SlideShare a Scribd company logo
1 of 5
Scott W. Strickland
Regional Manager
Haskell, Texas 79521
(812) 292-6540
Summary:
Professional experience in the fields of Oil and Gas Midstream, Renewable Energy, Ethanol, Bio Diesel,
Petroleum Refineries, Chemical Plants, Food and Beverage Facilities, Power Plants, and Industrial Steel
Mills. Complete Project Life Cycle for both Projects and Programs. Projects ranged in size from $10k to
over $260M and ranging from a few weeks to several years. A proven track record in establishing and
maintaininglongtermclientrelations,withmajoremphasesonsafety,qualityandschedule adherence.
Clientinteractionandsupportatall levelsfromqualitymanagementtoprofessionalprojectmanagement
to individual contributors in the client organization involved in joint activities and system testing.
Hiring and managing a staff of craft and administrative personnel under the concept of a “Project Team
Environment”. The projectteamismentoredwiththe understandingthattheyare ourgreatestasset. As
such, “Safety” is our number one priority.
Areasof expertiseincludeProjectSupervision,ConstructionManagement,CostEstimating,Procurement,
Scheduling,QualityAssurance/Quality Control and Safety adherence oversight in accordance with strict
OSHA compliance. Solid record of financial and personnel management including cost benefit analysis,
problem resolution, risk management, change order management and schedule compliance.
Professional Experience:
Brazos Rock Energy Services
SouthTexas Regional Manager– (2013 – Present)
Responsibilitiesencompass managingof multiple projectsaswell asmultipleprojectmanagers,all inthe
midstreamoil andgasindustry. Dutiesinclude the managementof facilitiesaswell as pipelines civil and
I/E. The most resentprojectwaswitha CO2 injectionfacility.
Sunland Industries,Inc.
ProjectManager - (2012- 2013)
Assignedtopipelineprojectsand compressorstationsinsouthcentral Texas. Responsibilities
encompassedall facetsof ProjectManagementoverall crafts. Installationof pipe andequipmentfor
three compressorstations andall undergroundpipe inbetween. Pipe sizesrangedbetween2”through
48” includinglaunchers,receivers,provers,canpumps,MCCbuildingspipe racks,andetc. Primarily
workedonPlainsPipelineprojects.
WestconIndustries,Inc.
Sr. ProjectSuperintendent- (2010 – 2012)
Assignedtoall typesof industrial constructionprojects,butmostimportantlythe oil andgasindustry.
Responsibilitiesencompassedall facetsof projectmanagementincluding,butnotlimitedto:project
scope initiation,scope management,schedulecompliance,costbenefitanalysis,riskanalysis,problem
resolution,clientinterface,strictsafetypolicyadherence andassignedcraftprojectdemobilization.
Hess Oil Company Inc.
Tioga NorthDakota – (2010)
Assignedtothe BakkenOil Reserve asa Sr. ProjectSuperintendentwithoutaProjectManageroverthe
designandbuildof oil andnatural gas compressor stationsprojectsrangingfrom30 millionto100
millionpeakingat150 employees.
Fagen,Inc.
ProjectSuperintendent –(2007 – 2010)
Assignedasmulti-discipline CraftSuperintendentdirectingthe fabricationandinstallationof pipe,
instrumentation, andmillwrights. Thispositionwasadirectreportto the assignedProjectManager.
Responsibilitiesencompassedall facetsof projectmanagementincluding,butnotlimitedto:project
scope initiation,scope management,schedulecompliance,costbenefitanalysis,riskanalysis,problem
resolution,clientinterface,strictsafetypolicyadherence andassignedprojectcraftdemobilization.
Thispositionrequireddirectsupervisionandmentoringof all assignedprojectcraftpersonnel in
additiontothe oversightandsupervisionof all subcontractors. Additionalprojectrequirements
includedthe developmentof material requisitions,bid evaluations, andtestingrequirements.
ProjectListat Fagen:
E-Energy ofAdams LLC
Assignedasmulti-discipline CraftSuperintendentdirectingthe fabricationandinstallationof
pipe, instrumentation, andmillwrights. Asthe ProjectSuperintendentthispositionincludedthe
overseeingof the specifiedcraftpertainingtothe designbuildof afifty(50) milliongallon per
year(MGY) drygrindethanol productionfacility.Thisfacilitywastakenfrom“Notice to
Proceed”(NTP) to“Substantial Completion”inexactlyone yeartothe daywithno losttime
accidents.The exemplaryqualityof craftsmanshipandteamworkresultedinasuccessful plant
start up withnorequiredoutages.Thisfacilitycontinuestorunwithan exceptional operating
record consistentlysettingnewmilestonesandproductionrecordsinthe industry.
Big River Galva LLC
Assignedasmulti-discipline CraftSuperintendentdirectingthe fabricationandinstallationof
pipe,instrumentationandmillwrights.Asthe ProjectSuperintendentthispositionincludedthe
overseeingof the specifiedcraftpertainingtothe designbuildof aone hundred(100) million
gallonperyear(MGY) dry grindethanol productionfacility.
ProjectListat Fagen (continued):
Louis DreyfusCommoditiesGrandJunction LLC
Assigned as multi-disciplineCraftSuperintendent directingthe fabrication and installation of pipeand
millwrights. Asthe ProjectSuperintendentthispositionincludedthe overseeingof the specified
craft pertainingtothe designbuildof aone hundred(100) milliongallonperyear(MGY) dry
grindethanol productionfacility.
Project RecoverySpecialist
Thispositionwasa directreportto the SeniorVice Presidentof Fagen,Inc. The primary
objective of thispositionwastooversee andassistinthe recoveryof problematicEthanol
projectsinthe area of pipe fabricationandinstallation. Additional areasincludedmillwrightand
instrumentationasnecessary. Cost, Risk, andSafetyanalysiswere performedtodeterminethe
stepsnecessarytoexpedite activitiesinthe areasthatwere behindschedule and/orover
budget. Examplesof identifiedactionsincluded;realignmentof craftteamsto achieve great
qualityandproductivity,schedulingandassigningcrewstonightshifttoavoidcongestedwork
areas, prefabrication, andpaintingwereperformedduringthe dayandinstalledonsecondshift,
utilization of special miscellaneous equipment.
 Projectrecoverywasperformedwithsuccessonthe followingfacilities:
Central Farmer’sCooperative/FREMARLLC – Marion,SD
NebraskaEnergyLLC – Aurora,NE
White EnergyPlainview –Plainview,TX
Big RiverResources,LLC– WestBurlington,IA
ValeroEnergyCorporation –Aurora,SD
Clear FieldEthanol LLC
Assignedasmulti-discipline CraftSuperintendentdirectingthe fabricationandinstallationof
pipe andmillwrights.Asthe ProjectSuperintendentthis positionincludedthe overseeingof the
specifiedcraftpertainingtothe designbuildof aone hundred(100) milliongallonperyear
(MGY) dry grindethanol productionfacility.
Tri-State Mechanical Contractors
PipingandMechanical Superintendent–(2003 – 2006)
Responsible forthe supervisionof all pipingandmechanical employees. Additional responsibilities
includedperformingsubcontractorevaluations,material takeoffs,costestimating,planning,and
schedulingof projectspertainingtoproposalsandsubsequentprojects.
 FacilitiesidentifiedasSteel Mills:
NorthAmericanStainless –Ghent,KY
GallatinSteel –Warsaw,KY
PipingSpecialists,LLC. - (2000 – 2003)
Piping&Mechanical Regional Superintendent
Responsible forthe supervisionof multiple jobsites.Additional responsibilitiesincludedthe supervision
oversight,directionandweeklysafetyevaluationof all subcontractorsassignedtovariousjobsites.
 Facilitiesidentifiedas Steel Mills:
NorthAmerican Stainless –Ghent,KY
GallatinSteel –Warsaw,KY
Gaylor Group– (1999 – 2000)
Piping&Mechanical Supervisor
Responsible forall primaryjobestimating,schedulingandplanning.Additional responsibilitiesincluded
subcontractevaluationandcostbenefitanalysis.
CCC Group– (1997 – 1999)
ProjectSuperintendent
Responsible forthe oversightof variouscraftactivitiesincludingCivil,Mechanical,Piping,Millwrights,
Electrical andStructural. Specificjobdutiesincludedsafetyandscheduleadherence.
 Workedat the followingfoodandbeveragefacilities:
Pillsbury –Murfreesboro,TN
Frito-Lay– Irving,TX
Campbell Soup –Fayetteville,AR
Coca- cola– Wichita,KS
Mohawk FieldServices – (1996 – 1997)
Shopand FieldSuperintendent
Responsible forprefabricationof pipingcomponents. Additional responsibilitiesincludedfield
evaluationforpredeterminedfitupandpotential onthe spotchangesto fieldmodifications.
 Oil RefineriesS/D&T/A Services
PowerCoal Generation
OG&E Oklahoma
KCPL Missouri
KentuckyUtilities
VariousGas turbines
MidwestServices– (1995 – 1996)
PipingandMechanical General Foreman
Responsible forassigningspecificworkactivities.
KCCI Construction– (1993 – 1995)
Pipeline WelderandSupervisor
Responsible forprovidingsupportandclarificationtootherwelders.
PipingEngineeringCompany,Inc. – (1988 – 1992)
CertifiedComboWelder&Pipe Fitter
 WeldingSites
ChevronUSA El Paso,Salt Lake City,El Segundo,Richmond
Shell Oil AnacortesLosAngelesCorpusChristi
BritishPetroleumNewOrleans
VistaChemical Lake Charles
SunOil Tulsa
CitgoLake Charles(ECT.)
VariousEthanol Plants
Certifications:
CPR
FirstAid
BloodBorn Pathogens
10 & 30 Hour OSHA Certification
CertifiedPipe WelderandFitter
PMP
Education:
1992 Graduate SapulpaVocational TechSchool
Math andBlueprintReadingCourse
1991 Graduate TulsaWeldingSchool
AdvancedPipe WeldingandBlueprintCourse
1988 – 1989 OklahomaJuniorCollege
1988 Graduate BeggsHighSchool

More Related Content

What's hot

Linkedin Summary
Linkedin SummaryLinkedin Summary
Linkedin SummaryIlyas Ahsan
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015gufron gufron
 
CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015Philip Turner
 
CV 08 May 2015 ncd
CV 08 May 2015 ncdCV 08 May 2015 ncd
CV 08 May 2015 ncdDavid Bates
 
PRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016CPRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016CRoderick Pruks
 
Zeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh
 
Keller, Keith EXPANDED RESUME
Keller, Keith EXPANDED RESUMEKeller, Keith EXPANDED RESUME
Keller, Keith EXPANDED RESUMEKeith H. Keller
 
John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15John Sinclair
 
CV Template-May 8 2015_KL
CV Template-May 8 2015_KLCV Template-May 8 2015_KL
CV Template-May 8 2015_KLMark DeSimas
 
Resume_062916_DHM - shorter
Resume_062916_DHM - shorterResume_062916_DHM - shorter
Resume_062916_DHM - shorterDavid Macaluso
 
Peter Bartlett - Personal CV (March 2016)
Peter Bartlett - Personal CV (March 2016)Peter Bartlett - Personal CV (March 2016)
Peter Bartlett - Personal CV (March 2016)Bartlett (Perth)
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015Ronald Fung
 
Tom resume' updated june 2016 pm
Tom resume' updated june 2016 pmTom resume' updated june 2016 pm
Tom resume' updated june 2016 pmTom Hinton
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016Mujahid Ali Akhtar
 

What's hot (20)

Linkedin Summary
Linkedin SummaryLinkedin Summary
Linkedin Summary
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015
 
CV of broosto -7-2016
CV of broosto -7-2016CV of broosto -7-2016
CV of broosto -7-2016
 
Lino Carrillo
Lino CarrilloLino Carrillo
Lino Carrillo
 
CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015CV - Philip Turner [Photo] - Nov 2015
CV - Philip Turner [Photo] - Nov 2015
 
CV 08 May 2015 ncd
CV 08 May 2015 ncdCV 08 May 2015 ncd
CV 08 May 2015 ncd
 
JBP_Resume
JBP_ResumeJBP_Resume
JBP_Resume
 
PRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016CPRUKS RESUME PROJ 2016C
PRUKS RESUME PROJ 2016C
 
Zeonn Koh 4 page CV
Zeonn Koh 4 page CVZeonn Koh 4 page CV
Zeonn Koh 4 page CV
 
Keller, Keith EXPANDED RESUME
Keller, Keith EXPANDED RESUMEKeller, Keith EXPANDED RESUME
Keller, Keith EXPANDED RESUME
 
John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15
 
CV Template-May 8 2015_KL
CV Template-May 8 2015_KLCV Template-May 8 2015_KL
CV Template-May 8 2015_KL
 
Cv rolando lópez_english1
Cv rolando lópez_english1Cv rolando lópez_english1
Cv rolando lópez_english1
 
Resume_062916_DHM - shorter
Resume_062916_DHM - shorterResume_062916_DHM - shorter
Resume_062916_DHM - shorter
 
Peter Bartlett - Personal CV (March 2016)
Peter Bartlett - Personal CV (March 2016)Peter Bartlett - Personal CV (March 2016)
Peter Bartlett - Personal CV (March 2016)
 
Topside
TopsideTopside
Topside
 
NS Resume S
NS  Resume SNS  Resume S
NS Resume S
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015
 
Tom resume' updated june 2016 pm
Tom resume' updated june 2016 pmTom resume' updated june 2016 pm
Tom resume' updated june 2016 pm
 
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
CASE STUDY: JABEL ALI REFINERY SHUTDOWN-2016
 

Similar to Scott Strickland Resume

John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Snyder
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project ManagementJames Gilmore
 
MG Resume 160727
MG Resume 160727MG Resume 160727
MG Resume 160727Mike Gibson
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015Suresha Rao
 
Jurg hauptli resume
Jurg hauptli resumeJurg hauptli resume
Jurg hauptli resumeJurg Hauptli
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016Larry Wicker
 
Kemp todd resume 3
Kemp todd resume 3Kemp todd resume 3
Kemp todd resume 3Todd Kemp
 
Rosental Alex 19 Oct09
Rosental Alex 19 Oct09Rosental Alex 19 Oct09
Rosental Alex 19 Oct09arosental
 
Sreejith_2484_b (2).doc
Sreejith_2484_b (2).docSreejith_2484_b (2).doc
Sreejith_2484_b (2).docSreejith Nair
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan
 
Michael E Burns Resume
Michael E Burns ResumeMichael E Burns Resume
Michael E Burns Resumemichael burns
 

Similar to Scott Strickland Resume (20)

Roger Berryment Resume
Roger Berryment ResumeRoger Berryment Resume
Roger Berryment Resume
 
John Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resumeJohn Charles Snyder Lead Engineer resume
John Charles Snyder Lead Engineer resume
 
Alistair Howson - Curriculum Vitae
Alistair Howson - Curriculum VitaeAlistair Howson - Curriculum Vitae
Alistair Howson - Curriculum Vitae
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project Management
 
MG Resume 160727
MG Resume 160727MG Resume 160727
MG Resume 160727
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015
 
Resume 3-16-15docx
Resume 3-16-15docxResume 3-16-15docx
Resume 3-16-15docx
 
RobertKulick2016
RobertKulick2016RobertKulick2016
RobertKulick2016
 
Jurg hauptli resume
Jurg hauptli resumeJurg hauptli resume
Jurg hauptli resume
 
Wicker, L.W. July 2016
Wicker, L.W. July 2016Wicker, L.W. July 2016
Wicker, L.W. July 2016
 
Resume
ResumeResume
Resume
 
CV Asif Rashid
CV Asif Rashid CV Asif Rashid
CV Asif Rashid
 
Kemp todd resume 3
Kemp todd resume 3Kemp todd resume 3
Kemp todd resume 3
 
RobertKulick_2016
RobertKulick_2016RobertKulick_2016
RobertKulick_2016
 
CV-VA- March2016
CV-VA- March2016CV-VA- March2016
CV-VA- March2016
 
Rosental Alex 19 Oct09
Rosental Alex 19 Oct09Rosental Alex 19 Oct09
Rosental Alex 19 Oct09
 
Sreejith_2484_b (2).doc
Sreejith_2484_b (2).docSreejith_2484_b (2).doc
Sreejith_2484_b (2).doc
 
Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)Rathiesh Rajakrishnan-CV (2) (1) (1)
Rathiesh Rajakrishnan-CV (2) (1) (1)
 
Scott Bullock CV 25112016
Scott Bullock CV 25112016Scott Bullock CV 25112016
Scott Bullock CV 25112016
 
Michael E Burns Resume
Michael E Burns ResumeMichael E Burns Resume
Michael E Burns Resume
 

Scott Strickland Resume

  • 1. Scott W. Strickland Regional Manager Haskell, Texas 79521 (812) 292-6540 Summary: Professional experience in the fields of Oil and Gas Midstream, Renewable Energy, Ethanol, Bio Diesel, Petroleum Refineries, Chemical Plants, Food and Beverage Facilities, Power Plants, and Industrial Steel Mills. Complete Project Life Cycle for both Projects and Programs. Projects ranged in size from $10k to over $260M and ranging from a few weeks to several years. A proven track record in establishing and maintaininglongtermclientrelations,withmajoremphasesonsafety,qualityandschedule adherence. Clientinteractionandsupportatall levelsfromqualitymanagementtoprofessionalprojectmanagement to individual contributors in the client organization involved in joint activities and system testing. Hiring and managing a staff of craft and administrative personnel under the concept of a “Project Team Environment”. The projectteamismentoredwiththe understandingthattheyare ourgreatestasset. As such, “Safety” is our number one priority. Areasof expertiseincludeProjectSupervision,ConstructionManagement,CostEstimating,Procurement, Scheduling,QualityAssurance/Quality Control and Safety adherence oversight in accordance with strict OSHA compliance. Solid record of financial and personnel management including cost benefit analysis, problem resolution, risk management, change order management and schedule compliance. Professional Experience: Brazos Rock Energy Services SouthTexas Regional Manager– (2013 – Present) Responsibilitiesencompass managingof multiple projectsaswell asmultipleprojectmanagers,all inthe midstreamoil andgasindustry. Dutiesinclude the managementof facilitiesaswell as pipelines civil and I/E. The most resentprojectwaswitha CO2 injectionfacility. Sunland Industries,Inc. ProjectManager - (2012- 2013) Assignedtopipelineprojectsand compressorstationsinsouthcentral Texas. Responsibilities encompassedall facetsof ProjectManagementoverall crafts. Installationof pipe andequipmentfor three compressorstations andall undergroundpipe inbetween. Pipe sizesrangedbetween2”through 48” includinglaunchers,receivers,provers,canpumps,MCCbuildingspipe racks,andetc. Primarily workedonPlainsPipelineprojects.
  • 2. WestconIndustries,Inc. Sr. ProjectSuperintendent- (2010 – 2012) Assignedtoall typesof industrial constructionprojects,butmostimportantlythe oil andgasindustry. Responsibilitiesencompassedall facetsof projectmanagementincluding,butnotlimitedto:project scope initiation,scope management,schedulecompliance,costbenefitanalysis,riskanalysis,problem resolution,clientinterface,strictsafetypolicyadherence andassignedcraftprojectdemobilization. Hess Oil Company Inc. Tioga NorthDakota – (2010) Assignedtothe BakkenOil Reserve asa Sr. ProjectSuperintendentwithoutaProjectManageroverthe designandbuildof oil andnatural gas compressor stationsprojectsrangingfrom30 millionto100 millionpeakingat150 employees. Fagen,Inc. ProjectSuperintendent –(2007 – 2010) Assignedasmulti-discipline CraftSuperintendentdirectingthe fabricationandinstallationof pipe, instrumentation, andmillwrights. Thispositionwasadirectreportto the assignedProjectManager. Responsibilitiesencompassedall facetsof projectmanagementincluding,butnotlimitedto:project scope initiation,scope management,schedulecompliance,costbenefitanalysis,riskanalysis,problem resolution,clientinterface,strictsafetypolicyadherence andassignedprojectcraftdemobilization. Thispositionrequireddirectsupervisionandmentoringof all assignedprojectcraftpersonnel in additiontothe oversightandsupervisionof all subcontractors. Additionalprojectrequirements includedthe developmentof material requisitions,bid evaluations, andtestingrequirements. ProjectListat Fagen: E-Energy ofAdams LLC Assignedasmulti-discipline CraftSuperintendentdirectingthe fabricationandinstallationof pipe, instrumentation, andmillwrights. Asthe ProjectSuperintendentthispositionincludedthe overseeingof the specifiedcraftpertainingtothe designbuildof afifty(50) milliongallon per year(MGY) drygrindethanol productionfacility.Thisfacilitywastakenfrom“Notice to Proceed”(NTP) to“Substantial Completion”inexactlyone yeartothe daywithno losttime accidents.The exemplaryqualityof craftsmanshipandteamworkresultedinasuccessful plant start up withnorequiredoutages.Thisfacilitycontinuestorunwithan exceptional operating record consistentlysettingnewmilestonesandproductionrecordsinthe industry. Big River Galva LLC Assignedasmulti-discipline CraftSuperintendentdirectingthe fabricationandinstallationof pipe,instrumentationandmillwrights.Asthe ProjectSuperintendentthispositionincludedthe overseeingof the specifiedcraftpertainingtothe designbuildof aone hundred(100) million gallonperyear(MGY) dry grindethanol productionfacility. ProjectListat Fagen (continued): Louis DreyfusCommoditiesGrandJunction LLC
  • 3. Assigned as multi-disciplineCraftSuperintendent directingthe fabrication and installation of pipeand millwrights. Asthe ProjectSuperintendentthispositionincludedthe overseeingof the specified craft pertainingtothe designbuildof aone hundred(100) milliongallonperyear(MGY) dry grindethanol productionfacility. Project RecoverySpecialist Thispositionwasa directreportto the SeniorVice Presidentof Fagen,Inc. The primary objective of thispositionwastooversee andassistinthe recoveryof problematicEthanol projectsinthe area of pipe fabricationandinstallation. Additional areasincludedmillwrightand instrumentationasnecessary. Cost, Risk, andSafetyanalysiswere performedtodeterminethe stepsnecessarytoexpedite activitiesinthe areasthatwere behindschedule and/orover budget. Examplesof identifiedactionsincluded;realignmentof craftteamsto achieve great qualityandproductivity,schedulingandassigningcrewstonightshifttoavoidcongestedwork areas, prefabrication, andpaintingwereperformedduringthe dayandinstalledonsecondshift, utilization of special miscellaneous equipment.  Projectrecoverywasperformedwithsuccessonthe followingfacilities: Central Farmer’sCooperative/FREMARLLC – Marion,SD NebraskaEnergyLLC – Aurora,NE White EnergyPlainview –Plainview,TX Big RiverResources,LLC– WestBurlington,IA ValeroEnergyCorporation –Aurora,SD Clear FieldEthanol LLC Assignedasmulti-discipline CraftSuperintendentdirectingthe fabricationandinstallationof pipe andmillwrights.Asthe ProjectSuperintendentthis positionincludedthe overseeingof the specifiedcraftpertainingtothe designbuildof aone hundred(100) milliongallonperyear (MGY) dry grindethanol productionfacility. Tri-State Mechanical Contractors PipingandMechanical Superintendent–(2003 – 2006) Responsible forthe supervisionof all pipingandmechanical employees. Additional responsibilities includedperformingsubcontractorevaluations,material takeoffs,costestimating,planning,and schedulingof projectspertainingtoproposalsandsubsequentprojects.  FacilitiesidentifiedasSteel Mills: NorthAmericanStainless –Ghent,KY GallatinSteel –Warsaw,KY PipingSpecialists,LLC. - (2000 – 2003) Piping&Mechanical Regional Superintendent
  • 4. Responsible forthe supervisionof multiple jobsites.Additional responsibilitiesincludedthe supervision oversight,directionandweeklysafetyevaluationof all subcontractorsassignedtovariousjobsites.  Facilitiesidentifiedas Steel Mills: NorthAmerican Stainless –Ghent,KY GallatinSteel –Warsaw,KY Gaylor Group– (1999 – 2000) Piping&Mechanical Supervisor Responsible forall primaryjobestimating,schedulingandplanning.Additional responsibilitiesincluded subcontractevaluationandcostbenefitanalysis. CCC Group– (1997 – 1999) ProjectSuperintendent Responsible forthe oversightof variouscraftactivitiesincludingCivil,Mechanical,Piping,Millwrights, Electrical andStructural. Specificjobdutiesincludedsafetyandscheduleadherence.  Workedat the followingfoodandbeveragefacilities: Pillsbury –Murfreesboro,TN Frito-Lay– Irving,TX Campbell Soup –Fayetteville,AR Coca- cola– Wichita,KS Mohawk FieldServices – (1996 – 1997) Shopand FieldSuperintendent Responsible forprefabricationof pipingcomponents. Additional responsibilitiesincludedfield evaluationforpredeterminedfitupandpotential onthe spotchangesto fieldmodifications.  Oil RefineriesS/D&T/A Services PowerCoal Generation OG&E Oklahoma KCPL Missouri KentuckyUtilities VariousGas turbines MidwestServices– (1995 – 1996) PipingandMechanical General Foreman Responsible forassigningspecificworkactivities. KCCI Construction– (1993 – 1995) Pipeline WelderandSupervisor Responsible forprovidingsupportandclarificationtootherwelders. PipingEngineeringCompany,Inc. – (1988 – 1992) CertifiedComboWelder&Pipe Fitter
  • 5.  WeldingSites ChevronUSA El Paso,Salt Lake City,El Segundo,Richmond Shell Oil AnacortesLosAngelesCorpusChristi BritishPetroleumNewOrleans VistaChemical Lake Charles SunOil Tulsa CitgoLake Charles(ECT.) VariousEthanol Plants Certifications: CPR FirstAid BloodBorn Pathogens 10 & 30 Hour OSHA Certification CertifiedPipe WelderandFitter PMP Education: 1992 Graduate SapulpaVocational TechSchool Math andBlueprintReadingCourse 1991 Graduate TulsaWeldingSchool AdvancedPipe WeldingandBlueprintCourse 1988 – 1989 OklahomaJuniorCollege 1988 Graduate BeggsHighSchool