1. NGI. SAID BACHA
+968-99-153373(OMAN) +92-333-5758666 (PAK)
DRIVING LICENSE: OMAN INTERNATIONAL
Position wanted: RF Engineer
Job category: Optimization
Objective and Resume Summary:
o 4+ years of experience as RF Engineer GSM/UMTS<E for
HuaweiEricsson&Motorola for different types of projects like MS Project, Antenna
Moderazation,3G<E SSV, Swap antenna, Swap for National and International
Operators. Full auditing of sites. Currently working on LTE/UMTS OMANTEL Project
since Feb 2015
More than four Years of Professional Experience of working on different Telecom
Managed Services, Drive Test Tools,UMTS/GSM Planning, LTE/UMTS/GSM
Optimization, MS Office Tools , RF Tools, Ericsson's TEMS, MapInfo 10.5,TEMS
Discovery 10.0.5,Google Earth ,KML, Huawei's GENEX Probe 3.14 & Assistant
V300R014,
projects.
Self-organized, highly structured, good team player with great leadership skills and
also submitted all above project reports.
Total Experience Summary:
Skills: Drive Test Tools,UMTS/GSM Planning, LTE/UMTS/GSM Optimization, MS
Office Tools , RF Tools, Ericsson's TEMS, MapInfo 10.5, TEMS Discovery
10.0.5 Google Earth ,KML, Huawei's GENEX Probe 3.14 & Assistant
V300R014,cell file updating both.
language English-- Good
Urdu-- Good
Pashto-- Good
Arabic…. Good
International Experience United Arab Emirates (work finished) &
Sultant of OMAN
Currently working MUSCAT OMAN
2. Education & Experience
Level of Education: BSC Engineering
Academic qualification at a glance:
Secondary School Certificate (S.S.C):
Passing Year: March 2003
School: IQRA Cadet School Garhi Kapoura Mardan
Courses: Physics,Maths,Computer and Chemistry .
Result: 1st division (70% marks achieved)
Higher Secondary School Certificate (H.S.S.C):
Passed Year,2005
College: Mardan Model School and College Mardan.
Course Duration: 2 Years
Result: 2st
division (70%)
Diploma of Information Technology(DIT), CCNA & MCSE
Passing Year: 2008,2009,
College: Lamar Degree College Peshawar
Duration: One Year
Bachelor Degree in Electronics Communication) Engineering:
Passing Year : July 2009
Course Duration : 4 Years
Institute :IQRA National University Peshawar..
Result: 1st Class (70% marks achieved) with HONOURS
Work Experiences:
RF Engineer - LTE/UMTS&2G
ERICSSON OMANTEL ...........SULTANT OF OMAN (2015 to still Working)
Responsible of Drive test on TEMS 16.3.6 and export files to MapInfo 10.5. put the
require parameter also make the report and analyze the issue.
Responsible for leading all RF Optimization of GSM/UMTS for Pre-launch and Post-
launch activities and setting up KPI process.
Heavily involved in day-to-day issues to deliver KPI of every GSM/UMTS.
Analyze and troubleshoot of 3G KPI parameters like RRC setup rate, CS AMR setup
rate, CS 64 Setup rate, PS setup rate and HSDPA Setup rate.
Optimizing 3G sites to reduce congestion and drops, improving the IRAT Handover, Soft
Handover, LU, Paging, CSSR, RRC Connection & RAB Establishment Success rate for
all AMR, Video, Packet & HSPA calls.
Performing Acceptance tests for new technologies (HSDPA, HSUPA, HSPA+) in test bed
and ensure smooth transition to Roll Out phase
Responsibility of taking care of customer complaints regarding Network Coverage
Support customer, internal team and sub contractor team for Spectrum clearance,
Scanner drive, Interference Test.
Responsibility of taking care of customer complaints regarding Network Coverage, bad
3. voice quality, poor browsing internet
Coordination with client for 2G/3G optimization (SSV, Cluster DT and optimization).
HUAWEI OMANTEL 3G ROLLOUT PROJECT 6 Months
Responsible for
3G SSV DT using TEMS 16.3.6
Responsible of Drive test as using GENEX Probe 3.14 and making report by using
Assistant V300R014,
Short/long calling test to monitor RSCP, EcNo.
3G message (sms) testing.
3G testing including cell reselections (3G to 2g &2G to 3G).
Perform IRAT Hos from 3G to 2G.
3G testing including data (HSPA+, HSDPA, HSUPA, R99).
Troubleshooting overshooting cells.
3G site audit including azimuth, Electrical and Mechanical tilt.
Drive Test (Pre Drive, Post Drive, Optimization).
New Site & Cluster Optimization drive tests using TEMS Investigation.
Verification of planning data during the drive test.
Identification of faults and issues during the drive test e.g. sector swaps (complete &
partial), Scrambling Codes clashes, Handover failures, Call drops, bad Quality and Ec/No
patches, missing neighbors and overshoots Reasons for bad Quality patches.
Drives for on-air sites for diagnosing Inter/Intra site HO.
Analyzing drive test log files to detect eventual problems and recommend changes to fix
those problems
OMANTEL ERICSSON
Position: RF ENGINEER LTE ROLLOUT PROJECT 5 Months
Throughput testing at near & far points.
Monitoring of RSRP, SINR & RSRQ to get estimation of RF conditions
Testing of carrier aggregation in LTE different band.
CSFB Testing of 4G to 3G.
CSFB Testing of 4G to 2G.
IRAT testing in dedicated mode.
Latency & Accessibility testing for KPI’s monitoring
Neighbors Audits & monitoring neighbors definition
Strict monitoring of LTE- Fast Return & A-3 events.
Performing both inter & intra HO tests.
Also perform SSV for LTE new sites of different bands then export make the reports.
4. ETISALAT
Position: IBS ENGINEER 4 years
Managed In-Building DAS projects origination from proposals, site surveys,
design, installation thru DAS commissioning & acceptance
Review & Prepare DAS designs and proposals/packages
Support project implementation, design systems by select sites, analyzing data,
and prepare customer documentation
Review & Support the configuration, testing, and commission DAS.
Overview fieldwork and measurements. Operate test equipment and run post-
processing software.
Meet and present DAS Proposals to customers & building management. In
building DAS Implementation Project involving complete life cycle from
commissioning, validation of site, optimization and
Knowledge & Skill sharing with customer on company’s optimization
methodology & tools. Update IBS Designing progress Report & daily Installation
work report
Provided IBS-IBS designs of major sites four seasons Hotel, Intercontinental Hotel, Gov.
Buildings. Walk test /Drive Tests using TEMS 16.3.2 & GENEX Probe 3.14
Engineering Project
Final year project wireless computer control devices (WCCD).
“In these project home appliances was control without wire through a computer (bulb,fan…etc)
“I used microcontroller IC (89c51) and radio transmitter and radio receiver. in which signal will
be transmitted from transmitter to receiver. it will received the signal so function will perform
,it range was 433mghz used also LCD to show the function is performing., so radio transmitter
was connected to pc and receiver was connected to serial port, I used also some electronics
devices(regulaterlm7805,resistors,Transistorpnp1805, crystal, jumper wires, monopole
telescopic antenna relay switch, LEDs, DB9connector and serial cables)”
PERSONAL INFORMATION
E-mail: RF.Engineer999@gmail.com Skype id : Engr.bacha
Saidnoor746@yahoo.com
Religion: Islam Date of Birth 7th
April 1985 Passeport BL3340282
Reference: :
Muhammad Zeeshan Ahmad Gandapur (+968-99654005) Muscat OMAN working in
huawei Project Manager.
Syed Mohideen (+971-504490388) Abu Dhabi UAE BS Expert Engineer in Etisalat