Curriculum-Vitae
kgsolanki.elect87@gmail.com
KRISHNA GOPAL SOLANKI Mobile: +91 8335877997,+91 9717192748
CAREER OBJECTIVE
Seeking a position to utilize my skills and abilities in the field of telecommunication. I am looking forward
to work in a challenging environment, aiding in the organization growth and enrichment of my professional
growth.
EXPERIENCE SUMMARY:
• 7 Years of qualitative experience in the field of telecommunication as a Telecom Engineer.
• Currently associated with Ericsson Globel India Ltd. , Kolkata-India as a RAN (Integration )
Senior Engineer. Hands on experience on Ericsson Traffic Node, Ericsson Minilink-E, and Ericsson
2G,3G & 4G BTS.
• Worked with Hayat Communication , Kuwait as BSS and Transmission
Implementation Engineer.
• Worked As Back-office Engineer (BSC-RNC Engineer) in Huawei –STC (VIVA) Project
(Kuwait) Huawei RTN 910,950,980, Huawei 2G, 3G & 4G BTS.
• Hands on Experience on Nokia 2G Ultra ,3G Supreme & Flexi
• Expertise in executing telecomm projects including rollout, integration, commissioning and testing of
Mobile Telecom system.
ORGANIZATIONAL EXPERIENCE:
1.Ericsson Globel India Limited Kolkata-India.
Role : Senior RAN Engineer (Integration)
Duration: 23th June 2014 to till Date
PROJECTS-
Integration, Network Deployment and Support
Customer: Sprint NV
Technology: LTE and CDMA
Product: RBS 6000
Description: Ericsson designs and deploys the core network of various vendors like Sprint. The scope of work
include the integration, upgrade, alarm troubleshooting, auditing, DT support and market launch of LTE and
CDMA sites.
Region North America (RNAM) Change Request Team
Customers: AT&T, Sprint, EKN, C-Spire
Technology: LTE
Description: The Design and Optimization team raises requests to make parameter changes in the Live
network. The scope of work is to implement these critical requests in specified time.
• Working on different RAN platforms (WRAN & LRAN).
• LTE ENodeB integration by auto & manual Integration.
• LTE SW upgrades L13B R22 EU to L13B R31AX & L12B IP16 to L12B CP4.
• LTE EnodeB feature audit check & parameter implementation, Support to drive test engineer for all
pre-launch sites & EnodeB launch activity.
• Implementation of IFHO on all pre-launch& post launch site as requested.
• Generation of Eutran Report for pre-launch & post-launch site.
• Monitoring of OSS, RNC and NodeB connectivity status.
• Escalate OSS connectivity related issues to local team.
2. Hayat Communication KSCC, Kuwait
Role : Sr. BSS Engineer
Duration: 25th July 2009 to 30th May 2014.
HUAWEI Back-Office Experience as BSC-RNC Engineer in STC (VIVA) Kuwait:
• New sites configuration for 2G and 3G as per BSC, RNC, site data & Engineering parameter.
• Rehoming 2G & 3G sites configuration with CME.
• 2G sites configuration expansion with CME (TRX Addition and Reduction).
• CE Expansions for 3G sites (EULP, EBBI, WBBP board addition & removal as per plan.
• Script for Modification of parameter (for daily activity purpose).
• Carrier addition and reduction in 3G sites as per plan.
• Checking the Alarms Of all BSC’s and RNC and Performing the solutions.
• Checking the alarms of sites and coordinating with site Engineer for Troubleshooting.
• Declaring the ON-Air Notifications of sites after testing and monitoring all the parameters.
• Upgrading the capacity of 3G BTS up to 42Mbps.
• Successfully loading the back up of all the BSC’s and RNC’s.
• Preparing the Script for Integrating the 2G BTS 3012 and 3900.
• Preparing the CME file for the Integrating the 3G BTS 3812 and 3900.
• Swapping the frequencies of the Existing channels in 2G as per RF Requirement.
• Remotely commissioning and integration of sites.
2G-3G Experience in Wataniya - NOKIA (Roll Out Project)- Kuwait:
• Commissioning of Nokia BTS.
• Troubleshooting and Maintenance during site Relocations, Network Upgrades etc.
• Traffic routing and testing.
• Cabinet Expansions for higher traffic cells.
• VSWR Measurement and power measurements.
• Installation of Nokia 3G Cabinet (Supreme and flexi).
• Commissioning of Nokia 3G Cabinet (Supreme and flexi).
• Swapping Between Nokia 3G supreme and flexi BTS.
• VSWR Measurement And Power Measurement.
Wataniya-ERICSSON SRAN & Antenna Modernization Project (2G-3G-4G) -
Implementation/Commissioning/Integration Team Lead for Watamiya SRAN Project –
• Installation and Commissioning of RBS 6601 ,DUG 10 -20,SIU,DUW 30-41,DUS 30,
• Having independent responsibility of installation, Commissioning & trouble shooting of complete
SRAN 6601 equipments & coordination for all technical activities with teams and project engineers.
• Managing total 10 teams of including 1 Engineer,1 supervisor and 8 technicians in each team.
• Post checks for script load activities, Maintenance window activities (Node B rehome, ATM to IP
Migration, carrier add, etc).
• Technical support for. Co-ordination between the civil, power and telecom team, to carry forward the
project smoothly.
• Upgrading the Microwave links, E1 Patching/E1 Migration activities as well for making Transmission
ready for SRAN.
• Have taken in charge of both outdoor antenna/feeder installations and indoor shelter installations with
keeping in mind about network safety and being extra careful when working on live networks
instructing the team under co-ordination.
• Having deep Knowledge of Ericsson BTS,MW,Antenna,Feeder,Loads,Splitter,Comibiner,Counpler
systems, expertise in IBS systems ,connections ,
• Worked on urgent basis whenever required upon customer request and been very efficient when it
comes to troubleshooting and clearing up issues at sites due to unfortunate circumstances.
Commissioning and software upgrades through BTS Local maintenance terminal software through
Ethernet.
• Hands on experience on using various testing equipments like Anritsu site master for Cable/Antenna
Analyzer and Sunlite for BER Testing. Using softwares such as RBS Element Manager and BTS
Maintenance terminal software for Alarm testing at sites.
• Good experience on PAT/PAC Documents making sure each quality instruction is followed as per
customer standard. Conducting site acceptance visit with customer representative.
Quality & PAT Team Lead for SRAN-
MAIN FUNCTIONS:-
• Responsible to implement Project Quality Plan in assigned scope of work
• Provide training for key staff
• Ensure execution of Surveillance Programs through development of Surveillance Plans and through
ongoing monitoring and auditing
• Report quality issues, status, metrics and lessons learned to Project Management
• Manage efforts to resolve quality issues and make improvements to quality activities
• Taken on the role of Procurement Quality Coordinator (PQC) and Site Quality Coordinator (SQC).
TASKS AND RESPONSIBILITIES:-
• Promote Quality awareness throughout the project
• Ensure establishment and proper implementation of adequate control processes within the subproject
PT, as specified in the Project Plan and the Project Quality Plan
• Provide oversight of Contractor's implementation of their Quality program and compliance with project
requirements
• Approve Contractor's Quality organization and monitor performance of key QA staff
• Review and approve Contractor's Quality Plan and Inspection and Test Plans (ITPs)
• Perform scheduled periodic assessments of the Contractor's activities in order to evaluate and monitor
implementation of Contractor's Quality Management systems
• Participate in qualification of proposed Subcontractors or Suppliers
• Ensure Contractor's surveillance activities are commensurate with Criticality Ratings
• Review Contractor's quality audit schedule, monitor Contractor's audit program, and participate in
selected audits
• Review Quality Plan of Suppliers of critical equipment / material in conjunction with PQC
• Ensure Contractor is performing quality reporting per the contract
• Monitor and audit implementation of PT Procurement and Construction Surveillance Programs
• Provide Quality training as required
• Review metrics from engineering, procurement, and construction sites to identify and assist in
resolution of issues
• Review and assist in development of Quality portion of site close-out reports as necessary
• Ensure best practices and lessons learned are implemented and that new lessons learned are identified
and distributed as required
2G-3G-4G Experience in Wataniya - ERICSSON ( Roll out Project)- Kuwait:
• Handling the Implementation and Commissioning of BTS in WATANIYA project.
• VSWR Measurement and power measurement.
• Troubleshooting and Maintenance during site Relocations, Network Upgrades etc.
• Cabinet Expansions for higher traffic cells.
• Implementation, Commissioning, Troubleshooting and Testing Ericsson Node B 3216, 3206.
• Configuring E1 Path, O&M Access, Site equipment and External Alarm.
• Installation of Ericsson 3G cabinets RBS 3202 and RBS 3206.
• Completed 4G pilot Sites project Phase 1&2 with Mw installation and Alignment of Mini Link TN,
• RBS 6201,6601 Installation , Antenna Swap for 4G Preparation.
Transmission:-
• Implementation, Commissioning and Testing of Mini-link E, Traffic node (MLTN).
• Implementation, Commissioning and Testing of SIEMENS SRAL and SRAL XD.
• Configuring MMU and NPU, software up gradation (MLTN).
• Installation and commissioning of Huawei microwave equipments. (RTN 900 series, 910,950,980).
• Doing the Software up gradation of Huawei RTN 900 series.
• Perform the cross connection for E1's.
• Handling the traffic routing, testing, trouble shooting.
• LOS survey for micro wave hops.
• Handling the swap and up gradation of 6P, 6PC and 20P.
• Swapping between SRAL and MLTN.
• Swapping between Mini Link E and MLTN.
• Network up gradation in MLTN.
• Migration of MLTN sites from one BSC to another.
• Links re routing during site relocations.
• Doing the new site survey and preparation of MR.
• Termination of External alarms and testing the same.
• Doing the E1 Patching at the BSC end
• Checking the Stability of the New Microwave System through BER Test.
• Performing the acceptance test.
• Planning and Execution of RAU Swap project.
Wataniya –Ericsson IBS-Indoor Building Solution (Roll out Project)-
• Conducting initial survey for planning and implementation of new indoor sites to provide indoor coverage.
• Responsible for testing feeder cables and antennas before and after installation.
• Responsible for supervise and monitor indoor sites installation of feeder cables and indoor antennas (Omni,
panel and back to back panel antennas) and keep close eye on proper cable routing and antenna, splitters,
tappers, coupler, RAU, Expansion hub and Main Hub(for active indoor solution) installation on proper
location.
• Handle any problem at site during the installation; monitor the antenna performance after the antenna swap
activities. Make sure antenna tilting and direction according the SDD (site Design Documentation).
• Prepare site folder as per site accomplishments antenna installation and sweep test records.
• Perform testing after completion of Indoor Implementation with Tems.
I. Neutek Communication Pvt Limited India.
Role : BSS Trainee Engineer (off role)
Duration: 10th
June 2008 to 20th
July 2009.
Job Responsibilities:-
• Responsible for Site Survey and Inspection.
• Installed NSN BTS
• PDH Radios of NOKIA using Flexi Hopper, Metro Hopper
• Did Installation & Commissioning of ODU (7, 15, 18, 23 GHz) with & without protection
• Performed Operation & Maintenance of link
• Alignment of Antennas(SD & Main)
• Routed traffic at BSC, Transmission Hubs, BTS Sites
• Carried out Telecom Installation, Quality Assurance & BER Testing check for Microwave & BTS
• Performed Quality check
• Performed acceptance for site.
• BSC hardware addition/ faulty card replacement.
• Network expansion activities.
• Q1 management for the sites
• Preventive maintenance and fault rectification of various SITES
• Troubleshoot and fault finding of the Nokia Ultra Site and Metro Site BTS and FIU19 & FIU 19E
Transmission equipment
TRAINNINGS & ACHIEVMENTS:-
• ESP Diploma training conducted by Ericsson for Wataniya SRAN Project attended on 14-15th
January
in Kuwait. It covered Ericsson RBS 6201/6202 & BBS/BBU 6201 course installation and standards,
RBS 6000 Main Remote and Power Systems installation and standard.
• RBS 6601 Commissioning and Integration training attended in Ericsson Kuwait.
• Attended Onsite training of PIM testing Tools for SRAN Project.
• BSC & RNC 6900 operation & Maintenance training attended in Huawei Back office Kuwait.
• Scored as Topper in Microwave RTN 900 series exam conducted by Huawei Kuwait for Wataniya Mw
Project Phase-1.
QUALIFICATION:-
• MBA in Information & Technology (Perusing) from Karnataka University by Distance Education.
• B.Tech in Electronics & Telecommunication Engineering At Rajasthan Vidhyapeeth Deemed
University. (2010-2013) with 72%.
• Polytechnic Diploma in Electrical & Electronics Engineering At B.R.Engineering Institute Bichpuri
Agra UP, First Class-75% (2005-2008).
• H.S.C in B.M.R.B Senior Secondry School Runukuta Agra, First Class -66% (2002-2004).
• S.S.C in B.M.R.B Senior Secondary School Runukuta Agra, First Class -74% (2000-2002).
EXTRA CURRICULAR ACTIVITIES:-
• Active member of sports and Quiz Competition.
• Volunteered many college events such as counseling, tech and cultural fests.
• State Level Runner-up in Volley-ball Championship.
• Topper of the Polytechnic Diploma Institute in Electrical & Electronics Trade with 75%.
ABOUT ME:-
• Open minded, positive with a flexible attitude and willing to work in teams of diverse professional and
cultural background.
• Effective skills in oral and written communication.
• Well-developed interpersonal skills.
• Well organized, methodical and careful.
• Reliable, conscientious and patient.
• Self motivated and works well under pressure.
• Customer oriented.
• Ability to guide trainee engineers.
• Ability to work as a member of a team.
• Ability and willingness to learn.
TOOLS & SOFTWARE:
Operating System : Windows, UNIX
BTS : Ericsson 2206, 2216, 3206, 3216.6201,6202,6101,6601,
Nokia Ultra, Supreme.flexi
Huawei 3012, 3812, 3900L,DBS3900
Microwave : Ericsson MiniLink TN, Ericsson MiniLink E.
SRAL,Huawei RTN 910, RTN950, RTN 980
Tools : Mini link Craft, Mini link Service manager.
OMT, RBS Element Manager, Moshell
Web LCT, LMT-Node B, PIM Test for E// SRAN, RET Test for E// SRAN
Testing Meter : Anritsu site Master, BER Meter.PIM testing tool,
PERSONAL DETAILS
Willing to learn new things, Managing teams, Good Communication Skills, Able to work at any kind
of circumstances
DOB : 17th
December 1987
Marital Status : Married
Language known : English, Hindi, Arabic (learner)
Nationality : Indian
Permanent Address : Chaudhary thoak, village Post= Midhakur Agra Up -283105
Passport : Passport No: G3104541 - Exp: 03th
May 2017
Nationality : Indian
Permanent Address : Chaudhary thoak, village Post= Midhakur Agra Up -283105
Passport : Passport No: G3104541 - Exp: 03th
May 2017

CV_Krishna_Gopal_Solanki_

  • 1.
    Curriculum-Vitae kgsolanki.elect87@gmail.com KRISHNA GOPAL SOLANKIMobile: +91 8335877997,+91 9717192748 CAREER OBJECTIVE Seeking a position to utilize my skills and abilities in the field of telecommunication. I am looking forward to work in a challenging environment, aiding in the organization growth and enrichment of my professional growth. EXPERIENCE SUMMARY: • 7 Years of qualitative experience in the field of telecommunication as a Telecom Engineer. • Currently associated with Ericsson Globel India Ltd. , Kolkata-India as a RAN (Integration ) Senior Engineer. Hands on experience on Ericsson Traffic Node, Ericsson Minilink-E, and Ericsson 2G,3G & 4G BTS. • Worked with Hayat Communication , Kuwait as BSS and Transmission Implementation Engineer. • Worked As Back-office Engineer (BSC-RNC Engineer) in Huawei –STC (VIVA) Project (Kuwait) Huawei RTN 910,950,980, Huawei 2G, 3G & 4G BTS.
  • 2.
    • Hands onExperience on Nokia 2G Ultra ,3G Supreme & Flexi • Expertise in executing telecomm projects including rollout, integration, commissioning and testing of Mobile Telecom system. ORGANIZATIONAL EXPERIENCE: 1.Ericsson Globel India Limited Kolkata-India. Role : Senior RAN Engineer (Integration) Duration: 23th June 2014 to till Date PROJECTS- Integration, Network Deployment and Support Customer: Sprint NV Technology: LTE and CDMA Product: RBS 6000 Description: Ericsson designs and deploys the core network of various vendors like Sprint. The scope of work include the integration, upgrade, alarm troubleshooting, auditing, DT support and market launch of LTE and CDMA sites. Region North America (RNAM) Change Request Team Customers: AT&T, Sprint, EKN, C-Spire Technology: LTE Description: The Design and Optimization team raises requests to make parameter changes in the Live network. The scope of work is to implement these critical requests in specified time. • Working on different RAN platforms (WRAN & LRAN). • LTE ENodeB integration by auto & manual Integration. • LTE SW upgrades L13B R22 EU to L13B R31AX & L12B IP16 to L12B CP4. • LTE EnodeB feature audit check & parameter implementation, Support to drive test engineer for all pre-launch sites & EnodeB launch activity. • Implementation of IFHO on all pre-launch& post launch site as requested. • Generation of Eutran Report for pre-launch & post-launch site. • Monitoring of OSS, RNC and NodeB connectivity status. • Escalate OSS connectivity related issues to local team.
  • 3.
    2. Hayat CommunicationKSCC, Kuwait Role : Sr. BSS Engineer Duration: 25th July 2009 to 30th May 2014. HUAWEI Back-Office Experience as BSC-RNC Engineer in STC (VIVA) Kuwait: • New sites configuration for 2G and 3G as per BSC, RNC, site data & Engineering parameter. • Rehoming 2G & 3G sites configuration with CME. • 2G sites configuration expansion with CME (TRX Addition and Reduction). • CE Expansions for 3G sites (EULP, EBBI, WBBP board addition & removal as per plan. • Script for Modification of parameter (for daily activity purpose). • Carrier addition and reduction in 3G sites as per plan. • Checking the Alarms Of all BSC’s and RNC and Performing the solutions. • Checking the alarms of sites and coordinating with site Engineer for Troubleshooting. • Declaring the ON-Air Notifications of sites after testing and monitoring all the parameters. • Upgrading the capacity of 3G BTS up to 42Mbps. • Successfully loading the back up of all the BSC’s and RNC’s. • Preparing the Script for Integrating the 2G BTS 3012 and 3900. • Preparing the CME file for the Integrating the 3G BTS 3812 and 3900. • Swapping the frequencies of the Existing channels in 2G as per RF Requirement. • Remotely commissioning and integration of sites. 2G-3G Experience in Wataniya - NOKIA (Roll Out Project)- Kuwait: • Commissioning of Nokia BTS. • Troubleshooting and Maintenance during site Relocations, Network Upgrades etc. • Traffic routing and testing. • Cabinet Expansions for higher traffic cells. • VSWR Measurement and power measurements. • Installation of Nokia 3G Cabinet (Supreme and flexi). • Commissioning of Nokia 3G Cabinet (Supreme and flexi). • Swapping Between Nokia 3G supreme and flexi BTS. • VSWR Measurement And Power Measurement.
  • 4.
    Wataniya-ERICSSON SRAN &Antenna Modernization Project (2G-3G-4G) - Implementation/Commissioning/Integration Team Lead for Watamiya SRAN Project – • Installation and Commissioning of RBS 6601 ,DUG 10 -20,SIU,DUW 30-41,DUS 30, • Having independent responsibility of installation, Commissioning & trouble shooting of complete SRAN 6601 equipments & coordination for all technical activities with teams and project engineers. • Managing total 10 teams of including 1 Engineer,1 supervisor and 8 technicians in each team. • Post checks for script load activities, Maintenance window activities (Node B rehome, ATM to IP Migration, carrier add, etc). • Technical support for. Co-ordination between the civil, power and telecom team, to carry forward the project smoothly. • Upgrading the Microwave links, E1 Patching/E1 Migration activities as well for making Transmission ready for SRAN. • Have taken in charge of both outdoor antenna/feeder installations and indoor shelter installations with keeping in mind about network safety and being extra careful when working on live networks instructing the team under co-ordination. • Having deep Knowledge of Ericsson BTS,MW,Antenna,Feeder,Loads,Splitter,Comibiner,Counpler systems, expertise in IBS systems ,connections , • Worked on urgent basis whenever required upon customer request and been very efficient when it comes to troubleshooting and clearing up issues at sites due to unfortunate circumstances. Commissioning and software upgrades through BTS Local maintenance terminal software through Ethernet. • Hands on experience on using various testing equipments like Anritsu site master for Cable/Antenna Analyzer and Sunlite for BER Testing. Using softwares such as RBS Element Manager and BTS Maintenance terminal software for Alarm testing at sites. • Good experience on PAT/PAC Documents making sure each quality instruction is followed as per customer standard. Conducting site acceptance visit with customer representative. Quality & PAT Team Lead for SRAN- MAIN FUNCTIONS:- • Responsible to implement Project Quality Plan in assigned scope of work • Provide training for key staff • Ensure execution of Surveillance Programs through development of Surveillance Plans and through ongoing monitoring and auditing
  • 5.
    • Report qualityissues, status, metrics and lessons learned to Project Management • Manage efforts to resolve quality issues and make improvements to quality activities • Taken on the role of Procurement Quality Coordinator (PQC) and Site Quality Coordinator (SQC). TASKS AND RESPONSIBILITIES:- • Promote Quality awareness throughout the project • Ensure establishment and proper implementation of adequate control processes within the subproject PT, as specified in the Project Plan and the Project Quality Plan • Provide oversight of Contractor's implementation of their Quality program and compliance with project requirements • Approve Contractor's Quality organization and monitor performance of key QA staff • Review and approve Contractor's Quality Plan and Inspection and Test Plans (ITPs) • Perform scheduled periodic assessments of the Contractor's activities in order to evaluate and monitor implementation of Contractor's Quality Management systems • Participate in qualification of proposed Subcontractors or Suppliers • Ensure Contractor's surveillance activities are commensurate with Criticality Ratings • Review Contractor's quality audit schedule, monitor Contractor's audit program, and participate in selected audits • Review Quality Plan of Suppliers of critical equipment / material in conjunction with PQC • Ensure Contractor is performing quality reporting per the contract • Monitor and audit implementation of PT Procurement and Construction Surveillance Programs • Provide Quality training as required • Review metrics from engineering, procurement, and construction sites to identify and assist in resolution of issues • Review and assist in development of Quality portion of site close-out reports as necessary • Ensure best practices and lessons learned are implemented and that new lessons learned are identified and distributed as required 2G-3G-4G Experience in Wataniya - ERICSSON ( Roll out Project)- Kuwait: • Handling the Implementation and Commissioning of BTS in WATANIYA project. • VSWR Measurement and power measurement. • Troubleshooting and Maintenance during site Relocations, Network Upgrades etc. • Cabinet Expansions for higher traffic cells. • Implementation, Commissioning, Troubleshooting and Testing Ericsson Node B 3216, 3206. • Configuring E1 Path, O&M Access, Site equipment and External Alarm. • Installation of Ericsson 3G cabinets RBS 3202 and RBS 3206. • Completed 4G pilot Sites project Phase 1&2 with Mw installation and Alignment of Mini Link TN, • RBS 6201,6601 Installation , Antenna Swap for 4G Preparation.
  • 6.
    Transmission:- • Implementation, Commissioningand Testing of Mini-link E, Traffic node (MLTN). • Implementation, Commissioning and Testing of SIEMENS SRAL and SRAL XD. • Configuring MMU and NPU, software up gradation (MLTN). • Installation and commissioning of Huawei microwave equipments. (RTN 900 series, 910,950,980). • Doing the Software up gradation of Huawei RTN 900 series. • Perform the cross connection for E1's. • Handling the traffic routing, testing, trouble shooting. • LOS survey for micro wave hops. • Handling the swap and up gradation of 6P, 6PC and 20P. • Swapping between SRAL and MLTN. • Swapping between Mini Link E and MLTN. • Network up gradation in MLTN. • Migration of MLTN sites from one BSC to another. • Links re routing during site relocations. • Doing the new site survey and preparation of MR. • Termination of External alarms and testing the same. • Doing the E1 Patching at the BSC end • Checking the Stability of the New Microwave System through BER Test. • Performing the acceptance test. • Planning and Execution of RAU Swap project. Wataniya –Ericsson IBS-Indoor Building Solution (Roll out Project)- • Conducting initial survey for planning and implementation of new indoor sites to provide indoor coverage. • Responsible for testing feeder cables and antennas before and after installation. • Responsible for supervise and monitor indoor sites installation of feeder cables and indoor antennas (Omni, panel and back to back panel antennas) and keep close eye on proper cable routing and antenna, splitters, tappers, coupler, RAU, Expansion hub and Main Hub(for active indoor solution) installation on proper location. • Handle any problem at site during the installation; monitor the antenna performance after the antenna swap activities. Make sure antenna tilting and direction according the SDD (site Design Documentation). • Prepare site folder as per site accomplishments antenna installation and sweep test records. • Perform testing after completion of Indoor Implementation with Tems. I. Neutek Communication Pvt Limited India. Role : BSS Trainee Engineer (off role) Duration: 10th June 2008 to 20th July 2009.
  • 7.
    Job Responsibilities:- • Responsiblefor Site Survey and Inspection. • Installed NSN BTS • PDH Radios of NOKIA using Flexi Hopper, Metro Hopper • Did Installation & Commissioning of ODU (7, 15, 18, 23 GHz) with & without protection • Performed Operation & Maintenance of link • Alignment of Antennas(SD & Main) • Routed traffic at BSC, Transmission Hubs, BTS Sites • Carried out Telecom Installation, Quality Assurance & BER Testing check for Microwave & BTS • Performed Quality check • Performed acceptance for site. • BSC hardware addition/ faulty card replacement. • Network expansion activities. • Q1 management for the sites • Preventive maintenance and fault rectification of various SITES • Troubleshoot and fault finding of the Nokia Ultra Site and Metro Site BTS and FIU19 & FIU 19E Transmission equipment TRAINNINGS & ACHIEVMENTS:- • ESP Diploma training conducted by Ericsson for Wataniya SRAN Project attended on 14-15th January in Kuwait. It covered Ericsson RBS 6201/6202 & BBS/BBU 6201 course installation and standards, RBS 6000 Main Remote and Power Systems installation and standard. • RBS 6601 Commissioning and Integration training attended in Ericsson Kuwait. • Attended Onsite training of PIM testing Tools for SRAN Project. • BSC & RNC 6900 operation & Maintenance training attended in Huawei Back office Kuwait. • Scored as Topper in Microwave RTN 900 series exam conducted by Huawei Kuwait for Wataniya Mw Project Phase-1. QUALIFICATION:- • MBA in Information & Technology (Perusing) from Karnataka University by Distance Education. • B.Tech in Electronics & Telecommunication Engineering At Rajasthan Vidhyapeeth Deemed University. (2010-2013) with 72%. • Polytechnic Diploma in Electrical & Electronics Engineering At B.R.Engineering Institute Bichpuri Agra UP, First Class-75% (2005-2008). • H.S.C in B.M.R.B Senior Secondry School Runukuta Agra, First Class -66% (2002-2004). • S.S.C in B.M.R.B Senior Secondary School Runukuta Agra, First Class -74% (2000-2002). EXTRA CURRICULAR ACTIVITIES:- • Active member of sports and Quiz Competition. • Volunteered many college events such as counseling, tech and cultural fests.
  • 8.
    • State LevelRunner-up in Volley-ball Championship. • Topper of the Polytechnic Diploma Institute in Electrical & Electronics Trade with 75%. ABOUT ME:- • Open minded, positive with a flexible attitude and willing to work in teams of diverse professional and cultural background. • Effective skills in oral and written communication. • Well-developed interpersonal skills. • Well organized, methodical and careful. • Reliable, conscientious and patient. • Self motivated and works well under pressure. • Customer oriented. • Ability to guide trainee engineers. • Ability to work as a member of a team. • Ability and willingness to learn. TOOLS & SOFTWARE: Operating System : Windows, UNIX BTS : Ericsson 2206, 2216, 3206, 3216.6201,6202,6101,6601, Nokia Ultra, Supreme.flexi Huawei 3012, 3812, 3900L,DBS3900 Microwave : Ericsson MiniLink TN, Ericsson MiniLink E. SRAL,Huawei RTN 910, RTN950, RTN 980 Tools : Mini link Craft, Mini link Service manager. OMT, RBS Element Manager, Moshell Web LCT, LMT-Node B, PIM Test for E// SRAN, RET Test for E// SRAN Testing Meter : Anritsu site Master, BER Meter.PIM testing tool, PERSONAL DETAILS Willing to learn new things, Managing teams, Good Communication Skills, Able to work at any kind of circumstances DOB : 17th December 1987 Marital Status : Married Language known : English, Hindi, Arabic (learner)
  • 9.
    Nationality : Indian PermanentAddress : Chaudhary thoak, village Post= Midhakur Agra Up -283105 Passport : Passport No: G3104541 - Exp: 03th May 2017
  • 10.
    Nationality : Indian PermanentAddress : Chaudhary thoak, village Post= Midhakur Agra Up -283105 Passport : Passport No: G3104541 - Exp: 03th May 2017