1. A Fairfax County, VA, publication
Department of Public Works and Environmental Services
Working for You!
PUBLIC SAFETY HEADQUARTERS
PROJECT NUMBER: PS-000006-001
SUPERVISORY DISTRICT: BRADDOCK
October 2017
3. Project Details
PUBLIC SAFETY HEADQUARTERS
Department of Public Works and Environmental Services/Building Design and Construction Division
Project Description:
The Public Safety Headquarters (PSHQ) is the new headquarters for both the
Police Department (PD) and the Fire & Rescue Department (FRD), and is located
at 12099 Government Center Parkway, Fairfax. It replaces the aging and badly
deteriorating Massey Building, which has operated for many years as the
headquarters for both departments. The new facility consists of a 274,000
square foot office building and an 860-stall parking structure, located on a 9.3-
acre site, on the Government Center campus, adjacent to the Herrity Building.
The 160-ft high-rise office building has eight levels of occupied space and a
two-level mechanical penthouse at the top of the structure. The office building
is connected on Level 2 via an elevated pedestrian bridge to the parking
structure, which has five parking levels including the top-deck. The PSHQ
building has a fire suppression system and is fully sprinklered.
Public Areas:
In addition to Police and Fire & Rescue administrative offices and support areas,
the first three levels of the PSHQ are open to the public and include shared
recruiting & testing areas and multi-purpose rooms, FRD’s Fire Alarm &
Sprinkler Systems Training (FASST) Lab, Occupational Health Center, and Fire
Prevention Plan In-Take Counters, as well as PD’s Central Records Division and
False Alarm Reduction Unit.
West Elevation
4. Project Details
PUBLIC SAFETY HEADQUARTERS
Department of Public Works and Environmental Services/Building Design and Construction Division
Green Features:
Designed to achieve LEED Silver certification, the PSHQ building will be the
County's first project to use energy-efficient LED lighting throughout the entire
facility – building, garage, and site. Other green features and stormwater
enhancements included at the PSHQ are as follows.
• Vegetated. green roofs
• Rain gardens
• Vegetated swales
• Permeable pavements
• Rain water harvesting
• Low-flow plumbing fixtures
• Eco-smart environmental controls
• Maximized daylighting inside the building
Campus Improvements:
Designed to support community needs, PSHQ project-related improvements are
outlined as follows.
• Traffic signal installation at Post Forest Drive and Random Hills Road.
• Sidewalk and trail installation along Random Hills Road
• Pedestrian refuge installation at the intersection of Government Center
Parkway and the Herrity Access Road
• Bus shelter installation along Monument Drive
• LED streetlight installation along Monument Drive & Random Hills Road
• Enhanced campus and vicinity signage
Secure Courtyard Entry
5. Project Details
PUBLIC SAFETY HEADQUARTERS
Department of Public Works and Environmental Services/Building Design and Construction Division
Project Cost:
Original Total Project Estimate $ 158,481,664
Revised Post Bid Total Project Estimate $ 142,021,738
Total, Construction Cost Only (Approximate) $ 100,500,000
Project Schedule:
Design/Permitting March 2011 - June 2014
Bidding/Construction July 2014 - August 2017
Furnishings, Punch List, Commissioning January 2017 – October 2017
Staff Moves October 2017 – December 2017
Full Operations December 2017
Architect: HOK, Inc.
• Scott Hemlock, Principal
• Frank Etro, Resident Architect
• Robert Karamitsos, Sr. Architect
• Julie Steele, Sr. Architect
Contractor: Manhattan Construction Co.
• Brian Killian, Project Executive
• Gerald French, Project Manager
• David Payne, Superintendent
Herrity and PSHQ at Circle
6. Project Details
PUBLIC SAFETY HEADQUARTERS
Department of Public Works and Environmental Services/Building Design and Construction Division
County Project Team:
Building Design and Construction Division- CAP/DPWES
• Eileen Gasteiger, Project Manager
• Maurice Avren, Project Engineer
• Geoffrey Kimmel, Asst. Project Engineer
• Gary Bolt, Building QC Inspector
• Jeffrey Bartlett, Site Inspector
Fire and Rescue Department
• Laurie Stone, Strategic Planner
• John Caussin, Assistant Fire Chief
Police Department
• Lawrence Magni, Director, Facilities Division
• Edward O’Carroll, Major
Department of Information Technology
• James Simmons, IT Program Manager
Lobby View - Level Two
7. Project Details
PUBLIC SAFETY HEADQUARTERS
Department of Public Works and Environmental Services/Building Design and Construction Division
County Project Team:
Facilities Management Department
• Christine Covey, Planner
• Rosalyn Sevilla, Planner
• Tom Derflinger, Chief Building Engineer
Stormwater Planning Division- DPWES
• Catherine Torgersen, Project Manager
• Matthew Meyers, Project Coordinator
Lobby Stair
8. PUBLIC SAFETY HEADQUARTERS
Department of Public Works and Environmental Services/Building Design and Construction Division
12099 GOVERNMENT CENTER PARKWAY, FAIRFAX, VA 22035
9. PUBLIC SAFETY HEADQUARTERS
Department of Public Works and Environmental Services/Building Design and Construction Division
Fire & Rescue and Police Memorials
10. PUBLIC SAFETY HEADQUARTERS
Department of Public Works and Environmental Services/Building Design and Construction Division
Public Lobby: Security Desk & Exhibit Space
11. PUBLIC SAFETY HEADQUARTERS
Department of Public Works and Environmental Services/Building Design and Construction Division
Staff Seating at Green Roof
12. PUBLIC SAFETY HEADQUARTERS
Department of Public Works and Environmental Services/Building Design and Construction Division
Press Room and Testing & Recruiting Room
13. Department of Public Works and Environmental Services/Building Design and Construction Division
PUBLIC SAFETY HEADQUARTERS
Typical Elevator Lobby and Staff Kitchenette
14. Department of Public Works and Environmental Services/Building Design and Construction Division
PUBLIC SAFETY HEADQUARTERS
Fitness Center and Locker Room
15. Department of Public Works and Environmental Services/Building Design and Construction Division
PUBLIC SAFETY HEADQUARTERS
Typical Shared Conference Room
16. Department of Public Works and Environmental Services/Building Design and Construction Division
PUBLIC SAFETY HEADQUARTERS
Occupational Health Center – Waiting / Exam
17. Department of Public Works and Environmental Services/Building Design and Construction Division
PUBLIC SAFETY HEADQUARTERS
Fire Prevention Plan – Intake and FASST Lab
18. Department of Public Works and Environmental Services/Building Design and Construction Division
PUBLIC SAFETY HEADQUARTERS
Police Quartermaster and Comp Stat Room
19. Before After
PUBLIC SAFETY HEADQUARTERS
Department of Public Works and Environmental Services/Building Design and Construction Division
07 11 2017
20. Additional Information
For additional Information, please call
www.fairfaxcounty.gov/dpwes
PUBLIC SAFETY HEADQUARTERS
Department of Public Works and Environmental Services/Building Design and Construction Division