The Impact of Socioeconomic Status on Education.pdf
Chris perry resume_2016
1. Chris Perry
162 Creel Lane
Oakdale, LA 71463
318-613-7966
Cperry28@aol.com
Summary of Qualifications
Overtwenty yearsof diversifiedandprogressiveconstruction management, coordinating, engineering,
and inspectionexperience withanemphasisinmechanical,piping,andequipmentoperation,aswell as
a strong backgroundinorganizational,managerial, computerliteracy andpersonal development.
Recognizedforexcellentcommunicationandpresentationskills,outstandinglisteningandinterpersonal
skills,aswell asstrongdecision-makingproblemsolvingskills. Diversificationof projectsinclude
pipeline,papermill,powerplant,petroleum/gasplants,refineriesandothergovernmentapplications.
Professional Experience
Seasoned Construction Manager, Coordinator, Chief Inspector, Utility Inspector, General Foreman,
Foreman, Pipeliner, CPWI+ Welding Inspector and Pipefitter as well as Fabricator, Trainer, and Team
leader.Abilitytorespondto emergencycallsand projectrequirements associatedwith extendedhours.
Strong ability to read and interpret blueprints, orthographics, isometric drawings, including layouts, as
built red lines, and follow verbal instructions.
Field Engineer Technician: Assist project engineers with project updates, trouble shooting,
recommending alternative solutions to design infractions and site issues in all phases of cradle-to-grave
construction activities. Coordinate with contractors, project manager, engineers, operations and
inspectionto ensureschedule,budgetandqualityare maintained.Submittingpackagesandjobscopesto
contractors for bid.
Construction Manager: Assist and Coordinate all phases of design including the review of conceptual
designs during development recommending alternative solutions whenever design details affect
constructionfeasibilityorschedules.Adviseonsiteuse andimprovements,selectionof materials,building
systems and equipment. Receiving and sorting thru bid packages from contractors for Project Manager
approval. Provide recommendations on relative construction feasibility, availability of materials and
labor, time requirements for installation/construction and factors related to cost, including costs of
alternative designs or materials, preliminary budgets and economic impacts. Responsible for putting
togetherscope of workpackagesfor bidding projectsaswell ascreatingthe jobplan.Supervisionof field
operations for pipeline, facility piping, and facility upgrade projects which include planning and
scheduling,qualityassurance andcontrol,materialpurchasing,costcontrol, contractorcoordinationand
expediting the project. Overseeing construction and inspection activities in the field to insure safety,
quality,andschedule are metwhile stayingunderbudget. Coordinatingbetweenoperations,inspection,
projectmanager,andcontractors to insure projectiscompletedwithschedule and budget being meet.
ChiefInspector.Responsible fororganizinginspectors, coordinatingbetweenoperationsandcontractors
to insure project is kept running smoothwithin budget and on time, looking for any problemsthat may
arise andcorrectingtheminacosteffectiveandtimelymanner,overseeingandgatheringdocumentsand
building job book needed for record keeping on pipeline projects including internal cleaning, pigging,
hydrostatic testing, rehab, and new construction.
2. Page 2 of 5
Utility Inspector. Responsible for overseeing pipeline work activities such as sandblasting and coating,
excavation, backfill, ROW clearing, ROW clean up, hydrostatic testing, and pigging, to insure work is
completed safely and all client and DOT policies and procedures are followed.
General Foreman. Responsible for planning, overseeing, and tracking work of multiple crews on field
operation projects in oil and gas refineries. Redlining and keeping drawings current to new revisions.
Foreman. Responsible for planning and overseeing crew to ensure work is completed safely, timely and
in a cost efficient manner.
Work History
TULSA INSPECTIONRESOURCES: Tulsa,Oklahoma 04/15 to Present
FieldEngineer Tech – Workingcloselywithprojectengineers, forplanning, coordinating,
troubleshooting,andoverseeing CortezCo2expansionprojectsthroughoutNew MexicoandColorado
areas forKinderMorgan thruall phasesfrombreakinggroundtocommissioning.Fournew pumping
stationswere simultaneously builtalongwitha4 mile 16” loopline. WorkedcloselywithConstruction
manageras counterpartto drive constructionactivitiesthroughoutthe project.Filledinaschief ontwo
locationsasthe projectwas windingdowntocompletion.
TULSA INSPECTIONRESOURCES; Tulsa,Oklahoma 02/14 to 04/15
ConstructionManager– Planningworkscope;coordinatingbetween projectmanager,inspection,
operationsandcontractors;makingsure that workscope is followed.Overseeingfieldprojectsand
inspectionstaff toinsure safety,quality,andscheduleare meetwhile stayingunderbudget;insureall
properdocumentationhasbeengatheredforprojects;buildingprojectbooksforfuture reference and
auditsforEnterprise Products Compliance group.
TULSA INSPECTIONRESOURCES; Tulsa,Oklahoma 02/12 to 02/14
ChiefInspector – Overseeingandcoordinatingfieldprojectsandinspectors onrehabandassessment
projectsforEnterprise Productsintegritygroup;insure all proper Documentationhasbeengatheredfor
projects;buildingprojectbooksforfuture reference and Audits.
KESTREL ENGINEERING,INC.;Houston,TX 06/11 to 02/12
ChiefInspector - Overseeingandcoordinatingfieldprojectsandinspectors;insure all proper
Documentationhasbeengatheredfor assessments projects;buildingproject booksforfuture reference
and auditsforEnterprise ProductsIntegrity group.
TULSA INSPECTIONRESOURCES; Tulsa,Oklahoma 03/10 to 06/11
ChiefInspector – Overseeingandcoordinatingfieldprojectsandinspectors;insureall proper
Documentationhasbeengatheredforprojects;buildingprojectbooksforfuture reference andAudits
for Enterprise ProductsIntegritygroup.
TULSA INSPECTIONRESOURSE; Tulsa,Oklahoma 09/04 to 03/10
UtilityInspector - Overseeingpipeline maintenance contractors workingonprojectssuchas Runningin-
line cleaningandinspectiondevices; decommission andre-commissionof Pipelinesandfacilities;
hydrostatictestingof pipelinesandfacilities;linelowering;coatingrepair; andrehaboperationsto
insure all pipelinecompanyalongwithDOT Policies,procedures,andstandardsare followed.
.
HARMONY CONSTRUCTION;Lake Charles,Louisiana 04/04 to 09/04
Pipe Fitter – Layout,fabricationandinstallationof small andlarge bore pipe fornew unitinpetroleum
chemical refinery. Heavyloadrigging,warehousing,expeditingandcrew managementemployedto
3. Page 3 of 5
install pipingsystemwithinschedule allottedandwithinbudgetaryconstraints.
CROWNENTERPRISES; Torrance, California 01/04 – 03/04
Pipe General Foreman – Fieldsupervisionforpipe fabricationandinstallationof pipingsystemsfor
FCCU unitfor ExxonMobile petrochem.facility. Responsible formaterialworkpackaging,receiving,
ordering,takeoff,orthographic,isometricandPIDinterpretations. Completedas-buildsof finished
pipingsystemstoreflectalterationsfromoriginal scope of worksecondarytoengineeringdesignflaws,
fieldinterferences,andstartup necessities.
INTERNATIONAL MAINTENANCECORP; Lake Charles,Louisiana 04/03 to 12/03
Pipe Fitter – Newpipingfabrication,bothsmall andlarge bore,variousmetallurgiessuchasnickel,
chrome,carbon andstainlesssteel,fortwonew refiningunitsatCitgopetroleumchemical plantforEPA
regulatoryupdates. Responsible forlayout,tacking, andfittingcomplex pipingsystems. Operationof
50-ton crane,boom truck,Lull.
CROWNENTERPRISES; Baytown,Texas 01/03 to 03/03
Pipe General Foreman – Fieldsupervisionforfast-pacedturnaroundforpetrochem.plant
reconditioningand upgrade forExxonMobile. 14-18 hour dayswithinheavyphysical environment.
Projectcompletedwithinsafetyparametersandunderbudget.
CROWNENTERPRISES; Chalmette,Louisiana 09/02 to 11/02
Pipe Fitter/ Lead man– Fieldsupervisionfor10-weekturnaroundforcat cracker unitat ExxonMobile
petrochem.plant. Responsible forsafetyawarenessandequipmentcheckoutandoperation. Operated
50-ton crane forcomplex equipmentandpipinglifts.
CROWNENTERPRISES; Cheyenne,Wyoming 07/02 to 08/02
Pipe Fitter/ Lead man – Annual shutdown,plant-wide,refurbishingpipingsystemsforhydraulicsin
fertilizerproducingplantforCoastal.
INTERNATIONAL MAINTENANCECORP; Lake Charles,Louisiana 05/02 to 07/02
Pipe Fitter – NewpipingsysteminstallationsforXylene unitforCitgo. Large andsmall bore pipe,fitinto
existingequipmentandnewpumps,stations,tanks,andvessels.
CROWNENTERPRISES; Chalmette,Louisiana 04/02 to 05/02
Pipe Foreman – Responsible forcrewmanagementforpipinginstallationforturnaroundonFCCUunit
for Exxon-Mobile. Operationof boomtrucks,18 T cranes,JLG instructor.
ZACHRY CONSTRUCTIONCO.;Eunice, Louisiana 11/01 to 03/02
Pipe Fitter – Fabricationandinstallationof new pipingsystemsforgrassrootsconstructiononCleco-
Calpine powerplant. Large bore carbonand stainlesspipe withhangercomponentsystems,flush,
commissioning,startup,andturnover.
CROWNENTERPRISES; Aruba 04/01 to 10/01
Pipe General Foreman–Installationof large bore heavywall pipe forBurnOutCrude Unit for Coastal
petrochem.refinery. Heavyequipmentoperationwith18ton cranes,boomtruck.
OTHER RELEVANT EMPLOYMENT HISTORY
01/01 – 03/01 CrownEnterprises;Torrance,California–Pipe Foreman
(ExxonHydrogenUnit)
10/00 – 12/00 CrownEnterprises;Torrance,California –Pipe Fitter(Exxon
Mobile Crude Unit)
5. Page 5 of 5
ConstructionSupervisorySeries ISNetworld OQ Training
50 Ton Crane Operator 18 Ton Crane Operator
CPWI+ - Certified Pipeline Welding Inspector (registration number 63767047)
2015 Enterprise C.O.R. training
References
Sandra Keeler 713-381-6686 sjkeeler@eprod.com
Megan Johnson 713-381-4315 mejohnson@eprod.com
Bobby Rayburn 225-675-2505 braburn@eprod.com
Russ English 281-687-7362 Apaloosa43@yahoo.com
Marco Roncal 713-824-6740 Marco_Roncal@kindermorgan.com
Mark Morey 713-206-5554 Mark_Morey@kindermorgan.com