SlideShare a Scribd company logo
1 of 3
NISHANT JANARDAN JAWALE
143 Grant Avenue Apt # 3 Harrison NJ-07029
Email:nishantjawale90@gmail.com
Phone:(832)-815-4262
SUMMARY:
• Good understanding on GPRS, EDGE, WCDMA, HSPA, 3GPP, 3GPP2
• Good knowledge of LTE, LTE advance, VoLTE, Antennas, WiMax, GSM and CDMA, EMBMS,
Carrier Aggregation, HetNet.
• Experience with Transport Layer protocols such as TCP, UDP, and analysis tools such as Wireshark.
• Good knowledge on LTE specifications for different layers (NAS, RRC, PDCP, RLC)
• Open for travel international, domestic and working long hours.
• Hands on experience on using command line program.
• Trainined and mentored new engineers on RF data collection and optimization.
PROFESSIONAL EXPERIENCE
RF ENGINEER
Amirit Technologies Inc (09/2015-Present)
• Monitored AT&T LTE KPIs of Accessibility, Retainability, Downlink and Uplink Throughput and
Latency at cluster & site level for acceptance.
• Performed root cause analysis on various LTE issues like Drop call, Blocked calls, Handover failure,
bad CINR and low throughputs etc. at cluster & site level on a regular basis.
• Monitored AT&T site unlock/lock request to Nokia OSC and site audit and alarm analysis on daily
basis.
• Supervised process of creating and editing routes for field data collection in MapInfo and MS Street
and trips for Single Site Verification (SSV), Clusters, IFHO & IRAT tests.
• Processed LTE RF data on Actix Analyzer and Nokia’s enhanced Data Analysis Tool.
• Identified Sector swap and Overshooting sites based on analysis of scanner data from baseline drive.
• Performed drive test coordination for Nokia AT&T 1C, 2C-VoLTE, non-VoLTE, 3C (BC - 29) &
WCS (BC - 30) for NJ/NY, Philly & WABA market.
• Performed drive test for LTE, Carrier Aggregation, VoLTE, WCDMA/UMTS sites using JDSU
• Collected FTP’s(Uploads/Downloads/GSM-LTE Hand Offs/LTE Mobility Tests/VoLTE Test calls).
• Collected propagation and signal measurement data for the analysis of RF performance
• Measured field data for the base station to identify RF signals frequencies and respective power levels
• Collected data for blocked call, dropped call, downlink and uplink throughput, Ping test
device test plans, test site scheduling, equipment calibration and setup, RF signal measurement,
created and presented process data to the team manager and the customer
• Responsible for cellular telephone network field data collection in a CDMA, GSM, UMTS and LTE
wireless field environment.
• Using JDSU/NEMO investigation observed the particular cell parameters such as RSRP level, EO/I
level, scrambling code, Rx level, Rx Quall, C/I, etc.
• Performed UMTS cluster drive testing for site validation.
• Data acquisition of RF Signal variables including RSRP, RSCP, SINR, CINR, and PCI.
• Conducted pre-launch and post-launch testing and verification of different sectors.
• Worked with JDSU/NEMO to log the Downlink and Uplink throughput as per the different test cases.
• Performed single site validation of 1C, 2C and 3C in NEMO 3.0 using PCTEL and MX scanners.
• Performed site shake down which included INTRA, Stationary and IFHO of 1C, 2C, 3C.
• Experienced in GPS Navigation programs such as MS Streets and Trips or, Delrome Street Atlas.
• Experience in troubleshooting TX imbalance & sector swap
ASSOCIATE RF ENGINEER
Verveba Telecom TX, USA (06/2015-09/2015)
• Execute detailed AT&T VOLTE testing on wireless networks using JDSU, NEMO Outdoor and 3G
testing on UMTS.
• Experience using the new Anova setup for JDSU and troubleshooting.
• Basic handson setup experience over UMTS kit.
• Perform Site Shakedown and Mobility Cluster Drives while working with RF engineering staff.
• Collect test data for network performance indicators like signal strength, data throughput, and
handovers.
• Tests include: Downlink and Uplink Speed Test, Ping Test, CSFB/Reselection, SRVCC and EXIT
routes testing, with emphasis in good RF conditions of RSRP, SNR, RSRQ, RSSI values .
Other tests include: IRAT, IFHO, & HO.
• Planning and running of AT&T Drive test and post processing analysis for interfernce and coverage
problem solving.
• Ensuring that newly integrated sites are tuned and provide provide optimum performance with
refernce to existing nodes and frequencies.
• Provide training to multiple drive test/RF data collecting teams on NEMO outdoor, and JDSU
• Perform pre-launch & post launch 4G LTE testing per AT&T request.
• Use of the program Actix to analyze drive testing data.
• Create reports of cell sites for upkeep and record.
• Troubleshoot test equipment and understand & follow drive testing procedures as prescribed by
Alcatel Lucent.
• Familiar with Samsung Rugby Pro, Samsung S4 mini, taking Scanner plots.
• Use of Streets and Trips, Street Atlas and Map info to create routes and map sites.
TESTING MARKETS – OH/MI/CO
PROJECT HIGHLIGHTS
Self Organizing Networks(SON): Researched and presented the working of a SON, its important drivers,
parametrs, proper implementation and benefits, cost reduction and how a self organizing network (SON,
specified in 3GPP) can help reduce the burden on service providers.
Blue-Sms(Under Grad final year project) :
• Using the combination of Bluetooth and SMS with mobile via a RF communication link and secure
protocol implementation to operate and control devices from our home, car and offices.
• Prototype system has been programmed with AT89S51 microcontroller to read the users mobile
number before executing any command for security reasons. IC 8870 microcontroller has been used to
decode the DTMF tones of users mobile phone to while using Bluetooth.
• But due to the disadvantage of limited range of Bluetooth(upto 10 meters) we included SMS feature.
• GSM modem has been placed which has inbuilt SIM card reader to receive and send SMS requires by
project(although modem has more uses).
• Antenna of 850/1900Mhz Antenna has been used to allow transmission of radio frequency signals
between modem and users mobile phone.
• Simple coding is done for authentication, identity and security of user to use it easily with the help of
just one SMS and Bluetooth connectivity.
Packet analysis using Wireshark: Complete understanding of TCP, ARP, DHCP and DNS packets by
capturing real-time packets, checking the flow of traffic on amazon and filtering them using the respective
protocol filters on wireshark software on www.amazon.com .
TECHNICAL SKILLS
• Proficient with PC platform (XP, Vista, Win7 Win8), Microsoft Office (Excel, Word, Outlook &
Power Point). QXDM, QCAT, QMICM, VZ Access Manager, ADB, Wireshark, HyperTerminal, Dial
up Connection, AT Commands, NFC, HPQC.
• Languages known C, C++, JAVA, basics of HTML, command programs.
• Design software skills in Autocad, Adobe photoshop.
• Courses done in CCNA, Certication- Post Graduate Diploma in Industrial Automation.
EDUCATIONAL QUALIFICATIONS:
• Masters in Electrical Engineering – NJIT (Fall 2014-May 2016) GPA 3.3/4.0 .
• B.E. in Electronics & Telecommunications Engineering – (2008-2012) – First Class .

More Related Content

What's hot

NSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimizationNSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimizationYogender Singh Rana
 
3G Drive Test Procedure_ By Md Joynal Abaden
3G Drive Test Procedure_ By Md Joynal Abaden3G Drive Test Procedure_ By Md Joynal Abaden
3G Drive Test Procedure_ By Md Joynal AbadenMd Joynal Abaden
 
3 g coverage guidelines v2
3 g coverage guidelines v23 g coverage guidelines v2
3 g coverage guidelines v2Ryan Racun
 
01 lte radio_parameters_lte_overview_rl1
01 lte radio_parameters_lte_overview_rl101 lte radio_parameters_lte_overview_rl1
01 lte radio_parameters_lte_overview_rl1Md.Akm Sahansha
 
Telecom Project Services - Pre-launch SSD / SSV
Telecom Project Services - Pre-launch SSD / SSVTelecom Project Services - Pre-launch SSD / SSV
Telecom Project Services - Pre-launch SSD / SSVAmar Uppalapati
 
Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1Ketut Widya
 
Cluster optimization procedure v1
Cluster optimization procedure v1Cluster optimization procedure v1
Cluster optimization procedure v1Terra Sacrifice
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...Jean de la Sagesse
 
SCFT-Training_v8.2-1
SCFT-Training_v8.2-1SCFT-Training_v8.2-1
SCFT-Training_v8.2-1mahesh savita
 
F01 beam forming_srs
F01 beam forming_srsF01 beam forming_srs
F01 beam forming_srsLuciano Motta
 
Lte drive test parameter introduction
Lte drive test parameter introductionLte drive test parameter introduction
Lte drive test parameter introductionRay KHASTUR
 
Lte rf optimization_guide
Lte rf optimization_guideLte rf optimization_guide
Lte rf optimization_guideHatim100
 

What's hot (20)

NSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimizationNSN NOKIA 3G KPI for Network planning and optimization
NSN NOKIA 3G KPI for Network planning and optimization
 
3G Radio Network Planning
3G Radio Network Planning3G Radio Network Planning
3G Radio Network Planning
 
3G Drive Test Procedure_ By Md Joynal Abaden
3G Drive Test Procedure_ By Md Joynal Abaden3G Drive Test Procedure_ By Md Joynal Abaden
3G Drive Test Procedure_ By Md Joynal Abaden
 
HOW TO DESIGN A CELLULAR RADIO TECHNOLOGY NETWORK
HOW TO DESIGN A CELLULAR RADIO TECHNOLOGY NETWORKHOW TO DESIGN A CELLULAR RADIO TECHNOLOGY NETWORK
HOW TO DESIGN A CELLULAR RADIO TECHNOLOGY NETWORK
 
3 g coverage guidelines v2
3 g coverage guidelines v23 g coverage guidelines v2
3 g coverage guidelines v2
 
01 lte radio_parameters_lte_overview_rl1
01 lte radio_parameters_lte_overview_rl101 lte radio_parameters_lte_overview_rl1
01 lte radio_parameters_lte_overview_rl1
 
Telecom Project Services - Pre-launch SSD / SSV
Telecom Project Services - Pre-launch SSD / SSVTelecom Project Services - Pre-launch SSD / SSV
Telecom Project Services - Pre-launch SSD / SSV
 
Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1Og 002 service flow of radio network planning issue1.1
Og 002 service flow of radio network planning issue1.1
 
Cluster optimization procedure v1
Cluster optimization procedure v1Cluster optimization procedure v1
Cluster optimization procedure v1
 
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
2 g and 3g kpi improvement by parameter optimization (nsn, ericsson, huawei) ...
 
Parameters for drive test
Parameters for drive testParameters for drive test
Parameters for drive test
 
Drive test final
Drive test  finalDrive test  final
Drive test final
 
SCFT-Training_v8.2-1
SCFT-Training_v8.2-1SCFT-Training_v8.2-1
SCFT-Training_v8.2-1
 
Lte kpis
Lte kpisLte kpis
Lte kpis
 
F01 beam forming_srs
F01 beam forming_srsF01 beam forming_srs
F01 beam forming_srs
 
Lte drive test parameter introduction
Lte drive test parameter introductionLte drive test parameter introduction
Lte drive test parameter introduction
 
Wcdma RNO RF optimization
Wcdma RNO RF optimizationWcdma RNO RF optimization
Wcdma RNO RF optimization
 
Lte key technologies
Lte key technologiesLte key technologies
Lte key technologies
 
Lte rf optimization_guide
Lte rf optimization_guideLte rf optimization_guide
Lte rf optimization_guide
 
3 g rf-opt-process.ppt
3 g rf-opt-process.ppt3 g rf-opt-process.ppt
3 g rf-opt-process.ppt
 

Similar to Resume_MS Nishant J

PD_GoutamPanda.pptxsaassasasasasasasasasasa
PD_GoutamPanda.pptxsaassasasasasasasasasasaPD_GoutamPanda.pptxsaassasasasasasasasasasa
PD_GoutamPanda.pptxsaassasasasasasasasasasadeepak383700
 
Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorHisham Zahoor
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resumepankaj patel
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume UpdatedDeepak Yadav
 
Hardeep Singh Gill_Resume
Hardeep Singh Gill_ResumeHardeep Singh Gill_Resume
Hardeep Singh Gill_ResumeHardeep Singh
 
Yan zhang resume
Yan zhang   resumeYan zhang   resume
Yan zhang resumeYanZhang314
 
Muhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jibran
 
Resume_Vaibhav Singh
Resume_Vaibhav SinghResume_Vaibhav Singh
Resume_Vaibhav SinghVaibhav Singh
 
FIELD TESTING of 2G 3G Devices.ppt
FIELD TESTING  of 2G 3G Devices.pptFIELD TESTING  of 2G 3G Devices.ppt
FIELD TESTING of 2G 3G Devices.pptpatrickwang85
 
CV_Nitin Awasthi_Sr. RF Engineer_6.7 yrs
CV_Nitin Awasthi_Sr. RF Engineer_6.7 yrsCV_Nitin Awasthi_Sr. RF Engineer_6.7 yrs
CV_Nitin Awasthi_Sr. RF Engineer_6.7 yrsNitin awasthi
 

Similar to Resume_MS Nishant J (20)

PD_GoutamPanda.pptxsaassasasasasasasasasasa
PD_GoutamPanda.pptxsaassasasasasasasasasasaPD_GoutamPanda.pptxsaassasasasasasasasasasa
PD_GoutamPanda.pptxsaassasasasasasasasasasa
 
Curriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham ZahoorCurriculam Vitea_Hisham Zahoor
Curriculam Vitea_Hisham Zahoor
 
Hadi Tohidlou-CV
Hadi Tohidlou-CVHadi Tohidlou-CV
Hadi Tohidlou-CV
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resume
 
SKK RESUME (1)
SKK RESUME (1)SKK RESUME (1)
SKK RESUME (1)
 
PPT TRAINING
PPT TRAININGPPT TRAINING
PPT TRAINING
 
KHAJA iFTEKHAR UDDIN CV
KHAJA iFTEKHAR UDDIN CVKHAJA iFTEKHAR UDDIN CV
KHAJA iFTEKHAR UDDIN CV
 
Deepk Resume Updated
Deepk Resume UpdatedDeepk Resume Updated
Deepk Resume Updated
 
Niraj (RF)
Niraj (RF)Niraj (RF)
Niraj (RF)
 
Resume_Sushil Kumar Kushwaha
Resume_Sushil Kumar KushwahaResume_Sushil Kumar Kushwaha
Resume_Sushil Kumar Kushwaha
 
Sandeep Sharma_CV
Sandeep Sharma_CVSandeep Sharma_CV
Sandeep Sharma_CV
 
Hardeep Singh Gill_Resume
Hardeep Singh Gill_ResumeHardeep Singh Gill_Resume
Hardeep Singh Gill_Resume
 
Mohammad Alsaleem cv rf
Mohammad Alsaleem cv rfMohammad Alsaleem cv rf
Mohammad Alsaleem cv rf
 
Naqash
NaqashNaqash
Naqash
 
Yan zhang resume
Yan zhang   resumeYan zhang   resume
Yan zhang resume
 
CV_ANUPAM MONDAL
CV_ANUPAM MONDALCV_ANUPAM MONDAL
CV_ANUPAM MONDAL
 
Muhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTE
 
Resume_Vaibhav Singh
Resume_Vaibhav SinghResume_Vaibhav Singh
Resume_Vaibhav Singh
 
FIELD TESTING of 2G 3G Devices.ppt
FIELD TESTING  of 2G 3G Devices.pptFIELD TESTING  of 2G 3G Devices.ppt
FIELD TESTING of 2G 3G Devices.ppt
 
CV_Nitin Awasthi_Sr. RF Engineer_6.7 yrs
CV_Nitin Awasthi_Sr. RF Engineer_6.7 yrsCV_Nitin Awasthi_Sr. RF Engineer_6.7 yrs
CV_Nitin Awasthi_Sr. RF Engineer_6.7 yrs
 

Resume_MS Nishant J

  • 1. NISHANT JANARDAN JAWALE 143 Grant Avenue Apt # 3 Harrison NJ-07029 Email:nishantjawale90@gmail.com Phone:(832)-815-4262 SUMMARY: • Good understanding on GPRS, EDGE, WCDMA, HSPA, 3GPP, 3GPP2 • Good knowledge of LTE, LTE advance, VoLTE, Antennas, WiMax, GSM and CDMA, EMBMS, Carrier Aggregation, HetNet. • Experience with Transport Layer protocols such as TCP, UDP, and analysis tools such as Wireshark. • Good knowledge on LTE specifications for different layers (NAS, RRC, PDCP, RLC) • Open for travel international, domestic and working long hours. • Hands on experience on using command line program. • Trainined and mentored new engineers on RF data collection and optimization. PROFESSIONAL EXPERIENCE RF ENGINEER Amirit Technologies Inc (09/2015-Present) • Monitored AT&T LTE KPIs of Accessibility, Retainability, Downlink and Uplink Throughput and Latency at cluster & site level for acceptance. • Performed root cause analysis on various LTE issues like Drop call, Blocked calls, Handover failure, bad CINR and low throughputs etc. at cluster & site level on a regular basis. • Monitored AT&T site unlock/lock request to Nokia OSC and site audit and alarm analysis on daily basis. • Supervised process of creating and editing routes for field data collection in MapInfo and MS Street and trips for Single Site Verification (SSV), Clusters, IFHO & IRAT tests. • Processed LTE RF data on Actix Analyzer and Nokia’s enhanced Data Analysis Tool. • Identified Sector swap and Overshooting sites based on analysis of scanner data from baseline drive. • Performed drive test coordination for Nokia AT&T 1C, 2C-VoLTE, non-VoLTE, 3C (BC - 29) & WCS (BC - 30) for NJ/NY, Philly & WABA market. • Performed drive test for LTE, Carrier Aggregation, VoLTE, WCDMA/UMTS sites using JDSU • Collected FTP’s(Uploads/Downloads/GSM-LTE Hand Offs/LTE Mobility Tests/VoLTE Test calls). • Collected propagation and signal measurement data for the analysis of RF performance • Measured field data for the base station to identify RF signals frequencies and respective power levels • Collected data for blocked call, dropped call, downlink and uplink throughput, Ping test device test plans, test site scheduling, equipment calibration and setup, RF signal measurement, created and presented process data to the team manager and the customer • Responsible for cellular telephone network field data collection in a CDMA, GSM, UMTS and LTE wireless field environment. • Using JDSU/NEMO investigation observed the particular cell parameters such as RSRP level, EO/I level, scrambling code, Rx level, Rx Quall, C/I, etc. • Performed UMTS cluster drive testing for site validation. • Data acquisition of RF Signal variables including RSRP, RSCP, SINR, CINR, and PCI. • Conducted pre-launch and post-launch testing and verification of different sectors. • Worked with JDSU/NEMO to log the Downlink and Uplink throughput as per the different test cases. • Performed single site validation of 1C, 2C and 3C in NEMO 3.0 using PCTEL and MX scanners. • Performed site shake down which included INTRA, Stationary and IFHO of 1C, 2C, 3C. • Experienced in GPS Navigation programs such as MS Streets and Trips or, Delrome Street Atlas.
  • 2. • Experience in troubleshooting TX imbalance & sector swap ASSOCIATE RF ENGINEER Verveba Telecom TX, USA (06/2015-09/2015) • Execute detailed AT&T VOLTE testing on wireless networks using JDSU, NEMO Outdoor and 3G testing on UMTS. • Experience using the new Anova setup for JDSU and troubleshooting. • Basic handson setup experience over UMTS kit. • Perform Site Shakedown and Mobility Cluster Drives while working with RF engineering staff. • Collect test data for network performance indicators like signal strength, data throughput, and handovers. • Tests include: Downlink and Uplink Speed Test, Ping Test, CSFB/Reselection, SRVCC and EXIT routes testing, with emphasis in good RF conditions of RSRP, SNR, RSRQ, RSSI values . Other tests include: IRAT, IFHO, & HO. • Planning and running of AT&T Drive test and post processing analysis for interfernce and coverage problem solving. • Ensuring that newly integrated sites are tuned and provide provide optimum performance with refernce to existing nodes and frequencies. • Provide training to multiple drive test/RF data collecting teams on NEMO outdoor, and JDSU • Perform pre-launch & post launch 4G LTE testing per AT&T request. • Use of the program Actix to analyze drive testing data. • Create reports of cell sites for upkeep and record. • Troubleshoot test equipment and understand & follow drive testing procedures as prescribed by Alcatel Lucent. • Familiar with Samsung Rugby Pro, Samsung S4 mini, taking Scanner plots. • Use of Streets and Trips, Street Atlas and Map info to create routes and map sites. TESTING MARKETS – OH/MI/CO PROJECT HIGHLIGHTS Self Organizing Networks(SON): Researched and presented the working of a SON, its important drivers, parametrs, proper implementation and benefits, cost reduction and how a self organizing network (SON, specified in 3GPP) can help reduce the burden on service providers. Blue-Sms(Under Grad final year project) : • Using the combination of Bluetooth and SMS with mobile via a RF communication link and secure protocol implementation to operate and control devices from our home, car and offices. • Prototype system has been programmed with AT89S51 microcontroller to read the users mobile number before executing any command for security reasons. IC 8870 microcontroller has been used to decode the DTMF tones of users mobile phone to while using Bluetooth. • But due to the disadvantage of limited range of Bluetooth(upto 10 meters) we included SMS feature. • GSM modem has been placed which has inbuilt SIM card reader to receive and send SMS requires by project(although modem has more uses). • Antenna of 850/1900Mhz Antenna has been used to allow transmission of radio frequency signals between modem and users mobile phone. • Simple coding is done for authentication, identity and security of user to use it easily with the help of just one SMS and Bluetooth connectivity.
  • 3. Packet analysis using Wireshark: Complete understanding of TCP, ARP, DHCP and DNS packets by capturing real-time packets, checking the flow of traffic on amazon and filtering them using the respective protocol filters on wireshark software on www.amazon.com . TECHNICAL SKILLS • Proficient with PC platform (XP, Vista, Win7 Win8), Microsoft Office (Excel, Word, Outlook & Power Point). QXDM, QCAT, QMICM, VZ Access Manager, ADB, Wireshark, HyperTerminal, Dial up Connection, AT Commands, NFC, HPQC. • Languages known C, C++, JAVA, basics of HTML, command programs. • Design software skills in Autocad, Adobe photoshop. • Courses done in CCNA, Certication- Post Graduate Diploma in Industrial Automation. EDUCATIONAL QUALIFICATIONS: • Masters in Electrical Engineering – NJIT (Fall 2014-May 2016) GPA 3.3/4.0 . • B.E. in Electronics & Telecommunications Engineering – (2008-2012) – First Class .