APPLICATION OF LEAN CONSTRUCTION TOOL (L.P.S) TO IMPROVE
LABOUR PRODUCTIVITY AT CONSTRUCTION SITE
Anshi Verma*1
, Dr. S.S. Angalekar2
, Prof. Manish Khandare3
*1,2,3
Construction management, R.M.D Sinhgad School of Engineering
DOI: 10.5281/zenodo.809172
ABSTRACT
Indian construction industry still follows the primitive work pattern, which generates poor management in
resources, waste management, over budgeting and schedule lagging.
To eliminate all the above mentioned issues, construction industries are now adopting sophisticated tools and
techniques like lean construction tool (L.P.S). This paper includes the implementation of last planner system at
site. After the implementation we observed the improvising effect in the area of labor productivity therefore, we
can conclude that the L.P.S technique is better than the primitive project management approach.
Keywords: Last Planner System, Lean Construction Institute, Lean Construction, Weekly Work Plan, Building
Information Modelling, Just – in- time and Project Evaluation Planning.
I. INTRODUCTION
In India, construction industry is the second largest industry after agriculture and services, according to XII
Five (5) year plan (2012-2017) there are several proposals for construction works like roads, railway, seaports,
airports, metro and smart- cities.
Lean construction system has been introduced as a new management approach to improve the productivity in
the construction industry.
A. Definitions
Lean construction is a method to design production system to reduce the wastage of materials, time and efforts
in order to generate the maximum possible outcome.
Lean: The main object is, to maximize customer value while minimizing wastage. Generally the meaning
of Lean is creating more value for customers within limited resources.
Construction: Building construction is the process of preparation and formation of building and building
system, which starts with planning, design, financing and continues until the structure is ready for
occupancy.
Management: The organization and coordination of the activities of a business in order to achieve the defined
objectives.
Last Planner System: it is a collaborative planning process that involves trade foremen or design team
leaders (the last planner) during planning in greater and greater detail as the time for the work to be done
get closer.
In UK it is known as: Collaborative Planning.
In USA it is known as: Pull Planning.
ISSN: 2277-9655
[Verma* et al., 6(6): June, 2017] Impact Factor: 4.116
IC™ Value: 3.00 CODEN: IJESS7
http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology
[288]
Fig 1. Last Planner System (Ref. 1)
B. History of Lean Management
. Lean manufacturing is not especially new, it derives from the Toyota Production System or Just-In-time
production, Henry Ford and other predecessors.
Henry Ford: Although there are instances of rigorous process thinking in manufacturing all the way back to the
Arsenal in Venice in 1450s, the first person who truly integrate an entire production process was Henry Ford.
Kiichiro Toyota: As Kiichiro Toyota, Taiichi Ohno, and others at Toyota observed this situation in 1930s, and
more intensely just after World War II , they learned that a series of impel innovations might create the
possibility to produce continuity in process flow and a wide range of variety in product offerings.
Lean today’s: Today’s big construction firm from U.S.A, U.K and China is easily accepting lean tools (L.P.S)
at site. Construction firm are accepting it and getting benefits after its implementation. Most important some of
the lean tools are in use from more than two decades throughout the world.
C. Objective of the study
. Identify tools and techniques of Lean Construction Tool. .
Identify the importance of L.C in Indian Construction Industry.
. Identify the impact on productivity of labors after the implementation of LPS in the Construction
industry.
. Identify the terms, where LPS is different than the traditional Project Management Approach.
D. Need for Study
Due to the infrastructure development in the county, several construction firms are launching themselves in the
market and labor productivity has been calculated annually 40-60%. Which can be increase by 60-70% by
applying L.P.S at site for upcoming projects. Implementation of L.P.S is necessary, the main objective of lean
management principle is “Drive more value by using less of resources.”
II. LITERATURE REVIEW
Mossman Alan, 2013 has worked on LPS and analyzed almost 26 Cases and feedbacks on the site of U.K,
where people were already using LPS. His published paper “Last Planner 5+1 crucial and collaborative
conversations for predictable design and construction delivery” explains the importance, compilation and
benefits of LPS implementation.
Amit Shankar Murje, in 2014 has elaborated that why Iean construction techniques is better than the traditional
project management approach.
ISSN: 2277-9655
[Verma* et al., 6(6): June, 2017] Impact Factor: 4.116
IC™ Value: 3.00 CODEN: IJESS7
http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology
[289]
Thomas & Maloney have published in ASCE journal paper “Modelling Construction Labor Productivity” and
discussed the formula to find out labor productivity in all different kind of site- situation.
In 2006 Aditi Javknedkar applied Lean Construction in concrete construction project, which introduced lean and
last planner system in construction industry.
In 2005 Mr. O.Salem and J. Salomom implemented and assessed lean at construction site of Honda U.K and
finished the case study.
III. RESEARCH METHODOLOGY
Fig 2.Sequence of Research Methodology
Stage I: Formulation of Objective of the study
Collection of references include journals, technical reports and books.
Stage II: Find out Importance of Lean Construction Technique in India
To address importance of lean technique in Indian construction industry.
Stage III: Apply Lean Technique at Site
Apply lean Technique at site and find out the impact.
Stage IV: Survey, Feedback, Observation, Calculation.
Data collection from observation and questioner survey and lowest possible level in a whole range of
one-off production calculation to find out labor productivity at construction site.
Stage V: Results and discussion
. To identify the benefits of Lean implementation.
. Collect suggestions from users.
IV. TOOLS AND TECHNIQUES
BIM (Lean Design),
A3, process design (Lean Design),
Offsite fabrication and JIT (Lean Supply),
Value chain mapping / Last planner system (Lean Assembly),
Visual site (Lean Assembly);
5S (Lean Assembly),
ISSN: 2277-9655
[Verma* et al., 6(6): June, 2017] Impact Factor: 4.116
IC™ Value: 3.00 CODEN: IJESS7
http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology
[290]
Daily crew huddles (Lean Assembly).
V. LAST PLANNER SYSTEM
On the basis of the research, Mr. Glenn Ballard and Greg Howell invented the last planner system to improve
construction productivity in 1980s. It is “The Collaborative, commitment based planning system that integrates
should-can-will-did planning (Pull Planning, Make-Ready plan, Look-ahead plan)with constraint analysis,
weekly work planning based upon reliable promises and learning based upon analysis of PPC (Plan Percentage
Completed) and reasons for variance.”
Fig 3. Mr. Gregg Howell (Right) & Dr Glenn Ballard (Left) (Fig. Ref. Google)
And they said “Last Planner Manages the relationships, conversations and commitment which enables program
and production planning decision to be made collaboratively at the lowest possible level in a whole range of
one-off production settings.”
Figure 4. Implementation of L.P.S at site (Image source: Google)
A. Why should construction people choose L.P.S?
Technical and non-technical person both can use the L.P.S at site to achieve best performance in design
and construction, to determine the schedule of work completion.
There are many reasons why any organization should adopt LPS (Including owners, designers and
constructors)
. To deliver projects more safely, on-time with less cost.
. To build more predictable production program.
. To reduce the stress/burden of project management team.
. To improve the overall production process.
. To increase the customer’s reliability by Just-In-Time delivery.
And on the basis of Case-Study reviewed papers there are some benefits like:
1. Smooth work flow.
2. Predictable work plan.
ISSN: 2277-9655
[Verma* et al., 6(6): June, 2017] Impact Factor: 4.116
IC™ Value: 3.00 CODEN: IJESS7
http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology
[291]
3. Reduces Cost.
4. Reduces delivery time.
5. Improves productivity.
6. Good collaboration/coordination with field personnel and subcontractors.
7. Helpful in monitoring.
B. Is LPS only applicable in construction sector?
Glenn Ballard, in May 2012 at Nottingham Trent University in U.K has been reported that LPS
can use in these fields also:
1. Production.
2. Software engineering.
3. Healthcare.
4. Development in the sector like Oil and Gas.
He said that “LPS works in all kind of situation where human coordination requires.”
C. Steps of Last Planner System
Collaborative Programming
↓↓
Make – Ready Plan (Look-Ahead Plan)
↓↓
Production Planning (Weekly work Plan)
↓↓
Production Management (Daily Huddle Meeting)
↓↓
Measurement, learning and Continual Improvement
5+ 1 First Run Studies
Last Planner System improves both design and construction, which gives project work flow, reliability and
completion of work on time.
Figure 5. Steps of Last Planner System
ISSN: 2277-9655
[Verma* et al., 6(6): June, 2017] Impact Factor: 4.116
IC™ Value: 3.00 CODEN: IJESS7
http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology
[292]
1. Collaborative Programming:
. Helps project team to increase the coordination by knowing each other, identify the problems within the project
and reaches on the decision by mutual agreement to how to solve it, design and plan handovers.
. Master planning and pull planning on the basis of overall project objectives and master scheduling plan to
know what should be done next.
Benefits of Collaborative Programming:
. Prepare each team member for action together from starting of project.
. Sorts out sequencing as well as issues/difficulties to make smooth work flow.
. Identifies unclear design details.
. Builds commitment within each participants and reduces overall program period.
2. Make – Ready
. Making tasks in the look ahead period ready so that they can be easily done whenever we want to do them.
. Ensure that the work will be done when it is require to do.
Benefits of Make-Ready Process
. Task or things are be ready for production or construction when requires.
. Less wastage of material and equipment due to greater certainty of time.
3. Production Evaluation & Planning :
. Regular Production evaluation and meeting planning is involve throughout the project in Last Planner System.
. This meeting is weekly and known as weekly work plan meeting.
. Beneficial in monitoring current activity at site.
. Each last planner leader proposes a construction program for his team In P.E.P meeting and they identifies if
there is any inter-dependencies between their proposals like resources, equipment and reduces the burden of
over-committing by distributing each task within team members.
Figure 6: Weekly Work Plan Format
ISSN: 2277-9655
[Verma* et al., 6(6): June, 2017] Impact Factor: 4.116
IC™ Value: 3.00 CODEN: IJESS7
http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology
[293]
Benefits of PEP meeting in the context of Last Planner:
. Try to maintain relationship between supplier and team leaders through reliable promises, commitment and
implementation.
. Maintains commitment by doing their task, and focuses on what can really be done.
. They work together every week for the improvement and learn from their own and other’s experience.
Figure 7. Promise Cycle of L.P.S
4. Production Management
. Collaboratively monitoring of production to keep activities on track.
. Helps to adjust plans in the light of new information/data according to the percentage (%) of work completed
actually and what is expected, means re-scheduling.
. Construction is a social process , coordination ,conferences on telephone between the contractors so that
manage/arrange the equipment/resources so that tomorrow’s work will be start on the time in-spite of last
minute adjustment and this is the responsibility of project manager for the set-up and brief meeting or
conversation and it takes not more than 15 minutes.
5. Measurement , Learning & Continual improvement
. Learning together is all about improving project, planning and production process.
. At the end of the task executed at site by measurement we can get to know the reason for variance and they try
to reduce in next activity and this is called continual improvement.
. And learning elements, encourages learning from success and reduces repeated failures.
. Last planner measures the predictability of work delivery – percentage of promises completed on time and at
the end of PPC meeting, team members get motivation to do next week activity for more satisfaction.
. After using LPS in U.K and U.S, construction industry institute reported the correlation between the PPC and
productivity on engineering construction project, they observed changes in productivity and profitability with
the PPC around 75%-90%.
ISSN: 2277-9655
[Verma* et al., 6(6): June, 2017] Impact Factor: 4.116
IC™ Value: 3.00 CODEN: IJESS7
http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology
[294]
Figure 8: Correlation between PPC and Productivity (Mossman)
There are various reasons which team member faced while its execution on site, so that the reason and type of
problem occurring find out by Pareto chart, Cause and effect diagram or by any other Quality Control tool.
Figure 9: Pareto chart for causes of late arrivals materials to the site
+1 First Run Studies
The first run study is integral part of LPS, FRS is used to learn about the sequence so that it can be improved
and done more safely, completed to the required quality, FRS is based upon Plan-Do-Check-Act cycle.
Figure 10: Deming P-D-C-A Cycle
ISSN: 2277-9655
[Verma* et al., 6(6): June, 2017] Impact Factor: 4.116
IC™ Value: 3.00 CODEN: IJESS7
http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology
[295]
VI. CASE – STUDY : IMPLEMENTATION AT SITE
In India , there are very few sites who actually use Last Planner System at site, the other tools like Building
information modelling ,A3 Report for documentation work , Just in Time , these are already in use at
construction site .
So the challenges is to implement L.P.S at site and to know that how much it is useful by taking feedback
through each employee.
That’s why we have been chosen a construction site in Pune (India) and the details are:
• Apply Last Planner System (LPS) at Site.
• Site name – Suvaranrekha
• Type of Building- Commercial ( 7 Floor)
• Location – Prabhat road , Pune ( INDIA )
• Project started – Feb 2012 , Finish – Dec 2016
Figure 11. Images of construction site
ISSN: 2277-9655
[Verma* et al., 6(6): June, 2017] Impact Factor: 4.116
IC™ Value: 3.00 CODEN: IJESS7
http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology
[296]
Figure 12. Apply last planner system at site
OBSERVATION / FINDING
By the implementation on construction site, taking feedback by questioners survey as well as observation
• Optimum use of resources
• Reduce waste
• Transparency
• Time save
• Avoid dispute
VII. EFFECT ON THE PRODUCTIVITY OF LABORS:
Calculation
A. Labor productivity = Output / Labor cost
B. Labor productivity = Output / Work-hour
C. Labor productivity = Labor cost / Output
OR = Work hours / Output
D. Performance factor = Estimated unit rate / Actual unit rate
1. For plastering work
Per day work done by the labor = 10 m2 (quantity of material)
(8 hour)
Area covered = 100 ft2
No. of person = 1 skilled labor + 1 unskilled labor + 1 helper
Cost for 1 day = 500 + 350 + 300
= 1150
a. Labor productivity = 100 / 1150 = 0.086 ft2/Rs.
After applying L.P.S = 110 /1150 = 0.095 ft2 / Rs.
b. Labor productivity = 100/ 8 = 12.5 work/hr
After applying L.P.S = 110/8 = 13.75 work/hr
c. Labor productivity = 1150 / 100 = 11.5 Rs/ ft2
After applying L.P.S = 1150/ 110 = 10.45 Rs/ft2
d. Performance factor = 10.45/ 11.5 = 0.9
After applying L.P.S = 11.5/11.5 = 1
2. Brick work in foundation and Plinth level with cement mortar
Quantity = 1.25 m3 / day
Work done by mason
Payment for 1 day to mason = 1150 /-
ISSN: 2277-9655
[Verma* et al., 6(6): June, 2017] Impact Factor: 4.116
IC™ Value: 3.00 CODEN: IJESS7
http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology
[297]
After applying L.P.S work done = 50 ft3
Quantity = 1.4 m3/day
a. Labor productivity = 45/1150 = 0.04 ft3/Rs.
After L.P.S = 50/1150 = 0.043
b. Labor productivity 45/8 = 5.6 ft3/hr
After L.P.S = 50/8 = 6.25 ft3/hr
c. Labor productivity = 1150/45 = 25.6 Rs./ft3
After L.P.S = 1150/ 50 = 23 Rs./ft3
d. Performance factor = 23/25.6 = 0.9
After L.P.S 25.6 / 25.6 = 1
Table 1. Productivity of labor for plastering work
For plastering work
About Before L.P.S After L.P.S
By equation A. Labor productivity 0.086 ft2/Rs. 0.095 ft2/Rs
By equation B. Labor productivity 12.5 ft2/hr. 13.75 ft2/hr
By equation C. Labor productivity 11.5 Rs./ft2 10.45 Rs./ft2
By equation D. Performance factor 0.9 1
Initially mason was covering 12.5 ft2 per hour plastering and after applying LPS the productivity improve by
13.75 and initially we were paying 11.5rs./ft2 and after applying LPS we are paying 10.45 for the same area. So
productivity increase and per ft2 payment is also reduce as compare to previous.
Table 2. Productivity of labor for brick work
For Brick work
About Before L.P.S After L.P.S
By equation A. Labor productivity 0.04 ft3/Rs. 0.043 ft3/Rs
By equation B. Labor productivity 5.62 ft3/hr. 6.25 ft3/hr
By equation C. Labor productivity 25.6 Rs./ft3 23 Rs./ft3
ISSN: 2277-9655
[Verma* et al., 6(6): June, 2017] Impact Factor: 4.116
IC™ Value: 3.00 CODEN: IJESS7
http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology
[298]
By equation D. Performance factor 0.9 1
Initially labor was covering 5.62 ft3 per hour brick work and after applying LPS the productivity improve by
6.25 and initially we were paying 25.6 Rs. /ft3 and after applying LPS we are paying 23 for the same area. So
productivity increase and per ft3 payment is also reduce as compare to previous.
VIII. DISCUSSION OF RESULTS AND RECOMMENDATIONS
By applying lean construction tool (L.P.S) at site, the labor productivity observed by 10 to 12% as compared to
previous. Exp. For plastering it improves 12.5 ft2/hr to 13.75ft2/hr and performance factor 0.9 to 1. Same as for
brick work and other construction work. So it is practically beneficial for the optimizing resources and improve
labor productivity at construction site.
Figure 13. Before and after applying LPS
With and without LPS
Fig 14.Without last planner system
ISSN: 2277-9655
[Verma* et al., 6(6): June, 2017] Impact Factor: 4.116
IC™ Value: 3.00 CODEN: IJESS7
http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology
[299]
Fig 15.After applying last planner system
IX. IN WHICH TERMS IT IS DIFFERENT THAN THE TRADITIONAL PROJECT
MANAGEMENT APPROACH:
Traditional Construction Management Lean Construction Management
1. Customer is not involving in planning stage. Customer, Client, Owner, Contractor, Project
Manager everyone involve from starting.
2. This is Push Techniques focus to increase
productivity of each activity even if this
may be causes of rework, reduce customer
satisfaction.
This is Pull Techniques, main focus is on the proper
flow of activities with reduce error or rework and
consideration of customer’s requirement and
satisfaction.
3. It does not consider adjustment because of
the isolated environment and only Project
Manager Work as a boss, so there are no
suggestion or ideas come from the
participants.
This system’s capacity absorb the variation, because
of feedback loop, learning and continual
improvement and rapid system response.
4. Traditional construction management does
not pay attention to continuous
improvement.
And this approach tries to make continuous
improvements.
5. Construction management decision rights
cantered to one person that is call project
manager.
And in Lean construction, decision power making is
distributed in all those who are involved.
6. It does not consider transparency in between
the customers, managers and labors.
It tries to increase transparency between the
customers, managers and labors.
ISSN: 2277-9655
[Verma* et al., 6(6): June, 2017] Impact Factor: 4.116
IC™ Value: 3.00 CODEN: IJESS7
http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology
[300]
.
X. CONCLUSION / BENEFITS OF L.P.S IN LABOR PRODUCTIVITY BY
FEEDBACK & IMPLEMENTATION
We have successfully applied L.P.S at site, and after analysis of 3 month we have observed by questioner
survey and feedback on construction site and the benefits are -
• Transparency in scheduling
• Avoid waste of resources
• Proper monitoring and improve labor productivity from 40 % - 60% to 60% - 70%
• Easy to planning the next activity
• Efficient use of time
• Less dispute due to clear vision / planning
• Project was successful, met overall deadlines for completion, did not use contingency and shared
savings resulted.
• Owner was pleased with the process efficiency, increased user input during design and final product.
• Team had well documented “lessons learned” for next project.
Fig 16. Benefits of L.P.S
ISSN: 2277-9655
[Verma* et al., 6(6): June, 2017] Impact Factor: 4.116
IC™ Value: 3.00 CODEN: IJESS7
http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology
[301]
XI. LIMITATION
Participants: Large construction companies are ready to implement after giving training or small
workshop, but the small and medium companies are not much interested to use it.
No – one – size – fit – to – all: All firms are not fit in the guidelines or the way of Toyota production
system, so all firms operate their works differently that’s why all firms do not accept easily.
Takes time: it is not gives result in short term basis, implementation and then result takes time,
overall it requires time, efforts, engagement of employees to make planning and get together within a
week.
Implementation: Implementation of L.C is easy in Production System but is very tough to
implement in construction sector.
XII. REFERENCE
1. Mossman Alan, 2013 paper “Last Planner 5+1 crucial and collaborative conversations for predictable
design and construction delivery.”
2. Amit Shankar Murje, 2014, why Iean construction techniques is better than the traditional project
management approach.
3. Thomas & Maloney has been published in ASCE journal paper “Modelling Construction Labor
Productivity”
4. Howell, Gregory A. (1999). "What is Lean Construction" (pdf). Proceedings IGLC-7. Lean
Construction Institute. pp. 1–10. Retrieved 31 March 2013.
5. Ballard, Glenn (2000). Last Planner™ System of Production Control (pdf) (Ph.D.). UK: University of
Birmingham. Retrieved 29 March 2013.
6. 2006 Aditi Javknedkar, Lean Construction in concrete construction project.
7. 2005 Mr. O.Salem and J. Salomom, implemented and assessed lean at construction site of Honda U.K
CITE AN ARTICLE
Verma, A., Ahgalekar, S., Dr, & Khandare, M., Prof. (2017). APPLICATION OF LEAN
CONSTRUCTION TOOL (L.P.S) TO IMPROVE LABOUR PRODUCTIVITY AT
CONSTRUCTION SITE. INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES &
RESEARCH TECHNOLOGY, 6(6), 288-301. doi:10.5281/zenodo.809172

More Related Content

What's hot

High volume fly ash concrete
High volume fly ash concreteHigh volume fly ash concrete
High volume fly ash concretevarunkv222
 
Construction Productivity
Construction ProductivityConstruction Productivity
Construction ProductivitySunil Manjeri
 
Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.
Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.
Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.Mr. Lucky
 
EXPERIMENTAL STUDIES ON PROPERTIES OF GEOPOLYMER CONCRETE WITH GGBS AND FLY ASH
EXPERIMENTAL STUDIES ON PROPERTIES OF GEOPOLYMER CONCRETE WITH GGBS AND FLY ASHEXPERIMENTAL STUDIES ON PROPERTIES OF GEOPOLYMER CONCRETE WITH GGBS AND FLY ASH
EXPERIMENTAL STUDIES ON PROPERTIES OF GEOPOLYMER CONCRETE WITH GGBS AND FLY ASHIAEME Publication
 
Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Murali Naidu
 
Glass powder replacement for cement.by ananth k p coorg
Glass powder replacement for cement.by ananth k p coorgGlass powder replacement for cement.by ananth k p coorg
Glass powder replacement for cement.by ananth k p coorgMujeeb Muji
 
Autoclaved Aerated Concrete Blocks
Autoclaved Aerated Concrete BlocksAutoclaved Aerated Concrete Blocks
Autoclaved Aerated Concrete BlocksThaju Zaman
 
Applications of six sigma in Construction
Applications of six sigma in ConstructionApplications of six sigma in Construction
Applications of six sigma in ConstructionAnkita Kolamkar
 
RECYCLED AGGREGATE CONCRETE / SLIDE SHARE / PPTX
RECYCLED AGGREGATE CONCRETE / SLIDE SHARE / PPTXRECYCLED AGGREGATE CONCRETE / SLIDE SHARE / PPTX
RECYCLED AGGREGATE CONCRETE / SLIDE SHARE / PPTXGOKULKRISHNAG4
 
Aluminium Formwork Vs Conventional Formwork
Aluminium Formwork Vs  Conventional  FormworkAluminium Formwork Vs  Conventional  Formwork
Aluminium Formwork Vs Conventional Formworkchaitanyakrsk
 
Bubble deck slab
Bubble deck slabBubble deck slab
Bubble deck slabAkhil Teja
 
Aerated autoclaved concrete
Aerated autoclaved concreteAerated autoclaved concrete
Aerated autoclaved concreteFrahim Akhtar
 

What's hot (20)

High volume fly ash concrete
High volume fly ash concreteHigh volume fly ash concrete
High volume fly ash concrete
 
Plastic bricks
Plastic bricksPlastic bricks
Plastic bricks
 
Construction Productivity
Construction ProductivityConstruction Productivity
Construction Productivity
 
Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.
Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.
Autoclaved Aerated Concrete Bricks (AAC) Seminar Report.
 
Om lean
Om leanOm lean
Om lean
 
EXPERIMENTAL STUDIES ON PROPERTIES OF GEOPOLYMER CONCRETE WITH GGBS AND FLY ASH
EXPERIMENTAL STUDIES ON PROPERTIES OF GEOPOLYMER CONCRETE WITH GGBS AND FLY ASHEXPERIMENTAL STUDIES ON PROPERTIES OF GEOPOLYMER CONCRETE WITH GGBS AND FLY ASH
EXPERIMENTAL STUDIES ON PROPERTIES OF GEOPOLYMER CONCRETE WITH GGBS AND FLY ASH
 
Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016Lean Construction_PMI_Nov 19, 2016
Lean Construction_PMI_Nov 19, 2016
 
Glass powder replacement for cement.by ananth k p coorg
Glass powder replacement for cement.by ananth k p coorgGlass powder replacement for cement.by ananth k p coorg
Glass powder replacement for cement.by ananth k p coorg
 
Autoclaved Aerated Concrete Blocks
Autoclaved Aerated Concrete BlocksAutoclaved Aerated Concrete Blocks
Autoclaved Aerated Concrete Blocks
 
ferrock cement
ferrock cementferrock cement
ferrock cement
 
Applications of six sigma in Construction
Applications of six sigma in ConstructionApplications of six sigma in Construction
Applications of six sigma in Construction
 
RECYCLED AGGREGATE CONCRETE / SLIDE SHARE / PPTX
RECYCLED AGGREGATE CONCRETE / SLIDE SHARE / PPTXRECYCLED AGGREGATE CONCRETE / SLIDE SHARE / PPTX
RECYCLED AGGREGATE CONCRETE / SLIDE SHARE / PPTX
 
Aluminium Formwork Vs Conventional Formwork
Aluminium Formwork Vs  Conventional  FormworkAluminium Formwork Vs  Conventional  Formwork
Aluminium Formwork Vs Conventional Formwork
 
Bubble deck slab
Bubble deck slabBubble deck slab
Bubble deck slab
 
Aerated autoclaved concrete
Aerated autoclaved concreteAerated autoclaved concrete
Aerated autoclaved concrete
 
Project csac
Project csacProject csac
Project csac
 
Recycled aggregates
Recycled aggregatesRecycled aggregates
Recycled aggregates
 
Bendable Concrete
Bendable ConcreteBendable Concrete
Bendable Concrete
 
Rubber Paver blocks
Rubber Paver blocksRubber Paver blocks
Rubber Paver blocks
 
Lean Construction Management
Lean Construction Management Lean Construction Management
Lean Construction Management
 

Similar to Application of last planner system

Project Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A ReviewProject Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A ReviewIRJET Journal
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryAM Publications
 
Delay Analysis in Construction of Redevelopment Residential Project
Delay Analysis in Construction of Redevelopment Residential ProjectDelay Analysis in Construction of Redevelopment Residential Project
Delay Analysis in Construction of Redevelopment Residential ProjectIRJET Journal
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...IRJET Journal
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...IRJET Journal
 
IRJET- Enhancement of Highway Project Performance using Lean Construction Method
IRJET- Enhancement of Highway Project Performance using Lean Construction MethodIRJET- Enhancement of Highway Project Performance using Lean Construction Method
IRJET- Enhancement of Highway Project Performance using Lean Construction MethodIRJET Journal
 
IRJET - Optimum Utilization of Construction Resources: A Review
IRJET -  	  Optimum Utilization of Construction Resources: A ReviewIRJET -  	  Optimum Utilization of Construction Resources: A Review
IRJET - Optimum Utilization of Construction Resources: A ReviewIRJET Journal
 
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...IRJET Journal
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil EngineeringIRJET Journal
 
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...IRJET Journal
 
Essay On Stage Scheduling
Essay On Stage SchedulingEssay On Stage Scheduling
Essay On Stage SchedulingJessica Lopez
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleIAEME Publication
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleIAEME Publication
 
Review Application of value engineering in construction project.
Review Application of value engineering in construction project.Review Application of value engineering in construction project.
Review Application of value engineering in construction project.IRJET Journal
 
Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...IRJET Journal
 
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewStudy of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewIRJET Journal
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET Journal
 

Similar to Application of last planner system (20)

Project Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A ReviewProject Planning: Advanced Techniques and Process Waste Removals – A Review
Project Planning: Advanced Techniques and Process Waste Removals – A Review
 
Barriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction IndustryBarriers to Implement Lean Principles in the Indian Construction Industry
Barriers to Implement Lean Principles in the Indian Construction Industry
 
Delay Analysis in Construction of Redevelopment Residential Project
Delay Analysis in Construction of Redevelopment Residential ProjectDelay Analysis in Construction of Redevelopment Residential Project
Delay Analysis in Construction of Redevelopment Residential Project
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...Application of Lean Construction Techniques in Civil Engineering: Plucking th...
Application of Lean Construction Techniques in Civil Engineering: Plucking th...
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
 
IRJET- Enhancement of Highway Project Performance using Lean Construction Method
IRJET- Enhancement of Highway Project Performance using Lean Construction MethodIRJET- Enhancement of Highway Project Performance using Lean Construction Method
IRJET- Enhancement of Highway Project Performance using Lean Construction Method
 
IRJET - Optimum Utilization of Construction Resources: A Review
IRJET -  	  Optimum Utilization of Construction Resources: A ReviewIRJET -  	  Optimum Utilization of Construction Resources: A Review
IRJET - Optimum Utilization of Construction Resources: A Review
 
Ijciet 08 04_218
Ijciet 08 04_218Ijciet 08 04_218
Ijciet 08 04_218
 
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
 
IRJET- A Study of Supply Chain Management in Civil Engineering
IRJET-  	  A Study of Supply Chain Management in Civil EngineeringIRJET-  	  A Study of Supply Chain Management in Civil Engineering
IRJET- A Study of Supply Chain Management in Civil Engineering
 
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
IRJET- Application of Machine Learning in Predicting Key Performance Indicato...
 
Essay On Stage Scheduling
Essay On Stage SchedulingEssay On Stage Scheduling
Essay On Stage Scheduling
 
B1303020508
B1303020508B1303020508
B1303020508
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principle
 
Minimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principleMinimising waste in construction by using lean six sigma principle
Minimising waste in construction by using lean six sigma principle
 
Review Application of value engineering in construction project.
Review Application of value engineering in construction project.Review Application of value engineering in construction project.
Review Application of value engineering in construction project.
 
Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...Construction Management Techniques to Complete the Project within Time Period...
Construction Management Techniques to Complete the Project within Time Period...
 
Study of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A ReviewStudy of Lean construction tools for Workflow Improvement -A Review
Study of Lean construction tools for Workflow Improvement -A Review
 
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
IRJET-Analysis of Losses Due to Breakdown of Equipments in Construction.
 

Recently uploaded

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 

Recently uploaded (20)

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

Application of last planner system

  • 1. ISSN: 2277-9655 [Verma* et al., 6(6): June, 2017] Impact Factor: 4.116 IC™ Value: 3.00 CODEN: IJESS7 http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology [287] IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY APPLICATION OF LEAN CONSTRUCTION TOOL (L.P.S) TO IMPROVE LABOUR PRODUCTIVITY AT CONSTRUCTION SITE Anshi Verma*1 , Dr. S.S. Angalekar2 , Prof. Manish Khandare3 *1,2,3 Construction management, R.M.D Sinhgad School of Engineering DOI: 10.5281/zenodo.809172 ABSTRACT Indian construction industry still follows the primitive work pattern, which generates poor management in resources, waste management, over budgeting and schedule lagging. To eliminate all the above mentioned issues, construction industries are now adopting sophisticated tools and techniques like lean construction tool (L.P.S). This paper includes the implementation of last planner system at site. After the implementation we observed the improvising effect in the area of labor productivity therefore, we can conclude that the L.P.S technique is better than the primitive project management approach. Keywords: Last Planner System, Lean Construction Institute, Lean Construction, Weekly Work Plan, Building Information Modelling, Just – in- time and Project Evaluation Planning. I. INTRODUCTION In India, construction industry is the second largest industry after agriculture and services, according to XII Five (5) year plan (2012-2017) there are several proposals for construction works like roads, railway, seaports, airports, metro and smart- cities. Lean construction system has been introduced as a new management approach to improve the productivity in the construction industry. A. Definitions Lean construction is a method to design production system to reduce the wastage of materials, time and efforts in order to generate the maximum possible outcome. Lean: The main object is, to maximize customer value while minimizing wastage. Generally the meaning of Lean is creating more value for customers within limited resources. Construction: Building construction is the process of preparation and formation of building and building system, which starts with planning, design, financing and continues until the structure is ready for occupancy. Management: The organization and coordination of the activities of a business in order to achieve the defined objectives. Last Planner System: it is a collaborative planning process that involves trade foremen or design team leaders (the last planner) during planning in greater and greater detail as the time for the work to be done get closer. In UK it is known as: Collaborative Planning. In USA it is known as: Pull Planning.
  • 2. ISSN: 2277-9655 [Verma* et al., 6(6): June, 2017] Impact Factor: 4.116 IC™ Value: 3.00 CODEN: IJESS7 http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology [288] Fig 1. Last Planner System (Ref. 1) B. History of Lean Management . Lean manufacturing is not especially new, it derives from the Toyota Production System or Just-In-time production, Henry Ford and other predecessors. Henry Ford: Although there are instances of rigorous process thinking in manufacturing all the way back to the Arsenal in Venice in 1450s, the first person who truly integrate an entire production process was Henry Ford. Kiichiro Toyota: As Kiichiro Toyota, Taiichi Ohno, and others at Toyota observed this situation in 1930s, and more intensely just after World War II , they learned that a series of impel innovations might create the possibility to produce continuity in process flow and a wide range of variety in product offerings. Lean today’s: Today’s big construction firm from U.S.A, U.K and China is easily accepting lean tools (L.P.S) at site. Construction firm are accepting it and getting benefits after its implementation. Most important some of the lean tools are in use from more than two decades throughout the world. C. Objective of the study . Identify tools and techniques of Lean Construction Tool. . Identify the importance of L.C in Indian Construction Industry. . Identify the impact on productivity of labors after the implementation of LPS in the Construction industry. . Identify the terms, where LPS is different than the traditional Project Management Approach. D. Need for Study Due to the infrastructure development in the county, several construction firms are launching themselves in the market and labor productivity has been calculated annually 40-60%. Which can be increase by 60-70% by applying L.P.S at site for upcoming projects. Implementation of L.P.S is necessary, the main objective of lean management principle is “Drive more value by using less of resources.” II. LITERATURE REVIEW Mossman Alan, 2013 has worked on LPS and analyzed almost 26 Cases and feedbacks on the site of U.K, where people were already using LPS. His published paper “Last Planner 5+1 crucial and collaborative conversations for predictable design and construction delivery” explains the importance, compilation and benefits of LPS implementation. Amit Shankar Murje, in 2014 has elaborated that why Iean construction techniques is better than the traditional project management approach.
  • 3. ISSN: 2277-9655 [Verma* et al., 6(6): June, 2017] Impact Factor: 4.116 IC™ Value: 3.00 CODEN: IJESS7 http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology [289] Thomas & Maloney have published in ASCE journal paper “Modelling Construction Labor Productivity” and discussed the formula to find out labor productivity in all different kind of site- situation. In 2006 Aditi Javknedkar applied Lean Construction in concrete construction project, which introduced lean and last planner system in construction industry. In 2005 Mr. O.Salem and J. Salomom implemented and assessed lean at construction site of Honda U.K and finished the case study. III. RESEARCH METHODOLOGY Fig 2.Sequence of Research Methodology Stage I: Formulation of Objective of the study Collection of references include journals, technical reports and books. Stage II: Find out Importance of Lean Construction Technique in India To address importance of lean technique in Indian construction industry. Stage III: Apply Lean Technique at Site Apply lean Technique at site and find out the impact. Stage IV: Survey, Feedback, Observation, Calculation. Data collection from observation and questioner survey and lowest possible level in a whole range of one-off production calculation to find out labor productivity at construction site. Stage V: Results and discussion . To identify the benefits of Lean implementation. . Collect suggestions from users. IV. TOOLS AND TECHNIQUES BIM (Lean Design), A3, process design (Lean Design), Offsite fabrication and JIT (Lean Supply), Value chain mapping / Last planner system (Lean Assembly), Visual site (Lean Assembly); 5S (Lean Assembly),
  • 4. ISSN: 2277-9655 [Verma* et al., 6(6): June, 2017] Impact Factor: 4.116 IC™ Value: 3.00 CODEN: IJESS7 http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology [290] Daily crew huddles (Lean Assembly). V. LAST PLANNER SYSTEM On the basis of the research, Mr. Glenn Ballard and Greg Howell invented the last planner system to improve construction productivity in 1980s. It is “The Collaborative, commitment based planning system that integrates should-can-will-did planning (Pull Planning, Make-Ready plan, Look-ahead plan)with constraint analysis, weekly work planning based upon reliable promises and learning based upon analysis of PPC (Plan Percentage Completed) and reasons for variance.” Fig 3. Mr. Gregg Howell (Right) & Dr Glenn Ballard (Left) (Fig. Ref. Google) And they said “Last Planner Manages the relationships, conversations and commitment which enables program and production planning decision to be made collaboratively at the lowest possible level in a whole range of one-off production settings.” Figure 4. Implementation of L.P.S at site (Image source: Google) A. Why should construction people choose L.P.S? Technical and non-technical person both can use the L.P.S at site to achieve best performance in design and construction, to determine the schedule of work completion. There are many reasons why any organization should adopt LPS (Including owners, designers and constructors) . To deliver projects more safely, on-time with less cost. . To build more predictable production program. . To reduce the stress/burden of project management team. . To improve the overall production process. . To increase the customer’s reliability by Just-In-Time delivery. And on the basis of Case-Study reviewed papers there are some benefits like: 1. Smooth work flow. 2. Predictable work plan.
  • 5. ISSN: 2277-9655 [Verma* et al., 6(6): June, 2017] Impact Factor: 4.116 IC™ Value: 3.00 CODEN: IJESS7 http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology [291] 3. Reduces Cost. 4. Reduces delivery time. 5. Improves productivity. 6. Good collaboration/coordination with field personnel and subcontractors. 7. Helpful in monitoring. B. Is LPS only applicable in construction sector? Glenn Ballard, in May 2012 at Nottingham Trent University in U.K has been reported that LPS can use in these fields also: 1. Production. 2. Software engineering. 3. Healthcare. 4. Development in the sector like Oil and Gas. He said that “LPS works in all kind of situation where human coordination requires.” C. Steps of Last Planner System Collaborative Programming ↓↓ Make – Ready Plan (Look-Ahead Plan) ↓↓ Production Planning (Weekly work Plan) ↓↓ Production Management (Daily Huddle Meeting) ↓↓ Measurement, learning and Continual Improvement 5+ 1 First Run Studies Last Planner System improves both design and construction, which gives project work flow, reliability and completion of work on time. Figure 5. Steps of Last Planner System
  • 6. ISSN: 2277-9655 [Verma* et al., 6(6): June, 2017] Impact Factor: 4.116 IC™ Value: 3.00 CODEN: IJESS7 http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology [292] 1. Collaborative Programming: . Helps project team to increase the coordination by knowing each other, identify the problems within the project and reaches on the decision by mutual agreement to how to solve it, design and plan handovers. . Master planning and pull planning on the basis of overall project objectives and master scheduling plan to know what should be done next. Benefits of Collaborative Programming: . Prepare each team member for action together from starting of project. . Sorts out sequencing as well as issues/difficulties to make smooth work flow. . Identifies unclear design details. . Builds commitment within each participants and reduces overall program period. 2. Make – Ready . Making tasks in the look ahead period ready so that they can be easily done whenever we want to do them. . Ensure that the work will be done when it is require to do. Benefits of Make-Ready Process . Task or things are be ready for production or construction when requires. . Less wastage of material and equipment due to greater certainty of time. 3. Production Evaluation & Planning : . Regular Production evaluation and meeting planning is involve throughout the project in Last Planner System. . This meeting is weekly and known as weekly work plan meeting. . Beneficial in monitoring current activity at site. . Each last planner leader proposes a construction program for his team In P.E.P meeting and they identifies if there is any inter-dependencies between their proposals like resources, equipment and reduces the burden of over-committing by distributing each task within team members. Figure 6: Weekly Work Plan Format
  • 7. ISSN: 2277-9655 [Verma* et al., 6(6): June, 2017] Impact Factor: 4.116 IC™ Value: 3.00 CODEN: IJESS7 http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology [293] Benefits of PEP meeting in the context of Last Planner: . Try to maintain relationship between supplier and team leaders through reliable promises, commitment and implementation. . Maintains commitment by doing their task, and focuses on what can really be done. . They work together every week for the improvement and learn from their own and other’s experience. Figure 7. Promise Cycle of L.P.S 4. Production Management . Collaboratively monitoring of production to keep activities on track. . Helps to adjust plans in the light of new information/data according to the percentage (%) of work completed actually and what is expected, means re-scheduling. . Construction is a social process , coordination ,conferences on telephone between the contractors so that manage/arrange the equipment/resources so that tomorrow’s work will be start on the time in-spite of last minute adjustment and this is the responsibility of project manager for the set-up and brief meeting or conversation and it takes not more than 15 minutes. 5. Measurement , Learning & Continual improvement . Learning together is all about improving project, planning and production process. . At the end of the task executed at site by measurement we can get to know the reason for variance and they try to reduce in next activity and this is called continual improvement. . And learning elements, encourages learning from success and reduces repeated failures. . Last planner measures the predictability of work delivery – percentage of promises completed on time and at the end of PPC meeting, team members get motivation to do next week activity for more satisfaction. . After using LPS in U.K and U.S, construction industry institute reported the correlation between the PPC and productivity on engineering construction project, they observed changes in productivity and profitability with the PPC around 75%-90%.
  • 8. ISSN: 2277-9655 [Verma* et al., 6(6): June, 2017] Impact Factor: 4.116 IC™ Value: 3.00 CODEN: IJESS7 http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology [294] Figure 8: Correlation between PPC and Productivity (Mossman) There are various reasons which team member faced while its execution on site, so that the reason and type of problem occurring find out by Pareto chart, Cause and effect diagram or by any other Quality Control tool. Figure 9: Pareto chart for causes of late arrivals materials to the site +1 First Run Studies The first run study is integral part of LPS, FRS is used to learn about the sequence so that it can be improved and done more safely, completed to the required quality, FRS is based upon Plan-Do-Check-Act cycle. Figure 10: Deming P-D-C-A Cycle
  • 9. ISSN: 2277-9655 [Verma* et al., 6(6): June, 2017] Impact Factor: 4.116 IC™ Value: 3.00 CODEN: IJESS7 http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology [295] VI. CASE – STUDY : IMPLEMENTATION AT SITE In India , there are very few sites who actually use Last Planner System at site, the other tools like Building information modelling ,A3 Report for documentation work , Just in Time , these are already in use at construction site . So the challenges is to implement L.P.S at site and to know that how much it is useful by taking feedback through each employee. That’s why we have been chosen a construction site in Pune (India) and the details are: • Apply Last Planner System (LPS) at Site. • Site name – Suvaranrekha • Type of Building- Commercial ( 7 Floor) • Location – Prabhat road , Pune ( INDIA ) • Project started – Feb 2012 , Finish – Dec 2016 Figure 11. Images of construction site
  • 10. ISSN: 2277-9655 [Verma* et al., 6(6): June, 2017] Impact Factor: 4.116 IC™ Value: 3.00 CODEN: IJESS7 http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology [296] Figure 12. Apply last planner system at site OBSERVATION / FINDING By the implementation on construction site, taking feedback by questioners survey as well as observation • Optimum use of resources • Reduce waste • Transparency • Time save • Avoid dispute VII. EFFECT ON THE PRODUCTIVITY OF LABORS: Calculation A. Labor productivity = Output / Labor cost B. Labor productivity = Output / Work-hour C. Labor productivity = Labor cost / Output OR = Work hours / Output D. Performance factor = Estimated unit rate / Actual unit rate 1. For plastering work Per day work done by the labor = 10 m2 (quantity of material) (8 hour) Area covered = 100 ft2 No. of person = 1 skilled labor + 1 unskilled labor + 1 helper Cost for 1 day = 500 + 350 + 300 = 1150 a. Labor productivity = 100 / 1150 = 0.086 ft2/Rs. After applying L.P.S = 110 /1150 = 0.095 ft2 / Rs. b. Labor productivity = 100/ 8 = 12.5 work/hr After applying L.P.S = 110/8 = 13.75 work/hr c. Labor productivity = 1150 / 100 = 11.5 Rs/ ft2 After applying L.P.S = 1150/ 110 = 10.45 Rs/ft2 d. Performance factor = 10.45/ 11.5 = 0.9 After applying L.P.S = 11.5/11.5 = 1 2. Brick work in foundation and Plinth level with cement mortar Quantity = 1.25 m3 / day Work done by mason Payment for 1 day to mason = 1150 /-
  • 11. ISSN: 2277-9655 [Verma* et al., 6(6): June, 2017] Impact Factor: 4.116 IC™ Value: 3.00 CODEN: IJESS7 http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology [297] After applying L.P.S work done = 50 ft3 Quantity = 1.4 m3/day a. Labor productivity = 45/1150 = 0.04 ft3/Rs. After L.P.S = 50/1150 = 0.043 b. Labor productivity 45/8 = 5.6 ft3/hr After L.P.S = 50/8 = 6.25 ft3/hr c. Labor productivity = 1150/45 = 25.6 Rs./ft3 After L.P.S = 1150/ 50 = 23 Rs./ft3 d. Performance factor = 23/25.6 = 0.9 After L.P.S 25.6 / 25.6 = 1 Table 1. Productivity of labor for plastering work For plastering work About Before L.P.S After L.P.S By equation A. Labor productivity 0.086 ft2/Rs. 0.095 ft2/Rs By equation B. Labor productivity 12.5 ft2/hr. 13.75 ft2/hr By equation C. Labor productivity 11.5 Rs./ft2 10.45 Rs./ft2 By equation D. Performance factor 0.9 1 Initially mason was covering 12.5 ft2 per hour plastering and after applying LPS the productivity improve by 13.75 and initially we were paying 11.5rs./ft2 and after applying LPS we are paying 10.45 for the same area. So productivity increase and per ft2 payment is also reduce as compare to previous. Table 2. Productivity of labor for brick work For Brick work About Before L.P.S After L.P.S By equation A. Labor productivity 0.04 ft3/Rs. 0.043 ft3/Rs By equation B. Labor productivity 5.62 ft3/hr. 6.25 ft3/hr By equation C. Labor productivity 25.6 Rs./ft3 23 Rs./ft3
  • 12. ISSN: 2277-9655 [Verma* et al., 6(6): June, 2017] Impact Factor: 4.116 IC™ Value: 3.00 CODEN: IJESS7 http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology [298] By equation D. Performance factor 0.9 1 Initially labor was covering 5.62 ft3 per hour brick work and after applying LPS the productivity improve by 6.25 and initially we were paying 25.6 Rs. /ft3 and after applying LPS we are paying 23 for the same area. So productivity increase and per ft3 payment is also reduce as compare to previous. VIII. DISCUSSION OF RESULTS AND RECOMMENDATIONS By applying lean construction tool (L.P.S) at site, the labor productivity observed by 10 to 12% as compared to previous. Exp. For plastering it improves 12.5 ft2/hr to 13.75ft2/hr and performance factor 0.9 to 1. Same as for brick work and other construction work. So it is practically beneficial for the optimizing resources and improve labor productivity at construction site. Figure 13. Before and after applying LPS With and without LPS Fig 14.Without last planner system
  • 13. ISSN: 2277-9655 [Verma* et al., 6(6): June, 2017] Impact Factor: 4.116 IC™ Value: 3.00 CODEN: IJESS7 http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology [299] Fig 15.After applying last planner system IX. IN WHICH TERMS IT IS DIFFERENT THAN THE TRADITIONAL PROJECT MANAGEMENT APPROACH: Traditional Construction Management Lean Construction Management 1. Customer is not involving in planning stage. Customer, Client, Owner, Contractor, Project Manager everyone involve from starting. 2. This is Push Techniques focus to increase productivity of each activity even if this may be causes of rework, reduce customer satisfaction. This is Pull Techniques, main focus is on the proper flow of activities with reduce error or rework and consideration of customer’s requirement and satisfaction. 3. It does not consider adjustment because of the isolated environment and only Project Manager Work as a boss, so there are no suggestion or ideas come from the participants. This system’s capacity absorb the variation, because of feedback loop, learning and continual improvement and rapid system response. 4. Traditional construction management does not pay attention to continuous improvement. And this approach tries to make continuous improvements. 5. Construction management decision rights cantered to one person that is call project manager. And in Lean construction, decision power making is distributed in all those who are involved. 6. It does not consider transparency in between the customers, managers and labors. It tries to increase transparency between the customers, managers and labors.
  • 14. ISSN: 2277-9655 [Verma* et al., 6(6): June, 2017] Impact Factor: 4.116 IC™ Value: 3.00 CODEN: IJESS7 http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology [300] . X. CONCLUSION / BENEFITS OF L.P.S IN LABOR PRODUCTIVITY BY FEEDBACK & IMPLEMENTATION We have successfully applied L.P.S at site, and after analysis of 3 month we have observed by questioner survey and feedback on construction site and the benefits are - • Transparency in scheduling • Avoid waste of resources • Proper monitoring and improve labor productivity from 40 % - 60% to 60% - 70% • Easy to planning the next activity • Efficient use of time • Less dispute due to clear vision / planning • Project was successful, met overall deadlines for completion, did not use contingency and shared savings resulted. • Owner was pleased with the process efficiency, increased user input during design and final product. • Team had well documented “lessons learned” for next project. Fig 16. Benefits of L.P.S
  • 15. ISSN: 2277-9655 [Verma* et al., 6(6): June, 2017] Impact Factor: 4.116 IC™ Value: 3.00 CODEN: IJESS7 http: // www.ijesrt.com © International Journal of Engineering Sciences & Research Technology [301] XI. LIMITATION Participants: Large construction companies are ready to implement after giving training or small workshop, but the small and medium companies are not much interested to use it. No – one – size – fit – to – all: All firms are not fit in the guidelines or the way of Toyota production system, so all firms operate their works differently that’s why all firms do not accept easily. Takes time: it is not gives result in short term basis, implementation and then result takes time, overall it requires time, efforts, engagement of employees to make planning and get together within a week. Implementation: Implementation of L.C is easy in Production System but is very tough to implement in construction sector. XII. REFERENCE 1. Mossman Alan, 2013 paper “Last Planner 5+1 crucial and collaborative conversations for predictable design and construction delivery.” 2. Amit Shankar Murje, 2014, why Iean construction techniques is better than the traditional project management approach. 3. Thomas & Maloney has been published in ASCE journal paper “Modelling Construction Labor Productivity” 4. Howell, Gregory A. (1999). "What is Lean Construction" (pdf). Proceedings IGLC-7. Lean Construction Institute. pp. 1–10. Retrieved 31 March 2013. 5. Ballard, Glenn (2000). Last Planner™ System of Production Control (pdf) (Ph.D.). UK: University of Birmingham. Retrieved 29 March 2013. 6. 2006 Aditi Javknedkar, Lean Construction in concrete construction project. 7. 2005 Mr. O.Salem and J. Salomom, implemented and assessed lean at construction site of Honda U.K CITE AN ARTICLE Verma, A., Ahgalekar, S., Dr, & Khandare, M., Prof. (2017). APPLICATION OF LEAN CONSTRUCTION TOOL (L.P.S) TO IMPROVE LABOUR PRODUCTIVITY AT CONSTRUCTION SITE. INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY, 6(6), 288-301. doi:10.5281/zenodo.809172