1. CURRICULUM VITAE
Position Applied for : Resident Engineer – (Roads)
Name : SRINIVAS MATETI
Profession : Civil Engineering
Date of Birth : 10-06-1966
Total Years of Experience : Eighteen (18) - from higher qualification
(1 Year +4 months in Doha, Qatar )
Nationality : Indian
Membership : 1.Life member in Indian Road Congress (LM-33937)
2. MMUP Qatar Engineer Registered Reg. No 11237
3. MIE (Institution of Engineers India) Reg. No M-1557607
4. Charted Engineer (C.Eng.) (Applied to IE India)
Contact Mobile No : +91 9515183804
E-mail : srinivasraga@yahoo.com
Tasks Detailed Assigned:
In Process Control pertaining to Supervision of Construction of Highway executed in both
EPC & BOT/ Design Built modes.
In monitoring the work progress both physically and financially and preparation of Progress
Reports.
Assist to Project Manager / Resident Engineer/ Team Leader in all aspects of Project
Management.
Identify priorities and tasks and develop the organization structure to assure execution of tasks
by providing clear direction on methods, time frame and schedule to achieve the stated goals
and provide clear definition of roles and responsibilities of Project Management staff to
build, motivate, develop and manage an effective team.
Develop best practices and tools for Project Execution and Management for shrewd planning
and precise execution.
Following the Specifications of MORTH, IS, IRC, BS, AASHTO and Qatar Construction
Specifications (QCS) including Ashghal Interim Advice Notes (IANs).
Conversant with FIDIC Contract Conditions and Concession Agreement (CA) / Contract
Agreements.
Key qualifications:
Having Thirty years (30) experience in Execution and Construction Supervision of Highway
Projects on National Highways/Expressways having both Rigid Pavements and Flexible Pavements
on Behalf of Both Consultants and Contractors. I had supervised construction of Roads involving
Earthwork, Sub-grade, Granular sub-base, WBM/WMM/CBM(Cement Bound Material), DBM,
Bituminous concrete(Asphalt Base and Wearing Courses), Concrete Pavements (DLC and PQC),
Major and Minor Cross drainage Works and Reinforced Earth(RE)/MS Wall with assurance of quality
through different routine tests in accordance with MOST at the different stages of construction. I am
well conversant with Geometric Design of Road, relevant IRC, IS, MORTH, BS, AASHTO and QCS
Specifications and FIDIC Contract conditions. I am being with substantial technical, practical and
managerial experience for effective supervision of the highway aspects of the construction works to
meet Project Objectives / Specifications.
Education : 1) Bachelor of Technology in Civil Engineering from JNT
University, Hyderabad in 1998, AP. India
2) Diploma in Civil Engineering from State Board of technical
Page 1 of 7
2. Education and Training, Hyderabad with First Class in 1986.
Computer Skills : MS Office., AutoCAD, MS Project.
Relevant Previous Assignments:
Assistant Resident
Engineer
(Roads)/Resident
Engineer (In charge)
in Halcrow a
CH2MHILL Company
IA 12/13 C 049 ST
Design and Construct of AL WAKRAH BYPASS ROAD
(P015) in DOHA QATAR
DOHA EXPRESSWAYS GROUP-1
Mar’2015 to
June 2016
Manager (Highways) /
Project Manager
(In charge) in GVK
Six laning of existing Three lanes for Bagodara-Wataman-
Tarapur-Vasad Road,SH-8, Km 0/0 to 101/9 in the State of
Gujarat on BOT basis.
Feb’2012 to
Jan’2015
Highway cum
Pavement Engineer &
Resident Engineer (In
charge)
In URS Scott Wilson
Construction Supervision of widening and strengthening of
existing NH from single lane to Four lane from Km 22+00
to Km 2+40 of Lanka to Daboka section of NH- 54 &
Daboka bypass in Assam on East West corridor under
Phase- II program of NHDP Contract Package No.EW- II
(AS- 16)
Sep’05 to
Jan’12
(Till End of
the Project
Completion
Including
DLP Period.)
Highway cum Pavement
Engineer
Improvement and Up gradation of P1A : Aizawl
-Thanzawl – Buangpui Road of PWD, Mizoram
Dec’04-to
Sep’05
Resident
Engineer
Supervision and Quality control Consultancy of rural
Roads Under PMGSY in Chhattisgarh 2003-04 Raipur
package.
Feb’04 to
Dec’04,
Senior Engineer
Construction of four laning new Nellore bypass from
Km.161.034 to 179.300 on NH-5 in the state of A.P. under
B.O.T. system.
Apr’02-to
Feb’04
Field Engineer
Construction of four laning and strengthening of existing
two lane from Km.233.000 to Km.284.000 Ichapuram –
Ganjam (Package OR8). on NH-5 in the state of Orissa
Aug ’01 to Apr
‘02
Site Engineer
Mumbai – Ahmedabad Highway # 8 from km 477.00 –
96.000 Pelhar to Ghorbandr Bridge Four laning and
Strengthening of two lane.
June’97 to
Jul’01
Site Engineer Rural Roads Under R&B
July’94 to
June’97
Site Engineer State highways and Major District Roads
May’86 to
Jul’94
EMPLOYMENT RECORD
March 2015 to June 2016
Position : Assistant Resident Engineer (Roads)
Employer : HALCROW a CH2MHILL Company
(Supervision Consultant)
Project : IA 12/13 C 049 ST
Design and Construct of AL WAKRAH BYPASS ROAD (P015) in DOHA
QATAR DOHA EXPRESSWAYS GROUP-1
Length / Lane : 11 km / 10 - Lane (Free Way)
Page 2 of 7
3. Cost : QAR 2.187 Billion (Dollar 0.6 Billion)
Funded By : STATE OF QATAR
Client : ASHGHAL
STATE OF QATAR PUBLIC WORKS AUTHORITY
INFRASTRUCTURES AFFAIRS – EXPRESSHIGHWAY
DEPARTMENT
Contractor : M/s LARSEN AND TOUBRO LIMITED
Design Consultant : M/s WSP
Project Management Consultant : KBR Inc
Project Description :
Design & Construct Al Wakrah Bypass Road (P015) The project involves construction of an 11 km
road consisting of 10 lanes and four future lane sections with additional Collectors/distributor
roads, frontage roads and ramps. The freeway will provide access to the Existing and planned
developments via FIVE (5) Major Interchanges namely IC10, IC11, IC11A, IC11B and IC12 comprising
of 20 bridges, 13 Bicycle overpasses, 8 vehicular underpasses, 3 pedestrian bridges and a 736 m long
and 32 m wide vehicular tunnel. A Major Road crossing over the Main line just north of IC12. State
of the art road furniture and other related utility works for Potable water, treated sewer effluent,
drainage, electrical, intelligent transportation system, Irrigation and landscaping/Hardscaping are
also part of the scope
Description of Duties:
• Assist the Resident Engineer Roads in performing the contractual duties on site
• Assist the Resident Engineer Roads with Prompt exchange of correspondence, submittals
(method of statements, Inspection and Test Plans and Review of IFC Drawings) and
reporting on progress against Planning / revised project Schedule (weekly and monthly
progress reports).
• Assist the Resident Engineer Roads in the management and direction of a team of Highway
Engineers and Inspectors for the supervision of the construction of the Expressways designs.
• Places an emphasis on safe construction practices (Target Zero) and on maintaining a high
quality of construction. Leads by example in driving safe practices on site by implementing HSE
(Health, safety & Environment) Policy.
• Coordinate with other discipline (Structures, Utilities etc.) to maintain consistency and integrity
in the overall construction.
February 2012 to Jan’2015
Position : Manager (Highway) /Asst. Project Manager
Employer : GVK Technical & Consultancy Services Pvt Ltd
(EPC Contractor) Hyderabad. (GVK Hyderabad EPC Division)
Project : Six laning of existing three lanes for Bagodara-Wataman-Tarapur-Vasad
Road, SH-8, Km 0/0 to 101/9 in the State of Gujarat on BOT basis
Length / Lane : 100 km / 6 - Lane
Cost : INR 1114.45 Cr.
Funded By : BOT Project
Client : Gujarat State Road Development Corporation Limited
Concessionaire : M/s GVK Bagodara Vasad Expressway Private Limited
Independent. Engineer : M/s Egis India Consulting Engineers Private Limited
Project Description :
Proposed 6-Lane Road Comprises of 100 KM length from Km.000.00 to 101.9 building the entire
Road as flexible Pavement in Which 5.10 Km & 2.8 Km Bypasses, 35 No’s of VUP & PUP with
Slip/Service Road , 4 No’s of ROB ,3 No of Major Bridge(Span > 30 Meters). 08 No of Minor Bridges
Page 3 of 7
4. (Span < 30 m), 182 No of Culverts, 40 no’s of Bus bays and 2 No’s Toll-Plazas, 2 no’s Truck By-
lanes etc.
Description of Duties :
• Section In charge of Km 00.00 To Km 53.00.
• Engaging in Construction of All highway activities up to completion of the 6-laned highway as per
Drawings and Specifications in Concession Agreement (CA).
• Works with the various Consultants and Contractors to manage and direct overall planning of
construction activities to identify critical milestones and priorities.
• Determines budget estimates and staffing requirements for the defined scope and schedule.
Monitors the services of subcontractors and major construction equipment required by the
project will be available at the appropriate time to ensure maximum efficiency and productivity.
• Provides leadership to confirm sound construction practices to attain required quality control at
the maximum efficiency and minimum cost.
• To plan, monitor, assess resources, direct and act to ensure adherence to the Construction
program in order to complete the project within the contract period.
• Interacting with Client and the Concessionaire
• Liaison with Govt. officials for land Acquisition and utility shifting.
• Checking Bills Claimed by Sub Contractors
• Developing ability to think ahead, identify new opportunities and create new and innovative
approaches to work related issues.
September 2005 to January 2012
Position : Highway cum Pavement Engineer (ARE Roads) /
Resident Engineer (In charge)
Employer : Scott Wilson (India) Pvt. Limited (Supervision Consultant)
New Delhi India
Project : Construction Supervision of Widening and Strengthening of Existing
National Highway from Single Lane to 4-Lane from KM 22.00 to KM
2.40 KM of Lanka to Daboka section of NH-54 & Daboka Bypass in
Assam in East – West Corridor under Phase-II Programme of NHDP-
Contract Package No- EW-II(AS-16)
Length / Lane : 24 km / 4 – Lane (Rigid Pavement PQC)
Cost : INR 198.65 Cr.
Funded By : Domestic Funded (Govt. of India)
Client : National Highway Authority of India New Delhi
Contractor : Punj Lloyd Limited New Delhi
Project Description :
Proposed 4-Lane Road Comprises 24.14 KM length (including 4.25 KM Bypass) Building the entire
Road as Rigid Pavement , 6.6 KM of Service Road ,1 No of Major Bridge(Span > 30 Meters). 8 No
of Minor Bridges (Span < Both sides of Underpass, 49 No of Culverts and 6 No of Bus bays and 4
Intersections.
Description of Duties:
• As a HPE, Responsible for Construction of Entire Project length highway activities up to
completion of the 4-laned highway as per Drawings and Specifications in Contract Documents.
• Coordinating with contractor’s supervisory personnel regarding schedule, sequence, and method of
work.
• Reviewing the contractor’s progress at all times
• Construction drawings are reviewed in advance of construction
• To check the Contractor’s method statements and as-built drawings.
• To organize and supervise the inspection of the execution of construction work to ensure
compliance with the drawings, specifications, safety and environmental provisions.
Page 4 of 7
5. • Attending Executive meetings with client and progress meetings held at the site as required by the
RE/Team Leader. Identify constraints and recommend corrective measures.
• Assist to Resident Engineer / Team Leader in Monitoring and Control Process of all activities
related to Highway and Pavement Construction.
• Supervise Laying of Rigid Pavement by Slip form Paver.
• Orient, assign, and supervise the construction inspection staff on a daily basis so that all contractor
activities are adequately covered...
• Acting Resident Engineer in the absence of Project Resident Engineer.
As a Resident Engineer (In charge)
• Ensure that the construction works are executed in accordance with the Technical
Specifications, GFC Drawings and FIDIC Contract documents
• Submitting Progress Reports, IPC of work done Review and recommend Variation Order (VO)
and Reports concerning the Package Status etc. to Team Leader in compliance with NHAI.
• Controlling Projects’ Cost, Time, Scope and Monitoring the Master program and tracking the
critical paths and mile stones for identifying them to the contractor.
• Scrutinizing Claims, As-Built Drawings, Statement at Completion according FIDIC Clause 60.5.to
arrive final value of work done etc. for completing in all aspects of the package for handing Over.
December 2004 to September 2005
Position : Highway cum Pavement Engineer
Employer : Holtec Consulting Pvt Ltd. Gurgaon, Haryana (Supervision Consultant)
Project : Improvement and up gradation of P1A: Aizawl -Thanzawl – Buangpui
Road of PWD, Mizoram (Hill Road)
Length / Lanes : 98 Km / Single Intermediate lane (Hill Section)
Cost : INR.100 Cr.
Funded By : World Bank
Client : PWD, Mizoram
Contractor : Bageeratha Engineering Limited
Description of Duties:
• Carryout Regular Supervision of all works in the assigned reach including pavement works.
• Regular checking the Quantity and Quality of all items of Road works in compliancy with
Specifications specified in Conditions of the contract.
• Evolve and implement quantity and quality control procedures.
• Assisting the Resident Engineer / Team Leader in monitoring Physical and Financial progress of
works.
February 2004 to December 2004
Position : Resident Engineer
Employer : Mahendra Raj Consultants Pvt Ltd.New Delhi (Supervision Consultant)
Project : Supervision and Quality control Consultancy of rural Roads under
PMGSY in Chhattisgarh 2003-04 Raipur package.
Length / Lanes : 60 Km / Single lane (Rural Road)
Cost : INR 115.6 Cr.
Funded By : Ministry of Rural Development. Govt. of India
:
Client : Chhattisgarh Rural Development Agency. Raipur. (C.G)
Description of Duties:
• Establishment of site offices and Exercise control on contractor’s laboratories for quality control..
• Scrutiny of contractor’s work program and scheme for the deployment of plant, equipment and
machinery.
• Interpretation of provisions in the contract documents and Technical Specifications.
• Regular Supervision of works.
• Evaluation of contractor’s claims.
Page 5 of 7
6. • Verification of the executed work with the Technical specifications, subcontractor’s billing and
measurements for the work done at the site.
• Monitoring of physical and financial progress of the works.
April 2002 to February 2004
Position : Senior Engineer
Employer : Soma Enterprise Ltd. Hyderabad
Project : Construction of four laning new Nellore bypass from Km.161.034 to
179.300 on NH-5 in the state of A.P. under B.O.T. system.
Length / Lane : 18 km / 4 - Lane
Cost : INR 142 Cr.
Funded By : BOT (Annuity) Govt. of India
Client : NHAI, New Delhi
Consultant : M/s Scott Wilson Kirkpatrick India Pvt. Ltd.
Description of Duties:
• Execution of embankments includes Sub grade, earthen shoulders and Requirements of the
specifications and inconformity with the lines, grades and cross Sections shown on the drawings
• Supervision of construction of sub base and base courses including Granular sub base,
Wet Mix Macadam accordance with specifications.
• Supervision of construction of base and surface bituminous courses Viz. Dense
Bituminous Macadam, Asphaltic Concrete etc.
• Co-operating with Consultants during the site visits and implementing various quality
Control parameters for the road as per directions of the consultants
August 2001 to April 2002
Position : Field Engineer
Employer : VAX Consultants Pvt. Ltd
Project : Construction of four laning and strengthening of existing two lane from
Km.233.000 to Km.284.000 Ichapuram – Ganjam (Package OR8). On
NH-5 in the state of Orissa
Length / Lane : 53 km / 4 - Lane
Cost : INR 450 Cr.
Funded by : World Bank
Client : NHAI, New Delhi
Consultant : DHV International BV.
Description of Duties:
• Execution of embankment layers /Sub grade layers with borrow area Materials and existing
Cutting soils.
June 1997 to July 2001
Position : Site Engineer
Employer : Progressive Constructions Limited Hyderabad
Project : Mumbai – Ahmedabad Highway # 8 from km 477.00 - Km 496.000
Pelhar to Ghorbandr Bridge Four laning and strengthening of two lane.
Length / Lane : 19 km / 4 - Lane
Cost : INR 142 Cr.
Funded by : World Bank
Client : NHAI New Delhi
Consultant : LBI, USA..
July 1994 to June 1997
Page 6 of 7
7. Position : Site Engineer
Employer : M/s KSR Constructions, Warangal.
Project : Rural Roads
Length / Lane : 70 km / Single Intermediate Lane (Rural Road)
Cost : INR 100 Cr.
Funded by : World Bank
Client : R&B CAD Roads Govt. of Andhra Pradesh India
Description of Duties:
• Engaging in Execution of Roads by Surveying and leveling of Roads for the Preparation of
Longitudinal and Cross Sections
• Computations of earth work quantities
• Drainage works includes Causeways, Hume Pipe Culverts, and Cement Concrete Pavements
May 1986 to June 1994
Position : Site Engineer
Employer : M/s Madhava Constructions Warangal.
Project : State Highways, Major District Roads.
Length / Lane : 70 km / Single Intermediate Lane & 2-lane
Cost : INR 100 Cr.
Funded by : Andhra Pradesh State Government Hyderabad.
Client : R&B CAD Roads Govt. of Andhra Pradesh India
Description of Duties:
• Engaging in Execution of Roads by Surveying and leveling of Roads for the Preparation of
Longitudinal and Cross Sections
• Computations of earth work quantities
• Preparation of abstract & detailed estimates
Passport Details:
Nationality : Indian
Passport No. : H3204640
Passport Expiry Date : 03 March 2019
Place of Issue : Andra Pradesh, India
Visa Status : Qatar Employment Visa (Transferable)
.
Languages known : English, Hindi, Telugu
Permanent address : H. No. 11-22- 547/1 Tilak Road,
Prataprudra Street, Kashibugga
Warangal Telangana, India 506002
Marital status : Married
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this bio data correctly describes
me, my qualifications and my experience. I understand that any willful misstatement described herein
may lead to disqualification or dismissal.
Signature
MATETI SRINIVAS
Date: 01- 11-2016
Page 7 of 7