SlideShare a Scribd company logo
1 of 10
Donald Chris Kane
Phoenix, AZ
Mobile: (323) 637-5723
E-mail: dckane78@gmail.com
Objective: Seeking a position as a Telecommunications Field Technician/Engineer with
a company where I may best utilize my team-player skills, and set a standard for all
around me.
Experience:
CVS Health via Randstad Staffing
02/2016 - 12/2016
Cable Technician/IT Desktop Admin
Cleaned up and removed “dead” cables on PBX in MDF
Went through floor tiles to remove over 500 amphenol and CAT 5E/6 cabling in MDF
Redesigned and revamped over 10 IDF’s throughout Shea location
Programmed client’s phones using Avaya’s ASA and HPSM ticketing system. Other
functions performed were: adds & removes of customer’s locations and/or phones
throughout the building; adding voicemail or additional lines to phone;
importing/exporting of files using ASA to create accurate spreadsheets
Assisted in new build of 44th
Street CVS location by: programming and placing phones,
and assigning employees’ locations
Verveba Telecom
10/2015 - 01/2016
Field Integration Engineer
Completed Carrier Aggregation for Verizon Wireless
Removed Slave DUS from 6601, and placed into 6102/6201 RBS cabinets – next to
Master DUS
Scratch loaded Slave DUS for NIC integration
Used Whiteboard (w/NIC) to integrate DUS’
Decommissioned 6601 and removed from site
Ran new or existing fibers from Raycap to new location
Ericsson Training
08/2105-09/2015
1. Basic Installation Techniques course. (Grapevine, TX)
2. LTE Commissioning course (Grapevine, TX)
3. L700 RBS Installation course (Corona, CA)
4. WCDMA RBS Installation course (Corona, CA)
Outsource Staffing
02/2014-08/2015
E911 Drive Tester/DAS Cable Technician/Installer
• Moved, removed, changed, and installed: POS systems, phone systems, computer
terminals, audio systems, DVR's, digital signage, traffic monitoring
systems/analytics and wireless RF units - in top restaurants and some mall retail
vendors: Macy's, JCPenney's, etc
• Removed/installed Alcatel CSR 7705 Router for T-Mobile in North and South
Carolinas. Powered up and commissioned CSR 7705 router; pinged connectivity
to the NOC; terminated and tested T1 connectivity for LTE expansion. Over 170
sites visited and prepared for upgrade.
• Moved T1 and other related cables from 3106/3206/6102/6132 to new L1900
cabinets. Also moved LMU and/or CSR 7705 Router to new Metro PCS cabinet.
• Converted over 80 sites for L1900 upgrade for T_MOBILE in North & South
Carolinas
• Experience with radio dispatch consoles: Motorola MCC7000, Centracom
GoldElite, Telex-Vega, AVTEC and Zetron
• Installed over 300 WAP's in retail stores, universities, and hospitals throughout
Phoenix, AZ major demographic
• Ran over 1900' of 24pr cat 5e/6 and fiber cable throughout Arizona Cardinals
Stadium's DAS deployment project for 2105 Super Bowl.
• Pulled fiber and data cables through various ground ports (manholes) up to 3000',
from new dorm developments IDF's to existing IDF's/MDF's @ Mid Western
University
• Installed Panduit paneling and terminated over 125-300 data cables on patch
panels (switch)
• Warranty replaced both NORTHSTAR and FIAMM 2V and 12V batteries in
Verizon cell tower cabinets.
• Maintained warehouse and related areas to assist in efficient productivity of
telecomm equipment
• Conduct drive testing & data collection using NEMO
• Monitor UMTS/LTE data service, handoff between all technologies, data
upload/download activities, ping, short & long calls on multiple systems
• Execute Data and Call Performance
• IRAT and Inter/ Intra BSC/RNC/TAC handover testing.
• Coordinate drive routes and updates maps and design cluster drive routes
• Identify, analyze, and document defects, questionable functions, errors, and
inconsistencies in handset behavior.
• Installed, commissioned, integrated, verified system & acceptance for Nokia
BTS/TD-LTE (Flexi platform) Network Element.
• Calibrated wireless devices using RF power meter and CW generator CMW500
• Verified wireless devices using (VSA) Vector signal analyzer for transmitter
verification with Multi Evaluation List Mode (MELM)
• Performed Layer 1 up to Layer 3 full stack tests including inter-RAT and multicell
as well as signaling conformance tests based on 3GPP, using the signaling
protocol tester CMW500
• Developed and maintained BTS/TD-LTE project competence, process, and
documents for deployment
• Able to perform troubleshooting, and follow NSN NED documentation to
independently resolve project issues.
• Understanding of Antenna Line Configuration and connectivity as well as Flexi
BTS/TD-LTE Feature set
• Installed, commissioned, and integrated over 40 Nokia BTS LTE sites.
• Performed RoofTop field cell site & RRU implementation
• Supported Customer Lab for SW/HW New Feature verification and validation
AT&T
08/2013-12/2013
Civil Crew Technician
• Measured, cut, and carried ground & fiber reels for tower crew, up to 8000ft in
length.
• Placed and positioned GPS mounting in select locations on site
• Ran ground, fiber, and GPS into shelter; fed lines across ladders; connected
power and fiber to respective BBU, RAYCAP, and PowerPlant
• Installed circuit breakers and power on PowerPlant during cutover (maintenance
window) hours
• Installed fiber tray both in/outdoors along with proper grounding (cad-weld when
needed)
• Installed FIF rack in shelters; along with RAYCAP, BBU, SAU, and fiber tray -
on rack
• Swept RF on new antennas using 33/3500 series Anritsu
• Weatherproofed all connections outdoors
Samsung Telecom Association (STA)
03/2013-08/2013
Jr Field Operations Technician
• Conducted Fiber M1 swaps. Conversion of T1's being transferred from Legacy
over to new BTS cabinet for 3G - allowing for 4G technologies to be incorporated
for Samsung/Sprint project
• Performed Pre ATP and ATP processes. Terminated punch-down process.
• Troubleshot battery and rectifier fail alarms. Troubleshot EAIU and related fail
alarms also.
• Commissioned DU's, ASR, and CSR with XShell, ProComm, and/or
HyperTerminal
• WFI (Samsung-MMBS/BSM Training)
• Knowledge and understanding of GSM/WCDMA/UMTS/HSPA/LTE standards
NexLink Wireless
10/2012-02/2013
Field Engineer/ Site Integrator
• Cable and provision DUWs, DUG, DUL and CSR 7705 router for T-Mobile
Modernization project.
• Reset ports on CSR via Switch. Place and move LMU from 3106 to 6102;
reroute/install GPS cable
• Installed components into new cabinets to converge Legacy 3G from 3106/3206
cabinets into new 6102/6201/6132 UMTS/HSPA, 4G & LTE cabinets for T-
Mobile Modernization Project
• Performed power switches from existing +/-48V to +/-24V during power upgrade;
along with installation of door vents, lighting, and removal of old slot cards for
installation of fiber
• Uploaded current software packages and scripts
• Work with the NIC to fully integrate and troubleshoot site. Call test sites
(scrambling codes), work with TDOA to capture call data
• Data entry of day's SOW in AMS tool
• Performed battery audits. Checking internal temp sensors, removing and replacing
thermal temp sensors, and routing breathing tubes from battery to battery
Quanta Wireless Solutions
Via Tangent Int'l
7/2012-10/2012
Field Engineer/Site Integrator
• Same duties as above mentioned
TNS Tangent International Inc.
1/2011-10/2012
Field Operations Technician
• Installed and commissioned 7705 Router. Tested and installed T1's ran from 7705
router in GSM cabinet to GSM cabinet for UMTS/HSPA, 4G upgrade.
• Swapped out CBU and replaced them with a DUW30. Loaded scripts and upgrade
package. Cleared all alarms with NIC.
• Installed and worked on RBS, 3106, 3206, 3518, 3418, 6601, & COW
• Complete ownership for Installation, Commissioning, Integration and Validation.
• Experience in 1st
carrier, 2nd
carriers, 3rd
/4th
carrier
• 3rd
carrier OBIF, 4th
carrier sector add
• Integrations: scratch, Load software, load scripts, p7%44; p7%70, w11
• Troubleshooting High RSSI and VSWR XLAM alarm setup with the DAS system
• Call Testing E911, troubleshooting RU and FU1900/850, PSU,
• Adding RAX board, TX boards, ETTMC1, OVP
• T1s testing with ATT/PCO troubleshooting t1s loop back and forth
• Worked in Dallas TX, East TX, West TX,
• Dealt directly with Ericsson Project managers, and T-Mobile Pm
• Performed Integrations and commission eNode B (3106, 3206, 3418, 3518 etc.)
1st, 2nd, 3rd and 4th carrier integrations.
• Used HyperTerminal, WS-FTP, Caeser FTP, RBS Element Manager, ALEX.,
DropBox
• Additionally, completed integrations of "COW" and "CALF", OBIF solutions,
cascading solutions, loading software via FTP's, loading scripts through EMAS,
and troubleshooting with the NIC/ DAX/ PCO/ MSN/ MSC.
• Also performed troubleshooting RSSI values high or low and any alarms.
Performed hardware cut over, hardware swaps, call testing, site surveying,
installation, general maintains of node b, and completed daily reports.
• Stage deployment of DAS technology in buildings, at universities, and hospitals:
for all interfaces including; LTE, GPRS, GSM, EDGE, UMTS, 1Xev, CDMA,
1XRTT, 3XRTT, wCDMA, CDMA2000, & iDEN
Tested interference generated by passive components thought to be linear such as connectors,
cable assemblies, filters, and antennas using Anritsu PIM Tester MW82119A
• Incorporated flexible forward and reverse RF path settings to optimize cell
performance and coverage for DAS deployment
• Used various base stations (telephone poles and/or light poles) to maximize
simulcast of DAS technology
• Initialized support for battery back-up at hub and at each RAN/microcell location.
• Light work installing antennas, and stringing fiber optical and coaxial cable
between the antenna module and the controller
SAC Wireless
10/2010-4/2011
Wireless Engineer
(Ericsson/T-Mobile)
• GSM to UMTS Harvest/Regroom/Cut-Over of 2102, 2202, 2106, 2206, & 3018
cabinets - to 3106 cabinets. eNode B, 2C install & integration of 3018 cabinets to
3106 cabinets. Terminated power of all rbs cabinets.
• To cut, reconnect, and sweep all RF cables. Proper instruction and certification on
3100/3200/3300 series Anritsu for cable sweeps.
• Removal of Diplexers and Multiplexers from 2102/2106/3018 cabinets, for
regroom of GSM to UMTS.
• Testing of T1's and T3's for movement of sector from 3018 cabinets to
2106/2206/3106 cabinets.
• Testing of Fiber Optic cabling with Optical Time Domain Reflectometers for Db loss
and attenuation.
• Configuration of PC Data exchange of Power meters, and Certification testers for
UTP, and Optical testing results.
• Termination of UTP cabling (T1, Category 3, 5, 5e, 6), and PA cabling with
EIA/TIA cabling standards.
• Termination of UTP stations and terminal cabinets with 8-position modular jacks,
RJ11, RJ45 connectors and 24, 48 port patch panels.
(Motorola/Verizon)
Extended UMTS and GSM T1 circuits from Verizon dmarc;
Terminated circuits into Nokia BTS cabinets; Tested circuits using a T-berd or
Fluke test set, to ensure circuit was error free from the CFL/CSC smartjack to the
ATT Switch;
Opened trouble tickets with Verizon's maintenance and provisioning departments
for circuit errors;
Installed and punched down 66-blocks/50pair at the dmarc and in the shelter;
Pulled cat5/6, 25pr, or 50pr cable to the dmarc;
Prepared BTS cabinets for Nokia technicians, including running power and
ground cables, and coaxial transmission cables. Swept cables with an Anritsu test
set to ensure error free signal.
Integrate, provision and commission Motorola 4812 BTS cabinets.
Program Voice and EVDO carriers, frame and carrier adds,
Make necessary cross connects at DSX panel or Cisco ip modems,
Provision Cisco 1400 MWR or EBH (ethernet backhaul) routers
Supply BSSM Scripts migrating Commercial Voice channels to BTS cabinet and
configuring ethernet on Legacy
Perform ATP tests using Agilent Base Station test equipment to ensure sites meet
necessary standards
USIT
12/2007-4/2010
Field Engineer/Drive Tester
Installation and Integration of Ericsson eNode B 2106, 2206, 2250 (HCHC),
3106,
3206, 3018; Nokia Radio Base Stations.
T1 configuration, integration, circuit identification tests, DSO tests, Loopback
tests. Installation Data Base configurations for DXU and TRU's Ericsson 850 and
1900. E-911 installation and configuration of Geometrix Wireless Location
Sensor's Carrier Access (Flexmasters, Pathmasters Linkmasters.) PSAP (E-911)
test calls.
Conduct drive testing & data collection using TEMS Edge 1.1.1 and TEMS
Investigation 10.6
Verify call has reached the correct PSAP
Verify the address /community is correct
Verify the sector quadrant / location (N, NE, SW, NW, etc.) is correct, which some
markets may not show.
Verify the Dispatcher sees your Call Back number.
Verify Call type / Class of Service / COS before asking for rebid. Phase 1 calls
will usually display WRLS or WPH1, while Phase 2 calls will display WPH2.
Have Dispatcher perform a rebid of the call
Monitor UMTS/LTE data service, handoff between all technologies, data
upload/download activities, ping, short & long calls on multiple systems
Troubleshooting of Radio Base stations faults. Clearing of faults for Radio Base
Stations with thorough fault probe through Installation Data Base. Launching
DXU's and dTRU's with into fully operational states with Ericsson OMT and
Nokia programs.
Installation and Integration of Ericsson GSM and CDMA for RF connectivity.
Diplexer and Multiplexer configuration of RF signal. Channel addition and Network
Topology Cascades of Multi Radio Base Station configurations for timeslot share of T1
transmissions.
True Position EMS (E 911 Phase II equipment). Tellabs Titan 5500 DACS.
Ericsson AXE - 501/810 APG40 platforms.
AVAYA phone system and General Data Communication (T1, PC Skills).
Ericsson 810 BSC installation and Alcatel Media Gateway migration.
Configuration of Ericsson switches (501 & 810 BSC's) of Ericsson 2102 and 2106
BTS versions.
Testing of T-1s and T-3s for DSO. Installation of T-Server applications with
UNIX platform.
Installation and integration of BTS Ericsson Node B 2106,2206 3106, 3206, 2109,
2308, 2206, 3108 TDMA, GSM, UMTS, Radio Base Stations. Integration
performed with OMT program for 1x2, 2x1, 2x6, 3x4 configurations for T1. T1
cross-connects through E-911 CSU.
Installation of and commissioning of E-911 frame relay systems. 3-G multiport T1
cross-connect, DSU, CSU within Ericsson 2G GSM networks. Operations and
Maintenance of Radio Base Station alarms with OMT program, and troubleshooting
E-911 frame relay.
Qualifications:
Installation and commission of LTE 6601, 6102, & 6131 cabinets; eNode B RBS
882, 884, 2102, 2106, 2109, 2308, 2202, 2206, 3106, 3206, 3518, 3418 IDBs
DUW30, DUG & DUL, XLU & XMU installation and commission: DT
configuration
Anritsu certified for 3300/3500 series equipment
EDGE upgrade; RF configuration 2G, 3G, 4G, & LTE Networks
E-911 (Andrew:WLS, True Position:LMU); Carrier Access: Pathmaster,
Flexmaster configuration ADC:Kentrox.
Certified to troubleshoot & integrate on the 6102 and 6131 installs/integration
Program Voice and EVDO carriers
Provision and commission of Motorola 4812 BTS cabinets.
Proficient knowledge of Nortel CDMA Legacy Hot slides product line.
Proficient knowledge of analog of RF Fingerprinting via T-Bird and/or Fluke
equipment
Able to validate T1 terminations before and after turn down of site.
Scope 2 LTE 4G Integration activity (Element Manager), DUL scripting
Certified for troubleshooting 2G, 3G, 4G technologies thru Ericsson
CERTIFICATIONS
Ericsson L700 RBS Installation certificate/badge (instructor based)
Ericsson WCDMA RBS Installation certificate/badge (instructor based)
Ericsson Basic Installation Techniques certificate/badge (instructor based)
Ericsson LTE commissioning certificate/badge (instructor based)
Ericsson 2G, 3G, 4G & LTE installation (over 8 yr period (instructor based))
Ericsson T-Mobile 4G troubleshooting (instructor based)
Ericsson per AT&T Smart Laptop Integration (certificate)
Ericsson per AT&T Smart Laptop Radio Testing (certificate)
Ericsson per AT&T Smart Laptop CBU to DUW training (certificate)
Ericsson (RTU2) per Ericsson grading system
EDUCATION
California State University Northridge
Mechanical Engineering 2004
DeVry Institute of Technology
Electronics Engineering Technician Program (EET) 2000
Operating Systems
Windows 2000, XP, 7, 8, Vista ▪ Solaris ▪ Unix ▪ Linux ▪ MSDOS ▪ HP/VX ▪ AIX
▪ Microsoft Office
California State University Northridge
Mechanical Engineering 2004
DeVry Institute of Technology
Electronics Engineering Technician Program (EET) 2000
Operating Systems
Windows 2000, XP, 7, 8, Vista ▪ Solaris ▪ Unix ▪ Linux ▪ MSDOS ▪ HP/VX ▪ AIX
▪ Microsoft Office

More Related Content

What's hot

Stephen kramer resume updated 2
Stephen kramer resume updated 2Stephen kramer resume updated 2
Stephen kramer resume updated 2Stephen Kramer
 
Curriculum Vitae - AHMED OMER 2015
Curriculum Vitae - AHMED OMER 2015Curriculum Vitae - AHMED OMER 2015
Curriculum Vitae - AHMED OMER 2015Ahmed dahab
 
Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)Nabeel Aslam
 
CV - Saif ul amIn-Mgmt
CV - Saif ul amIn-MgmtCV - Saif ul amIn-Mgmt
CV - Saif ul amIn-MgmtSaif ul Amin
 
LTE mobile system coverage, capacity and quality and its application to commu...
LTE mobile system coverage, capacity and quality and its application to commu...LTE mobile system coverage, capacity and quality and its application to commu...
LTE mobile system coverage, capacity and quality and its application to commu...Comms Connect
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yMasood Dar
 
Resume_PMoua 2016
Resume_PMoua 2016Resume_PMoua 2016
Resume_PMoua 2016Pheng Moua
 
CV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANYCV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANYAmit Kumar
 
Hardeep Singh Gill_Resume
Hardeep Singh Gill_ResumeHardeep Singh Gill_Resume
Hardeep Singh Gill_ResumeHardeep Singh
 
Lte drivetest guideline with genex probe
Lte drivetest guideline with genex probeLte drivetest guideline with genex probe
Lte drivetest guideline with genex probeRay KHASTUR
 
Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2Rabia MOKEDDEM
 
Resume Deepak Pandey Ericsson
Resume  Deepak Pandey EricssonResume  Deepak Pandey Ericsson
Resume Deepak Pandey EricssonDeepak Pandey
 

What's hot (20)

Stephen kramer resume updated 2
Stephen kramer resume updated 2Stephen kramer resume updated 2
Stephen kramer resume updated 2
 
Curriculum Vitae - AHMED OMER 2015
Curriculum Vitae - AHMED OMER 2015Curriculum Vitae - AHMED OMER 2015
Curriculum Vitae - AHMED OMER 2015
 
Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)Electrical Engineer -Nabeel Cv (1)
Electrical Engineer -Nabeel Cv (1)
 
CV - Saif ul amIn-Mgmt
CV - Saif ul amIn-MgmtCV - Saif ul amIn-Mgmt
CV - Saif ul amIn-Mgmt
 
LTE mobile system coverage, capacity and quality and its application to commu...
LTE mobile system coverage, capacity and quality and its application to commu...LTE mobile system coverage, capacity and quality and its application to commu...
LTE mobile system coverage, capacity and quality and its application to commu...
 
Amjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15yAmjad Dar_ CV pic Mobily 15y
Amjad Dar_ CV pic Mobily 15y
 
CV_HAFIZ_FAROOQ
CV_HAFIZ_FAROOQCV_HAFIZ_FAROOQ
CV_HAFIZ_FAROOQ
 
Usman khan Resume
Usman khan ResumeUsman khan Resume
Usman khan Resume
 
CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_CV_Krishna_Gopal_Solanki_
CV_Krishna_Gopal_Solanki_
 
shajeer cv
shajeer cvshajeer cv
shajeer cv
 
Resume_PMoua 2016
Resume_PMoua 2016Resume_PMoua 2016
Resume_PMoua 2016
 
Eslam CV-19062016
Eslam CV-19062016Eslam CV-19062016
Eslam CV-19062016
 
AHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DTAHSANULLAH BHUTTO CV-DT
AHSANULLAH BHUTTO CV-DT
 
CV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANYCV AMIT KUMAR FOR ERICSSON COMPANY
CV AMIT KUMAR FOR ERICSSON COMPANY
 
KW resume 2015
KW resume 2015KW resume 2015
KW resume 2015
 
Hardeep Singh Gill_Resume
Hardeep Singh Gill_ResumeHardeep Singh Gill_Resume
Hardeep Singh Gill_Resume
 
CV - Rashid
CV - RashidCV - Rashid
CV - Rashid
 
Lte drivetest guideline with genex probe
Lte drivetest guideline with genex probeLte drivetest guideline with genex probe
Lte drivetest guideline with genex probe
 
Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2Rabia Mokeddem Resume 2
Rabia Mokeddem Resume 2
 
Resume Deepak Pandey Ericsson
Resume  Deepak Pandey EricssonResume  Deepak Pandey Ericsson
Resume Deepak Pandey Ericsson
 

Viewers also liked

20160301 DHM Co-Profile
20160301 DHM Co-Profile20160301 DHM Co-Profile
20160301 DHM Co-ProfileDHM PARTNERS
 
2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINAL
2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINAL2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINAL
2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINALChristina Soon
 

Viewers also liked (6)

CV Mosaddaque Sabri
CV Mosaddaque SabriCV Mosaddaque Sabri
CV Mosaddaque Sabri
 
JCCC 10 7 16 Flyer draft
JCCC 10 7 16 Flyer draftJCCC 10 7 16 Flyer draft
JCCC 10 7 16 Flyer draft
 
Enbe 2
Enbe 2Enbe 2
Enbe 2
 
Edc Holster 2015
Edc Holster 2015Edc Holster 2015
Edc Holster 2015
 
20160301 DHM Co-Profile
20160301 DHM Co-Profile20160301 DHM Co-Profile
20160301 DHM Co-Profile
 
2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINAL
2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINAL2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINAL
2014 APEC CEO Survey_top 10 slides_with talking points_Chinese_FINAL
 

Similar to Donald resume new

Updated-Resume-2015
Updated-Resume-2015Updated-Resume-2015
Updated-Resume-2015Jiliang Wang
 
Eric Cory Resume
Eric Cory ResumeEric Cory Resume
Eric Cory ResumeEric Cory
 
Capabilities Presentation USA 2013
Capabilities Presentation USA 2013Capabilities Presentation USA 2013
Capabilities Presentation USA 2013Joseph Melanson
 
Atif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineerAtif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineerSyed Atif Shamim
 
Nathaniel weathers resume linkedin
Nathaniel weathers resume linkedinNathaniel weathers resume linkedin
Nathaniel weathers resume linkedinNathaniel Weathers
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMazhar Ali
 
GOPALAKRISHNAN
GOPALAKRISHNANGOPALAKRISHNAN
GOPALAKRISHNANGOPALA46
 
jon_sawyer_cv-Oct2015.doc
jon_sawyer_cv-Oct2015.docjon_sawyer_cv-Oct2015.doc
jon_sawyer_cv-Oct2015.docJonathan Sawyer
 
jay prakash_Resume
jay prakash_Resumejay prakash_Resume
jay prakash_Resumejay prakash
 
MARCOS SAMPLE2011
MARCOS SAMPLE2011MARCOS SAMPLE2011
MARCOS SAMPLE2011Marc Sample
 
Paul_Coulter_Resume_10_2016
Paul_Coulter_Resume_10_2016Paul_Coulter_Resume_10_2016
Paul_Coulter_Resume_10_2016Paul Coulter
 
Jacob Louwaert - Resume - 08.04.15
Jacob Louwaert - Resume - 08.04.15Jacob Louwaert - Resume - 08.04.15
Jacob Louwaert - Resume - 08.04.15Jacob Louwaert
 

Similar to Donald resume new (20)

Updated-Resume-2015
Updated-Resume-2015Updated-Resume-2015
Updated-Resume-2015
 
Eric Cory Resume
Eric Cory ResumeEric Cory Resume
Eric Cory Resume
 
Modassar Resume
Modassar ResumeModassar Resume
Modassar Resume
 
Capabilities Presentation USA 2013
Capabilities Presentation USA 2013Capabilities Presentation USA 2013
Capabilities Presentation USA 2013
 
Atif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineerAtif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineer
 
Nathaniel weathers resume linkedin
Nathaniel weathers resume linkedinNathaniel weathers resume linkedin
Nathaniel weathers resume linkedin
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
Rakesh
RakeshRakesh
Rakesh
 
GOPALAKRISHNAN
GOPALAKRISHNANGOPALAKRISHNAN
GOPALAKRISHNAN
 
jon_sawyer_cv-Oct2015.doc
jon_sawyer_cv-Oct2015.docjon_sawyer_cv-Oct2015.doc
jon_sawyer_cv-Oct2015.doc
 
DILLIBABU CV
DILLIBABU CVDILLIBABU CV
DILLIBABU CV
 
Nick_Tonhsai
Nick_TonhsaiNick_Tonhsai
Nick_Tonhsai
 
jay prakash_Resume
jay prakash_Resumejay prakash_Resume
jay prakash_Resume
 
Resume MMMagan
Resume MMMaganResume MMMagan
Resume MMMagan
 
MARCOS SAMPLE2011
MARCOS SAMPLE2011MARCOS SAMPLE2011
MARCOS SAMPLE2011
 
Paul_Coulter_Resume_10_2016
Paul_Coulter_Resume_10_2016Paul_Coulter_Resume_10_2016
Paul_Coulter_Resume_10_2016
 
CV_Devesh
CV_DeveshCV_Devesh
CV_Devesh
 
UPDATE CV 2016
UPDATE  CV 2016UPDATE  CV 2016
UPDATE CV 2016
 
Jacob Louwaert - Resume - 08.04.15
Jacob Louwaert - Resume - 08.04.15Jacob Louwaert - Resume - 08.04.15
Jacob Louwaert - Resume - 08.04.15
 
New Carlton Resume1(1)
New Carlton Resume1(1)New Carlton Resume1(1)
New Carlton Resume1(1)
 

Donald resume new

  • 1. Donald Chris Kane Phoenix, AZ Mobile: (323) 637-5723 E-mail: dckane78@gmail.com Objective: Seeking a position as a Telecommunications Field Technician/Engineer with a company where I may best utilize my team-player skills, and set a standard for all around me. Experience: CVS Health via Randstad Staffing 02/2016 - 12/2016 Cable Technician/IT Desktop Admin Cleaned up and removed “dead” cables on PBX in MDF Went through floor tiles to remove over 500 amphenol and CAT 5E/6 cabling in MDF Redesigned and revamped over 10 IDF’s throughout Shea location Programmed client’s phones using Avaya’s ASA and HPSM ticketing system. Other functions performed were: adds & removes of customer’s locations and/or phones throughout the building; adding voicemail or additional lines to phone; importing/exporting of files using ASA to create accurate spreadsheets Assisted in new build of 44th Street CVS location by: programming and placing phones, and assigning employees’ locations Verveba Telecom 10/2015 - 01/2016 Field Integration Engineer Completed Carrier Aggregation for Verizon Wireless Removed Slave DUS from 6601, and placed into 6102/6201 RBS cabinets – next to Master DUS Scratch loaded Slave DUS for NIC integration Used Whiteboard (w/NIC) to integrate DUS’ Decommissioned 6601 and removed from site Ran new or existing fibers from Raycap to new location Ericsson Training 08/2105-09/2015
  • 2. 1. Basic Installation Techniques course. (Grapevine, TX) 2. LTE Commissioning course (Grapevine, TX) 3. L700 RBS Installation course (Corona, CA) 4. WCDMA RBS Installation course (Corona, CA) Outsource Staffing 02/2014-08/2015 E911 Drive Tester/DAS Cable Technician/Installer • Moved, removed, changed, and installed: POS systems, phone systems, computer terminals, audio systems, DVR's, digital signage, traffic monitoring systems/analytics and wireless RF units - in top restaurants and some mall retail vendors: Macy's, JCPenney's, etc • Removed/installed Alcatel CSR 7705 Router for T-Mobile in North and South Carolinas. Powered up and commissioned CSR 7705 router; pinged connectivity to the NOC; terminated and tested T1 connectivity for LTE expansion. Over 170 sites visited and prepared for upgrade. • Moved T1 and other related cables from 3106/3206/6102/6132 to new L1900 cabinets. Also moved LMU and/or CSR 7705 Router to new Metro PCS cabinet. • Converted over 80 sites for L1900 upgrade for T_MOBILE in North & South Carolinas • Experience with radio dispatch consoles: Motorola MCC7000, Centracom GoldElite, Telex-Vega, AVTEC and Zetron • Installed over 300 WAP's in retail stores, universities, and hospitals throughout Phoenix, AZ major demographic • Ran over 1900' of 24pr cat 5e/6 and fiber cable throughout Arizona Cardinals Stadium's DAS deployment project for 2105 Super Bowl. • Pulled fiber and data cables through various ground ports (manholes) up to 3000', from new dorm developments IDF's to existing IDF's/MDF's @ Mid Western University • Installed Panduit paneling and terminated over 125-300 data cables on patch panels (switch) • Warranty replaced both NORTHSTAR and FIAMM 2V and 12V batteries in Verizon cell tower cabinets. • Maintained warehouse and related areas to assist in efficient productivity of telecomm equipment • Conduct drive testing & data collection using NEMO • Monitor UMTS/LTE data service, handoff between all technologies, data upload/download activities, ping, short & long calls on multiple systems • Execute Data and Call Performance • IRAT and Inter/ Intra BSC/RNC/TAC handover testing. • Coordinate drive routes and updates maps and design cluster drive routes
  • 3. • Identify, analyze, and document defects, questionable functions, errors, and inconsistencies in handset behavior. • Installed, commissioned, integrated, verified system & acceptance for Nokia BTS/TD-LTE (Flexi platform) Network Element. • Calibrated wireless devices using RF power meter and CW generator CMW500 • Verified wireless devices using (VSA) Vector signal analyzer for transmitter verification with Multi Evaluation List Mode (MELM) • Performed Layer 1 up to Layer 3 full stack tests including inter-RAT and multicell as well as signaling conformance tests based on 3GPP, using the signaling protocol tester CMW500 • Developed and maintained BTS/TD-LTE project competence, process, and documents for deployment • Able to perform troubleshooting, and follow NSN NED documentation to independently resolve project issues. • Understanding of Antenna Line Configuration and connectivity as well as Flexi BTS/TD-LTE Feature set • Installed, commissioned, and integrated over 40 Nokia BTS LTE sites. • Performed RoofTop field cell site & RRU implementation • Supported Customer Lab for SW/HW New Feature verification and validation AT&T 08/2013-12/2013 Civil Crew Technician • Measured, cut, and carried ground & fiber reels for tower crew, up to 8000ft in length. • Placed and positioned GPS mounting in select locations on site • Ran ground, fiber, and GPS into shelter; fed lines across ladders; connected power and fiber to respective BBU, RAYCAP, and PowerPlant • Installed circuit breakers and power on PowerPlant during cutover (maintenance window) hours • Installed fiber tray both in/outdoors along with proper grounding (cad-weld when needed) • Installed FIF rack in shelters; along with RAYCAP, BBU, SAU, and fiber tray - on rack • Swept RF on new antennas using 33/3500 series Anritsu • Weatherproofed all connections outdoors Samsung Telecom Association (STA) 03/2013-08/2013
  • 4. Jr Field Operations Technician • Conducted Fiber M1 swaps. Conversion of T1's being transferred from Legacy over to new BTS cabinet for 3G - allowing for 4G technologies to be incorporated for Samsung/Sprint project • Performed Pre ATP and ATP processes. Terminated punch-down process. • Troubleshot battery and rectifier fail alarms. Troubleshot EAIU and related fail alarms also. • Commissioned DU's, ASR, and CSR with XShell, ProComm, and/or HyperTerminal • WFI (Samsung-MMBS/BSM Training) • Knowledge and understanding of GSM/WCDMA/UMTS/HSPA/LTE standards NexLink Wireless 10/2012-02/2013 Field Engineer/ Site Integrator • Cable and provision DUWs, DUG, DUL and CSR 7705 router for T-Mobile Modernization project. • Reset ports on CSR via Switch. Place and move LMU from 3106 to 6102; reroute/install GPS cable • Installed components into new cabinets to converge Legacy 3G from 3106/3206 cabinets into new 6102/6201/6132 UMTS/HSPA, 4G & LTE cabinets for T- Mobile Modernization Project • Performed power switches from existing +/-48V to +/-24V during power upgrade; along with installation of door vents, lighting, and removal of old slot cards for installation of fiber • Uploaded current software packages and scripts • Work with the NIC to fully integrate and troubleshoot site. Call test sites (scrambling codes), work with TDOA to capture call data • Data entry of day's SOW in AMS tool • Performed battery audits. Checking internal temp sensors, removing and replacing thermal temp sensors, and routing breathing tubes from battery to battery Quanta Wireless Solutions Via Tangent Int'l 7/2012-10/2012 Field Engineer/Site Integrator
  • 5. • Same duties as above mentioned TNS Tangent International Inc. 1/2011-10/2012 Field Operations Technician • Installed and commissioned 7705 Router. Tested and installed T1's ran from 7705 router in GSM cabinet to GSM cabinet for UMTS/HSPA, 4G upgrade. • Swapped out CBU and replaced them with a DUW30. Loaded scripts and upgrade package. Cleared all alarms with NIC. • Installed and worked on RBS, 3106, 3206, 3518, 3418, 6601, & COW • Complete ownership for Installation, Commissioning, Integration and Validation. • Experience in 1st carrier, 2nd carriers, 3rd /4th carrier • 3rd carrier OBIF, 4th carrier sector add • Integrations: scratch, Load software, load scripts, p7%44; p7%70, w11 • Troubleshooting High RSSI and VSWR XLAM alarm setup with the DAS system • Call Testing E911, troubleshooting RU and FU1900/850, PSU, • Adding RAX board, TX boards, ETTMC1, OVP • T1s testing with ATT/PCO troubleshooting t1s loop back and forth • Worked in Dallas TX, East TX, West TX, • Dealt directly with Ericsson Project managers, and T-Mobile Pm • Performed Integrations and commission eNode B (3106, 3206, 3418, 3518 etc.) 1st, 2nd, 3rd and 4th carrier integrations. • Used HyperTerminal, WS-FTP, Caeser FTP, RBS Element Manager, ALEX., DropBox • Additionally, completed integrations of "COW" and "CALF", OBIF solutions, cascading solutions, loading software via FTP's, loading scripts through EMAS, and troubleshooting with the NIC/ DAX/ PCO/ MSN/ MSC. • Also performed troubleshooting RSSI values high or low and any alarms. Performed hardware cut over, hardware swaps, call testing, site surveying, installation, general maintains of node b, and completed daily reports. • Stage deployment of DAS technology in buildings, at universities, and hospitals: for all interfaces including; LTE, GPRS, GSM, EDGE, UMTS, 1Xev, CDMA, 1XRTT, 3XRTT, wCDMA, CDMA2000, & iDEN Tested interference generated by passive components thought to be linear such as connectors, cable assemblies, filters, and antennas using Anritsu PIM Tester MW82119A • Incorporated flexible forward and reverse RF path settings to optimize cell performance and coverage for DAS deployment • Used various base stations (telephone poles and/or light poles) to maximize simulcast of DAS technology • Initialized support for battery back-up at hub and at each RAN/microcell location.
  • 6. • Light work installing antennas, and stringing fiber optical and coaxial cable between the antenna module and the controller SAC Wireless 10/2010-4/2011 Wireless Engineer (Ericsson/T-Mobile) • GSM to UMTS Harvest/Regroom/Cut-Over of 2102, 2202, 2106, 2206, & 3018 cabinets - to 3106 cabinets. eNode B, 2C install & integration of 3018 cabinets to 3106 cabinets. Terminated power of all rbs cabinets. • To cut, reconnect, and sweep all RF cables. Proper instruction and certification on 3100/3200/3300 series Anritsu for cable sweeps. • Removal of Diplexers and Multiplexers from 2102/2106/3018 cabinets, for regroom of GSM to UMTS. • Testing of T1's and T3's for movement of sector from 3018 cabinets to 2106/2206/3106 cabinets. • Testing of Fiber Optic cabling with Optical Time Domain Reflectometers for Db loss and attenuation. • Configuration of PC Data exchange of Power meters, and Certification testers for UTP, and Optical testing results. • Termination of UTP cabling (T1, Category 3, 5, 5e, 6), and PA cabling with EIA/TIA cabling standards. • Termination of UTP stations and terminal cabinets with 8-position modular jacks, RJ11, RJ45 connectors and 24, 48 port patch panels. (Motorola/Verizon) Extended UMTS and GSM T1 circuits from Verizon dmarc; Terminated circuits into Nokia BTS cabinets; Tested circuits using a T-berd or Fluke test set, to ensure circuit was error free from the CFL/CSC smartjack to the ATT Switch; Opened trouble tickets with Verizon's maintenance and provisioning departments for circuit errors; Installed and punched down 66-blocks/50pair at the dmarc and in the shelter; Pulled cat5/6, 25pr, or 50pr cable to the dmarc; Prepared BTS cabinets for Nokia technicians, including running power and ground cables, and coaxial transmission cables. Swept cables with an Anritsu test set to ensure error free signal. Integrate, provision and commission Motorola 4812 BTS cabinets. Program Voice and EVDO carriers, frame and carrier adds, Make necessary cross connects at DSX panel or Cisco ip modems, Provision Cisco 1400 MWR or EBH (ethernet backhaul) routers Supply BSSM Scripts migrating Commercial Voice channels to BTS cabinet and configuring ethernet on Legacy
  • 7. Perform ATP tests using Agilent Base Station test equipment to ensure sites meet necessary standards USIT 12/2007-4/2010 Field Engineer/Drive Tester Installation and Integration of Ericsson eNode B 2106, 2206, 2250 (HCHC), 3106, 3206, 3018; Nokia Radio Base Stations. T1 configuration, integration, circuit identification tests, DSO tests, Loopback tests. Installation Data Base configurations for DXU and TRU's Ericsson 850 and 1900. E-911 installation and configuration of Geometrix Wireless Location Sensor's Carrier Access (Flexmasters, Pathmasters Linkmasters.) PSAP (E-911) test calls. Conduct drive testing & data collection using TEMS Edge 1.1.1 and TEMS Investigation 10.6 Verify call has reached the correct PSAP Verify the address /community is correct Verify the sector quadrant / location (N, NE, SW, NW, etc.) is correct, which some markets may not show. Verify the Dispatcher sees your Call Back number. Verify Call type / Class of Service / COS before asking for rebid. Phase 1 calls will usually display WRLS or WPH1, while Phase 2 calls will display WPH2. Have Dispatcher perform a rebid of the call Monitor UMTS/LTE data service, handoff between all technologies, data upload/download activities, ping, short & long calls on multiple systems Troubleshooting of Radio Base stations faults. Clearing of faults for Radio Base Stations with thorough fault probe through Installation Data Base. Launching DXU's and dTRU's with into fully operational states with Ericsson OMT and Nokia programs. Installation and Integration of Ericsson GSM and CDMA for RF connectivity. Diplexer and Multiplexer configuration of RF signal. Channel addition and Network Topology Cascades of Multi Radio Base Station configurations for timeslot share of T1 transmissions. True Position EMS (E 911 Phase II equipment). Tellabs Titan 5500 DACS. Ericsson AXE - 501/810 APG40 platforms. AVAYA phone system and General Data Communication (T1, PC Skills). Ericsson 810 BSC installation and Alcatel Media Gateway migration. Configuration of Ericsson switches (501 & 810 BSC's) of Ericsson 2102 and 2106 BTS versions. Testing of T-1s and T-3s for DSO. Installation of T-Server applications with UNIX platform. Installation and integration of BTS Ericsson Node B 2106,2206 3106, 3206, 2109, 2308, 2206, 3108 TDMA, GSM, UMTS, Radio Base Stations. Integration
  • 8. performed with OMT program for 1x2, 2x1, 2x6, 3x4 configurations for T1. T1 cross-connects through E-911 CSU. Installation of and commissioning of E-911 frame relay systems. 3-G multiport T1 cross-connect, DSU, CSU within Ericsson 2G GSM networks. Operations and Maintenance of Radio Base Station alarms with OMT program, and troubleshooting E-911 frame relay. Qualifications: Installation and commission of LTE 6601, 6102, & 6131 cabinets; eNode B RBS 882, 884, 2102, 2106, 2109, 2308, 2202, 2206, 3106, 3206, 3518, 3418 IDBs DUW30, DUG & DUL, XLU & XMU installation and commission: DT configuration Anritsu certified for 3300/3500 series equipment EDGE upgrade; RF configuration 2G, 3G, 4G, & LTE Networks E-911 (Andrew:WLS, True Position:LMU); Carrier Access: Pathmaster, Flexmaster configuration ADC:Kentrox. Certified to troubleshoot & integrate on the 6102 and 6131 installs/integration Program Voice and EVDO carriers Provision and commission of Motorola 4812 BTS cabinets. Proficient knowledge of Nortel CDMA Legacy Hot slides product line. Proficient knowledge of analog of RF Fingerprinting via T-Bird and/or Fluke equipment Able to validate T1 terminations before and after turn down of site. Scope 2 LTE 4G Integration activity (Element Manager), DUL scripting Certified for troubleshooting 2G, 3G, 4G technologies thru Ericsson CERTIFICATIONS Ericsson L700 RBS Installation certificate/badge (instructor based) Ericsson WCDMA RBS Installation certificate/badge (instructor based) Ericsson Basic Installation Techniques certificate/badge (instructor based) Ericsson LTE commissioning certificate/badge (instructor based) Ericsson 2G, 3G, 4G & LTE installation (over 8 yr period (instructor based)) Ericsson T-Mobile 4G troubleshooting (instructor based) Ericsson per AT&T Smart Laptop Integration (certificate) Ericsson per AT&T Smart Laptop Radio Testing (certificate) Ericsson per AT&T Smart Laptop CBU to DUW training (certificate) Ericsson (RTU2) per Ericsson grading system EDUCATION
  • 9. California State University Northridge Mechanical Engineering 2004 DeVry Institute of Technology Electronics Engineering Technician Program (EET) 2000 Operating Systems Windows 2000, XP, 7, 8, Vista ▪ Solaris ▪ Unix ▪ Linux ▪ MSDOS ▪ HP/VX ▪ AIX ▪ Microsoft Office
  • 10. California State University Northridge Mechanical Engineering 2004 DeVry Institute of Technology Electronics Engineering Technician Program (EET) 2000 Operating Systems Windows 2000, XP, 7, 8, Vista ▪ Solaris ▪ Unix ▪ Linux ▪ MSDOS ▪ HP/VX ▪ AIX ▪ Microsoft Office