1. OSCAR J. BROWN
76 Burnham Road, Florenceville, NB, Canada E7L 1Z2
C: (780) 381-8893 H: (506) 392-8366
E: grammy203@msn.com
Skilled and highly motivated Journeyman Steamfitter-Pipefitter. Experienced in both new construction and
maintenance of Alberta’smajoroil sandsfacilities.Experienced with many types and sizes of piping systems,
as well as jointing procedures. Adaptable in working within a team or independently.
Extremely organized with solid interpersonal and communication skills.
Committed to following all safety guidelines and procedures.
Core Competencies
ï‚· WorkingwithQA/QCdepartmentstoensure testing
and documentingrequirements;propermaterial
selectionandstrictadherence toITP’s,
weldprocedures,torqueingandtensioningof
flanges,andweldmappingof joints.
ï‚· Strongabilitytoreadand interpretblueprints,
isometricdrawingsandP&IDs.
 ConductingTHA’s/FLRA’s,reviewingsafety
proceduresandbestpractice documents,and
implementingthe appropriate controls.
ï‚· Riggingpipes/valvessafelyandefficiently
withcrane and hand-rigging.
ï‚· Workingwithoperationstowalkdownlines
to verifyisolationof systemsandensurelock
out/tagout proceduresare inplace.
ï‚· Conductinghydrotests/blow downs.
ï‚· Fabricatingpipingspoolsandfieldrunning
pipe.
Professional Experience
STEAMFITTER-PIPEFITTER
Black and McdonaldLtd. (CNRLHorizon) 2015 Feb. – Present
ï‚· NewConstruction:Activelyparticipatingasa teammemberinvolvedinamajorexpansionof Horizon's
vacuumdistillationanddilutedbitumenrecoveryunits.
ï‚· Contributionsincludebutare notlimitedto:workingwithaweldertofabricate pipingspoolsand
complete fieldwelds,safelyriggingandhoistingpipewithbothcrane andhandrigging,removing
temporarysupportsandshippingbracketsfrommodstoaccommodate the fitupof mod interconnect
joints,installingpipe supports,mentoringapprentices,andactivelyparticipatingindailytool box
meetingsaswell asFLRA/THAsandweeklysafetymeetings,etc.
STEAMFITTER-PIPEFITTER PCL Industrial
Constructors(ConocoPhillipsSurmount2) 2014 Oct. – Dec.
ï‚· NewConstruction:Hydrotestingcrew.
ï‚· Responsible forcloselyreviewingtestpackagesandensuringhydrotestsof manydifferentsizesand
typesof pipingsystemswere carriedoutontime andwithoutincident.
2. ï‚· Regulardutiesincluded:
Installing/removingblinds,trimmingoutblindsandventstoaccommodate the safe fill/drainof
systemsandremoval of airinthe process,runninghoses,boltingupandtorquingflanges,installing
PSVsand gauges,workingwithQA/QCdepartmentstoensure all testrequirementswere metand
results properlydocumented,etc.Alsoservedasalternate foremanwhenregularforemanattended
safetyandbettersupervisioncourses.
STEAMFITTER-PIPEFITTER
AeconIndustrial Western(SuncorEnergy) 2014, Aug. - Sept.
ï‚· Installedglycol andprocess(bitumen) pipingsystemsassociatedwitheightnew chillersandsix new
heatexchangers,inamajorexpansionof Suncor’seasttankfarm.
ï‚· Dutiesincludedbutwere notlimitedto:Participatingin,andcontributingtodailytool box talksand
weeklysafetymeetings.Conductingfieldlevelriskassessments,identifyinghazards,andimplementing
the appropriate controls.Preparingfieldweldjointsforwelders.Riggingspools/valvesforinstall,and
workingwithbothcranesandhand riggingtosuccessfullyaccomplishthe task.InstalledPipeSupports
and associatedguides/anchors.Boltedupandtorquedflanges,conductedhydrotests/blowdowns,
walkedlinesfordeficiencies,etc.
STEAMFITTER-PIPEFITTER 2014
Jacobs Industrial Services(Syncrude/Shell Albian/NexenLongLake) (contracts:2009/ 2012/2013)
ï‚· Regularly provided maintenance and assisted with new construction projects: MLMR at Syncrude, tank
connectivity,naturalgashandlingexpansionandmajorundergroundprojects.
ï‚· CST Twinningproject:tyinglarge bore frompipelinetonew pumphouses.
ï‚· Fabricated/installedsmall pipingandsupportsinside pumphouses.
ï‚· Performedmaintenance andmajorturnaroundinextractionareaandextractionoutage (2009& 2012).
STEAMFITTER-PIPEFITTER 2014
TransfieldAssetManagementServices(SuncorEnergy) (contracts:2010/2011/2012)
ï‚· Sustainable Projects/Outage teammember(2014)
ï‚· Responsible for installation of both small and large bore piping (part of booster pump house expansion
to increase tailings/handlingcapacity).
ï‚· Sustainable Projectsteammember;workedonmajorexpansionof RFGpipeline (2012).
ï‚· Providedmaintenance asmemberof outage/turnaroundteam(2011).
ï‚· Maintenance foroutage/turnaroundteam(2010).
ï‚· Communicate effectively;resolve issuesquicklyandbuildstronginternal workingrelationships.
STEAMFITTER-PIPEFITTER 2011 TO 2012
PCL Industrial ConstructorsInc.(Kearl Oil SandsProject)
ï‚· Efficiently assisted with new construction project; maintained clear communications on project
timelines.
ï‚· Assisted as heavy module install crew member comprised of both pipefitters and iron workers; worked
withengineersandcrane operatorstoinstall large,pre-assembledsectionsof the plant(mods).
STEAMFITTER-PIPEFITTER 2008 TO 2009
3. Lockerbie andHole Industrial/Contracting(SuncorEnergy)
ï‚· Performed maintenance for 10 months; new construction work for 6 months (subcontracted to build
newwatertreatmentandsewage facilitiestoservice Suncorcamps).
ï‚· Fabricatedandinstalledextensivepipingsystemsaccordingtoplanspecifications.
ï‚· Safelyoperatedequipmenttoliftandinstall pre-manufacturedcomponents.
ï‚· Usedtestingequipmenttochecksystemsforleaksandconductoverall final inspections.
Completed Education/Certifications
JourneymanSteamfitter-Pipefitter(RedSeal Certified)
(ApprenticeshipcompletedinAlberta)
HighSchool Diploma
CarletonNorthHighSchool
(NewBrunswick)
Industrial Training
ConstructionSafetyTrainingSystems
ConfinedSpace Entry
Fall Arrest
Aerial WorkPlatform
Self-ContainedBreathingApparatus(SCBA)
RespiratoryProtectiveEquipment(RPE)
StandardFirstAidwithLevel CCPR
H2S Alive