1. Page 1 of 5
Post applied For-Manager Installation & Testing
R.S.Verma
Plot 202, Flat-F2, Shalimar Garden Extn-I, Mob- +91-9717294808 ,
Sahibabad, Ghaziabad -201005 +91-8860362244
E-mail- rsverma122@gmail.com
Career Objective
To get the Job and Seek the opportunity to work with an organization, where I can contribute and utilize my skill ,
talents and experiences as a responsible employee towards progress while achieving the goals and deliver the
healthy project on time.
PROFILE AND STRENGTH
• Competent and result oriented having more than 16+ year experience in the field of Metro Rail Projects &
Indian Railways Signalling and Telecom projects for Installation , testing , Commissioning and Quality
Assurance .
• Leading as Installation Manager for Installation & Testing of Indoor equipment as well as outdoor
Wayside equipment.
Planning for the Installation of Indoor & Outdoor wayside equipment.
• Customer relationship through formal and informal channels and cordial relationship through regular
interaction.
• Lead Role and responsibilities of various running Metro Projects for Interface and decisions.
• Liaison with different department officials.
• Managing Capability for decision making for any change in planning.
• Excellent time management skill to prioritize the task and its coordination.
• Implementing service strategies according to set target and activity involved in controlling the service
deliverable.
• Health Safety and protection training to Project team Leaders, Supervisors and Workers
PROFESSIONAL POSITIONS :-
Bombardier Transportation India Ltd. Nov .2008 to till date
Manager Installation and Testing :
• Presently working with Bombardier Transportation India Pvt. Ltd for DELHI METRO RAIL CORPORATION
( DMRC) L-7 as Installation Manager for CBTC city Flow 650 Project
Project includes the driver less Train operation. Axle counter, Norming point and Radio System are the
controlling devices for the operation of train.OBC , ATSC , DTS and Regional ATSC are the controlling Indoor
equipment for the signalling system .
Project includes the Installation and testing of Outdoor equipment – Axel Counter , Norming Points , Signals
, WNRA /LOS Antenna Point Machine and indoor equipment- PDC, OBC, ATSC, DTS, RATC and IPUC .
• Worked with Bombardier Transportation MALYASIA for KVMRT City Flow 650 project for testing of Axle
counter , Signals and Wayside Radio Network Assembly for 03 Months as Technical Support .
2. Page 2 of 5
• Successfully completed the DMRC L-6 South Extn project 14 KMs from Badarpur to YMCA along with ATO
operation based on Train to wayside communication system .
• Worked with L5 & L6 Extn.(CS01 ) as Installation Manager for Indoor and Outdoor wayside equipment.
Also working as Interface Manager for DMRC L7 ( CS03) with Customer and System wise contractors .
• Worked With DMRC L5 & L6 ( BS02 ) Project - L5 line includes the installation of indoor and outdoor wayside
equipment at 16 Stations & one Depot ( ILOK to MADT & KNR Section) , this is appox .18.5 Kms line and L6
includes installation of indoor and outdoor wayside equipment at 16 stations and one Depot (CTST to BAPU
& SAVD), this is appox. 19 Kms line . L6 Project also includes 7 Kms Underground section installation in
Tunnel.
• Worked on BTS Merto Project Bangkok ( Thiland ) for 03 Months as Installation and Testing Engineer
for different wayside equipment like- Signal, Point Machine, Balise Programming and Hardware
Installation
• Training for Hardware installation and FAT/SAT testing in for One Month
JOB PROFILE –
• Site survey and survey report
• Mock up of wayside equipment
• Drawing Review and Red correction
• Material Planning
• Installation Planning
• Installation and Testing Documentation
• Interface meeting with costumer and associated contractors
• Installation of all indoor and Outdoor equipment..
• Documentation of Installation and Testing Records
• Handover Report Preparation from Installation to Testing for safety audit
• Daily progress and Interface report
• TWC/AP programming , Balise Programming & Jet Net Switch configuration
• Track Circuit Tuning.
• FAT of Track Circuit Cabinet and Object Control cabinet.
• Testing of Point Machine and Signals.
• Termination and testing Planning for indoor and outdoor equipment cables .
• OFC cable blowing and Splicing .
• Installation of Fibre Cable network and its Termination and Testing.
• Installation of TWC network system its Termination and Testing.
• Resource planning and deployment for smooth network operations
• Technical Trainings to customer team .
• Manpower Control, tool kits, control , material stocking, stock maintenance, Material Calculations and its
handling.
• LOS antenna installation and connectivity
• Axel counter installation, Termination and Testing
• Norming Point Programming
3. Page 3 of 5
Kalindee Rail NIrman Engineers (I) Ltd. July .2000 to Oct.2008
Sr. Project Engineer Installation and Testing
Worked for –
• Allahabad –Varanasi – Janghai Project - Successfully completed the 120 Kms Telecom and Signalling project
from 2000 to 2003.
Scope of work- Installation of Fiber cable ,Quad Cable , Signalling cable, Indoor cables , Indoor Cabinets,
outdoor Junction boxes , Emergency phones , Fiber termination and testing , copper cable termination & its
testing and Earthing Pit installation was involved the scope was work and it was done successfully.
• Ghaziabad -Tundla Project-- Worked on e Telecom and Signalling project from Ghaziabad to Tundla from
2003 to 2004.
• Ernakulam -Thiruvananthapuram Project- Successfully completed the 260 Kms Telecom and Signalling
project from 2004 to 2008
Scope of work- Installation of Fiber cable ,Quad Cable , Signalling cable, Indoor cables , Indoor Cabinets,
outdoor Junction boxes , Emergency phones , Fiber termination and testing , copper cable termination and
its testing was involved the scope was work and it was done successfully
JOB PROFILE –
• Site Survey and Report preparation
• Installation Planning
• Attending interface meeting with costumer and associated contractors
• Laying ,Termination and testing all type copper and Telecom Cables ,
• Laying Termination and testing of OFC Cables with OTDR and Power Meter
• FAT of all type Cables & outdoor wayside equipment.
• Installation of PDC, Power Backups systems (UPS) and Fibre Management Systems.
• Installation of J.B. Boxes , ODF Boxes at all stations..
• Duct lying, blowing, splicing and maintenance of Optical Fibre Network.
• Liaison/ meeting with contractors, Ward members, NH authorities, Govt. & Pvt. Sectors etc.
• Resource planning and deployment for smooth network operations.
• Training to new manpower of Project , O&M and Installation, which includes process & specifications
• Making route surveillance to be more Vigilant to prevent fault/cut.
• Liaison with local bodies (Govt. & Pvt. Sectors) authorities at the time of project.
Paramount Communications Ltd. May 1998 to June 2000
Sr. Engineer- QA Deptt.
Company involved in the field of design manufacturing testing , and supply of different types Telecom , power and
Signalling cable to different departments like BSNL, BHARTI, Indian Railways , Power Grids , NTPC , Army etc.
Company . having ISO-9001
JOB PROFILE-
• Testing of Final Product – Copper and Fibre cables .
• Planning for Internal testing of cables – Copper and Fibre cables
• Physical and Electrical testing of finished product
• Sampling ( FAT) testing of Finished product with customer
4. Page 4 of 5
• Preparation of Test Records
• Liaison with different customer officials.
• Inspection of Floor Materials.
• Study of Customers specification for design Bill of Material and Quality Control l.
• Preparation of Final Inspection Cum dispatch List for Inspected Materials
• Lot wise segregations of Inspected materials.
Haryana Telecom Ltd. Nov. 1995 to May 1998
Engineer-QA Deptt.
Company involved in the field of design manufacturing testing , and supply of different types Telecom , power and
Signalling cable to different departments like BSNL, BHARTI, Indian Railways , Power Grids , NTPC , Army etc.
Company having ISO-9001
Company having Technical collaboration of OEKW AUSTRIA & SIEMENS GERMENY.
JOB PROFILE-
• Testing of Final Product as well as Intermediate Product.
• Testing of Raw Materials.
• Offer Planning.
• Internal and Sampling Testing Planning.
• Liaison with different organisation officials.
• Inspection of Floor semi finished Materials.
• Feedback Report to Senior Management .
• Fault Reports.
• Manpower Management
5. Page 5 of 5
ACADEMIC & PROFESSIONAL QUALIFICATIONS
• PGDBA in Business Administration (Operations) -------------------------2009
• Three Year Diploma In Electronics Instrumentation with 78%-----------1993
I.E.R.T. Allahabad
• Intermediate from U.P Board First Div with 66% ------------1989
• High School from U.P Board First Div with 66% -------------1987
Skills-
• Adaptable to any kind of environment
• Passionate to learn & an attitude to take Impossible as “I M Possible”
• Good in Team Work – Passion of learning & ability to work in team
Achievements
• Bombardier Signalling System Hardware Training Certificate from Bombardier Bangkok Thiland.
• Point Machine Maintenance Training certificate from Bombardier
EXTRA ACTIVITIES & PROFILE :
• Planning of the work & Responsibilities.
• Documentation and Records
• Team Management.
• Knowledge of ISO 9001, ISO 9002 and QMS Documentation
PERSONAL DETAILS
Date of Birth : 3rd
June 1971
Passport No : G5409028 Valid up to 19.12.2017
Father’s Name : Sh. Vishwanath Verma
Marital Status : Married
Language Known : Hindi , English
Date----
Place----Delhi R.S.Verma