N o: 4/425-D3, Ganga Nagar, Namakkal – 637 001.
Mob: 09976825577. Email: csmcommunication@gmail.com
CSM Construction objective is to provide complete range
of services in Network Planning, Design through Operation
and Maintenance of telecom networks. It offers complete
range of services for telecom networks viz. design, build
and maintain turnkey basis or in specific defined model.
The continuous improvement and substantial growth of
CSM Communication helps the resource planning and
financial control over the years and focusing on expansion
of business in Project Management, Engineering
Construction Services, Operations and Maintenance.
CSM Construction played a part of the Telecom modern
revolution in India for over a year. In addition to offering
complete turnkey solutions for Telecom OEM and Service
providers.
CSM Construction takes pride in having executing several
challenging projects in many parts of the country with
dedicated team of professionals having wide experience in
telecommunications i.e. Cable Network installation, civil
works, electrical works
ABOUT US:
 Civil Survey.
 ROW (Right of Way).
 Trenching digging.
 Manual Installation
 Cable blowing with DIT (Duct Integration Test).
 Splicing and Termination.
 Link test (End to End)
 Test and Acceptance
 All necessary permissions with regulatory authorities
like CPWD for laying of cable in the national highway.
 Permissions from Municipal Corporation for laying in
urban areas.
 Co-ordination with DOT & Electricity board
Our relation with these authorities while working on
projects earlier assures the customer that we will be able to
handle this part easily and quickly. CSM Construction
complete entire cable work in time and deliver as per time
schedule with customer satisfaction.
CSM Construction generate an Output of 2 Kms/day
trenching with regard to OFC works (The capacity of above
work will be increased depending on time schedule) from
effective date of contract. The entire grounding system is
tested and the test report will be furnished to the customer
OUR ACTIVITIES:
RJIL (Reliance Jeo) 4G
1. Intracity Projects executing in SALEM TIRUPPUR
and ERODE . – 60 Kms
2. NLD Project executing in SALEM – NAMAKKAL –
20 Kms.
3. Project executing in VAZHAPADI, BARGUR – 20
KMS
AIRCEL LIMITED :
1. NLD Work executing in Ariyalur to Lalgudi(Trichy)
- 40 Kms
2. Intracity Work executing In KARUR – 20 Kms
L & T (BSNL Project for DEFENCE)
1.Work Executing in SAYALKUDI - UCHIPULI – 77 Kms.
2. Work Executing in ITTAMOZHI – THIRUCHENDUR -
35 Kms
3. Work Executing in MALLIPATTINAM –
JEGATHAPATTINAM - 45 Kms
CURRENT OFC PROJECTS:
PROJECTS COMPLETED :
AIRCLE LIMITED :
1.Work Executed for Aircel in Dindigul – Theni route – 90 Kms.
2.Work Executed for Vodafone Essar Ltd in Erode Intracity – 4kms
PROJECTS FOR HFCL, Chennai :
3. Work Executed in NAGARCOIL to RADHAPURAM route - 15 Kms.
4. Work executed in VILAATHIKULAM to MADURAI route - 30 Kms
TOWER FIELD :
Projects from Exicom Tele-systems Ltd , Chennai
ABOUT MANPOWER
 We have sufficient man power to organize the
works in a proper manner and to complete the
works on or before the schedule agreed with the
consultants / companies.
Hierarchy:
PROJECT 1:
OFC WORK – Theni to Dindigul Route (30 Kms)
Days Estimation:
Standard Project Period - 50 kms in 60 days
Schedule Period - 30 Kms in 36 Days
Planned days Buffer Days Total Days
33 3 36
Estimation after getting the Row of Way (ROW) Permission
No Classification of Work No of Days
1 Preliminary Survey:
• Route Facility
• Alternate Route
• Route Classification
• Soil Nature
• Depth of the trench
• Possibilities of Trench less technology
• Survey details and Documentation
3 Days
2. Trench digging (Manual) 15 Days
3. Manhole / Route Indicator Installation:
• Route Marker Identification
• Distribution Manhole
• Joint Manhole
6 Days
No Classification of Work No of Days
4 Cable blowing with DIT (Duct
Integration Test)
3 Days
5. Splicing and Termination (for 2 kms
drum – 5 Joints)
4 Days
6. Link test (End to End) 2 Days
Total Days 33 Days
Acceptance Test – Client Side
Men / Machine Details & Capacity:
Earth Mover – Open Trench
•Excavation Capacity (Normal Soil) – 20 Meters /
Hour
•200 Meters / Day
•Make: JCB
Horizontal Directional Drilling (HDD) – 15 days /
5 Kms
•Pulling Capacity – 200 Meters
•1 Shot / One night
Manual excavation
•One team (25 Persons) – 200 meters / Day
Plan
Plan & Actual
PAN - AAFFC9595B TIN - 33503103477
CST - 947736 SERVICE TAX -
AAFFC9595BST001
PF NO - TN/SLM/71570
BUSINESS DETAILS

More Related Content

What's hot (19)

CV_Shrikant
CV_ShrikantCV_Shrikant
CV_Shrikant
 
ramakant_23.9.2016 (1)
ramakant_23.9.2016 (1)ramakant_23.9.2016 (1)
ramakant_23.9.2016 (1)
 
Ramy Emad C.V Project Engineer
Ramy Emad C.V Project EngineerRamy Emad C.V Project Engineer
Ramy Emad C.V Project Engineer
 
Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
 
Somejit chakraborty presentation
Somejit chakraborty presentationSomejit chakraborty presentation
Somejit chakraborty presentation
 
Resume Sivakumar SKTJ
Resume Sivakumar SKTJResume Sivakumar SKTJ
Resume Sivakumar SKTJ
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
 
NEW CV
NEW CVNEW CV
NEW CV
 
Atchiraju Batchu_CV (1)
Atchiraju Batchu_CV (1)Atchiraju Batchu_CV (1)
Atchiraju Batchu_CV (1)
 
Resume(1)(1) - Copy
Resume(1)(1) - CopyResume(1)(1) - Copy
Resume(1)(1) - Copy
 
RS Resume
RS ResumeRS Resume
RS Resume
 
final resume
final resumefinal resume
final resume
 
Gurpreet singh (MEP services manager with 9.8 year Exp)
Gurpreet singh (MEP services manager with 9.8 year Exp)Gurpreet singh (MEP services manager with 9.8 year Exp)
Gurpreet singh (MEP services manager with 9.8 year Exp)
 
CV
CVCV
CV
 
CV Sada
CV SadaCV Sada
CV Sada
 
Nagappa
NagappaNagappa
Nagappa
 
Mochamad Kholik - CV
Mochamad Kholik - CVMochamad Kholik - CV
Mochamad Kholik - CV
 
Muthukumaran cv
Muthukumaran cvMuthukumaran cv
Muthukumaran cv
 
Glad CV
Glad CVGlad CV
Glad CV
 

Viewers also liked

Integrated Home - System Design
Integrated Home - System DesignIntegrated Home - System Design
Integrated Home - System DesignJustin James
 
Konopravda-ПРАВДА-8
Konopravda-ПРАВДА-8Konopravda-ПРАВДА-8
Konopravda-ПРАВДА-8aiWorker.com
 
와와카지노머니,생방송룰렛 // MAS77。C○M // 온라인바카라머니,라이브블랙잭
와와카지노머니,생방송룰렛 // MAS77。C○M // 온라인바카라머니,라이브블랙잭와와카지노머니,생방송룰렛 // MAS77。C○M // 온라인바카라머니,라이브블랙잭
와와카지노머니,생방송룰렛 // MAS77。C○M // 온라인바카라머니,라이브블랙잭worxjsj4561
 
Plano de negócios demut
Plano de negócios demutPlano de negócios demut
Plano de negócios demutCarlos Eugênio
 
Slides | Research data literacy and the library
Slides | Research data literacy and the librarySlides | Research data literacy and the library
Slides | Research data literacy and the libraryLibrary_Connect
 

Viewers also liked (15)

Integrated Home - System Design
Integrated Home - System DesignIntegrated Home - System Design
Integrated Home - System Design
 
Mateja
MatejaMateja
Mateja
 
VS International
VS InternationalVS International
VS International
 
Konopravda-ПРАВДА-8
Konopravda-ПРАВДА-8Konopravda-ПРАВДА-8
Konopravda-ПРАВДА-8
 
SWM-horizontal
SWM-horizontalSWM-horizontal
SWM-horizontal
 
MMO
MMOMMO
MMO
 
Phraseo
PhraseoPhraseo
Phraseo
 
L Mullikin DGSA cert 2015
L Mullikin DGSA cert 2015L Mullikin DGSA cert 2015
L Mullikin DGSA cert 2015
 
Alzheimer's Disease Essay
Alzheimer's Disease EssayAlzheimer's Disease Essay
Alzheimer's Disease Essay
 
The Dawn of NFV
The Dawn of NFVThe Dawn of NFV
The Dawn of NFV
 
와와카지노머니,생방송룰렛 // MAS77。C○M // 온라인바카라머니,라이브블랙잭
와와카지노머니,생방송룰렛 // MAS77。C○M // 온라인바카라머니,라이브블랙잭와와카지노머니,생방송룰렛 // MAS77。C○M // 온라인바카라머니,라이브블랙잭
와와카지노머니,생방송룰렛 // MAS77。C○M // 온라인바카라머니,라이브블랙잭
 
Plano de negócios demut
Plano de negócios demutPlano de negócios demut
Plano de negócios demut
 
Coco easy 10 p
Coco easy 10 pCoco easy 10 p
Coco easy 10 p
 
Eng Ibrahim Omar
Eng Ibrahim OmarEng Ibrahim Omar
Eng Ibrahim Omar
 
Slides | Research data literacy and the library
Slides | Research data literacy and the librarySlides | Research data literacy and the library
Slides | Research data literacy and the library
 

Similar to CSM_Profile (20)

Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
Profile at a glance
Profile at a glanceProfile at a glance
Profile at a glance
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 
Mahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCVMahmoud Ahmed ElbadawyCV
Mahmoud Ahmed ElbadawyCV
 
V. SRINIVASA RAO CV
V. SRINIVASA RAO CVV. SRINIVASA RAO CV
V. SRINIVASA RAO CV
 
cv Rashid Tagelsir updated . -2016
cv Rashid Tagelsir   updated . -2016cv Rashid Tagelsir   updated . -2016
cv Rashid Tagelsir updated . -2016
 
Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th Jeddah metro full presentation - Briefing Day March, 30th
Jeddah metro full presentation - Briefing Day March, 30th
 
Khizer CV 2016
Khizer CV 2016Khizer CV 2016
Khizer CV 2016
 
Delhi Metro Rail
Delhi Metro RailDelhi Metro Rail
Delhi Metro Rail
 
CV R.S.Verma
CV R.S.VermaCV R.S.Verma
CV R.S.Verma
 
Aslam fahmi cv
Aslam fahmi cvAslam fahmi cv
Aslam fahmi cv
 
hamed_barakat_CV_New
hamed_barakat_CV_Newhamed_barakat_CV_New
hamed_barakat_CV_New
 
Aslam fahmi CV
Aslam fahmi CVAslam fahmi CV
Aslam fahmi CV
 
Mohamed Abou mesalem updated CV
Mohamed Abou mesalem  updated CVMohamed Abou mesalem  updated CV
Mohamed Abou mesalem updated CV
 
summer training report in L&T construction
summer training report in L&T construction summer training report in L&T construction
summer training report in L&T construction
 
updated Curriculum -osama[1]
updated Curriculum -osama[1]updated Curriculum -osama[1]
updated Curriculum -osama[1]
 
RSR LATEST TRESUME
RSR LATEST TRESUMERSR LATEST TRESUME
RSR LATEST TRESUME
 
Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01
 
CV_Gursharan Choudhary
CV_Gursharan ChoudharyCV_Gursharan Choudhary
CV_Gursharan Choudhary
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 

CSM_Profile

  • 1. N o: 4/425-D3, Ganga Nagar, Namakkal – 637 001. Mob: 09976825577. Email: csmcommunication@gmail.com
  • 2. CSM Construction objective is to provide complete range of services in Network Planning, Design through Operation and Maintenance of telecom networks. It offers complete range of services for telecom networks viz. design, build and maintain turnkey basis or in specific defined model. The continuous improvement and substantial growth of CSM Communication helps the resource planning and financial control over the years and focusing on expansion of business in Project Management, Engineering Construction Services, Operations and Maintenance. CSM Construction played a part of the Telecom modern revolution in India for over a year. In addition to offering complete turnkey solutions for Telecom OEM and Service providers. CSM Construction takes pride in having executing several challenging projects in many parts of the country with dedicated team of professionals having wide experience in telecommunications i.e. Cable Network installation, civil works, electrical works ABOUT US:
  • 3.  Civil Survey.  ROW (Right of Way).  Trenching digging.  Manual Installation  Cable blowing with DIT (Duct Integration Test).  Splicing and Termination.  Link test (End to End)  Test and Acceptance  All necessary permissions with regulatory authorities like CPWD for laying of cable in the national highway.  Permissions from Municipal Corporation for laying in urban areas.  Co-ordination with DOT & Electricity board Our relation with these authorities while working on projects earlier assures the customer that we will be able to handle this part easily and quickly. CSM Construction complete entire cable work in time and deliver as per time schedule with customer satisfaction. CSM Construction generate an Output of 2 Kms/day trenching with regard to OFC works (The capacity of above work will be increased depending on time schedule) from effective date of contract. The entire grounding system is tested and the test report will be furnished to the customer OUR ACTIVITIES:
  • 4. RJIL (Reliance Jeo) 4G 1. Intracity Projects executing in SALEM TIRUPPUR and ERODE . – 60 Kms 2. NLD Project executing in SALEM – NAMAKKAL – 20 Kms. 3. Project executing in VAZHAPADI, BARGUR – 20 KMS AIRCEL LIMITED : 1. NLD Work executing in Ariyalur to Lalgudi(Trichy) - 40 Kms 2. Intracity Work executing In KARUR – 20 Kms L & T (BSNL Project for DEFENCE) 1.Work Executing in SAYALKUDI - UCHIPULI – 77 Kms. 2. Work Executing in ITTAMOZHI – THIRUCHENDUR - 35 Kms 3. Work Executing in MALLIPATTINAM – JEGATHAPATTINAM - 45 Kms CURRENT OFC PROJECTS:
  • 5. PROJECTS COMPLETED : AIRCLE LIMITED : 1.Work Executed for Aircel in Dindigul – Theni route – 90 Kms. 2.Work Executed for Vodafone Essar Ltd in Erode Intracity – 4kms PROJECTS FOR HFCL, Chennai : 3. Work Executed in NAGARCOIL to RADHAPURAM route - 15 Kms. 4. Work executed in VILAATHIKULAM to MADURAI route - 30 Kms TOWER FIELD : Projects from Exicom Tele-systems Ltd , Chennai ABOUT MANPOWER  We have sufficient man power to organize the works in a proper manner and to complete the works on or before the schedule agreed with the consultants / companies. Hierarchy:
  • 6. PROJECT 1: OFC WORK – Theni to Dindigul Route (30 Kms) Days Estimation: Standard Project Period - 50 kms in 60 days Schedule Period - 30 Kms in 36 Days Planned days Buffer Days Total Days 33 3 36 Estimation after getting the Row of Way (ROW) Permission No Classification of Work No of Days 1 Preliminary Survey: • Route Facility • Alternate Route • Route Classification • Soil Nature • Depth of the trench • Possibilities of Trench less technology • Survey details and Documentation 3 Days 2. Trench digging (Manual) 15 Days 3. Manhole / Route Indicator Installation: • Route Marker Identification • Distribution Manhole • Joint Manhole 6 Days
  • 7. No Classification of Work No of Days 4 Cable blowing with DIT (Duct Integration Test) 3 Days 5. Splicing and Termination (for 2 kms drum – 5 Joints) 4 Days 6. Link test (End to End) 2 Days Total Days 33 Days Acceptance Test – Client Side Men / Machine Details & Capacity: Earth Mover – Open Trench •Excavation Capacity (Normal Soil) – 20 Meters / Hour •200 Meters / Day •Make: JCB Horizontal Directional Drilling (HDD) – 15 days / 5 Kms •Pulling Capacity – 200 Meters •1 Shot / One night Manual excavation •One team (25 Persons) – 200 meters / Day
  • 8. Plan Plan & Actual PAN - AAFFC9595B TIN - 33503103477 CST - 947736 SERVICE TAX - AAFFC9595BST001 PF NO - TN/SLM/71570 BUSINESS DETAILS