SlideShare a Scribd company logo
1 of 7
SHAJEER P
Punthengode,
Kalamattom Contact:00966542150347
Velliyanchery(P.O), Email:shajeerputhangode@gmail.com
Malappuram,Kerala
CAREER OBJECTIVE:
 To be part of a dynamic group developing new technologies. To be involved in
challenging assignments in the domain of electronics, communication and allied
software fields and to be a continuous learner.
WORK EXPERIENCE:
 Organization : Batco Telecom
 Contract : NSN Project for Mobily
 Duration: May 2013 to Present
 Designation: Telecom Engineer
 Projects Handled : Operation & Maintenance for MNS – MOBILY -NSN/Ericsson in
Northern Region - Hail, Saudi Arabia
FLM Service Description
 Carried out to rectify a service-affecting fault directly or by making a temporary fix.
The event is initiated by the Network Operation Center (NOC) Monitoring team.
 Any faults shall be recorded within the time limits stated in the Service Line
Agreement (SLA). If the fault situation can only be solved in a temporary manner or is
non-service affecting, then the fault will be transferred and handled under corrective
pre-planned maintenance.
 Pre-planned Corrective Maintenance is carried out to rectify a non-service affecting
fault (In this document classified as Minor and Non-Fault Enquiry fault).
Main activities
 Corrective maintenance (24*7) – network fault troubleshooting and corrective event
maintenance activities required on site. Equipment covered is all service affecting
equipment typically Ericsson Mini-Link Traffic Node (TN) and High Capacity (HC) /
Nokia BTS, rectifiers, DDF, cables, jumpers, connectors and antenna systems.
 Configuration and Troubleshooting of Ericsson 2P, 6P or 20P traffic node including
power connection from the rectifier.
 To handle daily trouble shooting as per the NOC analysis and escalation of any
problem
 Configuration of NPU 1B, NPU 1C, LTU 155e/0, LTU 16x2 upgrades.
 IP Configuration and Make Traffic Node Visible to SOM.
 Down/Upload the Backup files to or from NPU through BFTP Server.
 Performing BER Test for E1 Performance.
 Upgrade Baseline software.
 Realignment of the Link to improve RSL.
 SW Upgrade of TN at PDH Nodes (From SW Baseline R11E10 to R15A23/R20A34) in
order to remove the SW/HW Compatibility Issues of different plug in units.
 Conduct MDT for Hardware Upgradation (Capacity, frequency)
 Software Upgrading for HC using TFTP & Configuring HC links
 Down/Upload the Backup files to or from HC through TFTP Server
 Experience in doing MDT for links Upgrade.
 Traffic Routing, E1 Transferring and Troubleshooting of E1’s.
 Lead and supporting implementation team for the PAT & FAT with the customer to
assure all equipments are in good conditions and track all snag lists
 Upgrading software for Ericsson 2P, 6P and 20P Traffic Nodes including software
up gradation for MMU, NPU and LTU.
 Performs Mini-Link High Capacity (HC) software upgrades to the R8F and R8G
package required.
 Configuration of Radio links (Fixing RSL issues, Capacity upgrades ,Monitoring radio
performance ..etc)
 Trouble shooting High capacity links
 Carrying out MDT (Maintenance Down Time) if needed to resolve the issue.
 Replacing Faulty Modules / Equipments and reconfiguration of the Link.
 Maintaining & Troubleshooting of 1+1, 1+0 Microwave Links .
 Monitored spares / replacement of faulty Modules, Sub-System and Cables etc
 To handle the statistical activity daily, weekly and monthly report ( Hardware
replacement, Faults breakdown, PAT status.. etc)
 Co-ordinate all network activities i.e. Work Orders, planned work, outages and
maintenance
 Site provisioning (add/remove modules like TRX, RAU, MMU, PFU, NPU, TRU, ETU,
AMM)
 Spare parts Management
-Stock spare parts in safe secure environment.
-Keep track on spares in stock, faulty spares etc.
-Regularly reported the spare parts inventory to NOC.
-Pick up/drop replacement spare parts from/to warehouse.
 Provide agreed reports on regular basis and ad hoc reports as per NSN
requirements.
 Co-ordinate all network activities i.e. Work Orders, planned work, outages and
maintenance.
 Organization: Integrated Wireless Solutions
 Contract: Ericsson Project in Airtel subcon
 Total Experience: 1 year
Designation: Transmission & Integration Engineer
 Handling MDT for Traffic Node Shifting from 2P/6P/20P
 Installation, configuration of Ericsson MINILINK classic.
 Microwave Link Up gradation, new link Installation(0.2,0.3,0.6,1.2,1.8) and Radio
Panning.
 Upgrading link, cutover, cross connection and traffic routing for 2P, 6P and 20P
Traffic Nodes.
 Configuration of MMU 2B, MMU2C 4-34, MMU2C 4-64 and MMU2 D, MMU2H,
High-Cap.
 ETU2 (Ethernet Interface Unit) card Installation & software up gradation.
 Upgrading link capacity from 8*2 to 34+2, 45Mbps, 94Mbps, 155Mbps etc.
 End to End Testing to get the available E1’s for the 3G Node B and make it ready for
integration
 Insallation of the various microwave Antennas like 0.2,0.3,0.6,1.2,1.8 with different
polarizations(Vert,Horizontal)
 Organization: Integrated Wireless Solutions
 Contract: Huawei Telecommunications on Tata Docomo Project
 Designation: RF Engineer(Drive test)
 Total Experience: 1.6 years
 Jobs done:
RF Site Audit
o Conducting RF Audit to verify the planned azimuths, Feeder swap, tilts,
handovers and defining neighbors list.
o Handling tasks like RF Surveys which include proposing the orientation of
GSM antenna, its height, deciding the number of sites in a particular area and
deciding the suitability of the site.
o Responsible for conducting Surveys to check the costumer complaint and
collect the parameter (BCCH, Rx Level, Rx Quality, CID, Current channel,
TA, Co-ordinates)
Optimization Operations
o Taking initiatives to improve the coverage of the network by making the
changes on sites & by analysis of OMC reports to find congestion on site, to
reduce interference & to make better quality & C/I.
o Carrying out consistency checks between OMC and RF plan and default
parameters, checking mutually defined neighbors.
o Suggesting the use of High gain ANTENNAS, TMA & TMB for proper
optimization of the network.
o Evaluating the KPI (key performance indicator) and carrying out RF
Acceptance Test of voice quality, signal strength, hand off & calls.
Testing & Quality
o Routine monitoring of performance reports as a measure of preventive
maintenance.
o Identifying performance bottlenecks and taking adequate measures to rectify
faults.
o Conducting drive Test , to find the coverage of the network, & to verify
different parameters e.g. Rx level, Rx quality, Cell ID, LAC, BSIC, HSN &
MAIO as per defined by the operator.
o Analyzing the drive test conducted to find the causes of the call drops
blocked calls, handover failures, excessive handovers, poor quality, poor C/I,
interferences.
o Checking AMR Code Rx Quality & SQI of Cell Site by making test calls to
check ISD call, Emergency call, Fixed to mobile, Mobile to mobile, analysis of
the test performed and generation of the report
o Drive test of MBC (Multi band sites) and Walk test of IBS.
 Organization: CMS Info system
 Contract: Huawei Telecommunications on Tata Docomo Project
 Total Experience: 6 months
 Jobs done:
o Handled both network and switch complaints.
o Online traces and HLR,VLR status are checked for the resolution of switch
complaints
o For the resolution of coverage complaints, field visit and site visit have been
done, included in drive test .
o Comfortable with using map info and Huawei Genex Probe software ,Huawei
LMT,M2000.
o Trx,Neighbour addition ,deletion ,modifications are done.
o Performance analysis and BSC,RNC activities are done.
o Storage of BSC & MSC MML Reports.
o RF-customer complaint support to TSG team
Testing & Quality
o Routine monitoring of performance reports as a measure of preventive
maintenance.
o Identifying performance bottlenecks and taking adequate measures to
rectify faults.
o Conducting drive Test , to find the coverage of the network, & to verify
different parameters e.g. Rx level, Rx quality, Cell ID, LAC, BSIC, HSN &
MAIO as per defined by the operator.
o Analyzing the drive test conducted to find the causes of the call drops
blocked calls, handover failures, excessive handovers, poor quality, poor
C/I, interferences.
o Checking AMR Code Rx Quality & SQI of Cell Site by making test calls
to check ISD call, Emergency call, Fixed to mobile, Mobile to mobile,
analysis of the test performed and generation of the report
o Drive test of MBC (Multi band sites).
o Walk test of IBS.
TECHNICAL PROFICIENCY as an FIELD Engineer.
Trouble shooting - Transmission like rerouting the sites by changing the hub sites(creating the
new traffic routing for 2g,3g)performing rf loop test for radios,performing loop test for
e1s,Clearing the e1 errors,performing the software upgrades,configurations in ip ran by
choosing the different ports with vlan ids(o&m and traffic),changing the switch modes in
protection hopes,performing los survey with clear los,doing fine tuning to achieve required rsl.
Telecom Software: OMS 1410, Mini-link Service Manager (MSM), MINI-LINK Craft, Mini-link
High Capacity, BFTP Server. Huawei Genex Probe software ,Huawei LMT,M2000
ACADEMIC PROFILE:
 Degree : Bachelor of Technology (B.Tech.)
 Discipline : Electronics and communication
 College : MEA Engineering College,
Perinthalmanna under Calicut University, Kerala, India.
Batch : 2006-2010.
ACHIEVEMENTS:
Successfully completed major Industrial Projects.
 GSM BASED ENERGY METER.
 9 LINE TELEPHONE SHARER.
COMPUTER PROFICIENCY:
 Programming :C,MAT LAB,Visual basic
 Operating System: Windows XP, Professional, Vista and windows 7
PERSONAL SKILLS:
Ability to deal with people diplomatically, ability to lead, willing to learn, Good listener, team
facilitator, hard working.
PERSONAL PROFILE:
DOB : 28th
April 1989.
Sex : Male.
Father’s Name : P.Ummer.
Marital Status : Single.
Nationality : Indian.
Mother Tongue : Malayalam.
Languages known : English, Malayalam, Hindi & Tamil.
Contact No : 00966542150347
DECLARATION:
I, SHAJEER P hereby confirm that the information given above is true to the best of
my knowledge and belief.
SHAJEER P

More Related Content

What's hot

AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)ajay Verma
 
Network optimization presentation generic dec18
Network optimization presentation generic dec18Network optimization presentation generic dec18
Network optimization presentation generic dec18frankjoh
 
Demystifying LTE Performance Management and Optimization
Demystifying LTE Performance Management and OptimizationDemystifying LTE Performance Management and Optimization
Demystifying LTE Performance Management and OptimizationOpeyemi Praise
 
60936529 55241452-kpi-3 g-3[1]
60936529 55241452-kpi-3 g-3[1]60936529 55241452-kpi-3 g-3[1]
60936529 55241452-kpi-3 g-3[1]picaraza9
 
T sel3 g optimization process and guideline ver01
T sel3 g optimization process and guideline ver01T sel3 g optimization process and guideline ver01
T sel3 g optimization process and guideline ver01Eko Priyanto
 
Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)Munendra singh jadon
 
Resume Ganesh
Resume GaneshResume Ganesh
Resume GaneshGanesh S
 
Lte drive test parameter introduction
Lte drive test parameter introductionLte drive test parameter introduction
Lte drive test parameter introductionRay KHASTUR
 
Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Mashaal322
 
3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?TTI Telecom
 
Harshit Sengar Resume
Harshit Sengar Resume Harshit Sengar Resume
Harshit Sengar Resume Harshit Sengar
 
49823859 gsm-gprs-evaluatioin-and-optimization
49823859 gsm-gprs-evaluatioin-and-optimization49823859 gsm-gprs-evaluatioin-and-optimization
49823859 gsm-gprs-evaluatioin-and-optimizationMery Koto
 
Lte drivetest guideline with genex assistant
Lte drivetest guideline with genex assistantLte drivetest guideline with genex assistant
Lte drivetest guideline with genex assistantRay KHASTUR
 
wcdma-drive-test-analysis-ppt-libre
wcdma-drive-test-analysis-ppt-librewcdma-drive-test-analysis-ppt-libre
wcdma-drive-test-analysis-ppt-libreNarcisse FOIDIENG
 
Usman Ghani Resume LTE
Usman Ghani Resume LTE Usman Ghani Resume LTE
Usman Ghani Resume LTE usman ghani
 

What's hot (20)

AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)AJAY VERMA Resume(RNO)
AJAY VERMA Resume(RNO)
 
Network optimization presentation generic dec18
Network optimization presentation generic dec18Network optimization presentation generic dec18
Network optimization presentation generic dec18
 
Demystifying LTE Performance Management and Optimization
Demystifying LTE Performance Management and OptimizationDemystifying LTE Performance Management and Optimization
Demystifying LTE Performance Management and Optimization
 
Harshit resume
Harshit resumeHarshit resume
Harshit resume
 
60936529 55241452-kpi-3 g-3[1]
60936529 55241452-kpi-3 g-3[1]60936529 55241452-kpi-3 g-3[1]
60936529 55241452-kpi-3 g-3[1]
 
T sel3 g optimization process and guideline ver01
T sel3 g optimization process and guideline ver01T sel3 g optimization process and guideline ver01
T sel3 g optimization process and guideline ver01
 
Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)Munendra Singh Jadon LTE Optimization (1)
Munendra Singh Jadon LTE Optimization (1)
 
Lte kpis
Lte kpisLte kpis
Lte kpis
 
Resume Ganesh
Resume GaneshResume Ganesh
Resume Ganesh
 
Lte drive test parameter introduction
Lte drive test parameter introductionLte drive test parameter introduction
Lte drive test parameter introduction
 
Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0Radio network optimization flow 20090429-a-4.0
Radio network optimization flow 20090429-a-4.0
 
Niraj (RF)
Niraj (RF)Niraj (RF)
Niraj (RF)
 
Lte drive test parameters
Lte drive test parametersLte drive test parameters
Lte drive test parameters
 
3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?3G & Beyond: What Lies Ahead for Performance Management?
3G & Beyond: What Lies Ahead for Performance Management?
 
Harshit Sengar Resume
Harshit Sengar Resume Harshit Sengar Resume
Harshit Sengar Resume
 
49823859 gsm-gprs-evaluatioin-and-optimization
49823859 gsm-gprs-evaluatioin-and-optimization49823859 gsm-gprs-evaluatioin-and-optimization
49823859 gsm-gprs-evaluatioin-and-optimization
 
SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016
 
Lte drivetest guideline with genex assistant
Lte drivetest guideline with genex assistantLte drivetest guideline with genex assistant
Lte drivetest guideline with genex assistant
 
wcdma-drive-test-analysis-ppt-libre
wcdma-drive-test-analysis-ppt-librewcdma-drive-test-analysis-ppt-libre
wcdma-drive-test-analysis-ppt-libre
 
Usman Ghani Resume LTE
Usman Ghani Resume LTE Usman Ghani Resume LTE
Usman Ghani Resume LTE
 

Viewers also liked

Making Data-Driven Investment Decisions
Making Data-Driven Investment DecisionsMaking Data-Driven Investment Decisions
Making Data-Driven Investment DecisionsGolden Gate Ventures
 
Private Taxi Service Weybridge
Private Taxi Service WeybridgePrivate Taxi Service Weybridge
Private Taxi Service Weybridgetaxisweybridgeuk
 
ODI Leeds sponsors update may 16
ODI  Leeds sponsors update may 16ODI  Leeds sponsors update may 16
ODI Leeds sponsors update may 16odileeds
 
Second Hand Rose Press Book
Second Hand Rose Press BookSecond Hand Rose Press Book
Second Hand Rose Press Bookjinmingl
 
Scientometric Analysis
Scientometric AnalysisScientometric Analysis
Scientometric Analysissumitbanshal
 
mRelief social service delivery website and SMS application
mRelief social service delivery website and SMS applicationmRelief social service delivery website and SMS application
mRelief social service delivery website and SMS applicationsariyie
 
Cheap airport transfer by hiring taxi cabs in weybridge
Cheap airport transfer by hiring taxi cabs in weybridgeCheap airport transfer by hiring taxi cabs in weybridge
Cheap airport transfer by hiring taxi cabs in weybridgetaxisweybridgeuk
 
"Профессиональное обучение без границ"
"Профессиональное обучение без границ""Профессиональное обучение без границ"
"Профессиональное обучение без границ"Larisa Gromseva
 
relasi dan fungsi kelompok 4 smpn 3 cikarang timur kelas 83
relasi dan fungsi kelompok 4 smpn 3 cikarang timur kelas 83relasi dan fungsi kelompok 4 smpn 3 cikarang timur kelas 83
relasi dan fungsi kelompok 4 smpn 3 cikarang timur kelas 83Dewi Dewi
 

Viewers also liked (11)

5. суша
5. суша5. суша
5. суша
 
Making Data-Driven Investment Decisions
Making Data-Driven Investment DecisionsMaking Data-Driven Investment Decisions
Making Data-Driven Investment Decisions
 
Private Taxi Service Weybridge
Private Taxi Service WeybridgePrivate Taxi Service Weybridge
Private Taxi Service Weybridge
 
ODI Leeds sponsors update may 16
ODI  Leeds sponsors update may 16ODI  Leeds sponsors update may 16
ODI Leeds sponsors update may 16
 
Second Hand Rose Press Book
Second Hand Rose Press BookSecond Hand Rose Press Book
Second Hand Rose Press Book
 
Scientometric Analysis
Scientometric AnalysisScientometric Analysis
Scientometric Analysis
 
mRelief social service delivery website and SMS application
mRelief social service delivery website and SMS applicationmRelief social service delivery website and SMS application
mRelief social service delivery website and SMS application
 
Cheap airport transfer by hiring taxi cabs in weybridge
Cheap airport transfer by hiring taxi cabs in weybridgeCheap airport transfer by hiring taxi cabs in weybridge
Cheap airport transfer by hiring taxi cabs in weybridge
 
"Профессиональное обучение без границ"
"Профессиональное обучение без границ""Профессиональное обучение без границ"
"Профессиональное обучение без границ"
 
Eliminasi urine
Eliminasi urineEliminasi urine
Eliminasi urine
 
relasi dan fungsi kelompok 4 smpn 3 cikarang timur kelas 83
relasi dan fungsi kelompok 4 smpn 3 cikarang timur kelas 83relasi dan fungsi kelompok 4 smpn 3 cikarang timur kelas 83
relasi dan fungsi kelompok 4 smpn 3 cikarang timur kelas 83
 

Similar to shajeer cv (20)

Amit chakraborty_Resume
Amit chakraborty_ResumeAmit chakraborty_Resume
Amit chakraborty_Resume
 
Resume Alok
Resume AlokResume Alok
Resume Alok
 
irshadali_CV
irshadali_CVirshadali_CV
irshadali_CV
 
Naveed RF Engineer
Naveed RF EngineerNaveed RF Engineer
Naveed RF Engineer
 
Ankit Tomar_Resume
Ankit Tomar_ResumeAnkit Tomar_Resume
Ankit Tomar_Resume
 
priyank _cv
priyank _cvpriyank _cv
priyank _cv
 
Waqas_Abbasi
Waqas_AbbasiWaqas_Abbasi
Waqas_Abbasi
 
Resume Ganesh
Resume GaneshResume Ganesh
Resume Ganesh
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
AMIT MODI
AMIT MODIAMIT MODI
AMIT MODI
 
CV Shabbir 1
CV Shabbir 1CV Shabbir 1
CV Shabbir 1
 
Engr Abdul Samad CV
Engr Abdul Samad CVEngr Abdul Samad CV
Engr Abdul Samad CV
 
Bhim Sen Singh_Resume-RAN FM Engineer
Bhim Sen Singh_Resume-RAN FM EngineerBhim Sen Singh_Resume-RAN FM Engineer
Bhim Sen Singh_Resume-RAN FM Engineer
 
Resume_Sushil Kumar Kushwaha
Resume_Sushil Kumar KushwahaResume_Sushil Kumar Kushwaha
Resume_Sushil Kumar Kushwaha
 
Vaijanath resume Updated
Vaijanath resume UpdatedVaijanath resume Updated
Vaijanath resume Updated
 
CV Professional Telco_Hanif
CV Professional Telco_HanifCV Professional Telco_Hanif
CV Professional Telco_Hanif
 
GOPALAKRISHNAN
GOPALAKRISHNANGOPALAKRISHNAN
GOPALAKRISHNAN
 
said bacha cv
said bacha cvsaid bacha cv
said bacha cv
 
CV - Rashid
CV - RashidCV - Rashid
CV - Rashid
 
Tabish resume
Tabish resumeTabish resume
Tabish resume
 

shajeer cv

  • 1. SHAJEER P Punthengode, Kalamattom Contact:00966542150347 Velliyanchery(P.O), Email:shajeerputhangode@gmail.com Malappuram,Kerala CAREER OBJECTIVE:  To be part of a dynamic group developing new technologies. To be involved in challenging assignments in the domain of electronics, communication and allied software fields and to be a continuous learner. WORK EXPERIENCE:  Organization : Batco Telecom  Contract : NSN Project for Mobily  Duration: May 2013 to Present  Designation: Telecom Engineer  Projects Handled : Operation & Maintenance for MNS – MOBILY -NSN/Ericsson in Northern Region - Hail, Saudi Arabia FLM Service Description  Carried out to rectify a service-affecting fault directly or by making a temporary fix. The event is initiated by the Network Operation Center (NOC) Monitoring team.  Any faults shall be recorded within the time limits stated in the Service Line Agreement (SLA). If the fault situation can only be solved in a temporary manner or is non-service affecting, then the fault will be transferred and handled under corrective pre-planned maintenance.  Pre-planned Corrective Maintenance is carried out to rectify a non-service affecting fault (In this document classified as Minor and Non-Fault Enquiry fault). Main activities  Corrective maintenance (24*7) – network fault troubleshooting and corrective event maintenance activities required on site. Equipment covered is all service affecting equipment typically Ericsson Mini-Link Traffic Node (TN) and High Capacity (HC) / Nokia BTS, rectifiers, DDF, cables, jumpers, connectors and antenna systems.  Configuration and Troubleshooting of Ericsson 2P, 6P or 20P traffic node including power connection from the rectifier.  To handle daily trouble shooting as per the NOC analysis and escalation of any problem
  • 2.  Configuration of NPU 1B, NPU 1C, LTU 155e/0, LTU 16x2 upgrades.  IP Configuration and Make Traffic Node Visible to SOM.  Down/Upload the Backup files to or from NPU through BFTP Server.  Performing BER Test for E1 Performance.  Upgrade Baseline software.  Realignment of the Link to improve RSL.  SW Upgrade of TN at PDH Nodes (From SW Baseline R11E10 to R15A23/R20A34) in order to remove the SW/HW Compatibility Issues of different plug in units.  Conduct MDT for Hardware Upgradation (Capacity, frequency)  Software Upgrading for HC using TFTP & Configuring HC links  Down/Upload the Backup files to or from HC through TFTP Server  Experience in doing MDT for links Upgrade.  Traffic Routing, E1 Transferring and Troubleshooting of E1’s.  Lead and supporting implementation team for the PAT & FAT with the customer to assure all equipments are in good conditions and track all snag lists  Upgrading software for Ericsson 2P, 6P and 20P Traffic Nodes including software up gradation for MMU, NPU and LTU.  Performs Mini-Link High Capacity (HC) software upgrades to the R8F and R8G package required.  Configuration of Radio links (Fixing RSL issues, Capacity upgrades ,Monitoring radio performance ..etc)  Trouble shooting High capacity links  Carrying out MDT (Maintenance Down Time) if needed to resolve the issue.  Replacing Faulty Modules / Equipments and reconfiguration of the Link.  Maintaining & Troubleshooting of 1+1, 1+0 Microwave Links .  Monitored spares / replacement of faulty Modules, Sub-System and Cables etc
  • 3.  To handle the statistical activity daily, weekly and monthly report ( Hardware replacement, Faults breakdown, PAT status.. etc)  Co-ordinate all network activities i.e. Work Orders, planned work, outages and maintenance  Site provisioning (add/remove modules like TRX, RAU, MMU, PFU, NPU, TRU, ETU, AMM)  Spare parts Management -Stock spare parts in safe secure environment. -Keep track on spares in stock, faulty spares etc. -Regularly reported the spare parts inventory to NOC. -Pick up/drop replacement spare parts from/to warehouse.  Provide agreed reports on regular basis and ad hoc reports as per NSN requirements.  Co-ordinate all network activities i.e. Work Orders, planned work, outages and maintenance.  Organization: Integrated Wireless Solutions  Contract: Ericsson Project in Airtel subcon  Total Experience: 1 year Designation: Transmission & Integration Engineer  Handling MDT for Traffic Node Shifting from 2P/6P/20P  Installation, configuration of Ericsson MINILINK classic.  Microwave Link Up gradation, new link Installation(0.2,0.3,0.6,1.2,1.8) and Radio Panning.  Upgrading link, cutover, cross connection and traffic routing for 2P, 6P and 20P Traffic Nodes.  Configuration of MMU 2B, MMU2C 4-34, MMU2C 4-64 and MMU2 D, MMU2H, High-Cap.  ETU2 (Ethernet Interface Unit) card Installation & software up gradation.  Upgrading link capacity from 8*2 to 34+2, 45Mbps, 94Mbps, 155Mbps etc.  End to End Testing to get the available E1’s for the 3G Node B and make it ready for integration
  • 4.  Insallation of the various microwave Antennas like 0.2,0.3,0.6,1.2,1.8 with different polarizations(Vert,Horizontal)  Organization: Integrated Wireless Solutions  Contract: Huawei Telecommunications on Tata Docomo Project  Designation: RF Engineer(Drive test)  Total Experience: 1.6 years  Jobs done: RF Site Audit o Conducting RF Audit to verify the planned azimuths, Feeder swap, tilts, handovers and defining neighbors list. o Handling tasks like RF Surveys which include proposing the orientation of GSM antenna, its height, deciding the number of sites in a particular area and deciding the suitability of the site. o Responsible for conducting Surveys to check the costumer complaint and collect the parameter (BCCH, Rx Level, Rx Quality, CID, Current channel, TA, Co-ordinates) Optimization Operations o Taking initiatives to improve the coverage of the network by making the changes on sites & by analysis of OMC reports to find congestion on site, to reduce interference & to make better quality & C/I. o Carrying out consistency checks between OMC and RF plan and default parameters, checking mutually defined neighbors. o Suggesting the use of High gain ANTENNAS, TMA & TMB for proper optimization of the network. o Evaluating the KPI (key performance indicator) and carrying out RF Acceptance Test of voice quality, signal strength, hand off & calls. Testing & Quality o Routine monitoring of performance reports as a measure of preventive maintenance. o Identifying performance bottlenecks and taking adequate measures to rectify faults. o Conducting drive Test , to find the coverage of the network, & to verify different parameters e.g. Rx level, Rx quality, Cell ID, LAC, BSIC, HSN & MAIO as per defined by the operator. o Analyzing the drive test conducted to find the causes of the call drops blocked calls, handover failures, excessive handovers, poor quality, poor C/I, interferences.
  • 5. o Checking AMR Code Rx Quality & SQI of Cell Site by making test calls to check ISD call, Emergency call, Fixed to mobile, Mobile to mobile, analysis of the test performed and generation of the report o Drive test of MBC (Multi band sites) and Walk test of IBS.  Organization: CMS Info system  Contract: Huawei Telecommunications on Tata Docomo Project  Total Experience: 6 months  Jobs done: o Handled both network and switch complaints. o Online traces and HLR,VLR status are checked for the resolution of switch complaints o For the resolution of coverage complaints, field visit and site visit have been done, included in drive test . o Comfortable with using map info and Huawei Genex Probe software ,Huawei LMT,M2000. o Trx,Neighbour addition ,deletion ,modifications are done. o Performance analysis and BSC,RNC activities are done. o Storage of BSC & MSC MML Reports. o RF-customer complaint support to TSG team Testing & Quality o Routine monitoring of performance reports as a measure of preventive maintenance. o Identifying performance bottlenecks and taking adequate measures to rectify faults. o Conducting drive Test , to find the coverage of the network, & to verify different parameters e.g. Rx level, Rx quality, Cell ID, LAC, BSIC, HSN & MAIO as per defined by the operator. o Analyzing the drive test conducted to find the causes of the call drops blocked calls, handover failures, excessive handovers, poor quality, poor C/I, interferences. o Checking AMR Code Rx Quality & SQI of Cell Site by making test calls to check ISD call, Emergency call, Fixed to mobile, Mobile to mobile, analysis of the test performed and generation of the report o Drive test of MBC (Multi band sites). o Walk test of IBS.
  • 6. TECHNICAL PROFICIENCY as an FIELD Engineer. Trouble shooting - Transmission like rerouting the sites by changing the hub sites(creating the new traffic routing for 2g,3g)performing rf loop test for radios,performing loop test for e1s,Clearing the e1 errors,performing the software upgrades,configurations in ip ran by choosing the different ports with vlan ids(o&m and traffic),changing the switch modes in protection hopes,performing los survey with clear los,doing fine tuning to achieve required rsl. Telecom Software: OMS 1410, Mini-link Service Manager (MSM), MINI-LINK Craft, Mini-link High Capacity, BFTP Server. Huawei Genex Probe software ,Huawei LMT,M2000 ACADEMIC PROFILE:  Degree : Bachelor of Technology (B.Tech.)  Discipline : Electronics and communication  College : MEA Engineering College, Perinthalmanna under Calicut University, Kerala, India. Batch : 2006-2010. ACHIEVEMENTS: Successfully completed major Industrial Projects.  GSM BASED ENERGY METER.  9 LINE TELEPHONE SHARER. COMPUTER PROFICIENCY:  Programming :C,MAT LAB,Visual basic  Operating System: Windows XP, Professional, Vista and windows 7 PERSONAL SKILLS: Ability to deal with people diplomatically, ability to lead, willing to learn, Good listener, team facilitator, hard working. PERSONAL PROFILE: DOB : 28th April 1989. Sex : Male. Father’s Name : P.Ummer. Marital Status : Single. Nationality : Indian. Mother Tongue : Malayalam. Languages known : English, Malayalam, Hindi & Tamil. Contact No : 00966542150347
  • 7. DECLARATION: I, SHAJEER P hereby confirm that the information given above is true to the best of my knowledge and belief. SHAJEER P