Scotthasover 30 yearsof professionalexperiencein Engineering Design and Management. In project
roles including ProjectDirector, ProjectManager,Chief Engineerand Clientsrepresentative,Scotthas
developed an extensivedepthof experiencein all aspectsof projectdevelopmentfrom pre-feasibility,
feasibilityand EPC or EPCMstages of power, mining,CSMgas, chemicaland infrastructureprojectsto
in excess of $2 billion. He has been responsible for the safe design, procurement and expediting,
contracts management, scheduling, capital cost estimates, project cost control, construction and
commissioning of both greenfield and brownfield projects in these industries.
Scott hasa sound understanding of whatcompany Boardsrequirein terms of projectvalue,schedule
and costand hasbeeninstrumentalin assistingseveralmajorprojects“overtheline”of Board approval
through improved plant layouts, alternative strategies for project execution, operational structure,
review and recommendations for appropriate allowances for contingency and risk and methods to
increase plant availability and profitability.
EDUCATION
Bachelorof Engineering(Mechanical),Universityof Queensland(1981). CPEng,RPEQ
OVERSEAS EXPERIENCE
AssignmentsinSwitzerland,Ireland,USA,Japan,Colombia,Indonesia, New Guinea, SolomonIslands
and NewCaledonia.
KEY ACHIEVEMENTS
As a Consultantandpart of a teamof three,I wasinstrumental inre-designingthe layoutand
configurationof the GoroNickel projectinNew Caledonia. The re-designresultedinsignificant
capital cost reductionsandcontributedtothe seniormanagementof Incohavingthe confidenceto
re-startthe projectafterit washalteddue to constructioncost overruns.
I was appointedthe firstManagerof the Processand Industrial Divisionof Kinhill (now KBR) and
grewthe Divisionfromastaff of twoto 16 staff and 30 Contractors intwo years. Thiswas achieved
throughspecializingthe Divisionintodeliveringprojectsforthree keyQueenslandindustries(Sugar,
FertilizerandCoal SeamMethane).
I identifiedCoal SeamMethane asanemergingmarketinQueenslandin1996; employedstaff with
appropriate skills,negotiatedserviceagreementswithcompanies(suchasPGT for pipeline studies
and engineeringsupport) anddesignedandmanagedone of the firstCSMgatheringstationsfor
Tristar at Fairview(nearRoma) andoverlandpipeline.
I developedadatabase applicationtoenable the automationof the “Kinhill BusinessProcess”(KBP).
Thisapplicationcoveredkeyaspectsof the engineeringdesignprocessincluding correspondence,
documentcontrol andprojectperformance. The use of this applicationinaprojectI managedledto
Kinhill Queenslandbeingthe firstoffice accreditedtoISO9001 in Australia.
I was a pioneerof the use of FiberReinforcedPlasticinacidslurryservice EZRisdon(1998).
As a youngdesignengineer, IwasselectedbyEvansDeakinfora 12 monthintensive trainingcourse
inpowerstationdesign withABBinBaden,Switzerland(1986).
2 | P a g e
EXPERIENCE
2015 SNC LAVALIN (QLD) – ENGINEERING MANAGER– SILANGANPROJECT DFS
Engineering design manager for Silangan mining’s copper/gold project in the Philippines.
Responsible for the design of the metallurgical process plant and related infrastructure. Capital
value approx.. USD1.5B.
2014 SUN ENGINEERING (QLD) PTY LTD– PROVISION OF EXPERT ADVICE
Retained to provide expert advice to Sun Engineering relating to the completeness of engineering
designs provided for fabrication.
2012 CONQUEST MINING LIMITED
Principal Mechanical Consultantfor ConquestMining’sMountCarltoncopper/silvergold
mine inNorthQueensland. Iwasretainedbythe General Managerof Mount Carltonto
provide Consultingservicesduringthe laterstagesof projectconstruction.
03/2011 – 06/2012 CALDER PROJECT SERVICES
ProjectManager andEngineeringManagerforConquestMining’sMountCarlton
copper/silvergoldmine inNorthQueensland. Thisappointmentwasatthe requestedof the
General Managerof ConquestMining. Capital value $175m.
05/2010 – 05/2011 INTECH ENGINEERS PTY LTD.
ProjectManager andEngineeringManagerforthe Ravenswoodgoldmine upgrade.
Installationof newcrushingstation,conveyors,cyclones,concentratorsandgoldroom.
ProjectManager andEngineeringManagerforLady Annie coppermine- installationof new
cathode strippingmachine suppliedbyXstrataTechnology.
09/2009- 05/2010 TRANSPORT ENERGYSYSTEMS.
Technical andmarketingManagerfor familyR&Dbusiness. Thisprojectdevelopedpatented
worldclasshybridtechnologyinthe formof a “regenerative brakingmodule”forinstallation
incity transitbuses. Typical fuel savings realizedvariedbetween17% and30% depending
on the busroute. I wasresponsibleforprovingand rationalizingthe thirdgeneration
technologysuitable formassproductionandidentificationandnegotiationswithcompanies
capable of manufacturing,distributionandsupportof the productworldwide.
03/2008- 08/2009 AUSTRALIAN SOLOMONSGOLD.
CLIENT REPRESENTATIVE
I was appointedClientrepresentative forthe GoldRidge projectinthe SolomonIslands. This
requiredworkingcloselywiththe CEO,CFOand otherseniormanagement. Activities
includedidentifyingissueswhichaffectedthe previousoperationandmaking
recommendationsforchangesnecessarytoensure are-openedmine wouldbe efficientand
profitable. Recommendationsincludedimproved“mine tomill”managementpracticesand
3 | P a g e
specialized equipmenttoimprove plantavailability,(particularlywithrespecttohandling
lateriticores) andthe selectionof asuitable EPCcontractor.
2006- 12/2007 SNC LAVALINAUSTRALIA, Brisbane, Queensland
OPERATIONS AND ACTING GENERAL MANAGER
I was appointed Operations Manager for SNC Lavalin Brisbane in August 2006, following
completion of the Goro Nickel assignment.
Iwasresponsibleforall personnelandprojects (asProjectDirector) conductedintheBrisbane
office. These included:
RioTinto Aluminium –Boyne Island - CarbonBakehouse Replacement:
Projectscope included designandconstructionof aGreenfieldAnode CarbonBaking
Furnace to replace the existingfurnacesatthe Boyne IslandAluminiumSmelter.
Approximate capital costof $A300 million.
RioTinto Aluminium –Boyne Island - ReductionLine &2Cranes Optimization:
Projectscope wasto modernise andoptimisethe existingCranes,RailsandAlumina
DistributionsystemonReductionLine 1&2 whichhas beeninproductionforover25 years.
Approximate capital costof $A320 million.
Dyno-Nobel –ProjectAurora– AmmoniumNitrate Plant
OwnersTeamServicesforthe EPCMphase of the DynoNobel MoranbahAmmoniumNitrate
Project. The plantis designedtoproduce 350,000 TPA of ammoniumNitrate forthe rapidly
expandingQueenslandMiningIndustry.
Ma'aden/AlcanJV
Program ManagementServicesforthe FEL2phase of the Az-ZabirahintegratedAluminium
ProjectinSaudi Arabia. As PMC, SNC-Lavalinwasresponsibleformanaginganddelivering
the Pre-feasibilitystudyforthe Mine andAluminaRefinerycomponentof the Project.
ServicesincludeProjectManagement,EngineeringandProcurement.
2003- 2006 SNC LAVALINAUSTRALIA., Brisbane, Queensland
SENIOR CHIEF ENGINEER - GoroNickel Project, NewCaledonia
Priorto completionof the detail designphase IwaspromotedtoSeniorChief Engineer,
responsible forresolutionof technicalissuescoveringall disciplinesandthe review of
projectdeliverables.
As Chief Mechanical andPipingEngineerIwasresponsible forateamof over 100 personnel.
Tasks undertakenbythe teamssupportedincludedFlow sheetandP&IDproduction, PDS
design,plantandequipmentlayoutandpipingdesignandspecification,tenderanalysisand
materialsselectionforstorage facilities,pipingandequipment. (Deliverableswere provided
inEnglishandFrench languages).Specificplantareasincluded:
 Feedpreparationplant
4 | P a g e
 Feedstorage,thickeningandheating
 HPAL
 CCD circuits
 Solventextractionplants
 Effluenttreatmentincludingtailingsdisposal
 Reticulationof all servicesandreagentsincludingfire water,potableandprocess
water,flocculants,caustic,limeslurryetc.
 Overlandpipelinesincludingtailings,raw water,feedslurryandseawateroutfall.
 Internal plantpipe racks
 HFO, HCL and Sulphuricacidhandlingandstorage
 Limestone andlime plant
 Sulphur,limestone andcoal stockyard,conveyorsandstacker
I was alsoresponsible forreviewingdesignsbyoutsidecontractorsforfacilitiesincludingthe
Port andSulphuricAcidplant.
Duringthe DefinitiveFeasibilityStudy(phase2B) I wasresponsibleforthe rationalization of
the entire plant layoutwhichresultedinthe overall plotplanbeingreducedinphysical size
by 50%. This andhis participationinthe value engineeringprocesscontributedtoreduction
inforecastprojectcapital cost by $US300M.
2001 – 2003 AUSENCOLIMITED
PRINCIPALSTUDYENGINEER(Contract)
Western Metals Cooper Ltd – Grinding and Flotation Plant Study, Mount Gordon
Preliminarydesign, capital and operating cost estimates for the materials handling,grinding
and flotationplantupgradesrequiredtoincrease copperore throughout. Projectproceeded
to completion.
Newcrest Mining Limited – Klondyke Project, Cracow
Detailed design and tender preparation for surface mine infrastructure facilities (MIA) to
support a new underground mine development. Project proceeded to completion.
Porgera Joint Venture – Secondary Crushing Review, Porgera PNG
Reviewof proposedsecondarycrushingdesigns. Recommendationsacceptedandthe project
proceeded to completion.
Carpentaria Gold – Process Pipework Review, Ravenswood
Review and report on methods to increase plant throughout from 3.5Mtpa to 5.5Mtpa.
BHP Billiton Ltd – North Block Pre-feasibility study
Preliminarydesign, capital and operating cost estimates for the materials handling,grinding
and flotation plant upgradesrequired to increase base metal ore throughput from 2Mt/a to
3Mt/a.
Mount Isa Mines – Pebble Crushing Feasibility Study
Preliminarydesign,capital andoperatingcostestimatesforthematerialshandlingandpebble
crushing circuit.
5 | P a g e
2001 OSD ENERGYSERVICES
STUDY MANAGER(Contract)
Review of a coal seam methane facility in the Surat Basin in the vicinity of Chinchilla on behalf of
CS Energy. CS Energy commissioned a study on the capital costs and project operating profile for
potential coal seam methane. The project included the option to take coal seam methane gas
from three separate unitised fields and feed into a single central production facility whereby the
gas is exported to the Roma to Brisbane pipeline or to alternatively to a gas turbine.
1990 -1999 KINHILLENGINEERS(nowKBR),
MANAGERPROCESS AND INDUSTRIAL DIVISION,QUEENSLAND
This division was created to capitalize on Process and Industrial market segments not
previouslyservicedbyKinhill. Iwas appointedDivisionManagerinSeptember1994 and was
responsible for all personnel and projects conducted in the Brisbane office for this Division
including the Project Controls group.
During this period, I acted as the Project Director, Project Supervisor and/or Technical
Reviewer for a wide variety of projects conducted by the Division including the following
Projects, Reports and Capital Cost Estimates:
Cerro Matoso due diligence report; Queensland Nickel: Site visit to Northern Colombia and
report covering process and environmental risks to the Cerro Matoso Ferronickel mine was
prepared for the Board of Queensland Nickel prior to the merger with Billiton.
GladstoneIlmenitestorageand handling,Globex: Preliminarydesignandcapital costestimate
for a new storage and handling facility at the Port of Gladstone. (1998)
Mt Isa Gas pipeline,Mimpex: Route selection andcapital costestimate forSWQueenslandto
Mt Isa gas pipeline. (1997)
Fairview Interconnect Project, PGT Australia: Design, procurement and commissioning of
PGT’s Fairview interconnect facilitiesfrom TriStar’s Fairview CSMgathering station to PGT’s
pipelineatRidgelands. Projectincluded gas filtering, metering and a 26km pipeline. (1997)
Product and Storage Handling facilities, Western Mining Corporation Fertilizers: Site visits,
technical report and capital cost estimate for proposed fertilizer and sulphur storage and
handling facilities for Phosphate Hill and Townsville. (1996).
BrisbanePipeline,PGT Australia: Preliminaryroute selectionforaproposedpipelinefromSW
Queensland to Petrie in Brisbane. (1996)
GrasstreeInfrastructureStudy,ShellCoal: Site inspection,reportandcapital costestimate for
the proposed Grasstrees underground coal mine development including surface
infrastructure. (1995)
DartbrookInfrastructureStudy,ShellCoal: Reportandcapital cost estimate forthe proposed
Dartbrook underground coal mine infrastructure requirements. (1995)
Gregory overland Conveyor, BHP Australia Coal: Preliminary design and pricing of crushing,
stockpiling, reclaiming and overland conveyor between Crinum and Gregory mines.
6 | P a g e
Ballera Infrastructure project, Santos: Capital cost estimate, detail design and contract
management for a new airfield, roads, refuelling system and other infrastructure at Ballera.
(1998)
OCTOBER 1998 TO DECEMBER 1999
PROJECT MANAGER, WMC FERTILIZERS—MATERIALS HANDLING AND MINE
INFRASTRUCTURE, PHOSPHATE HILL
Detail design and procurement of the product handling and general infrastructure and
services between Lump Sum Turn Key process plants, power plantand other facilitiesat the
$700 million Queensland Fertilizer Project, Phosphate Hill.
Servicesincludeddesign,procurement,constructionandcommissioningsupervision. The
projectteamwas responsible forthe areasof productstorage,handling andrail loadout
includingall roads,sewage,power,processandfirewater,plantairandcontrol throughout
the plant,bothundergroundandon mainpipe racks. The projectteamconsistedof upto
thirty-six designengineersanddrafters,aprocurementandinspectionworkforce of seven
and six fieldengineers.
February 1992 to August, 1994
Project Supervisor
Appointedtothe positionofProjectSupervisor,responsibleforthe overalldesign,contractual
requirements and financial performance of the following projects:
Mackay Refined Sugars —Sugarconditioning,storageand handling plant: Detaileddesignof
the above plant for the Racecourse Mill site, Mackay Harbour and Glebe Island sites. These
included a 5,000t sugar-conditioning silo, a 45,000t storage silo, fourteen 2,000t silos,
packaging plant and ship loader and unloader. The facilities are for the bulk storage and
transport of refined white sugar.
CSR New Farm Refinery, Brisbane — Refined Warehouse Packaging Station: Design,
procurement, construction management, commissioning of sugar handling plant and
packaging equipment for the upgrade of the New Farm Refinery.
September1991 to February 1992
SeniorMechanical Engineer
Final feasibility study for the Lihir Island gold project in Papua New Guinea. This study was
carried out in San Ramon, San Francisco for Kennecott Mining/RTZ Company. My
contributions included design, drawing review, specification preparation, and tender
evaluation for mechanical aspects of the 2.825 Mt/a gold processing plant.
July 1990 to September1991
SeniorMechanical Engineer,Kunwarara Preconcentrationand Beneficiation Plant
Detail mechanical design of a 2.5 Mt/a magnesite ore crushing, screening, washing and
grading facility for Queensland Magnesia (Operations) Pty Ltd. The plant included both low
and high-grade heavy medium separation circuits. Capital value $11 million.
ElectrofusionPlant- QMAG
Preparationof plantconcept,engineering,procurementandconstructionmanagementfor
the electrofusionplantlocatedinRockhampton,Queensland. The plantfeaturesspecially
7 | P a g e
designedelectric-arcHigginsfurnacestomeltcausticcalcinedmagnesiaat28000
C,
producinghighgrade fusedmagnesia forthe refractoryindustry.
1988 TO 1990
MINPROCENGINEERS PTY LTD
Lead Engineer for the neutral leach, weak acid leach and pre-neutralisation plants for
Pasminco Metals Electrolytic Zinc Refinery, Tasmania. Lead design engineer carrying overall
responsibility for the design of the hydrometallurgical leaching plants. Plant design was
undertaken concurrently in Brisbane over a two-year period by a multi-disciplined team of
seventeen draftsmen and five engineers. Key achievements in this project were in the
selectionof appropriate materialsincludingPVDFandFRPforthe acid service andthe design
of the now world standard segmented FRP thickener covers. Capital value $26 million.
1982 TO 1988
EVANS DEAKIN INDUSTRIES LIMITED
As DesignEngineer/Mechanical Plant, I wasinvolvedinthe preliminarydesignandpricingof
the following mechanical plant:
• Callide ‘B’ Power Station Coal Handling Plant
• Fisherman Island Wheat Terminal at the Port of Brisbane
• Brisbane Sugar Terminal at the Port of Brisbane.
During this period, I was also appointed Area Engineer for Loy Yang ‘A’ Unit 2 Power Station
Feedwater Heating Plant, in Victoria Australia. I was responsible for on-site design
modifications, contractor supervision, progress claims, manpower planning and assisting in
commissioning. Priorto mobilisingtosite,I carried out pipeworkdesignandstressanalysis,
vessel and heater design, and condenser design utilising proprietary computer software
including:
 Ampol Refineries,Lytton,Brisbane— FCCUGas Tail Expansionproject: Detail designof
pressure vessels,platformsandpipe supports.
1985 TO 1986
BROWN BOVERI CORPORATION, SWITZERLAND
As Design Engineer/Process Plant, I underwent intensive applied training in the design of
power plants and their components including:
• thermal designforfeedwater heating and condensing plants, and co-generation plants;
• thermal design of systems, feedwater heaters, direct contact heaters, condensers and
coolers;
• mechanical design of heat exchangers, condensers, water treatment plant and
demineralisation plants.

More Related Content

What's hot

Chris perry resume_2016
Chris perry resume_2016Chris perry resume_2016
Chris perry resume_2016Chris Perry
 
CV_2015_David_Darr
CV_2015_David_DarrCV_2015_David_Darr
CV_2015_David_DarrDavid Darr
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson
 
Planning Engineer CV Faizan
Planning Engineer CV FaizanPlanning Engineer CV Faizan
Planning Engineer CV FaizanFaizan Ahmed
 
NauticAWT Subsurface & Wells
NauticAWT Subsurface & WellsNauticAWT Subsurface & Wells
NauticAWT Subsurface & WellsAga Manhao
 
NauticAWT Brochure
NauticAWT BrochureNauticAWT Brochure
NauticAWT BrochureAga Manhao
 
Taylor, Michael J Resume
Taylor, Michael J   ResumeTaylor, Michael J   Resume
Taylor, Michael J Resumemjtaylor52
 
Arun Sahu_ Project Management _ Oil & Gas _ Petrochemical
Arun Sahu_ Project Management _ Oil & Gas _ PetrochemicalArun Sahu_ Project Management _ Oil & Gas _ Petrochemical
Arun Sahu_ Project Management _ Oil & Gas _ PetrochemicalArun Sahu, CIPM/CrtPRM
 
James A Sayers Contract Specialist
James A Sayers Contract SpecialistJames A Sayers Contract Specialist
James A Sayers Contract SpecialistJames Sayers
 
Operation & intervention engineer achievements
Operation & intervention engineer achievementsOperation & intervention engineer achievements
Operation & intervention engineer achievementsJoseph Bracic
 
Sreejith_2484_b (2).doc
Sreejith_2484_b (2).docSreejith_2484_b (2).doc
Sreejith_2484_b (2).docSreejith Nair
 
2016 07 Henry Campbell
2016 07 Henry Campbell2016 07 Henry Campbell
2016 07 Henry CampbellHarry Campbell
 
S Perez Resume1
S Perez Resume1S Perez Resume1
S Perez Resume1Greatdanes
 
Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21Craig Marshall
 

What's hot (20)

Chris perry resume_2016
Chris perry resume_2016Chris perry resume_2016
Chris perry resume_2016
 
CV_2015_David_Darr
CV_2015_David_DarrCV_2015_David_Darr
CV_2015_David_Darr
 
John John_ Resume
John John_ ResumeJohn John_ Resume
John John_ Resume
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
 
Planning Engineer CV Faizan
Planning Engineer CV FaizanPlanning Engineer CV Faizan
Planning Engineer CV Faizan
 
CV_Romeo_2016Latest
CV_Romeo_2016LatestCV_Romeo_2016Latest
CV_Romeo_2016Latest
 
NauticAWT Subsurface & Wells
NauticAWT Subsurface & WellsNauticAWT Subsurface & Wells
NauticAWT Subsurface & Wells
 
NauticAWT Brochure
NauticAWT BrochureNauticAWT Brochure
NauticAWT Brochure
 
Taylor, Michael J Resume
Taylor, Michael J   ResumeTaylor, Michael J   Resume
Taylor, Michael J Resume
 
Ska5
Ska5Ska5
Ska5
 
Rakesh
RakeshRakesh
Rakesh
 
Arun Sahu_ Project Management _ Oil & Gas _ Petrochemical
Arun Sahu_ Project Management _ Oil & Gas _ PetrochemicalArun Sahu_ Project Management _ Oil & Gas _ Petrochemical
Arun Sahu_ Project Management _ Oil & Gas _ Petrochemical
 
Civil Engineer Hassan Shafeeq CV
Civil Engineer Hassan Shafeeq CVCivil Engineer Hassan Shafeeq CV
Civil Engineer Hassan Shafeeq CV
 
Edward daly resume 12292016
Edward daly resume 12292016Edward daly resume 12292016
Edward daly resume 12292016
 
James A Sayers Contract Specialist
James A Sayers Contract SpecialistJames A Sayers Contract Specialist
James A Sayers Contract Specialist
 
Operation & intervention engineer achievements
Operation & intervention engineer achievementsOperation & intervention engineer achievements
Operation & intervention engineer achievements
 
Sreejith_2484_b (2).doc
Sreejith_2484_b (2).docSreejith_2484_b (2).doc
Sreejith_2484_b (2).doc
 
2016 07 Henry Campbell
2016 07 Henry Campbell2016 07 Henry Campbell
2016 07 Henry Campbell
 
S Perez Resume1
S Perez Resume1S Perez Resume1
S Perez Resume1
 
Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21
 

Similar to Scott Bullock CV 25112016

Similar to Scott Bullock CV 25112016 (20)

Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15Resume of kerry polkinghorne 22.07.15
Resume of kerry polkinghorne 22.07.15
 
MP Singh_ Resume 001
MP Singh_ Resume 001MP Singh_ Resume 001
MP Singh_ Resume 001
 
S nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNGS nikkhah CV Oil Gas CSG LNG
S nikkhah CV Oil Gas CSG LNG
 
Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017Dean Hamilton Estimating Jan 2017
Dean Hamilton Estimating Jan 2017
 
CV_Mark Fayle _Brief
CV_Mark Fayle _BriefCV_Mark Fayle _Brief
CV_Mark Fayle _Brief
 
Ravi's CV
Ravi's CVRavi's CV
Ravi's CV
 
SRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction SuperintendentSRINIVAS_Project Engineer_Construction Superintendent
SRINIVAS_Project Engineer_Construction Superintendent
 
William Adams CV_N1_Jan 2016
William Adams CV_N1_Jan 2016William Adams CV_N1_Jan 2016
William Adams CV_N1_Jan 2016
 
PAUL FOTHERGILL CV
PAUL FOTHERGILL CVPAUL FOTHERGILL CV
PAUL FOTHERGILL CV
 
Peter Bartlett - Personal CV (March 2016)
Peter Bartlett - Personal CV (March 2016)Peter Bartlett - Personal CV (March 2016)
Peter Bartlett - Personal CV (March 2016)
 
MS CV May 2016
MS CV May 2016MS CV May 2016
MS CV May 2016
 
T&T Draft Brochure Rev Dark
T&T Draft Brochure Rev DarkT&T Draft Brochure Rev Dark
T&T Draft Brochure Rev Dark
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Siemens_CV1
Siemens_CV1Siemens_CV1
Siemens_CV1
 
Resume Leyla Clothier
Resume Leyla ClothierResume Leyla Clothier
Resume Leyla Clothier
 
Grahame Binks 11.16
Grahame Binks 11.16Grahame Binks 11.16
Grahame Binks 11.16
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
DominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_datesDominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_dates
 
SUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CVSUDARSAN CAUSHIK CV
SUDARSAN CAUSHIK CV
 

Scott Bullock CV 25112016

  • 1. 1 | P a g e Scotthasover 30 yearsof professionalexperiencein Engineering Design and Management. In project roles including ProjectDirector, ProjectManager,Chief Engineerand Clientsrepresentative,Scotthas developed an extensivedepthof experiencein all aspectsof projectdevelopmentfrom pre-feasibility, feasibilityand EPC or EPCMstages of power, mining,CSMgas, chemicaland infrastructureprojectsto in excess of $2 billion. He has been responsible for the safe design, procurement and expediting, contracts management, scheduling, capital cost estimates, project cost control, construction and commissioning of both greenfield and brownfield projects in these industries. Scott hasa sound understanding of whatcompany Boardsrequirein terms of projectvalue,schedule and costand hasbeeninstrumentalin assistingseveralmajorprojects“overtheline”of Board approval through improved plant layouts, alternative strategies for project execution, operational structure, review and recommendations for appropriate allowances for contingency and risk and methods to increase plant availability and profitability. EDUCATION Bachelorof Engineering(Mechanical),Universityof Queensland(1981). CPEng,RPEQ OVERSEAS EXPERIENCE AssignmentsinSwitzerland,Ireland,USA,Japan,Colombia,Indonesia, New Guinea, SolomonIslands and NewCaledonia. KEY ACHIEVEMENTS As a Consultantandpart of a teamof three,I wasinstrumental inre-designingthe layoutand configurationof the GoroNickel projectinNew Caledonia. The re-designresultedinsignificant capital cost reductionsandcontributedtothe seniormanagementof Incohavingthe confidenceto re-startthe projectafterit washalteddue to constructioncost overruns. I was appointedthe firstManagerof the Processand Industrial Divisionof Kinhill (now KBR) and grewthe Divisionfromastaff of twoto 16 staff and 30 Contractors intwo years. Thiswas achieved throughspecializingthe Divisionintodeliveringprojectsforthree keyQueenslandindustries(Sugar, FertilizerandCoal SeamMethane). I identifiedCoal SeamMethane asanemergingmarketinQueenslandin1996; employedstaff with appropriate skills,negotiatedserviceagreementswithcompanies(suchasPGT for pipeline studies and engineeringsupport) anddesignedandmanagedone of the firstCSMgatheringstationsfor Tristar at Fairview(nearRoma) andoverlandpipeline. I developedadatabase applicationtoenable the automationof the “Kinhill BusinessProcess”(KBP). Thisapplicationcoveredkeyaspectsof the engineeringdesignprocessincluding correspondence, documentcontrol andprojectperformance. The use of this applicationinaprojectI managedledto Kinhill Queenslandbeingthe firstoffice accreditedtoISO9001 in Australia. I was a pioneerof the use of FiberReinforcedPlasticinacidslurryservice EZRisdon(1998). As a youngdesignengineer, IwasselectedbyEvansDeakinfora 12 monthintensive trainingcourse inpowerstationdesign withABBinBaden,Switzerland(1986).
  • 2. 2 | P a g e EXPERIENCE 2015 SNC LAVALIN (QLD) – ENGINEERING MANAGER– SILANGANPROJECT DFS Engineering design manager for Silangan mining’s copper/gold project in the Philippines. Responsible for the design of the metallurgical process plant and related infrastructure. Capital value approx.. USD1.5B. 2014 SUN ENGINEERING (QLD) PTY LTD– PROVISION OF EXPERT ADVICE Retained to provide expert advice to Sun Engineering relating to the completeness of engineering designs provided for fabrication. 2012 CONQUEST MINING LIMITED Principal Mechanical Consultantfor ConquestMining’sMountCarltoncopper/silvergold mine inNorthQueensland. Iwasretainedbythe General Managerof Mount Carltonto provide Consultingservicesduringthe laterstagesof projectconstruction. 03/2011 – 06/2012 CALDER PROJECT SERVICES ProjectManager andEngineeringManagerforConquestMining’sMountCarlton copper/silvergoldmine inNorthQueensland. Thisappointmentwasatthe requestedof the General Managerof ConquestMining. Capital value $175m. 05/2010 – 05/2011 INTECH ENGINEERS PTY LTD. ProjectManager andEngineeringManagerforthe Ravenswoodgoldmine upgrade. Installationof newcrushingstation,conveyors,cyclones,concentratorsandgoldroom. ProjectManager andEngineeringManagerforLady Annie coppermine- installationof new cathode strippingmachine suppliedbyXstrataTechnology. 09/2009- 05/2010 TRANSPORT ENERGYSYSTEMS. Technical andmarketingManagerfor familyR&Dbusiness. Thisprojectdevelopedpatented worldclasshybridtechnologyinthe formof a “regenerative brakingmodule”forinstallation incity transitbuses. Typical fuel savings realizedvariedbetween17% and30% depending on the busroute. I wasresponsibleforprovingand rationalizingthe thirdgeneration technologysuitable formassproductionandidentificationandnegotiationswithcompanies capable of manufacturing,distributionandsupportof the productworldwide. 03/2008- 08/2009 AUSTRALIAN SOLOMONSGOLD. CLIENT REPRESENTATIVE I was appointedClientrepresentative forthe GoldRidge projectinthe SolomonIslands. This requiredworkingcloselywiththe CEO,CFOand otherseniormanagement. Activities includedidentifyingissueswhichaffectedthe previousoperationandmaking recommendationsforchangesnecessarytoensure are-openedmine wouldbe efficientand profitable. Recommendationsincludedimproved“mine tomill”managementpracticesand
  • 3. 3 | P a g e specialized equipmenttoimprove plantavailability,(particularlywithrespecttohandling lateriticores) andthe selectionof asuitable EPCcontractor. 2006- 12/2007 SNC LAVALINAUSTRALIA, Brisbane, Queensland OPERATIONS AND ACTING GENERAL MANAGER I was appointed Operations Manager for SNC Lavalin Brisbane in August 2006, following completion of the Goro Nickel assignment. Iwasresponsibleforall personnelandprojects (asProjectDirector) conductedintheBrisbane office. These included: RioTinto Aluminium –Boyne Island - CarbonBakehouse Replacement: Projectscope included designandconstructionof aGreenfieldAnode CarbonBaking Furnace to replace the existingfurnacesatthe Boyne IslandAluminiumSmelter. Approximate capital costof $A300 million. RioTinto Aluminium –Boyne Island - ReductionLine &2Cranes Optimization: Projectscope wasto modernise andoptimisethe existingCranes,RailsandAlumina DistributionsystemonReductionLine 1&2 whichhas beeninproductionforover25 years. Approximate capital costof $A320 million. Dyno-Nobel –ProjectAurora– AmmoniumNitrate Plant OwnersTeamServicesforthe EPCMphase of the DynoNobel MoranbahAmmoniumNitrate Project. The plantis designedtoproduce 350,000 TPA of ammoniumNitrate forthe rapidly expandingQueenslandMiningIndustry. Ma'aden/AlcanJV Program ManagementServicesforthe FEL2phase of the Az-ZabirahintegratedAluminium ProjectinSaudi Arabia. As PMC, SNC-Lavalinwasresponsibleformanaginganddelivering the Pre-feasibilitystudyforthe Mine andAluminaRefinerycomponentof the Project. ServicesincludeProjectManagement,EngineeringandProcurement. 2003- 2006 SNC LAVALINAUSTRALIA., Brisbane, Queensland SENIOR CHIEF ENGINEER - GoroNickel Project, NewCaledonia Priorto completionof the detail designphase IwaspromotedtoSeniorChief Engineer, responsible forresolutionof technicalissuescoveringall disciplinesandthe review of projectdeliverables. As Chief Mechanical andPipingEngineerIwasresponsible forateamof over 100 personnel. Tasks undertakenbythe teamssupportedincludedFlow sheetandP&IDproduction, PDS design,plantandequipmentlayoutandpipingdesignandspecification,tenderanalysisand materialsselectionforstorage facilities,pipingandequipment. (Deliverableswere provided inEnglishandFrench languages).Specificplantareasincluded:  Feedpreparationplant
  • 4. 4 | P a g e  Feedstorage,thickeningandheating  HPAL  CCD circuits  Solventextractionplants  Effluenttreatmentincludingtailingsdisposal  Reticulationof all servicesandreagentsincludingfire water,potableandprocess water,flocculants,caustic,limeslurryetc.  Overlandpipelinesincludingtailings,raw water,feedslurryandseawateroutfall.  Internal plantpipe racks  HFO, HCL and Sulphuricacidhandlingandstorage  Limestone andlime plant  Sulphur,limestone andcoal stockyard,conveyorsandstacker I was alsoresponsible forreviewingdesignsbyoutsidecontractorsforfacilitiesincludingthe Port andSulphuricAcidplant. Duringthe DefinitiveFeasibilityStudy(phase2B) I wasresponsibleforthe rationalization of the entire plant layoutwhichresultedinthe overall plotplanbeingreducedinphysical size by 50%. This andhis participationinthe value engineeringprocesscontributedtoreduction inforecastprojectcapital cost by $US300M. 2001 – 2003 AUSENCOLIMITED PRINCIPALSTUDYENGINEER(Contract) Western Metals Cooper Ltd – Grinding and Flotation Plant Study, Mount Gordon Preliminarydesign, capital and operating cost estimates for the materials handling,grinding and flotationplantupgradesrequiredtoincrease copperore throughout. Projectproceeded to completion. Newcrest Mining Limited – Klondyke Project, Cracow Detailed design and tender preparation for surface mine infrastructure facilities (MIA) to support a new underground mine development. Project proceeded to completion. Porgera Joint Venture – Secondary Crushing Review, Porgera PNG Reviewof proposedsecondarycrushingdesigns. Recommendationsacceptedandthe project proceeded to completion. Carpentaria Gold – Process Pipework Review, Ravenswood Review and report on methods to increase plant throughout from 3.5Mtpa to 5.5Mtpa. BHP Billiton Ltd – North Block Pre-feasibility study Preliminarydesign, capital and operating cost estimates for the materials handling,grinding and flotation plant upgradesrequired to increase base metal ore throughput from 2Mt/a to 3Mt/a. Mount Isa Mines – Pebble Crushing Feasibility Study Preliminarydesign,capital andoperatingcostestimatesforthematerialshandlingandpebble crushing circuit.
  • 5. 5 | P a g e 2001 OSD ENERGYSERVICES STUDY MANAGER(Contract) Review of a coal seam methane facility in the Surat Basin in the vicinity of Chinchilla on behalf of CS Energy. CS Energy commissioned a study on the capital costs and project operating profile for potential coal seam methane. The project included the option to take coal seam methane gas from three separate unitised fields and feed into a single central production facility whereby the gas is exported to the Roma to Brisbane pipeline or to alternatively to a gas turbine. 1990 -1999 KINHILLENGINEERS(nowKBR), MANAGERPROCESS AND INDUSTRIAL DIVISION,QUEENSLAND This division was created to capitalize on Process and Industrial market segments not previouslyservicedbyKinhill. Iwas appointedDivisionManagerinSeptember1994 and was responsible for all personnel and projects conducted in the Brisbane office for this Division including the Project Controls group. During this period, I acted as the Project Director, Project Supervisor and/or Technical Reviewer for a wide variety of projects conducted by the Division including the following Projects, Reports and Capital Cost Estimates: Cerro Matoso due diligence report; Queensland Nickel: Site visit to Northern Colombia and report covering process and environmental risks to the Cerro Matoso Ferronickel mine was prepared for the Board of Queensland Nickel prior to the merger with Billiton. GladstoneIlmenitestorageand handling,Globex: Preliminarydesignandcapital costestimate for a new storage and handling facility at the Port of Gladstone. (1998) Mt Isa Gas pipeline,Mimpex: Route selection andcapital costestimate forSWQueenslandto Mt Isa gas pipeline. (1997) Fairview Interconnect Project, PGT Australia: Design, procurement and commissioning of PGT’s Fairview interconnect facilitiesfrom TriStar’s Fairview CSMgathering station to PGT’s pipelineatRidgelands. Projectincluded gas filtering, metering and a 26km pipeline. (1997) Product and Storage Handling facilities, Western Mining Corporation Fertilizers: Site visits, technical report and capital cost estimate for proposed fertilizer and sulphur storage and handling facilities for Phosphate Hill and Townsville. (1996). BrisbanePipeline,PGT Australia: Preliminaryroute selectionforaproposedpipelinefromSW Queensland to Petrie in Brisbane. (1996) GrasstreeInfrastructureStudy,ShellCoal: Site inspection,reportandcapital costestimate for the proposed Grasstrees underground coal mine development including surface infrastructure. (1995) DartbrookInfrastructureStudy,ShellCoal: Reportandcapital cost estimate forthe proposed Dartbrook underground coal mine infrastructure requirements. (1995) Gregory overland Conveyor, BHP Australia Coal: Preliminary design and pricing of crushing, stockpiling, reclaiming and overland conveyor between Crinum and Gregory mines.
  • 6. 6 | P a g e Ballera Infrastructure project, Santos: Capital cost estimate, detail design and contract management for a new airfield, roads, refuelling system and other infrastructure at Ballera. (1998) OCTOBER 1998 TO DECEMBER 1999 PROJECT MANAGER, WMC FERTILIZERS—MATERIALS HANDLING AND MINE INFRASTRUCTURE, PHOSPHATE HILL Detail design and procurement of the product handling and general infrastructure and services between Lump Sum Turn Key process plants, power plantand other facilitiesat the $700 million Queensland Fertilizer Project, Phosphate Hill. Servicesincludeddesign,procurement,constructionandcommissioningsupervision. The projectteamwas responsible forthe areasof productstorage,handling andrail loadout includingall roads,sewage,power,processandfirewater,plantairandcontrol throughout the plant,bothundergroundandon mainpipe racks. The projectteamconsistedof upto thirty-six designengineersanddrafters,aprocurementandinspectionworkforce of seven and six fieldengineers. February 1992 to August, 1994 Project Supervisor Appointedtothe positionofProjectSupervisor,responsibleforthe overalldesign,contractual requirements and financial performance of the following projects: Mackay Refined Sugars —Sugarconditioning,storageand handling plant: Detaileddesignof the above plant for the Racecourse Mill site, Mackay Harbour and Glebe Island sites. These included a 5,000t sugar-conditioning silo, a 45,000t storage silo, fourteen 2,000t silos, packaging plant and ship loader and unloader. The facilities are for the bulk storage and transport of refined white sugar. CSR New Farm Refinery, Brisbane — Refined Warehouse Packaging Station: Design, procurement, construction management, commissioning of sugar handling plant and packaging equipment for the upgrade of the New Farm Refinery. September1991 to February 1992 SeniorMechanical Engineer Final feasibility study for the Lihir Island gold project in Papua New Guinea. This study was carried out in San Ramon, San Francisco for Kennecott Mining/RTZ Company. My contributions included design, drawing review, specification preparation, and tender evaluation for mechanical aspects of the 2.825 Mt/a gold processing plant. July 1990 to September1991 SeniorMechanical Engineer,Kunwarara Preconcentrationand Beneficiation Plant Detail mechanical design of a 2.5 Mt/a magnesite ore crushing, screening, washing and grading facility for Queensland Magnesia (Operations) Pty Ltd. The plant included both low and high-grade heavy medium separation circuits. Capital value $11 million. ElectrofusionPlant- QMAG Preparationof plantconcept,engineering,procurementandconstructionmanagementfor the electrofusionplantlocatedinRockhampton,Queensland. The plantfeaturesspecially
  • 7. 7 | P a g e designedelectric-arcHigginsfurnacestomeltcausticcalcinedmagnesiaat28000 C, producinghighgrade fusedmagnesia forthe refractoryindustry. 1988 TO 1990 MINPROCENGINEERS PTY LTD Lead Engineer for the neutral leach, weak acid leach and pre-neutralisation plants for Pasminco Metals Electrolytic Zinc Refinery, Tasmania. Lead design engineer carrying overall responsibility for the design of the hydrometallurgical leaching plants. Plant design was undertaken concurrently in Brisbane over a two-year period by a multi-disciplined team of seventeen draftsmen and five engineers. Key achievements in this project were in the selectionof appropriate materialsincludingPVDFandFRPforthe acid service andthe design of the now world standard segmented FRP thickener covers. Capital value $26 million. 1982 TO 1988 EVANS DEAKIN INDUSTRIES LIMITED As DesignEngineer/Mechanical Plant, I wasinvolvedinthe preliminarydesignandpricingof the following mechanical plant: • Callide ‘B’ Power Station Coal Handling Plant • Fisherman Island Wheat Terminal at the Port of Brisbane • Brisbane Sugar Terminal at the Port of Brisbane. During this period, I was also appointed Area Engineer for Loy Yang ‘A’ Unit 2 Power Station Feedwater Heating Plant, in Victoria Australia. I was responsible for on-site design modifications, contractor supervision, progress claims, manpower planning and assisting in commissioning. Priorto mobilisingtosite,I carried out pipeworkdesignandstressanalysis, vessel and heater design, and condenser design utilising proprietary computer software including:  Ampol Refineries,Lytton,Brisbane— FCCUGas Tail Expansionproject: Detail designof pressure vessels,platformsandpipe supports. 1985 TO 1986 BROWN BOVERI CORPORATION, SWITZERLAND As Design Engineer/Process Plant, I underwent intensive applied training in the design of power plants and their components including: • thermal designforfeedwater heating and condensing plants, and co-generation plants; • thermal design of systems, feedwater heaters, direct contact heaters, condensers and coolers; • mechanical design of heat exchangers, condensers, water treatment plant and demineralisation plants.