NEW POLICE HEADQUARTERS
CITY COUNCIL REVIEW - NOVEMBER 9, 2017
OVERVIEW OF PROJECT / TIMELINE
 Project Budget $28 Million
 2016 Facility Program
 $28M and 78,000 SF
 October 2, 2017
 $27.94 Million and 74,815 SF
 Council desires a traditional design theme
 November 9, 2017
 Present three new conceptual designs for review and direction
 Conceptual designs inspired by Melissa, Southlake, & Lewisville, Texas
 Design Features
 Pitched roof, arches, columns, brick
 Gateway sign color scheme
CONCEPT 1
INSPIRED BY SOUTHLAKE, TX
CONCEPT 1 - DESIGN CONSIDERATIONS
INSPIRED BY SOUTHLAKE, TX
 Exceeds the current budget of $28M
 Costly exterior detailing
 No exterior window shading
 High floor to floor and roof volume
 Interior plan must align with façade
design
 Interior design needs to match exterior
traditional aesthetic
 Covered entry porch
CONCEPT 2
INSPIRED BY MELISSA, TX
CONCEPT 2 – DESIGN CONSIDERATIONS
INSPIRED BY MELISSA, TX
 Close to the current budget of
$28M
 Simple and less costly exterior
detailing
 Overhang to shade exterior
windows
 Covered entry porch
 Low second floor to roof volume
 Façade is modulated and flexible
to interior layout
 Interior design aesthetic is flexible
 Strong street presence
 Integral side balconies with roof
overhang
CONCEPT 3
INSPIRED BY LEWISVILLE, TX
CONCEPT 3 - DESIGN CONSIDERATIONS
INSPIRED BY LEWISVILLE, TX
 Exceeds current budget of $28M
 Simple exterior detailing
 No exterior window shading
 Covered entry porch
 High floor to floor and roof
volume
 Interior design aesthetic is
flexible
 Interior plan must align with
façade design
 Strong street presence
 Large vertical façade openings
ASSOCIATED DESIGN AND CONSTRUCTION COST
 Modifications to the design will require:
 Additional time
 Additional funds OR
 A reduction in the size of the building
 Interior plan / layout must be changed to align with façade design
 Minimum of 8 weeks for redesign
 Concept 2 offers the least amount of changes needed to the interior layout
 Estimated additional construction costs
 All three concepts will exceed the programmed budget of $28M
 Concept 2 is the closest to the programmed budget
NEXT STEPS
 Project Schedule
 Council’s implementation of their Strategic Plan – construction to begin in FY18
 From date of selected design concept, a minimum of 8 weeks for program development
 Council Approval / Architectural Advisory Committee Review
 Will the Architectural Advisory Committee be reviewing and providing a recommendation to Council?
 Architectural Advisory Committee appointments - January 11, 2018
 Design Concept Approval
 Received November 9th
 Begin developing drawings immediately
 Council review of final design concepts and programming early 2018
 Received after Architectural Advisory Committee review / recommendation
 Begin developing drawings early 2018
 Council review of final design concepts and programming spring 2018
SEEKING DIRECTION
 Council approval of one of the
concepts presented
 Council direction on the involvement
of the Architectural Advisory
Committee
NEW POLICE HEADQUARTERS
CITY COUNCIL REVIEW - NOVEMBER 9, 2017
CITYOF MELISSA CITY
HALL
CITYOF LEWISVILLE CITY
HALL
CITYOF SOUTHLAKE CITY
HALL
DESIGN
PRECEDENTS
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
CITYOF SOUTHLAKE CITY
HALL
CITYOF MELISSA CITY
HALL
CITYOF LEWISVILLE CITY
HALL
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERSCITYCOUNCIL REVIEW | OCTOBER 02,
2017
SECURE POINT
SECURE POINT
NEW CURB
CUT
FENCED
MECHANICALYARD
FUTURE
EXPANSION
AREA
PRE-CAST CONCRETE
SECURITY WALL
CHAINLINK FENCE,
TYP. ON NON ROAD
FACING FENCE
PRE-CAST CONCRETE
SECURITY WALL
PROPERTY LINE
& SETBACK
TRUE
NORTH
Graphic Scale: 1 inch = 30 feet
0 30' 60' 90' 120'
CENTRAL PARK
KRENEKTAPRD.
TRASH
38VISITORPARKINGSPACES
110 SECURE STAFF PARKING SPACES
224 SECURED PARKING SPACES
78 PUBLIC PARKING SPACES
317 TOTAL
FUTURE
PARKING
EXPANSION
114 SECURE STAFF PARKING SPACES
ANNEX
BUILDING
40PDVISITOR&
PUBLICPARK
PARKINGSPACES
EXISTING
SIDEWALK
EXISTING
SIDEWALK
CENTRALPARK
133'
262'-6" 268'-6"
47'
ENTRY
PLAZA
MAIN
BUILDING
DARTMOUTH ST.
EXISTING
SIDEWALK
NEW CURB CUT
PRE-CAST CONCRETE
SECURITY WALL
DROP-OFF AND TRUCK
TURN AROUND
24'
24'
440'30'
786'30'
BUILDING
ENTRANCE
162'-11/2"
560'-67/8"
1 1"=30'-0" A2- SITE PLAN- PRESENTATIONOVERALL
OVERALLSITE PLAN - SCHEMATIC
DESIGN
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
UP
DN
STAIR
216 SF
(200 SF)
UP
DN
2
3
4
5
MNOPQRS
2A
3A
4A
5A
6A
G
F
E
D
C
A
27'-6"27'-6"27'-6"27'-6"
TRAINING
LARGE
ASSEMBLY
2,331 SF
(2,500 SF)
FORENSIC
EXAMINATION
BAY
564 SF
(550 SF)
MECHANICAL B
340 SF
(0 SF)
CRIME SCENE CRIME SCENE
FORENSIC LAB
484 SF
(160 SF)
COPY
34 SF
(60 S
RECORDS
STORAGE
126 SF
(200 SF)
MECHANICAL A
614 SF
(400 SF)
JANITOR
49 SF
(80 SF)
ACO
WORKSPACE /
REPORT
WRITING
189 SF
(208 SF)
SUPPORT
SERVICES
MANAGER
151 SF
(150 SF)
COPY/COFFEE
98 SF
(100 SF)
INFORMATION
SERVICES
MANAGER
155 SF
(150 SF)
LOBBY MENS
RR
184 SF
(200 SF)
LOBBY
WOMENS RR
184 SF
(200 SF)
INTERVIEW
ROOM
110 SF
(100 SF)
EL EVATOR
INFO/SERVICE
POLICE ASSIST.
73 SF
(64 SF)
TECHNICAL
SERVICES
COORD.
115 SF
(120 SF)
GIS ANALYST
108 SF
(81 SF)
IT SERVER RM
613 SF
(750 SF)
EVENINGSHIFT
LIEUTENANT
156SF
(150SF)
ADMINISTRATIVE
LIEUTENANT
187SF
(150SF)
BRIEFING
ROOM
770 SF
(735 SF)
CRIME SCENE CRIME SCENE FORENSIC
TECHNICIAN SPECIALIST
131 SF
(120 SF)
111 SF
(120 SF)
TECHNICIAN TECHNICIAN
117 SF
(120 SF)
DAY SHIFT NIGHT SHIFT DAY SHIFT NIGHT SHIFT DAY SHIFT NIGHT SHIFT
SERGEANT SERGEANT SERGEANT SERGEANT SERGEANT SERGEANT
85 SF
(81 SF)
NIGHT SHIFT DAY SHIFT NIGHT SHIFT DAY SHIFT NIGHT SHIFT DAY SHIFT
SERGEANT SERGEANT SERGEANT SERGEANT SERGEANT SERGEANT
85 SF
(81 SF)
83 SF
(81 SF)
84 SF
(81 SF)
84 SF
(81 SF)
84 SF
(81 SF)
83 SF
(81 SF)
84 SF
(81 SF)
84 SF
(81 SF)
84 SF
(81 SF)
85 SF
(81 SF)
85 SF
(81 SF)
EVENING SHIFT
CSTEP SERGEANT
94 SF
(81 SF)SERGEANT
91 SF
(81 SF)
EVENING SHIFT
SERGEANT
92 SF
(81 SF)
SERGEANT ADMIN.
SERGEANT
92 SF
(81 SF)
EVENING SHIFT
91 SF
(81 SF)
ADMIN.
SERGEANT
94 SF
(81 SF)
JANITOR
48 SF
(50 SF)
UNISEX
RESTRM
74 SF
(80 SF)
UNISEX
RESTRM
74 SF
(80 SF)
UNISEX
RESTRM RESTRM
75 SF 74 SF
(80 SF)
CHARGING
ROOM
195 SF
(120 SF)
NISEX
(80 SF)
UNISEX
RESTRM
75 SF
(80 SF)
DIGITAL
FORENSICS
102 SF
(100 SF)
POWDER
PROCESSING
148 SF
(0 SF)
ALTERNATE
LIGHT SOURCE
121 SF
(0 SF)
COUNSELING
ROOM
120 SF
(225 SF)
INVENTORY
TECHNICIAN
99 SF
(120 SF)
R/T ARMORY
556 SF
(200 SF)
LOADING
301 SF
(300 SF)
ASSISTANT
BUYER
99 SF
(120 SF)
COPY
72 SF
(60 SF)
COMMUNITY
ENHANCEMENT
SERGEANTS
677 SF
(800 SF)
TRAFFIC
Department Legend
ADMIN
ADMIN SERVICES BUREAU
CIRCULATION
CORE
FIELD OPERATIONS
GENERAL
LOBBY
OPERATION SUPPORT BUREAU
RECORDS
TRAINING
FIRST FLOOR: 40,775 GSF
SECOND FLOOR : 22,815 GSF
MAIN BUILDING: 63,590 GSF
ANNEX: 11,225 GSF
GRAND TOTAL: 74,815 GSF
MENS LOCKERS:
24" X 24": 206
12" X 12": 0
TOTAL: 206
AUGUST 10, 2017
J
3B
H
K
1
L
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 32'-6" 28'-7 5/8"
COMMUNITY/MEDIA
MEETING ROOM
920 SF
(650 SF)
MOTO REPORT
WRITING
520 SF
(800 SF)
BREAK ROOM
Not Enclosed
(800 SF)
VOLUNTEER
STAFF
64 SF
(50 SF)
VOLUNTEER
STAFF
63 SF
(50 SF)
DAY SHIFT NIGHT SHIFT
LIEUTENANT LIEUTENANT LIEUTENANT
166 SF
(150 SF)
166 SF
(150 SF)
DAY SHIFT
165 SF
(150 SF)
PO'S REPORT
WRITING
328 SF
(320 SF)
SPECIAL OP
(TRAFFIC)
LIEUTENANT
165 SF
(150 SF)
SERGEANT WRITER
80 SF
(80 SF)
MOTOR
SERGEANT
81 SF
(81 SF)
PROPERTY
1,277 SF
(450 SF)
INFO/SERVICE
72 SF
(64 SF)
MAIN LOBBY
1,260 SF
(500 SF)
STAIR
218 SF
(200 SF)
TRUE
NORTH
TRAINI
STORAGE
94 SF
(200 SF)
INFORMATION
SERVICES
SUPERVISOR
117 SF
(120 SF)
ACO
SUPERVISOR
121 SF
(120 SF)
117 SF
(120 SF)
SUPERVISOR
165 SF
(150 SF)
CRIME ANALYST CRIME ANALYST
120 SF
(120 SF)
120 SF
(120 SF)
ADMINISTRATIVE
LIEUTENANT
163SF
(150SF)
(2) FIELD
OPERATIONS
POLICE ASST
74 SF
(64 SF)
COMMUNITY
ENHANCEMENT
OFFICER
119 SF
(120 SF)
MAIL B OXES /
C OF FEE BAR
59 SF
(80 SF )
STOR.
64 SF
(0 SF)
ELECTRICAL &
TELE / DATA
225 SF
(100 SF)
RECORD TECH
63 SF
(64 SF)
RECORD TECH
63 SF
(64 SF)
RECORD TECH
RECORD TECH
63 SF
(64 SF)
63 SF
(64 SF)
TRAINING
LOBBY
253 SF
(150 SF)
PATROL
81 SF
(80 SF)
PATROL
WRITER
79 SF
(80 SF)
PATROL
WRITER
80 SF
(80 SF)
CIT RM
108 SF
(0 SF)
RSTRM
72 SF
(0 SF)
RECORD TECH
63 SF
(64 SF)
RECORD TECH
63 SF
(64 SF)
RECORDS
CLOSET
105 SF
(0 SF)
INTERVIEW
ROOM
113 SF
(100 SF)
(2) FIELD
OPERATIONS
POLICE ASST
73 SF
(64 SF)
(2) FIELD
OPERATIONS
POLICE ASST
74 SF
(64 SF)
RECORDS
CLOSET
77 SF
(0 SF)
IDF RM
95 SF
(0 SF)
ANIMAL
CONTROL &
STORAGE
195 SF
(0 SF)
1A
EVIDENCE TECH EVIDENCE
STORAGE
2,261 SF
(900 SF)
EVIDENCE
ROCESSING
101 SF
(0 SF)
EVIDENCELOC.
26SF
(20SF)
EVIDENCE
PROCESSING
AREA
127 SF
(100 SF)
EVIDENCE
56 SF
(63 SF) TECH
56 SF
(63 SF)
EVIDENCE
SUPERVISOR
122 SF
(120 SF)
COLD STORAGE
84 SF
(20 SF)
VAULT
122 SF
(120 SF)
VOLUNTEER
STAFF
61SFSTAFF
57SF
VOLUNTEER
MENS LOCKER
ROOM (206 2x2
LOCKERS)
2,578 SF
(2,080 SF)
MENS RR
211 SF
MENS SHWR
77 SF
MENS RR
191 SF
WOMENS RR
192 SF
CEU STORAGE
368 SF
(800 SF)
CSTEP
STORAGE
362 SF
(0 SF)
SIU STORAGE
367 SF
(300 SF)
TRAINING
STORAGE
241 SF
(200 SF)
TRAINING
STORAGE
95 SF
(200 SF)
WOMENS
LOCKER ROOM
(33 2X2)
516 SF
(68 SF)
WOMENS RR
223 SF
M
A
34
5:
4
1:
1
FIRSTFLOOR
PLAN
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
DN
216 SF DN
2
3
4
5
MNOPQRS
K
2A
2A
3A
4A
5A
G
F
E
D
C
A
J
1
L
H
30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 32'-6" 28'-7 5/8"
27'-6"27'-6"27'-6"27'-6"
STAIR
(200 SF)
OPEN TO
BELOW
OPEN?
106 SF?
(0 SF)(?)
EL EVATOR
ROOF DECK
PATIO
3B
COMM.
BREAKROOM
203 SF
(200 SF)
RECRUITING /
TRAINING
OFFICER
124 SF
(120 SF)
CIVILIAN
TRAINING
COORDINATOR
124 SF
(120 SF)
COMM.
MANAGER
149 SF
(150 SF)
PUBLIC SAFETY VOLUNTEER
TELECOM
SUPERVISORS
327 SF
(140 SF) RECRUITING /
TRAINING
OFFICER
85 SF
(80 SF)
RECRUITING /
TRAINING
LIEUTENANT
149 SF
(150 SF)
BREAK ROOM
187 SF
(150 SF)
UNISEX
RSTRM
61 SF
(80 SF)
UNISEX
RSTRM
61 SF
(80 SF)
UNISEX
RSTRM
63 SF
(80 SF)
UNISEX
RSTRM
62 SF
(80 SF)
ELECTRICAL
178 SF
(200 SF)
MECHANICAL
393 SF
(400 SF)
ADMIN
CONFERENCE
ROOM
701 SF
(500 SF)
PERSONNEL
FILES
93 SF
(120 SF)
ADMIN IA
LIEUTENANT147 SF
(150 SF)
ADMIN
SECRETARY
117 SF
(120 SF)
BUDGET
ANALYST
125 SF
(120 SF)
ASSIST. CHIEF
OPER.
SUPPORT
BUREAU
194 SF
(200 SF)
(2) VOLUNTEER
COORDINATOR
ASSIST.
184 SF
(240 SF)
IA SERGEANT
147 SF
(120 SF)
OFF DUTY ASSISTANT PIO VOLUNTEER
/ VOL. COORD.
SERGEANT
134 SF
(120 SF)
CHIEF OF
POLICE
254 SF
(300 SF)
ASSISTANT
CHIEF ADMIN
FIELD
OPERATIONS
BUREAU
251 SF
(200 SF)
ASSISTANT
CHIEF ADMIN
SERV. BUREAU
195 SF
(200 SF)
MDF ROOM
159 SF
(100 SF)
CRIME VICTIM
COORDINATOR
131 SF
(165 SF)
(3) CRIMINAL
INVESTIGATIONS
POLICE
ASSISTANTS165 SF
(192 SF)
INVSTGTRS
53SF
(64SF)
2ND FLOOR
LOBBY
631 SF
(0 SF)
CONFERENCE
ROOM
261 SF
(0 SF)
COFFEE/
PANTRY/MAIL
/COPY
53SF
(100SF)
STAFF ASSIST
128 SF
(120 SF)
SIU STORAGE
146 SF
(0 SF)
SECRETARY
109 SF
(120 SF)
VOLUNTEER
57 SF
(50 SF)
TRAINING
ROOM
193 SF
(0 SF)
TRAINING
FILES /COPY
115 SF
(120 SF)
C L OSET
TRAINER
52 SF
(0 SF)
TRAINER
52 SF
(0 SF)
TRAINER
52 SF
(0 SF)
BCKGRND
INVEST.
76 SF
(0 SF)
ACADEMY
COORD.
76 SF
(120 SF)
TRAINEE
52 SF
(0 SF)
TRAINEE
52 SF
(0 SF)
TRAINEE
52 SF
(0 SF)
55 SF
(50 SF)
RECRUITING /
TRAINING
SERGEANT
133 SF
(120 SF)
RECRUITING /
TRAINING
SERGEANT
125 SF
(120 SF)
(2) DETECTIVES
127 SF
(128 SF)
CRIMINAL
INVESTIGATIONS
SERGEANT
151 SF(81 SF)
(2) DETECTIVES
157 SF
(128 SF)
(2) DETECTIVES
127 SF
(128 SF)
(2) DETECTIVES
157 SF
(128 SF)
CRIMINAL
INVESTIGATIONS
SERGEANT
121 SF
(81 SF)
CRIMINAL
INVESTIGATIONS
SERGEANT121 SF
(81 SF)
CRIMINAL
INVESTIGATIONS
LIEUTENANT
153 SF
(150 SF)
CRIMINAL
INVESTIGATIONS
LIEUTENANT
184 SF
(150 SF)
(2) DETECTIVES
157 SF
(128 SF)
(2) DETECTIVES
157 SF
(128 SF)
(2) DETECTIVES
157 SF
(128 SF)
(2) DETECTIVES
157 SF
(128 SF)
(2) DETECTIVES
160 SF
(128 SF)
(2) DETECTIVES
160 SF
(128 SF)
FILES
INTERVIEW
110 SF
(100 SF)
FILES
CRIMINAL
INVESTIGATIONS
WAR ROOM
310 SF
(350 SF)
INTERVIEW
110 SF
(100 SF)
TECH CLOSET
92 SF
(0 SF)
ADMIN
CONF.STOR.
61 SF
(75 SF)
JANITOR
71 SF
(70 SF)
STAFF
123 SF
(120 SF)
CONFSTO.
47SF
(100SF)
ACCREDITATION
MANAGER150 SF
(150 SF)
MABOXES
COFFEEBAR
45SF
(50SF)
PIO /
COORD.
LIEUTENANT
134 SF
(150 SF)
COORD.
Redundant Room
(0 SF)
COMPLIANT /
RESEARCH /
ACRED
ASSISTANT
134 SF
(120 SF)
(2) VOLUNTEER
191 SF
(100 SF)
EL EVATOR
EQU IPMENT
R OOM
40 SF
(50 SF )
Department Legend
ADMIN
ADMIN SERVICES BUREAU
CIRCULATION
CORE
FIELD OPERATIONS
GENERAL
FIRST FLOOR: 40,775 GSF
SECOND FLOOR : 22,815 GSF
MAIN BUILDING: 63,590 GSF
ANNEX: 11,225 GSF
GRAND TOTAL: 74,815 GSF
LOBBY
OPERATION SUPPORT BUREAU
TRAINING AND RECRUITING
MENS LOCKERS:
24" X 24": 206
12" X 12": 0
TOTAL: 206
AUGUST 10, 2017
TRUE
NORTH
IT ROOM
60 SF
(150 SF)
DISPATCH
ROOM
1,694 SF
(1,500 SF)
CONF. ROOM
119 SF
(120 SF)
RECRUITING /
TRAINING
OFFICER
85 SF
(80 SF)
COMM.
RSTRM
76 SF
(80 SF)
FILES AND
STOR. RM
100 SF
(0 SF)
CRIME VICTIM
COORDINATOR
133 SF
(165 SF)
PR IN T
(2)DETECTIVES
209SF
(128SF)
(2) DETECTIVES
154 SF
(128 SF)
COMM.
RSTRM
73 SF
(80 SF)
SIU SECRETARY
210 SF
(120 SF)
INVSTGTRS
53SF
(64SF)
INVSTGTRS
53SF
(64SF)
INVSTGTRS
52SF
(64SF)
INVSTGTRS
53SF
(64SF)
INVSTGTRS
53SF
(64SF)
COMM DOWN
103 SF
(0 SF)
1A
1A
SLOPEDMETALROOF
FLAT TPO
ROOF
FUTURE
240 SF
(150 SF)
M
A
55
5:4
:
SECOND FLOOR
PLAN
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
A3
A2
A1
AA AB BB CC DD EE
30'-0"30'-0"
30'-0" 32'-0" 26'-0" 32'-0" 27'-6" 27'-6"
OUTDOOR
EVIDENCE
STORAGE
1,928 SF
(800 SF)
COMMAND
CENTER BAY
964 SF
(960 SF)
HOSTAGE
NEGOTIATIONS
TRAILER BAY
994 SF
(640 SF)
HNT STORAGE
257 SF
(200 SF)
BOMB
TRUCK/TRAILER
BAY
992 SF
(600 SF)
SWAT TEAM
BAY
686 SF
(640 SF)
VEHICLE
MAINTENANCE
BAY
523 SF
(640 SF)
POLICE VAN
BAY
487 SF
(640 SF)
FORENSIC
TRUCK BAY
487 SF
(640 SF)
STORAGE
157 SF
(300 SF)
BOMB
STORAGE
198 SF
(0 SF)
STORAGE
53 SF
(300 SF)
MOTORCYCLE
GARGE
635 SF
WORKOUT
ROOM
1,302 SF
(500 SF)
RESTROOM
64 SF
(100 SF)
STORAGE
119 SF
RESTROOM
64 SF
(100 SF)
TEAM LEADER
RM
102 SF
SPECIAL
OPERATIONS
ROOM
455 SF
8'-0"
6
CIRCULATION
55 SF
ANNEX FLOOR
PLAN
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
MATERIAL
CONCEPTS
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
AERIALPERSPECTIVE - NORTHEAST
CORNER
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
PERSPECTIVE - KRENEK TAP
VIEW
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
PERSPECTIVE - NORTHFACADE @ TURN
AROUND
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
PERSPECTIVE - CORNER
VIEW
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
PERSPECTIVE - MAINBUILDING
ENTRANCE
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
ALTERNATE FACADE OPTION |MATERIAL
CONCEPTS
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
ALTERNATE FACADE OPTION |AERIALPERSPECTIVE - NORTHEAST
CORNER
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
ALTERNATE FACADE OPTION |PERSPECTIVE - KRENEK TAP
VIEW
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
ALTERNATE FACADE OPTION |PERSPECTIVE - NORTHFACADE @ TURN
AROUND
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
ALTERNATE FACADE OPTION |PERSPECTIVE - CORNER
VIEW
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
ALTERNATE FACADE OPTION |PERSPECTIVE - MAINBUILDING
ENTRANCE
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
SECURE POINT
PROPERTY LINE
& SETBACK
SECURITY
FENCE/WALL
SECURE POINT
PUBLICPARKING
PUBLIC PARKING
JAIL PARKING
DROP-OFF
SECURE EMPLOYEE PARKING
FENCED
MECHANICAL YARD
FUTURE
EXPANSION
AREA
SECURITY
FENCE/WALL
SECURITY
FENCE/WALL
TRUE
NORTH
60' 90' 120'
Graphic Scale: 1 inch = 30 feet
0 30'
CENTRAL PARK
1 1"=30'-0" A2- SITE PLAN- PRESENTATIONOVERALL
OVERALLSITE PLAN - ORIGINALCONCEPT
DESIGN
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
PERSPECTIVE - LOBBY
WEST
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
PERSPECTIVE - LOBBY
EAST
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
ALTERNATE FACADE OPTION |PERSPECTIVE - LOBBY
WEST
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS
ALTERNATE FACADE OPTION |PERSPECTIVE - LOBBY
EAST
CITY OF COLLEGE
STATION
NEW POLICE HEADQUARTERS

Police Station Design Concepts

  • 1.
    NEW POLICE HEADQUARTERS CITYCOUNCIL REVIEW - NOVEMBER 9, 2017
  • 2.
    OVERVIEW OF PROJECT/ TIMELINE  Project Budget $28 Million  2016 Facility Program  $28M and 78,000 SF  October 2, 2017  $27.94 Million and 74,815 SF  Council desires a traditional design theme  November 9, 2017  Present three new conceptual designs for review and direction  Conceptual designs inspired by Melissa, Southlake, & Lewisville, Texas  Design Features  Pitched roof, arches, columns, brick  Gateway sign color scheme
  • 3.
    CONCEPT 1 INSPIRED BYSOUTHLAKE, TX
  • 4.
    CONCEPT 1 -DESIGN CONSIDERATIONS INSPIRED BY SOUTHLAKE, TX  Exceeds the current budget of $28M  Costly exterior detailing  No exterior window shading  High floor to floor and roof volume  Interior plan must align with façade design  Interior design needs to match exterior traditional aesthetic  Covered entry porch
  • 5.
  • 6.
    CONCEPT 2 –DESIGN CONSIDERATIONS INSPIRED BY MELISSA, TX  Close to the current budget of $28M  Simple and less costly exterior detailing  Overhang to shade exterior windows  Covered entry porch  Low second floor to roof volume  Façade is modulated and flexible to interior layout  Interior design aesthetic is flexible  Strong street presence  Integral side balconies with roof overhang
  • 7.
    CONCEPT 3 INSPIRED BYLEWISVILLE, TX
  • 8.
    CONCEPT 3 -DESIGN CONSIDERATIONS INSPIRED BY LEWISVILLE, TX  Exceeds current budget of $28M  Simple exterior detailing  No exterior window shading  Covered entry porch  High floor to floor and roof volume  Interior design aesthetic is flexible  Interior plan must align with façade design  Strong street presence  Large vertical façade openings
  • 9.
    ASSOCIATED DESIGN ANDCONSTRUCTION COST  Modifications to the design will require:  Additional time  Additional funds OR  A reduction in the size of the building  Interior plan / layout must be changed to align with façade design  Minimum of 8 weeks for redesign  Concept 2 offers the least amount of changes needed to the interior layout  Estimated additional construction costs  All three concepts will exceed the programmed budget of $28M  Concept 2 is the closest to the programmed budget
  • 10.
    NEXT STEPS  ProjectSchedule  Council’s implementation of their Strategic Plan – construction to begin in FY18  From date of selected design concept, a minimum of 8 weeks for program development  Council Approval / Architectural Advisory Committee Review  Will the Architectural Advisory Committee be reviewing and providing a recommendation to Council?  Architectural Advisory Committee appointments - January 11, 2018  Design Concept Approval  Received November 9th  Begin developing drawings immediately  Council review of final design concepts and programming early 2018  Received after Architectural Advisory Committee review / recommendation  Begin developing drawings early 2018  Council review of final design concepts and programming spring 2018
  • 11.
    SEEKING DIRECTION  Councilapproval of one of the concepts presented  Council direction on the involvement of the Architectural Advisory Committee
  • 12.
    NEW POLICE HEADQUARTERS CITYCOUNCIL REVIEW - NOVEMBER 9, 2017
  • 13.
    CITYOF MELISSA CITY HALL CITYOFLEWISVILLE CITY HALL CITYOF SOUTHLAKE CITY HALL DESIGN PRECEDENTS CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 14.
  • 15.
  • 16.
  • 17.
    CITY OF COLLEGE STATION NEWPOLICE HEADQUARTERSCITYCOUNCIL REVIEW | OCTOBER 02, 2017
  • 18.
    SECURE POINT SECURE POINT NEWCURB CUT FENCED MECHANICALYARD FUTURE EXPANSION AREA PRE-CAST CONCRETE SECURITY WALL CHAINLINK FENCE, TYP. ON NON ROAD FACING FENCE PRE-CAST CONCRETE SECURITY WALL PROPERTY LINE & SETBACK TRUE NORTH Graphic Scale: 1 inch = 30 feet 0 30' 60' 90' 120' CENTRAL PARK KRENEKTAPRD. TRASH 38VISITORPARKINGSPACES 110 SECURE STAFF PARKING SPACES 224 SECURED PARKING SPACES 78 PUBLIC PARKING SPACES 317 TOTAL FUTURE PARKING EXPANSION 114 SECURE STAFF PARKING SPACES ANNEX BUILDING 40PDVISITOR& PUBLICPARK PARKINGSPACES EXISTING SIDEWALK EXISTING SIDEWALK CENTRALPARK 133' 262'-6" 268'-6" 47' ENTRY PLAZA MAIN BUILDING DARTMOUTH ST. EXISTING SIDEWALK NEW CURB CUT PRE-CAST CONCRETE SECURITY WALL DROP-OFF AND TRUCK TURN AROUND 24' 24' 440'30' 786'30' BUILDING ENTRANCE 162'-11/2" 560'-67/8" 1 1"=30'-0" A2- SITE PLAN- PRESENTATIONOVERALL OVERALLSITE PLAN - SCHEMATIC DESIGN CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 19.
    UP DN STAIR 216 SF (200 SF) UP DN 2 3 4 5 MNOPQRS 2A 3A 4A 5A 6A G F E D C A 27'-6"27'-6"27'-6"27'-6" TRAINING LARGE ASSEMBLY 2,331SF (2,500 SF) FORENSIC EXAMINATION BAY 564 SF (550 SF) MECHANICAL B 340 SF (0 SF) CRIME SCENE CRIME SCENE FORENSIC LAB 484 SF (160 SF) COPY 34 SF (60 S RECORDS STORAGE 126 SF (200 SF) MECHANICAL A 614 SF (400 SF) JANITOR 49 SF (80 SF) ACO WORKSPACE / REPORT WRITING 189 SF (208 SF) SUPPORT SERVICES MANAGER 151 SF (150 SF) COPY/COFFEE 98 SF (100 SF) INFORMATION SERVICES MANAGER 155 SF (150 SF) LOBBY MENS RR 184 SF (200 SF) LOBBY WOMENS RR 184 SF (200 SF) INTERVIEW ROOM 110 SF (100 SF) EL EVATOR INFO/SERVICE POLICE ASSIST. 73 SF (64 SF) TECHNICAL SERVICES COORD. 115 SF (120 SF) GIS ANALYST 108 SF (81 SF) IT SERVER RM 613 SF (750 SF) EVENINGSHIFT LIEUTENANT 156SF (150SF) ADMINISTRATIVE LIEUTENANT 187SF (150SF) BRIEFING ROOM 770 SF (735 SF) CRIME SCENE CRIME SCENE FORENSIC TECHNICIAN SPECIALIST 131 SF (120 SF) 111 SF (120 SF) TECHNICIAN TECHNICIAN 117 SF (120 SF) DAY SHIFT NIGHT SHIFT DAY SHIFT NIGHT SHIFT DAY SHIFT NIGHT SHIFT SERGEANT SERGEANT SERGEANT SERGEANT SERGEANT SERGEANT 85 SF (81 SF) NIGHT SHIFT DAY SHIFT NIGHT SHIFT DAY SHIFT NIGHT SHIFT DAY SHIFT SERGEANT SERGEANT SERGEANT SERGEANT SERGEANT SERGEANT 85 SF (81 SF) 83 SF (81 SF) 84 SF (81 SF) 84 SF (81 SF) 84 SF (81 SF) 83 SF (81 SF) 84 SF (81 SF) 84 SF (81 SF) 84 SF (81 SF) 85 SF (81 SF) 85 SF (81 SF) EVENING SHIFT CSTEP SERGEANT 94 SF (81 SF)SERGEANT 91 SF (81 SF) EVENING SHIFT SERGEANT 92 SF (81 SF) SERGEANT ADMIN. SERGEANT 92 SF (81 SF) EVENING SHIFT 91 SF (81 SF) ADMIN. SERGEANT 94 SF (81 SF) JANITOR 48 SF (50 SF) UNISEX RESTRM 74 SF (80 SF) UNISEX RESTRM 74 SF (80 SF) UNISEX RESTRM RESTRM 75 SF 74 SF (80 SF) CHARGING ROOM 195 SF (120 SF) NISEX (80 SF) UNISEX RESTRM 75 SF (80 SF) DIGITAL FORENSICS 102 SF (100 SF) POWDER PROCESSING 148 SF (0 SF) ALTERNATE LIGHT SOURCE 121 SF (0 SF) COUNSELING ROOM 120 SF (225 SF) INVENTORY TECHNICIAN 99 SF (120 SF) R/T ARMORY 556 SF (200 SF) LOADING 301 SF (300 SF) ASSISTANT BUYER 99 SF (120 SF) COPY 72 SF (60 SF) COMMUNITY ENHANCEMENT SERGEANTS 677 SF (800 SF) TRAFFIC Department Legend ADMIN ADMIN SERVICES BUREAU CIRCULATION CORE FIELD OPERATIONS GENERAL LOBBY OPERATION SUPPORT BUREAU RECORDS TRAINING FIRST FLOOR: 40,775 GSF SECOND FLOOR : 22,815 GSF MAIN BUILDING: 63,590 GSF ANNEX: 11,225 GSF GRAND TOTAL: 74,815 GSF MENS LOCKERS: 24" X 24": 206 12" X 12": 0 TOTAL: 206 AUGUST 10, 2017 J 3B H K 1 L 30'-0" 30'-0" 30'-0" 30'-0" 30'-0" 32'-6" 28'-7 5/8" COMMUNITY/MEDIA MEETING ROOM 920 SF (650 SF) MOTO REPORT WRITING 520 SF (800 SF) BREAK ROOM Not Enclosed (800 SF) VOLUNTEER STAFF 64 SF (50 SF) VOLUNTEER STAFF 63 SF (50 SF) DAY SHIFT NIGHT SHIFT LIEUTENANT LIEUTENANT LIEUTENANT 166 SF (150 SF) 166 SF (150 SF) DAY SHIFT 165 SF (150 SF) PO'S REPORT WRITING 328 SF (320 SF) SPECIAL OP (TRAFFIC) LIEUTENANT 165 SF (150 SF) SERGEANT WRITER 80 SF (80 SF) MOTOR SERGEANT 81 SF (81 SF) PROPERTY 1,277 SF (450 SF) INFO/SERVICE 72 SF (64 SF) MAIN LOBBY 1,260 SF (500 SF) STAIR 218 SF (200 SF) TRUE NORTH TRAINI STORAGE 94 SF (200 SF) INFORMATION SERVICES SUPERVISOR 117 SF (120 SF) ACO SUPERVISOR 121 SF (120 SF) 117 SF (120 SF) SUPERVISOR 165 SF (150 SF) CRIME ANALYST CRIME ANALYST 120 SF (120 SF) 120 SF (120 SF) ADMINISTRATIVE LIEUTENANT 163SF (150SF) (2) FIELD OPERATIONS POLICE ASST 74 SF (64 SF) COMMUNITY ENHANCEMENT OFFICER 119 SF (120 SF) MAIL B OXES / C OF FEE BAR 59 SF (80 SF ) STOR. 64 SF (0 SF) ELECTRICAL & TELE / DATA 225 SF (100 SF) RECORD TECH 63 SF (64 SF) RECORD TECH 63 SF (64 SF) RECORD TECH RECORD TECH 63 SF (64 SF) 63 SF (64 SF) TRAINING LOBBY 253 SF (150 SF) PATROL 81 SF (80 SF) PATROL WRITER 79 SF (80 SF) PATROL WRITER 80 SF (80 SF) CIT RM 108 SF (0 SF) RSTRM 72 SF (0 SF) RECORD TECH 63 SF (64 SF) RECORD TECH 63 SF (64 SF) RECORDS CLOSET 105 SF (0 SF) INTERVIEW ROOM 113 SF (100 SF) (2) FIELD OPERATIONS POLICE ASST 73 SF (64 SF) (2) FIELD OPERATIONS POLICE ASST 74 SF (64 SF) RECORDS CLOSET 77 SF (0 SF) IDF RM 95 SF (0 SF) ANIMAL CONTROL & STORAGE 195 SF (0 SF) 1A EVIDENCE TECH EVIDENCE STORAGE 2,261 SF (900 SF) EVIDENCE ROCESSING 101 SF (0 SF) EVIDENCELOC. 26SF (20SF) EVIDENCE PROCESSING AREA 127 SF (100 SF) EVIDENCE 56 SF (63 SF) TECH 56 SF (63 SF) EVIDENCE SUPERVISOR 122 SF (120 SF) COLD STORAGE 84 SF (20 SF) VAULT 122 SF (120 SF) VOLUNTEER STAFF 61SFSTAFF 57SF VOLUNTEER MENS LOCKER ROOM (206 2x2 LOCKERS) 2,578 SF (2,080 SF) MENS RR 211 SF MENS SHWR 77 SF MENS RR 191 SF WOMENS RR 192 SF CEU STORAGE 368 SF (800 SF) CSTEP STORAGE 362 SF (0 SF) SIU STORAGE 367 SF (300 SF) TRAINING STORAGE 241 SF (200 SF) TRAINING STORAGE 95 SF (200 SF) WOMENS LOCKER ROOM (33 2X2) 516 SF (68 SF) WOMENS RR 223 SF M A 34 5: 4 1: 1 FIRSTFLOOR PLAN CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 20.
    DN 216 SF DN 2 3 4 5 MNOPQRS K 2A 2A 3A 4A 5A G F E D C A J 1 L H 30'-0"30'-0" 30'-0" 30'-0" 30'-0" 32'-6" 28'-7 5/8" 27'-6"27'-6"27'-6"27'-6" STAIR (200 SF) OPEN TO BELOW OPEN? 106 SF? (0 SF)(?) EL EVATOR ROOF DECK PATIO 3B COMM. BREAKROOM 203 SF (200 SF) RECRUITING / TRAINING OFFICER 124 SF (120 SF) CIVILIAN TRAINING COORDINATOR 124 SF (120 SF) COMM. MANAGER 149 SF (150 SF) PUBLIC SAFETY VOLUNTEER TELECOM SUPERVISORS 327 SF (140 SF) RECRUITING / TRAINING OFFICER 85 SF (80 SF) RECRUITING / TRAINING LIEUTENANT 149 SF (150 SF) BREAK ROOM 187 SF (150 SF) UNISEX RSTRM 61 SF (80 SF) UNISEX RSTRM 61 SF (80 SF) UNISEX RSTRM 63 SF (80 SF) UNISEX RSTRM 62 SF (80 SF) ELECTRICAL 178 SF (200 SF) MECHANICAL 393 SF (400 SF) ADMIN CONFERENCE ROOM 701 SF (500 SF) PERSONNEL FILES 93 SF (120 SF) ADMIN IA LIEUTENANT147 SF (150 SF) ADMIN SECRETARY 117 SF (120 SF) BUDGET ANALYST 125 SF (120 SF) ASSIST. CHIEF OPER. SUPPORT BUREAU 194 SF (200 SF) (2) VOLUNTEER COORDINATOR ASSIST. 184 SF (240 SF) IA SERGEANT 147 SF (120 SF) OFF DUTY ASSISTANT PIO VOLUNTEER / VOL. COORD. SERGEANT 134 SF (120 SF) CHIEF OF POLICE 254 SF (300 SF) ASSISTANT CHIEF ADMIN FIELD OPERATIONS BUREAU 251 SF (200 SF) ASSISTANT CHIEF ADMIN SERV. BUREAU 195 SF (200 SF) MDF ROOM 159 SF (100 SF) CRIME VICTIM COORDINATOR 131 SF (165 SF) (3) CRIMINAL INVESTIGATIONS POLICE ASSISTANTS165 SF (192 SF) INVSTGTRS 53SF (64SF) 2ND FLOOR LOBBY 631 SF (0 SF) CONFERENCE ROOM 261 SF (0 SF) COFFEE/ PANTRY/MAIL /COPY 53SF (100SF) STAFF ASSIST 128 SF (120 SF) SIU STORAGE 146 SF (0 SF) SECRETARY 109 SF (120 SF) VOLUNTEER 57 SF (50 SF) TRAINING ROOM 193 SF (0 SF) TRAINING FILES /COPY 115 SF (120 SF) C L OSET TRAINER 52 SF (0 SF) TRAINER 52 SF (0 SF) TRAINER 52 SF (0 SF) BCKGRND INVEST. 76 SF (0 SF) ACADEMY COORD. 76 SF (120 SF) TRAINEE 52 SF (0 SF) TRAINEE 52 SF (0 SF) TRAINEE 52 SF (0 SF) 55 SF (50 SF) RECRUITING / TRAINING SERGEANT 133 SF (120 SF) RECRUITING / TRAINING SERGEANT 125 SF (120 SF) (2) DETECTIVES 127 SF (128 SF) CRIMINAL INVESTIGATIONS SERGEANT 151 SF(81 SF) (2) DETECTIVES 157 SF (128 SF) (2) DETECTIVES 127 SF (128 SF) (2) DETECTIVES 157 SF (128 SF) CRIMINAL INVESTIGATIONS SERGEANT 121 SF (81 SF) CRIMINAL INVESTIGATIONS SERGEANT121 SF (81 SF) CRIMINAL INVESTIGATIONS LIEUTENANT 153 SF (150 SF) CRIMINAL INVESTIGATIONS LIEUTENANT 184 SF (150 SF) (2) DETECTIVES 157 SF (128 SF) (2) DETECTIVES 157 SF (128 SF) (2) DETECTIVES 157 SF (128 SF) (2) DETECTIVES 157 SF (128 SF) (2) DETECTIVES 160 SF (128 SF) (2) DETECTIVES 160 SF (128 SF) FILES INTERVIEW 110 SF (100 SF) FILES CRIMINAL INVESTIGATIONS WAR ROOM 310 SF (350 SF) INTERVIEW 110 SF (100 SF) TECH CLOSET 92 SF (0 SF) ADMIN CONF.STOR. 61 SF (75 SF) JANITOR 71 SF (70 SF) STAFF 123 SF (120 SF) CONFSTO. 47SF (100SF) ACCREDITATION MANAGER150 SF (150 SF) MABOXES COFFEEBAR 45SF (50SF) PIO / COORD. LIEUTENANT 134 SF (150 SF) COORD. Redundant Room (0 SF) COMPLIANT / RESEARCH / ACRED ASSISTANT 134 SF (120 SF) (2) VOLUNTEER 191 SF (100 SF) EL EVATOR EQU IPMENT R OOM 40 SF (50 SF ) Department Legend ADMIN ADMIN SERVICES BUREAU CIRCULATION CORE FIELD OPERATIONS GENERAL FIRST FLOOR: 40,775 GSF SECOND FLOOR : 22,815 GSF MAIN BUILDING: 63,590 GSF ANNEX: 11,225 GSF GRAND TOTAL: 74,815 GSF LOBBY OPERATION SUPPORT BUREAU TRAINING AND RECRUITING MENS LOCKERS: 24" X 24": 206 12" X 12": 0 TOTAL: 206 AUGUST 10, 2017 TRUE NORTH IT ROOM 60 SF (150 SF) DISPATCH ROOM 1,694 SF (1,500 SF) CONF. ROOM 119 SF (120 SF) RECRUITING / TRAINING OFFICER 85 SF (80 SF) COMM. RSTRM 76 SF (80 SF) FILES AND STOR. RM 100 SF (0 SF) CRIME VICTIM COORDINATOR 133 SF (165 SF) PR IN T (2)DETECTIVES 209SF (128SF) (2) DETECTIVES 154 SF (128 SF) COMM. RSTRM 73 SF (80 SF) SIU SECRETARY 210 SF (120 SF) INVSTGTRS 53SF (64SF) INVSTGTRS 53SF (64SF) INVSTGTRS 52SF (64SF) INVSTGTRS 53SF (64SF) INVSTGTRS 53SF (64SF) COMM DOWN 103 SF (0 SF) 1A 1A SLOPEDMETALROOF FLAT TPO ROOF FUTURE 240 SF (150 SF) M A 55 5:4 : SECOND FLOOR PLAN CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 21.
    A3 A2 A1 AA AB BBCC DD EE 30'-0"30'-0" 30'-0" 32'-0" 26'-0" 32'-0" 27'-6" 27'-6" OUTDOOR EVIDENCE STORAGE 1,928 SF (800 SF) COMMAND CENTER BAY 964 SF (960 SF) HOSTAGE NEGOTIATIONS TRAILER BAY 994 SF (640 SF) HNT STORAGE 257 SF (200 SF) BOMB TRUCK/TRAILER BAY 992 SF (600 SF) SWAT TEAM BAY 686 SF (640 SF) VEHICLE MAINTENANCE BAY 523 SF (640 SF) POLICE VAN BAY 487 SF (640 SF) FORENSIC TRUCK BAY 487 SF (640 SF) STORAGE 157 SF (300 SF) BOMB STORAGE 198 SF (0 SF) STORAGE 53 SF (300 SF) MOTORCYCLE GARGE 635 SF WORKOUT ROOM 1,302 SF (500 SF) RESTROOM 64 SF (100 SF) STORAGE 119 SF RESTROOM 64 SF (100 SF) TEAM LEADER RM 102 SF SPECIAL OPERATIONS ROOM 455 SF 8'-0" 6 CIRCULATION 55 SF ANNEX FLOOR PLAN CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 22.
  • 23.
    AERIALPERSPECTIVE - NORTHEAST CORNER CITYOF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 24.
    PERSPECTIVE - KRENEKTAP VIEW CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 25.
    PERSPECTIVE - NORTHFACADE@ TURN AROUND CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 26.
    PERSPECTIVE - CORNER VIEW CITYOF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 27.
    PERSPECTIVE - MAINBUILDING ENTRANCE CITYOF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 28.
    ALTERNATE FACADE OPTION|MATERIAL CONCEPTS CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 29.
    ALTERNATE FACADE OPTION|AERIALPERSPECTIVE - NORTHEAST CORNER CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 30.
    ALTERNATE FACADE OPTION|PERSPECTIVE - KRENEK TAP VIEW CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 31.
    ALTERNATE FACADE OPTION|PERSPECTIVE - NORTHFACADE @ TURN AROUND CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 32.
    ALTERNATE FACADE OPTION|PERSPECTIVE - CORNER VIEW CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 33.
    ALTERNATE FACADE OPTION|PERSPECTIVE - MAINBUILDING ENTRANCE CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 34.
    SECURE POINT PROPERTY LINE &SETBACK SECURITY FENCE/WALL SECURE POINT PUBLICPARKING PUBLIC PARKING JAIL PARKING DROP-OFF SECURE EMPLOYEE PARKING FENCED MECHANICAL YARD FUTURE EXPANSION AREA SECURITY FENCE/WALL SECURITY FENCE/WALL TRUE NORTH 60' 90' 120' Graphic Scale: 1 inch = 30 feet 0 30' CENTRAL PARK 1 1"=30'-0" A2- SITE PLAN- PRESENTATIONOVERALL OVERALLSITE PLAN - ORIGINALCONCEPT DESIGN CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 35.
    PERSPECTIVE - LOBBY WEST CITYOF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 36.
    PERSPECTIVE - LOBBY EAST CITYOF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 37.
    ALTERNATE FACADE OPTION|PERSPECTIVE - LOBBY WEST CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS
  • 38.
    ALTERNATE FACADE OPTION|PERSPECTIVE - LOBBY EAST CITY OF COLLEGE STATION NEW POLICE HEADQUARTERS