water(s1)
Anaerobic
pond(s2)
Facultative
pond(s3)
Maturation
pond(s4)
Maturation
pond(s5)
Autumn
winter
Spring
Summer
30
80
130
180
230
280
330
380
430
Raw waste
water(s1)
Anaerobic
pond(s2)
Facultative
pond(s3)
Maturation
pond(s4)
Maturation
pond(s5)
BODconcentrationmg/l
Autumn
winter
Spring
Summer
Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt.
International organization of Scientific Research 18 | P a g e
IV. CONCLUSION
1- The wastewater temperatures of the plant were decreased along the ponds series and recorded 350
C as a
higher values in anaerobic ponds in sumer season, while recorded 180
C as minimum values in winter
season in the last maturation ponds.
2- The average variation values of measured pH of Elzaraby WSPs is increased along the ponds series from
6.36 (minimum values occurred in raw wastewater) to 8.8 as a maximum values in the last maturation
ponds, so faecal bacteria die very quickly and the photosynthesis activity of algae becomes less. Also, the
high pH values occurred in ponds leads to high efficiency removed of heavy metal.
3- Concentration values of measured DO is increased along the pond series and recorded maximum values in
summer season in the last maturation ponds.
4- The electrical conductivity EC is recorded variation values and changed seasonally along the ponds series,
the values of EC increased in summer season relative to other months.
5- The maximum overall removal efficiency of measured T.S.S was 70% in summer season and recorded
48% as minimum values in winter season, furthermore the average over all removal efficiency of T.S.S
from the ponds series along the study period was 59%. The average concentration values of the last
maturation ponds T.S.S was 85 mg/l so, the treated wastewater allow to be reused in agriculture in grade
(C) as in Egyptian Code for the Use of Treated Wastewater in Agriculture.
6- The maximum overall removal efficiency of BOD5 was in summer (88%) and minimum efficiency was
(73%) in winter season, while The average values of measured BOD5 in the last maturation ponds was 60
mg/l which allow to be reused in agriculture in grade (B,C) as in Egyptian Code for the Use of Treated
Wastewater in Agriculture
REFERENCE
[1] Mara, D. D. "Domestic Wastewater Treatment in Developing Countries", Earth scan, London , Sterling,
VA, 2004
[2] Ramadan, H., Ponce, V. "Design and Performance of Waste Stabilization Ponds".info@virginglobe.com
Version 081218, 2011
[3] Abdel- Kader, A.M., Abdel-Rassoul, S.M. (2010)., Prospects of water conservation in Egypt(special
reference to wastewater reuse).Fourteenth international water technology conference, 25-27 March 2010.
[4] MWRI/USAID (2000): Policies and procedures for improved urban wastewater discharge and reuse.
Appendix 2: Health impact and water quality standards in wastewater irrigation. Report No.34, Egyptian
Ministry of Water Resources and Irrigation and US Agency for International Development, available
online at http://pdf.usaid. gov/pdf_docs/PNACS687.pdf (last accessed 3 January 2013).
[5] APHA (2005). Standard methods for the examination of water and wastewater, 20th and 21st ed.
American Public Health Association, Washington, DC.
[6] Haydeh Hayati1, Mohammadreza Doosti1, Mohammadhossein Sayadi., Performance evaluation of waste
stabilization pond in Birjand, Iran for the
[7] treatment of municipal sewage . Civil and Environmental Engineering Department, University of
Birjand, Birjand, Iran., 2013
[8] Bastawey. M.A. (2010). Diurnal variation of some physical – chemical parameters in natural waste
stabilization ponds in upper Egypt.
[9] Nasr. F.A., El-Ashmawy. A., Eltaweel. G., El-Shafai. S.A. (2007). Waste Stabilization Ponds for
Wastewater Treatment and Reuse in Egypt. Environmental Sciences Division, Department of Water
Pollution Research
[10] Ebrahimi, A., Ehrampoosh, M., Samaie, M., Ghelmani, S., Talebi, P., Dehghan, M., Honardoost, A.,
Shahsavani, E., 2010. Removal Efficiency of Linear Alkyl Benzene Sulfonate (LAS) in Yazd
Stabilization Pond. Scientific Information Database, Iran.
[11] Hasan, A.’ Program of Water and Environmental Engineering 461652, Spring 2011 Natural WWT, 2-
WSP.
[12] Ram Kumar Kushwah, Avinash Bajpai, Suman Malik and Archana Singh, Assessment of Some
Physicochemical Parameters in Influent and Effluent and Water from Sewage Treatment Plant at Bhopal,
M.P. (India) Water Research & Development Vol. 1 | No.1 | 59-62 | January-April | 2011
[13] Gad, A., Ali, A., 2005. The pereformance of an existing system of waste stabilization ponds in upper
Egypt. In: First Ain Shams University International Conference on Environmental Engineering.

More Related Content

What's hot

IRJET-Study of Physcio-Chemical and Bacteriological Analysis of Indrayani Riv...
IRJET-Study of Physcio-Chemical and Bacteriological Analysis of Indrayani Riv...IRJET-Study of Physcio-Chemical and Bacteriological Analysis of Indrayani Riv...
IRJET-Study of Physcio-Chemical and Bacteriological Analysis of Indrayani Riv...IRJET Journal
 
Water supply and sewerage engineering
Water supply and sewerage engineeringWater supply and sewerage engineering
Water supply and sewerage engineeringInzamul Mehedi
 
Water quality variables from peerwadi well, uran
Water quality variables from peerwadi well, uranWater quality variables from peerwadi well, uran
Water quality variables from peerwadi well, uranPrabhakar Pawar
 
An Assessment of Water Quality of Gomati River Particular Relevant To Physico...
An Assessment of Water Quality of Gomati River Particular Relevant To Physico...An Assessment of Water Quality of Gomati River Particular Relevant To Physico...
An Assessment of Water Quality of Gomati River Particular Relevant To Physico...IJERA Editor
 
IRJET- Water Quality Assesment of Kotithirta –A Holy Temple Lake of Gokar...
IRJET-  	  Water Quality Assesment of Kotithirta –A Holy Temple Lake of Gokar...IRJET-  	  Water Quality Assesment of Kotithirta –A Holy Temple Lake of Gokar...
IRJET- Water Quality Assesment of Kotithirta –A Holy Temple Lake of Gokar...IRJET Journal
 
The Effluent Quality Discharged and Its Impacts on the Receiving Environment ...
The Effluent Quality Discharged and Its Impacts on the Receiving Environment ...The Effluent Quality Discharged and Its Impacts on the Receiving Environment ...
The Effluent Quality Discharged and Its Impacts on the Receiving Environment ...Agriculture Journal IJOEAR
 
Determination-Of-Sources-Of-Water-Pollution
Determination-Of-Sources-Of-Water-PollutionDetermination-Of-Sources-Of-Water-Pollution
Determination-Of-Sources-Of-Water-PollutionCOLLINS KUFFOUR
 
Study of Seasonal Variations in Oxygen Consumption of Estuarine Clam, Meretri...
Study of Seasonal Variations in Oxygen Consumption of Estuarine Clam, Meretri...Study of Seasonal Variations in Oxygen Consumption of Estuarine Clam, Meretri...
Study of Seasonal Variations in Oxygen Consumption of Estuarine Clam, Meretri...ijtsrd
 
Evaluation of physico chemical parameters and microbiological populations o...
Evaluation of physico   chemical parameters and microbiological populations o...Evaluation of physico   chemical parameters and microbiological populations o...
Evaluation of physico chemical parameters and microbiological populations o...eSAT Publishing House
 
Assessment of physico chemical properties and sewage pollution
Assessment of physico chemical properties and sewage pollutionAssessment of physico chemical properties and sewage pollution
Assessment of physico chemical properties and sewage pollutionRaj111yqyqyq
 
Orissa gw wq monitoring and modelling of taldanda canal, orissa
Orissa gw wq monitoring and modelling of taldanda canal, orissaOrissa gw wq monitoring and modelling of taldanda canal, orissa
Orissa gw wq monitoring and modelling of taldanda canal, orissahydrologyproject0
 
11.application of principal component analysis & multiple regression models i...
11.application of principal component analysis & multiple regression models i...11.application of principal component analysis & multiple regression models i...
11.application of principal component analysis & multiple regression models i...Alexander Decker
 
IRJET- Study and Analysis of Changes in Water Quality of Gomti River at diffe...
IRJET- Study and Analysis of Changes in Water Quality of Gomti River at diffe...IRJET- Study and Analysis of Changes in Water Quality of Gomti River at diffe...
IRJET- Study and Analysis of Changes in Water Quality of Gomti River at diffe...IRJET Journal
 

What's hot (20)

IRJET-Study of Physcio-Chemical and Bacteriological Analysis of Indrayani Riv...
IRJET-Study of Physcio-Chemical and Bacteriological Analysis of Indrayani Riv...IRJET-Study of Physcio-Chemical and Bacteriological Analysis of Indrayani Riv...
IRJET-Study of Physcio-Chemical and Bacteriological Analysis of Indrayani Riv...
 
Effect of Increasing Sewage Waste on the Population of Some Microbes of River...
Effect of Increasing Sewage Waste on the Population of Some Microbes of River...Effect of Increasing Sewage Waste on the Population of Some Microbes of River...
Effect of Increasing Sewage Waste on the Population of Some Microbes of River...
 
Hydrological Parameters of East Kolkata Wetlands: Time Series Analysis
Hydrological Parameters of East Kolkata Wetlands: Time Series AnalysisHydrological Parameters of East Kolkata Wetlands: Time Series Analysis
Hydrological Parameters of East Kolkata Wetlands: Time Series Analysis
 
Ep35806817
Ep35806817Ep35806817
Ep35806817
 
Water supply and sewerage engineering
Water supply and sewerage engineeringWater supply and sewerage engineering
Water supply and sewerage engineering
 
Water quality variables from peerwadi well, uran
Water quality variables from peerwadi well, uranWater quality variables from peerwadi well, uran
Water quality variables from peerwadi well, uran
 
An Assessment of Water Quality of Gomati River Particular Relevant To Physico...
An Assessment of Water Quality of Gomati River Particular Relevant To Physico...An Assessment of Water Quality of Gomati River Particular Relevant To Physico...
An Assessment of Water Quality of Gomati River Particular Relevant To Physico...
 
IRJET- Water Quality Assesment of Kotithirta –A Holy Temple Lake of Gokar...
IRJET-  	  Water Quality Assesment of Kotithirta –A Holy Temple Lake of Gokar...IRJET-  	  Water Quality Assesment of Kotithirta –A Holy Temple Lake of Gokar...
IRJET- Water Quality Assesment of Kotithirta –A Holy Temple Lake of Gokar...
 
Analysis of Water Quality of Bharatpur
Analysis of Water Quality of BharatpurAnalysis of Water Quality of Bharatpur
Analysis of Water Quality of Bharatpur
 
The Effluent Quality Discharged and Its Impacts on the Receiving Environment ...
The Effluent Quality Discharged and Its Impacts on the Receiving Environment ...The Effluent Quality Discharged and Its Impacts on the Receiving Environment ...
The Effluent Quality Discharged and Its Impacts on the Receiving Environment ...
 
Determination-Of-Sources-Of-Water-Pollution
Determination-Of-Sources-Of-Water-PollutionDetermination-Of-Sources-Of-Water-Pollution
Determination-Of-Sources-Of-Water-Pollution
 
Study of Seasonal Variations in Oxygen Consumption of Estuarine Clam, Meretri...
Study of Seasonal Variations in Oxygen Consumption of Estuarine Clam, Meretri...Study of Seasonal Variations in Oxygen Consumption of Estuarine Clam, Meretri...
Study of Seasonal Variations in Oxygen Consumption of Estuarine Clam, Meretri...
 
Evaluation of physico chemical parameters and microbiological populations o...
Evaluation of physico   chemical parameters and microbiological populations o...Evaluation of physico   chemical parameters and microbiological populations o...
Evaluation of physico chemical parameters and microbiological populations o...
 
Assessment of physico chemical properties and sewage pollution
Assessment of physico chemical properties and sewage pollutionAssessment of physico chemical properties and sewage pollution
Assessment of physico chemical properties and sewage pollution
 
Orissa gw wq monitoring and modelling of taldanda canal, orissa
Orissa gw wq monitoring and modelling of taldanda canal, orissaOrissa gw wq monitoring and modelling of taldanda canal, orissa
Orissa gw wq monitoring and modelling of taldanda canal, orissa
 
11.application of principal component analysis & multiple regression models i...
11.application of principal component analysis & multiple regression models i...11.application of principal component analysis & multiple regression models i...
11.application of principal component analysis & multiple regression models i...
 
Application of geoaccumulation
Application of geoaccumulationApplication of geoaccumulation
Application of geoaccumulation
 
ESP document
ESP documentESP document
ESP document
 
ANALYSIS OF WATER OF RAIGARH AREA WITH SPECIAL REFERENCE TO HEAVY METALS
ANALYSIS OF WATER OF RAIGARH AREA WITH SPECIAL REFERENCE TO HEAVY METALSANALYSIS OF WATER OF RAIGARH AREA WITH SPECIAL REFERENCE TO HEAVY METALS
ANALYSIS OF WATER OF RAIGARH AREA WITH SPECIAL REFERENCE TO HEAVY METALS
 
IRJET- Study and Analysis of Changes in Water Quality of Gomti River at diffe...
IRJET- Study and Analysis of Changes in Water Quality of Gomti River at diffe...IRJET- Study and Analysis of Changes in Water Quality of Gomti River at diffe...
IRJET- Study and Analysis of Changes in Water Quality of Gomti River at diffe...
 

Similar to C05111018

G046405057
G046405057G046405057
G046405057IOSR-JEN
 
Evaluation of physico chemical quality of water stored in underground reinfor...
Evaluation of physico chemical quality of water stored in underground reinfor...Evaluation of physico chemical quality of water stored in underground reinfor...
Evaluation of physico chemical quality of water stored in underground reinfor...IAEME Publication
 
Comprehensive Assessment of Groundwater from various areas of Aurangabad city...
Comprehensive Assessment of Groundwater from various areas of Aurangabad city...Comprehensive Assessment of Groundwater from various areas of Aurangabad city...
Comprehensive Assessment of Groundwater from various areas of Aurangabad city...IRJET Journal
 
Optimization modeling of water quality in pollution regions of nigeria
Optimization modeling of water quality in pollution regions of  nigeriaOptimization modeling of water quality in pollution regions of  nigeria
Optimization modeling of water quality in pollution regions of nigeriaAlexander Decker
 
IRJET- Analysis of Groundwater Quality of Usilampatti Region in Tamilnadu
IRJET- Analysis of Groundwater Quality of Usilampatti Region in TamilnaduIRJET- Analysis of Groundwater Quality of Usilampatti Region in Tamilnadu
IRJET- Analysis of Groundwater Quality of Usilampatti Region in TamilnaduIRJET Journal
 
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...IRJESJOURNAL
 
IRJET- Analysis of Physico Chemical Parameters of Underground Water Sample fr...
IRJET- Analysis of Physico Chemical Parameters of Underground Water Sample fr...IRJET- Analysis of Physico Chemical Parameters of Underground Water Sample fr...
IRJET- Analysis of Physico Chemical Parameters of Underground Water Sample fr...IRJET Journal
 
Ecological and Agricultural monitoring of Sebou river waters at Kariat Bamoha...
Ecological and Agricultural monitoring of Sebou river waters at Kariat Bamoha...Ecological and Agricultural monitoring of Sebou river waters at Kariat Bamoha...
Ecological and Agricultural monitoring of Sebou river waters at Kariat Bamoha...Agriculture Journal IJOEAR
 
Effect of Earthworms on Distillery Effluent Treatment through Vermifiltration
Effect of Earthworms on Distillery Effluent Treatment through VermifiltrationEffect of Earthworms on Distillery Effluent Treatment through Vermifiltration
Effect of Earthworms on Distillery Effluent Treatment through VermifiltrationIJERA Editor
 
To Study the Effect of Municipal Treated Effluent on Groundwater Quality Near...
To Study the Effect of Municipal Treated Effluent on Groundwater Quality Near...To Study the Effect of Municipal Treated Effluent on Groundwater Quality Near...
To Study the Effect of Municipal Treated Effluent on Groundwater Quality Near...IRJET Journal
 
Assessment of Physico-Chemical Properties and Toxic Heavy Metals in Water Fro...
Assessment of Physico-Chemical Properties and Toxic Heavy Metals in Water Fro...Assessment of Physico-Chemical Properties and Toxic Heavy Metals in Water Fro...
Assessment of Physico-Chemical Properties and Toxic Heavy Metals in Water Fro...IRJET Journal
 
Characterizing Automobile Industrial Wastewater and its Impacts on Surroundin...
Characterizing Automobile Industrial Wastewater and its Impacts on Surroundin...Characterizing Automobile Industrial Wastewater and its Impacts on Surroundin...
Characterizing Automobile Industrial Wastewater and its Impacts on Surroundin...Dr. Amarjeet Singh
 
THE WATER QUALITY ASSESSMENT IN AND AROUND AMUBULIAR WATERSHED OF PUDUKKOTTAI...
THE WATER QUALITY ASSESSMENT IN AND AROUND AMUBULIAR WATERSHED OF PUDUKKOTTAI...THE WATER QUALITY ASSESSMENT IN AND AROUND AMUBULIAR WATERSHED OF PUDUKKOTTAI...
THE WATER QUALITY ASSESSMENT IN AND AROUND AMUBULIAR WATERSHED OF PUDUKKOTTAI...IRJET Journal
 
Experimental analysis of dew drain water
Experimental analysis of dew drain waterExperimental analysis of dew drain water
Experimental analysis of dew drain waterIRJET Journal
 
Performance of combination of pre ozonation and membrane biological reactor o...
Performance of combination of pre ozonation and membrane biological reactor o...Performance of combination of pre ozonation and membrane biological reactor o...
Performance of combination of pre ozonation and membrane biological reactor o...Alexander Decker
 
IRJET- Water Quality Analysis of Avaragere Lake- A Case Study
IRJET- Water Quality Analysis of Avaragere Lake- A Case StudyIRJET- Water Quality Analysis of Avaragere Lake- A Case Study
IRJET- Water Quality Analysis of Avaragere Lake- A Case StudyIRJET Journal
 
IRJET- Hydrodynamic Integrated Modelling of Basic Water Quality and Nutrient ...
IRJET- Hydrodynamic Integrated Modelling of Basic Water Quality and Nutrient ...IRJET- Hydrodynamic Integrated Modelling of Basic Water Quality and Nutrient ...
IRJET- Hydrodynamic Integrated Modelling of Basic Water Quality and Nutrient ...IRJET Journal
 
Comparative study on performance of coagulants in
Comparative study on performance of coagulants inComparative study on performance of coagulants in
Comparative study on performance of coagulants ineSAT Publishing House
 

Similar to C05111018 (20)

G046405057
G046405057G046405057
G046405057
 
Evaluation of physico chemical quality of water stored in underground reinfor...
Evaluation of physico chemical quality of water stored in underground reinfor...Evaluation of physico chemical quality of water stored in underground reinfor...
Evaluation of physico chemical quality of water stored in underground reinfor...
 
Abrha mulu article 2
Abrha mulu article 2 Abrha mulu article 2
Abrha mulu article 2
 
Comprehensive Assessment of Groundwater from various areas of Aurangabad city...
Comprehensive Assessment of Groundwater from various areas of Aurangabad city...Comprehensive Assessment of Groundwater from various areas of Aurangabad city...
Comprehensive Assessment of Groundwater from various areas of Aurangabad city...
 
Optimization modeling of water quality in pollution regions of nigeria
Optimization modeling of water quality in pollution regions of  nigeriaOptimization modeling of water quality in pollution regions of  nigeria
Optimization modeling of water quality in pollution regions of nigeria
 
IRJET- Analysis of Groundwater Quality of Usilampatti Region in Tamilnadu
IRJET- Analysis of Groundwater Quality of Usilampatti Region in TamilnaduIRJET- Analysis of Groundwater Quality of Usilampatti Region in Tamilnadu
IRJET- Analysis of Groundwater Quality of Usilampatti Region in Tamilnadu
 
20720130101006
2072013010100620720130101006
20720130101006
 
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
 
IRJET- Analysis of Physico Chemical Parameters of Underground Water Sample fr...
IRJET- Analysis of Physico Chemical Parameters of Underground Water Sample fr...IRJET- Analysis of Physico Chemical Parameters of Underground Water Sample fr...
IRJET- Analysis of Physico Chemical Parameters of Underground Water Sample fr...
 
Ecological and Agricultural monitoring of Sebou river waters at Kariat Bamoha...
Ecological and Agricultural monitoring of Sebou river waters at Kariat Bamoha...Ecological and Agricultural monitoring of Sebou river waters at Kariat Bamoha...
Ecological and Agricultural monitoring of Sebou river waters at Kariat Bamoha...
 
Effect of Earthworms on Distillery Effluent Treatment through Vermifiltration
Effect of Earthworms on Distillery Effluent Treatment through VermifiltrationEffect of Earthworms on Distillery Effluent Treatment through Vermifiltration
Effect of Earthworms on Distillery Effluent Treatment through Vermifiltration
 
To Study the Effect of Municipal Treated Effluent on Groundwater Quality Near...
To Study the Effect of Municipal Treated Effluent on Groundwater Quality Near...To Study the Effect of Municipal Treated Effluent on Groundwater Quality Near...
To Study the Effect of Municipal Treated Effluent on Groundwater Quality Near...
 
Assessment of Physico-Chemical Properties and Toxic Heavy Metals in Water Fro...
Assessment of Physico-Chemical Properties and Toxic Heavy Metals in Water Fro...Assessment of Physico-Chemical Properties and Toxic Heavy Metals in Water Fro...
Assessment of Physico-Chemical Properties and Toxic Heavy Metals in Water Fro...
 
Characterizing Automobile Industrial Wastewater and its Impacts on Surroundin...
Characterizing Automobile Industrial Wastewater and its Impacts on Surroundin...Characterizing Automobile Industrial Wastewater and its Impacts on Surroundin...
Characterizing Automobile Industrial Wastewater and its Impacts on Surroundin...
 
THE WATER QUALITY ASSESSMENT IN AND AROUND AMUBULIAR WATERSHED OF PUDUKKOTTAI...
THE WATER QUALITY ASSESSMENT IN AND AROUND AMUBULIAR WATERSHED OF PUDUKKOTTAI...THE WATER QUALITY ASSESSMENT IN AND AROUND AMUBULIAR WATERSHED OF PUDUKKOTTAI...
THE WATER QUALITY ASSESSMENT IN AND AROUND AMUBULIAR WATERSHED OF PUDUKKOTTAI...
 
Experimental analysis of dew drain water
Experimental analysis of dew drain waterExperimental analysis of dew drain water
Experimental analysis of dew drain water
 
Performance of combination of pre ozonation and membrane biological reactor o...
Performance of combination of pre ozonation and membrane biological reactor o...Performance of combination of pre ozonation and membrane biological reactor o...
Performance of combination of pre ozonation and membrane biological reactor o...
 
IRJET- Water Quality Analysis of Avaragere Lake- A Case Study
IRJET- Water Quality Analysis of Avaragere Lake- A Case StudyIRJET- Water Quality Analysis of Avaragere Lake- A Case Study
IRJET- Water Quality Analysis of Avaragere Lake- A Case Study
 
IRJET- Hydrodynamic Integrated Modelling of Basic Water Quality and Nutrient ...
IRJET- Hydrodynamic Integrated Modelling of Basic Water Quality and Nutrient ...IRJET- Hydrodynamic Integrated Modelling of Basic Water Quality and Nutrient ...
IRJET- Hydrodynamic Integrated Modelling of Basic Water Quality and Nutrient ...
 
Comparative study on performance of coagulants in
Comparative study on performance of coagulants inComparative study on performance of coagulants in
Comparative study on performance of coagulants in
 

More from IOSR-JEN

More from IOSR-JEN (20)

C05921721
C05921721C05921721
C05921721
 
B05921016
B05921016B05921016
B05921016
 
A05920109
A05920109A05920109
A05920109
 
J05915457
J05915457J05915457
J05915457
 
I05914153
I05914153I05914153
I05914153
 
H05913540
H05913540H05913540
H05913540
 
G05913234
G05913234G05913234
G05913234
 
F05912731
F05912731F05912731
F05912731
 
E05912226
E05912226E05912226
E05912226
 
D05911621
D05911621D05911621
D05911621
 
C05911315
C05911315C05911315
C05911315
 
B05910712
B05910712B05910712
B05910712
 
A05910106
A05910106A05910106
A05910106
 
B05840510
B05840510B05840510
B05840510
 
I05844759
I05844759I05844759
I05844759
 
H05844346
H05844346H05844346
H05844346
 
G05843942
G05843942G05843942
G05843942
 
F05843238
F05843238F05843238
F05843238
 
E05842831
E05842831E05842831
E05842831
 
D05842227
D05842227D05842227
D05842227
 

Recently uploaded

How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 

Recently uploaded (20)

How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 

C05111018

  • 1. IOSR Journal of Engineering (IOSRJEN) www.iosrjen.org ISSN (e): 2250-3021, ISSN (p): 2278-8719 Vol. 05, Issue 01 (January. 2015), ||V1|| PP 10-18 International organization of Scientific Research 10 | P a g e Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. A. M. AbdEL-rahman,1 Ahmed. AbdEL-halim2 , Ali. A. M. Gad2 , M. Hashem2 . 1 M.SC. Researcher, Civil Engineering Department, Faculty of Engineering, Assiut University, Egypt. 2Associate Professor, Civil Engineering Department, Faculty of Engineering, Assiut University, Egypt. Abstract: - Sewage can be defined as discharges from domestic and sanitary appliances or simply a complex mixture of materials from varied sources. This complex mixture contains both soluble and insoluble materials. Waste stabilization ponds are recognized as the solution to domestic wastewater treatment in developing countries. The use of such natural systems is considered to be very important. This is because it is cheap, easy to construct and they do not require high skilled laborite. In this study, samples were taken from the raw wastewater and effluents of treatment ponds of Elzaraby waste stabilization ponds over a period of one year. The treated effluent is either discharged into surface waters or reused for agricultural irrigation. The samples were analyzed according to the standard methods. The results obtained from the samples taken in different seasons showed the maximum wastewater temperature were in the influent (350 C) in summer season, and the minimum were (180 C) in winter season. The values of hydrogen power (pH) and dissolved oxygen (DO) is increased along the ponds series. The average annual overall removal efficiency of TSS and TDS were 70% and 26%, while the maximum overall efficiency of BOD5 was in summer (88%) and minimum efficiency was (73%) in winter season. I. INTRODUCTION The increasing demands for domestic wastewater due to population growth, improvement in living standards and the growing industrial sector will increase the total amount of wastewater available for reuse as an important source. The major issues include public health and environmental hazards as well as technical, institutional, socio-cultural and sustainability aspects. Waste stabilization ponds (WSP) are large shallow basins enclosed by earth embankments in which raw wastewater is treated by entirely natural processes involving both algae and bacteria[1], WSPs are usually the most appropriate method for domestic and municipal wastewater treatment in developing countries, where the climate is most favorable for their operation. WSPs are low-cost, low-maintenance, highly efficient. The only energy they use is direct solar energy, so they do not need any electromechanical equipment, saving expenditure on electricity and more skilled operation. WSPs can be classified with respect to the types of biological activity occurring in a pond. Three types are distinguished; anaerobic, facultative and maturation ponds. Usually WSPs system comprises a single series of the aforementioned three ponds types or several such series in parallel [2]. Sanitation services in Egypt are less developed than water supply services. At present, there are more than 323 wastewater treatment plants in the country. The capacity of wastewater treatment plants has increased by 10 times in the last two decades. The existing capacity is 12 million m3/day. Length of wastewater collection networks / sanitation pipelines increased from 28,000 km in 2005 to 34,000 km in 2010 [3]. Urban coverage with improved sanitation gradually increased from 45% in 1993 to 56% in 2004, reaching 100% in urban and 40% in rural areas by the end of 2012. The low coverage in rural sanitation results in serious problems of water pollution and health conditions due to the discharge raw domestic wastewater directly into the waterways [4]. The main objectives of this study is to evaluate the performance of waste stabilization ponds (WSPs) in Elzaraby village, Abutig, Assiut governorate Egypt. some physical and biological characteristics of the waste water through the treatment plant are investigated. II. MATERIAL AND METHODS 2.1. Description of wastewater treatment plant A recent full-scale system of WSPs was constructed in 2009 in Elzaraby village in Upper Egypt (Fig.1). Elzaraby WSPs are designed to treat domestic waste water from Abutig city, with mean daily design flow rate of 16500 m3 /day.
  • 2. Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. International organization of Scientific Research 11 | P a g e Fig. 1. Elzaraby Waste stabilization ponds. The physical characteristics of the ponds are given in (Table. 1). The wastewater after screening is used to feed two parallel anaerobic ponds (A1~A2). The two effluent of the anaerobic ponds is used to feed two facultative ponds (F1~F2), the effluent from the facultative ponds passes through two parallel lines of maturation ponds. Each line comprising a first, second and third maturation pond, (M1~M6). The treated effluent is either discharged into surface water or reused for agriculture irrigation. Table 1. Design basis for physical and operational characteristic of Elzaraby WSPs. Ponds Dimensions (m)of the water body Design basis Bottom/top Length (m) Bottom/top Width (m) Water Depth (m) Water Volume (m3) Flow rate (m3/day) HRT (day) A1-A2 146/163.6 45.4/63 4.4 37257 8250 4.5 F1-F2 277.8/288.8 154/164 2.5 112680 8250 14 M1-M2 158/164 104/110 1.5 25854 8250 3.0 M3-M4 158/164 104/110 1.5 25854 8250 3.0 M5-M6 158/164 104/110 1.5 25854 8250 3.0
  • 3. Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. International organization of Scientific Research 12 | P a g e 2.2 Wastewater sampling Wastewater samples were collected monthly from the plant through a period of one years, from Spt. 2011 to Aug. 2012 to study the seasonal removal efficiency of LAS in natural WSPs, Monthly-samples of raw wastewater after screening and effluents from each type ponds were collected (S1to S5) as shown in ( Fig. 2) of the sampling points. The samples were collected in plastic containers of 2 liter capacity. Fig. 2. The layout of Elzaraby WSPs The following parameter were studied; water temperature (T), (pH) value, dissolved oxygen (DO), biochemical oxygen demand (BOD5), total suspended solid (T.S.S), total dissolved solids (T.D.S), electrical conductivity (EC),Turbidity(FTU)as in (table.2). All analysis have been carried out according to standard methods for examination of water and waste water (APHA, 2005) [5].
  • 4. Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. International organization of Scientific Research 13 | P a g e III. RESULTS AND DISCUSSIONS In this study, a complete one year monthly samples of wastewater were taken from WSPs of Elzaraby plant from locations S1~S5 totally 60 samples. The average seasonal values of T, pH, DO, TSS, TDS,EC, BOD5 and Tur through the ponds were calculated. 3.1 Wastewater temperatures in the ponds The wastewater temperature for the four season of the year from (Spt. 2011 to Aug. 2012) through the water pass in WSPs are illustrated in (Fig. 3). Measured temperatures of wastewater through the ponds were ranged between 18 0 C and 35 0 C. The maximum wastewater temperature in anaerobic ponds was 31.8 0 C in summer season while the minimum was 22.1 0 C in winter season. In facultative ponds, the temperature were ranged between 20.1 0 C to 30.6 0 C in winter and summer, respectively. In the last maturation ponds the minimum and maximum temperature were 18 0 C in winter and 27 0 C in summer season. Fig. 3. Wastewater temperature for different season through the wastewater pass in Elzaraby WSPs. 15.00 18.00 21.00 24.00 27.00 30.00 33.00 36.00 Raw waste water(s1)Anaerobic pond(s2)Facultative pond(s3)Maturation pond(s4)Maturation pond(s5) Wastewatertemperature0C Autumn winter Spring Summer
  • 5. Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. International organization of Scientific Research 14 | P a g e As shown in (Fig. 3), it is clear that the wastewater temperature decreases along the pass of the ponds and maximum temperature occurs in summer season[6]. The decreasing rate is find to be much higher in the summer season (80 C) than that in the winter season (4.40 C), this due to the higher evaporation rate from the surface of the ponds which accomplished with higher latent heat in summer compared with that in winter season. 3.2 pH variations along the pond series The average seasonal variation of the measured pH value for the raw sewage and effluent from each type of ponds in the period from Spt. 2011 to Aug. 2012 are presented in (Fig. 4). The average pH value of raw wastewater ranged between 6.63~7.4, while increased in anaerobic ponds to be 6.75 and 7.8 as minimum and maximum values in winter and summer seasons, respectively. In maturation ponds the measured pH recorded a maximum value in summer 8.8 and a minimum value in winter was 7.7. As shown in Figure, the pH values of the ponds’ wastewater has it’ s higher values in the summer season, and it increases along the wastewater pass with the highest values in the last maturation ponds. The increased of pH value in maturation ponds is due to rapid photosynthesis by the pond algae, which consumes Carbon dioxide (CO2 )faster than it can be replaced by bacterial respiration; as a result carbonate and bicarbonate ions dissociate. Algae fix the resulting CO2 from the dissociation while hydroxyl ions (OH- ) accumulate so raising the pH value. Similar results were found by[7]. 3.3 DO concentration along the ponds series From (Fig -5) it is clear that the DO average concentration values for four season along Elzaraby WSPs series were increased along the ponds and recorded a maximum values in summer season and minimum values in winter season (ranged from 0.0 to 6 mg/l), while the mean values in the ponds during autumn and spring season are located in the intermediate range between summer and winter season. It is clear that the value of DO in the summer season increases relative to the winter season, because the rate of algae photosynthesis and the cellular metabolism of microorganisms in the ponds are enhanced by high temperatures and retarded by low temperatures. Algal oxygen production is directly related to photosynthesis, which depends on temperature variations. From the figure [8]. Fig. 4. Seasonal variation of pH value measured along Elzaraby WSPs. 6.00 6.50 7.00 7.50 8.00 8.50 9.00 Raw waste water(s1) Anaerobic pond(s2) facultative pond(s3) maturation pond(s4) maturation pond(s5) pHvalue Autumn winter Spring Summer
  • 6. Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. International organization of Scientific Research 15 | P a g e Fig. 5. Seasonal concentration value of DO measured along Elzaraby WSPs. 3-4 T.S.S values along the ponds series For a comparison between the mean values of the measured T.S.S in the different four seasons of the year are plotted as shown in (Fig. 6 ). The average T.S.S values in raw wastewater recorded 202, 153, 227 and 326 mg/l in Autumn, winter, Spring and summer seasons respectively, while they recorded in the effluent in last maturation ponds 74,75, 105 and 110 mg/l in Autumn, winter, Spring and summer seasons respectively. From the figure it is clear that T.S.S concentration values increased in hot seasons and decreased in cold seasons. The reason of these phenomena is that high wastewater in hot season accomplished with high photosynthesis and evaporation rates. High rate of photosynthesis generates many new cells of algae which increases the values of the T.S.S in the ponds. Also, a high evaporation rate in the summer tends to increase the T.S.S concentration in the ponds and T.S.S concentration values is decreased along the ponds series [9]. Fig. 6. Average Seasonal variation values of measured T.S.S along the ponds series at Elzaraby WSPs. 0.00 1.00 2.00 3.00 4.00 5.00 6.00 Raw waste water(s1) Anaerobic pond(s2) Facultative pond(s3) Maturation pond(s4) Maturation pond(s5) DOconcentrationmg/l Autumn winter Spring Summer 60 80 100 120 140 160 180 200 220 240 260 280 300 320 Raw waste water(s1) Anaerobic pond(s2) Facultative pond(s3) Maturation pond(s4) Maturation pond(s5) Autumn winter Spring Summer
  • 7. Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. International organization of Scientific Research 16 | P a g e 3-5 T.D.S values along the ponds series For comparison the mean annual values of the measured T.D.S in the different four seasons of the year are plotted as shown in (Fig. 7), from the figure it is clear that T.D.S concentration values decreased along the ponds series [ 10]. From the it is clear that the overall removal efficiency of T.D.S increased in hot seasons and decreased in cold seasons. The reason of these phenomena is that high wastewater temperature in hot season accomplished with high photosynthesis and high evaporation rates, the result showed higher removal efficiency of TDS than other study in Ethiopia the avarege annual removal efficiency of the ponds was 26%. Fig. 7. Average Seasonal variation values of measured T.D.S along the ponds series at Elzaraby WSPs. 3-6 Average Turbidity values along the ponds series. As shown in (Fig.8), in the period of investigation turbidity concentration values increased in hot seasons and decreased in cold seasons, and the overall removal efficiency of turbidity from Elzaraby WSPs in summer menthes is higher than other menthes. The reason of these phenomena is that high wastewater temperature in hot season [11] . Fig. 8. Average Seasonal variation values of measured Turbidity along the ponds series at Elzaraby WSPs. 3-7 Average values of measured conductivity along the ponds series for the four seasons. For comparison the mean values of the measured EC in different four seasons of the year are plotted as shown in (Fig. 9). The average EC values in raw wastewater recorded 1260, 1169, 1285 and 1553 μs/cm in Autumn, winter, Spring and summer seasons respectively, while they recorded in the effluent in last maturation ponds 1070, 855, 1121 and 1249 μs/cm in Autumn, winter, Spring and summer seasons respectively. From the 250 300 350 400 450 500 550 600 Raw waste water(s1) Anaerobic pond(s2) Facultative pond(s3) Maturation pond(s4) Maturation pond(s5) Autumn winter Spring Summer 0 50 100 150 200 250 300 350 400 450 Raw waste water(s1) Anaerobic pond(s2) Facultative pond(s3) Maturation pond(s4) Maturation pond(s5) Autumn winter Spring Summer
  • 8. Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. International organization of Scientific Research 17 | P a g e figuer It is clear that the maximum EC values occur in the summer season, while the minimum EC values are in the winter season because high air and water temperature and high evaporation rate occurs in summer season relative to other seasons[8]. Fig. 9. Average Seasonal variation values of measured EC along the ponds series at Elzaraby WSPs. 3-8 BOD average seasonal concentration value For comparison the mean values of the measured unfiltered BOD5 in different four seasons of the year are plotted as shown in (Fig. 10). The average concentration of BOD5 values in raw wastewater were ranged between 426.3 mg /l to 305 mg/l in summer and winter seasons respectively, while they recorded in anaerobic ponds 314~167.5 mg/l as a maximum and a minimum values. In facultative ponds BOD5 concentrations were found to be ranged between 275~111 mg/l, while the effluent of the last maturation ponds has BOD5 concentrations of 43.5, 51.5, 55 and 73.3 mg/l in autumn, winter, spring and summer seasons, respectively. Fig. 10. Seasonal concentration value of BOD measured along Elzaraby WSPs. From (Fig. 10). It is clear that the maximum BOD5 values occur in the summer season, while the minimum BOD5 values are in the winter season. The reason of this phenomenon is that high air and water temperature and sun light intensity occurs in summer season relative to other seasons, which increased algal grow [12]. 700 800 900 1000 1100 1200 1300 1400 1500 1600 Raw waste water(s1) Anaerobic pond(s2) Facultative pond(s3) Maturation pond(s4) Maturation pond(s5) Autumn winter Spring Summer 30 80 130 180 230 280 330 380 430 Raw waste water(s1) Anaerobic pond(s2) Facultative pond(s3) Maturation pond(s4) Maturation pond(s5) BODconcentrationmg/l Autumn winter Spring Summer
  • 9. Assessment of Waste Stabilization Ponds for The Treatment of Municipal Wastewater in Upper Egypt. International organization of Scientific Research 18 | P a g e IV. CONCLUSION 1- The wastewater temperatures of the plant were decreased along the ponds series and recorded 350 C as a higher values in anaerobic ponds in sumer season, while recorded 180 C as minimum values in winter season in the last maturation ponds. 2- The average variation values of measured pH of Elzaraby WSPs is increased along the ponds series from 6.36 (minimum values occurred in raw wastewater) to 8.8 as a maximum values in the last maturation ponds, so faecal bacteria die very quickly and the photosynthesis activity of algae becomes less. Also, the high pH values occurred in ponds leads to high efficiency removed of heavy metal. 3- Concentration values of measured DO is increased along the pond series and recorded maximum values in summer season in the last maturation ponds. 4- The electrical conductivity EC is recorded variation values and changed seasonally along the ponds series, the values of EC increased in summer season relative to other months. 5- The maximum overall removal efficiency of measured T.S.S was 70% in summer season and recorded 48% as minimum values in winter season, furthermore the average over all removal efficiency of T.S.S from the ponds series along the study period was 59%. The average concentration values of the last maturation ponds T.S.S was 85 mg/l so, the treated wastewater allow to be reused in agriculture in grade (C) as in Egyptian Code for the Use of Treated Wastewater in Agriculture. 6- The maximum overall removal efficiency of BOD5 was in summer (88%) and minimum efficiency was (73%) in winter season, while The average values of measured BOD5 in the last maturation ponds was 60 mg/l which allow to be reused in agriculture in grade (B,C) as in Egyptian Code for the Use of Treated Wastewater in Agriculture REFERENCE [1] Mara, D. D. "Domestic Wastewater Treatment in Developing Countries", Earth scan, London , Sterling, VA, 2004 [2] Ramadan, H., Ponce, V. "Design and Performance of Waste Stabilization Ponds".info@virginglobe.com Version 081218, 2011 [3] Abdel- Kader, A.M., Abdel-Rassoul, S.M. (2010)., Prospects of water conservation in Egypt(special reference to wastewater reuse).Fourteenth international water technology conference, 25-27 March 2010. [4] MWRI/USAID (2000): Policies and procedures for improved urban wastewater discharge and reuse. Appendix 2: Health impact and water quality standards in wastewater irrigation. Report No.34, Egyptian Ministry of Water Resources and Irrigation and US Agency for International Development, available online at http://pdf.usaid. gov/pdf_docs/PNACS687.pdf (last accessed 3 January 2013). [5] APHA (2005). Standard methods for the examination of water and wastewater, 20th and 21st ed. American Public Health Association, Washington, DC. [6] Haydeh Hayati1, Mohammadreza Doosti1, Mohammadhossein Sayadi., Performance evaluation of waste stabilization pond in Birjand, Iran for the [7] treatment of municipal sewage . Civil and Environmental Engineering Department, University of Birjand, Birjand, Iran., 2013 [8] Bastawey. M.A. (2010). Diurnal variation of some physical – chemical parameters in natural waste stabilization ponds in upper Egypt. [9] Nasr. F.A., El-Ashmawy. A., Eltaweel. G., El-Shafai. S.A. (2007). Waste Stabilization Ponds for Wastewater Treatment and Reuse in Egypt. Environmental Sciences Division, Department of Water Pollution Research [10] Ebrahimi, A., Ehrampoosh, M., Samaie, M., Ghelmani, S., Talebi, P., Dehghan, M., Honardoost, A., Shahsavani, E., 2010. Removal Efficiency of Linear Alkyl Benzene Sulfonate (LAS) in Yazd Stabilization Pond. Scientific Information Database, Iran. [11] Hasan, A.’ Program of Water and Environmental Engineering 461652, Spring 2011 Natural WWT, 2- WSP. [12] Ram Kumar Kushwah, Avinash Bajpai, Suman Malik and Archana Singh, Assessment of Some Physicochemical Parameters in Influent and Effluent and Water from Sewage Treatment Plant at Bhopal, M.P. (India) Water Research & Development Vol. 1 | No.1 | 59-62 | January-April | 2011 [13] Gad, A., Ali, A., 2005. The pereformance of an existing system of waste stabilization ponds in upper Egypt. In: First Ain Shams University International Conference on Environmental Engineering.