900 South Reconstruction &
9-Line Trail (Lincoln Street - 1300 East)
In 2018, Salt Lake City will reconstruct 900 South from
Lincoln Street (950 East) to 1300 East. To repair this badly
deteriorated street, the project will reconstruct the road
base, make minor utility improvements, and repave in
concrete. The 6-month project is expected to begin in May.
As part of this reconstruction, a new bike path will be
constructed on the park strip on the south side of the
street, part of the 9 Line Trail Extension. Pedestrian
crossings will be enhanced with shorter crossing distances
and colored crosswalks. On street parking will remain.
The 9-Line Trail will eventually extend approximately 9
miles across the city, from Emigration Canyon to the Surplus
Canal Trail (planned), west of Redwood Road.
Full Extent of 9-Line Trail (proposed)
The proposed trail will connect parks, neighborhoods, the University of
Utah, and business areas at 9th & 9th East, Central 9th, and 9th & 9th West.
N
Jordan
River
Trail
Liberty
Park
¦15
¦215
State
Redwood
Foothill
700E
900 S Sunnyside
UofU
be further adjusted
to facilitate traffic
flow at 900 South and
1100 East.
draft conceptual design
70 | SALT LAKE CITY - 9-LINE TRAIL EXTENSION STUDY
11’
130’ ROW
11’
6’ 8’
Varies
Bike
Lane
11’
Turn
8’
3’6’
1-way
(uphill)
B
p
i
pp
ke
Path
6’
6’ 12’
9-LINE TRAIL CENTRAL: LINCOLN TO 130
DNALLELCCM
1000E
E0011
DNALLELCCM
1000E
TSNLOCNIL
E00
1100
McClelland Trail /
Buffered bike lane to
2-way bike path transition
Fhefei[Z '(&& ;Wij % /#B_d[ JhW_b
(#MWo X_a[ fWj^ m_j^ Zemd^_bb X_a[ bWd[
5
This conceptual design separates out Gilmer Avenue as its
own “T intersection” with 900 South. Bulb out designs will
Proposed Intersection Redesign:
Lane Reconfiguration:
900 South will be striped with one lane in each direction
and a center turn lane, similar to the configuration both
east and west of this segment.
People with disabilities can request reasonable accommodation
with 48 hours advance notice. Accommodations may include
alternative formats, interpreters, and other auxiliary aids. Please
contact Moana Uluave-Hafoka, Coordinator for Disability Rights,
moana.uh@slcgov.com, 801-535-7697, TTD 711.
Find out more & give us your input.
JOIN US IN PERSON:
Open House - Thursday, February 8, stop by between
6-8 pm, Tracy Aviary in Liberty Park, Chase Mill.
PARTICIPATE ONLINE:
www.slcgov.com/transportation/9Line
Online questionnaire to be launched by February 8
EMAIL OR CALL US:
Salt Lake City Transportation Division
801-535-7274 becka.roolf@slcgov.com
If you have questions, thoughts, or concerns,
please respond by February 15.
~ ~ ~
900 S
1100E
GILMER
900 S
MCCLELLAND
1
1
2
3
2
4 4
2
2
2
3
3
3
4
4
5
1
1
1 1
4
9heiiel[h hWcf Wbbemi CY9b[bbWdZ JhW_b
ki[hi je WYY[ii _cfhel[Z Yheii_d] X[jm[[d
e¢i[j _dj[hi[Yj_ed b[]i
Jof_YWb /#B_d[ Yehd[h fbWpW
H[YjWd]kbWh hWf_Z ÔWi^_d] X[WYed HH8
_cfhel[i o_[bZ Yecfb_WdY[ Wj Yheii_d]
9ehd[h h[k][ _ibWdZ
9khX [nj[di_ed WdZ jkhd gk[k[ Wbbemi
Zemd^_bb X_a[ bWd[ ki[hi je kj_b_p[ Yheii_d]
je jhWdi_j_ed je jme#mWo X_a[ fWj^ ed iekj^
i_Z[ e / I
HW_i[Z jhW_b Yheii_d] Wj h[#Wb_]d[Z =_bc[h Ij$
Fej[dj_Wb c[Z_Wd [nj[di_edi YekbZ khj^[h
YWbc j^[ Yheii_d] Xo h[ijh_Yj_d] b[j jkhdi
edje CY9b[bbWdZ
:emd^_bb X_a[ bWd[
9heiiel[h hWcfi i^ekbZ X[ i[j XWYa Wh
[dek]^ hec ijef XWh je Wbbem gk[k_d] eh
jme YWhi
5
5
McClelland Intersection
1100 E / 900 S / Gilmer Intersectio
Incorporation of 9-Line Trail:
Following the conceptual design in the Trail Extension Study,
construct a bike path on the south side of 900 South. On the
steep hill, construct an uphill path downhill bike lane.