SlideShare a Scribd company logo
1 of 4
ZACH W. MADDOX
zwmaddox@gmail.com
07427 393023
London
https://au.linkedin.com/pub/zachary-maddox/70/608/a11
Site Engineer, 25years old, four plus years previous construction experience for Tier 1 companies.
I am a highly adaptable individual who is proactive and an excellent team player. My values listed
below underpin who I am and how I go about my daily job. I strive for and deliver results, my work
ethic and determination is very high and above all I’m driven to succeed.
VALUES
● Respect Honesty Integrity Resilience Strong Work Ethic Initiative Loyalty Adaptability● ● ● ● ● ● ●
CAREER
Costain Skanska JV – Shift Engineer, London
Apr 2016 – Current
Project Overview Paddington – Bakerloo Pedestrian Cross Passage
Total Cost Approx. £80m
Work Overview 125m tunnelled link between Crossrail and Bakerloo line. Includes Lift shaft,
escalator and new switchroom.
SwitchRoom Construction
• Handwork tunnelling
• Temporary works (timber and steel supported digs)
• 10 x SGI ring install
• Insitu concrete works
LEIGHTONS - Site Engineer (Tier 1 Company), Australia
Apr 2015 – Sept 2015
Project Overview Ichthys LNG Project – CVL3
Total Cost Approx. $35b
Work Overview C300 & C600 Waste Treatment, compressor foundations and Bund Wall Civil
Works. Self-performed works on a cost plus contract - construction driven
by productivity in a FIFO role
C300 & C600 Civil Works (5 months)
• Extremely challenging works Liaising with multiple teams within Leightons (LCPL) and other
external subcontractors in small work areas
• FRP of Concrete foundations and Bund Wall – Temp Controlled & Self-performed
• Precast pedestal foundations install
• General Minor earthworks
• Conduit Duct Bank Construction
• Stab sand backfill to correct levels ready for service install
• Overseeing the correct Services install for areas – Incl. GRE pipes, Electrical, Instrumentation,
Conc. RCP
Concrete Co-ordination for LCPL site wide (1 months)
• Daily Concrete Pump Co-Ordination Meetings for LCPL
• Liaising with Client, LCPL, Concrete Supplier (Wagners) for Daily concrete pours
• Daily co-ordination & re-organising of pumps
• Preparing Daily reports monitoring concrete volumes, programme, progress for managers
• Preparing Weekly reports for team meetings
• Organizing any special requirements for LCPL with batch plant
THIESS - Grad Site Engineer (Tier 1 Company), Australia
Mar 2014 – Apr 2015
Project Overview Moreton Bay Rail Project
Total Cost Approx. 14km Rail Civil Infrastructure – $1.15b
Thiess Component - $800m Civil infrastructure (up to Rail Capping & Mast
foundations)
Work Overview Bridge Construction 300m length (14 span), Over North Pine River, Adjacent
existing live rail, Subcontractor managed works
Temporary Traffic Control Scheme install
Temporary Park Road Construction (2 coat seal)
Site Set Up
• Park closure, Fence install, Site access, Pedestrian Access, Clear & Grub
Piling Pad Construction
• Environmental controls and plan developed for construction near/over river
• Piling Pad construction through park into river (280kPa bearing pressure)
Temporary Jetty Construction over river
• Temporary jetty constructed for Piling, FRP & Girder Install over the river
• Steel Pile, steel frame, concrete slab design
• Construction next to live rail and over water
Piling
• Consisted of Bored Piles (Perm. Steel Liner & Polymer with Perm. Steel Liner)
• Wet & Dry Piling to DTMR Specification
• Challenging geotechnical conditions
• Over water, next to rail
FRP Bridge
• Column, headstock, pedestal construction
• Large Temp controlled headstock pours
• Over water, next to live rail
• Co-ordination and programming between multiple contractors
Girder Install
• 14 spans - 80 Super T Girders (30m span), 48 QR Deck Slabs (15m span)
• Lift completed with 280T Crawler & 500T Hydraulic Single lift
• Dual Crane Pass out over water lift
• Girder construction audits
• Bearing Pad inspections and beam jacking to reposition beams
• Temporary restraint install
• Permanent Fix & Epoxy bearing pads where required
Deck Slab construction
• Large single deck pours
THIESS - Under Grad/Grad Engineer (Tier 1 Company), Australia
Apr 2011 – Feb 2014
Project Overview Trackstar Alliance – Collaboration between Thiess (Construction PC), Aecom
(Design), Aurecom (Design)
13km extension, Greenfield Rail Civil Infrastructure
Bulk earthworks, Drainage, Bridge Construction, 2 x Stations
Project total $750m
Thiess Component - $450m Civil infrastructure (up to Rail Capping & Mast
foundations)
Queensland Rail (Client) - $300m Lay Track and all OHLE install
10 months - Road Finishing Works (Grad)
• Road Sealing (2 coat Seal DTMR Spec)
• Minor Earthworks – Emergency bay install
• Road furniture install – Gantry Signs, Guardrail
• Noise Barrier Construction – 1 km I-beam, Concrete Panel Design
• Road Closures
• Temporary Construction earth pads
• Temp Concrete barrier Install
• Working next to properties & Live traffic
• Concrete Panel Subcontractor Audits
2 years - QA (Undergrad)
• Work breakdown Structure for Major Projects
• Development of ITP’s – DTMR & QR Specifications
• NCR & RFI Processing
• On Site Audits
• Document Control – Drawing & Specification Updating
• Online Quality Control & Training
EDUCATION
University of Queensland, Australia
2010 – 2013
BEng Civil
Downlands College Toowoomba, Australia
2002 - 2008
Year 12 Certificate
SKILLS & CAPABILITIES
- Set out and survey
- Site inspections/Supervision - FRP Major & Minor Works
- Minor Earthworks - General Construction Works
- Working with MRTS Specifications - Programming (4WLAH)
- Scope of works - Work method statements
- Risk Assessments - Dig Permits & Investigation
- ITP’s - Quality Requirements
- Lift studies - Emergency Planning
- Safety Management - SWMS Review
- Implementing Road Closures - Quality Assurance
- Daily costings - Forecast & Accruals
- Quantity Take Offs - Daily Diary
- Weekly Reporting - Managing Subcontractors & Contracts
- Managing Clients & building relations - Material Procurement
- Lifts - Concrete Volumes & Onsite Ordering/Supervision
- Work Pack Formulation
REFEREES
Richard Gilligan – Shift Manager, CSJV – 07961638653, richard.gilligan@blljv.co.uk
James Donaghey – Superintendent, Theiss - 0411 331 009
Carlton Brogan - Construction Manager, Theiss - 3897 7512, cbrogan@thiess.com
Tony Friscic - Construction Manager, Leighton Contractors, Ichthys LNG Project Darwin –
0404 494 952, tony.friscic@leicon.com.au

More Related Content

What's hot

Russell Noanoa resume for 2015
Russell Noanoa resume for 2015Russell Noanoa resume for 2015
Russell Noanoa resume for 2015Russell Noanoa
 
Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017Crosstown TO
 
Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15VDOT Northern Virginia
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaStephen McKnight
 
Nathan Mudd Resume
Nathan Mudd ResumeNathan Mudd Resume
Nathan Mudd ResumeNathan Mudd
 
Multiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas IndustryMultiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas IndustryHank Rawlins
 
Road and Bridges_3-D Milling_0311RB
Road and Bridges_3-D Milling_0311RBRoad and Bridges_3-D Milling_0311RB
Road and Bridges_3-D Milling_0311RBMark Mann
 
jarrad healy resume2016
jarrad healy resume2016jarrad healy resume2016
jarrad healy resume2016jarrad healy
 
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015Mohd Murtaza
 
Resume- Nauss, Paul M.
Resume- Nauss, Paul M.Resume- Nauss, Paul M.
Resume- Nauss, Paul M.Paul Nauss
 
Tareq Mahmood (20361572)
Tareq Mahmood (20361572)Tareq Mahmood (20361572)
Tareq Mahmood (20361572)Tareqmah
 
Curriculum Vitae Darren Shepherdson 2014
Curriculum Vitae Darren Shepherdson 2014Curriculum Vitae Darren Shepherdson 2014
Curriculum Vitae Darren Shepherdson 2014Darren Shepherdson
 
Sobhy C V 2015 Rev Q S
Sobhy C V  2015 Rev  Q S  Sobhy C V  2015 Rev  Q S
Sobhy C V 2015 Rev Q S sobhey ahmed
 

What's hot (20)

Russell Noanoa resume for 2015
Russell Noanoa resume for 2015Russell Noanoa resume for 2015
Russell Noanoa resume for 2015
 
Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017Leaside & Laird Stations Open House - October 2017
Leaside & Laird Stations Open House - October 2017
 
Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15
 
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South AustraliaMine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
Mine Haul Road Upgrade Project OZ Minerals Prominent Hill South Australia
 
Nathan Mudd Resume
Nathan Mudd ResumeNathan Mudd Resume
Nathan Mudd Resume
 
Multiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas IndustryMultiphase Desanding for Upstream Oil & Gas Industry
Multiphase Desanding for Upstream Oil & Gas Industry
 
Road and Bridges_3-D Milling_0311RB
Road and Bridges_3-D Milling_0311RBRoad and Bridges_3-D Milling_0311RB
Road and Bridges_3-D Milling_0311RB
 
Kpr resume tunnel engineer
Kpr resume tunnel engineerKpr resume tunnel engineer
Kpr resume tunnel engineer
 
jarrad healy resume2016
jarrad healy resume2016jarrad healy resume2016
jarrad healy resume2016
 
Vedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas ShipsVedam Design: Engineering Solutions - Gas Ships
Vedam Design: Engineering Solutions - Gas Ships
 
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
RESUME Senior Geotechnical & Material NATM Tunnel Engineer 21032015
 
Linkedin
LinkedinLinkedin
Linkedin
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
Resume- Nauss, Paul M.
Resume- Nauss, Paul M.Resume- Nauss, Paul M.
Resume- Nauss, Paul M.
 
Viaduct experience
Viaduct experienceViaduct experience
Viaduct experience
 
Tareq Mahmood (20361572)
Tareq Mahmood (20361572)Tareq Mahmood (20361572)
Tareq Mahmood (20361572)
 
Vedam Design:- BWTS - Retrofits Services
Vedam Design:-  BWTS - Retrofits Services Vedam Design:-  BWTS - Retrofits Services
Vedam Design:- BWTS - Retrofits Services
 
Curriculum Vitae Darren Shepherdson 2014
Curriculum Vitae Darren Shepherdson 2014Curriculum Vitae Darren Shepherdson 2014
Curriculum Vitae Darren Shepherdson 2014
 
Sobhy C V 2015 Rev Q S
Sobhy C V  2015 Rev  Q S  Sobhy C V  2015 Rev  Q S
Sobhy C V 2015 Rev Q S
 
Two-Lift Paving - Contractor's Viewpoints
Two-Lift Paving - Contractor's ViewpointsTwo-Lift Paving - Contractor's Viewpoints
Two-Lift Paving - Contractor's Viewpoints
 

Similar to Zach Maddox - CV 2016 May 01

Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017Steven Miller
 
T.Shaji George - Copy - Copy ts
T.Shaji George - Copy - Copy tsT.Shaji George - Copy - Copy ts
T.Shaji George - Copy - Copy tsSHAJI GEORGE
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMUTHUKUMAR428109
 
AEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdfAEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdfAayoghEngineering
 
Linkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiLinkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiKrystian Gnysinski
 
Kevin Quigley Portfolio Condensed
Kevin Quigley Portfolio CondensedKevin Quigley Portfolio Condensed
Kevin Quigley Portfolio Condensedkevin quigley
 
Eric Heikkila's resume
Eric Heikkila's resumeEric Heikkila's resume
Eric Heikkila's resumeEric Heikkila
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-Shyamal Sahu
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13iain_cameron
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cvGeoff Chandler
 

Similar to Zach Maddox - CV 2016 May 01 (20)

resume frfcf murgi
resume frfcf murgiresume frfcf murgi
resume frfcf murgi
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
Steve Miller CV 2017
Steve Miller CV 2017Steve Miller CV 2017
Steve Miller CV 2017
 
T.Shaji George - Copy - Copy ts
T.Shaji George - Copy - Copy tsT.Shaji George - Copy - Copy ts
T.Shaji George - Copy - Copy ts
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Muthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdfMuthukumar Civil engineer resume UPDATED (1).pdf
Muthukumar Civil engineer resume UPDATED (1).pdf
 
Katleho P LETELE CV with picture
Katleho P LETELE CV with pictureKatleho P LETELE CV with picture
Katleho P LETELE CV with picture
 
AEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdfAEPL Presentation Rev_2 -O&G.pdf
AEPL Presentation Rev_2 -O&G.pdf
 
Resume
ResumeResume
Resume
 
Linkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian GnysinskiLinkedin Presentation Krysyian Gnysinski
Linkedin Presentation Krysyian Gnysinski
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
 
Kevin Quigley Portfolio Condensed
Kevin Quigley Portfolio CondensedKevin Quigley Portfolio Condensed
Kevin Quigley Portfolio Condensed
 
paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
Eric Heikkila's resume
Eric Heikkila's resumeEric Heikkila's resume
Eric Heikkila's resume
 
Resume shyamal kr sahu-
Resume shyamal kr sahu-Resume shyamal kr sahu-
Resume shyamal kr sahu-
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13
 
Sarvesh_CV (2)
Sarvesh_CV (2)Sarvesh_CV (2)
Sarvesh_CV (2)
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cv
 
Resume vinoth kumar
Resume   vinoth kumarResume   vinoth kumar
Resume vinoth kumar
 

Zach Maddox - CV 2016 May 01

  • 1. ZACH W. MADDOX zwmaddox@gmail.com 07427 393023 London https://au.linkedin.com/pub/zachary-maddox/70/608/a11 Site Engineer, 25years old, four plus years previous construction experience for Tier 1 companies. I am a highly adaptable individual who is proactive and an excellent team player. My values listed below underpin who I am and how I go about my daily job. I strive for and deliver results, my work ethic and determination is very high and above all I’m driven to succeed. VALUES ● Respect Honesty Integrity Resilience Strong Work Ethic Initiative Loyalty Adaptability● ● ● ● ● ● ● CAREER Costain Skanska JV – Shift Engineer, London Apr 2016 – Current Project Overview Paddington – Bakerloo Pedestrian Cross Passage Total Cost Approx. £80m Work Overview 125m tunnelled link between Crossrail and Bakerloo line. Includes Lift shaft, escalator and new switchroom. SwitchRoom Construction • Handwork tunnelling • Temporary works (timber and steel supported digs) • 10 x SGI ring install • Insitu concrete works LEIGHTONS - Site Engineer (Tier 1 Company), Australia Apr 2015 – Sept 2015 Project Overview Ichthys LNG Project – CVL3 Total Cost Approx. $35b Work Overview C300 & C600 Waste Treatment, compressor foundations and Bund Wall Civil Works. Self-performed works on a cost plus contract - construction driven by productivity in a FIFO role C300 & C600 Civil Works (5 months) • Extremely challenging works Liaising with multiple teams within Leightons (LCPL) and other external subcontractors in small work areas • FRP of Concrete foundations and Bund Wall – Temp Controlled & Self-performed • Precast pedestal foundations install • General Minor earthworks • Conduit Duct Bank Construction • Stab sand backfill to correct levels ready for service install • Overseeing the correct Services install for areas – Incl. GRE pipes, Electrical, Instrumentation, Conc. RCP Concrete Co-ordination for LCPL site wide (1 months)
  • 2. • Daily Concrete Pump Co-Ordination Meetings for LCPL • Liaising with Client, LCPL, Concrete Supplier (Wagners) for Daily concrete pours • Daily co-ordination & re-organising of pumps • Preparing Daily reports monitoring concrete volumes, programme, progress for managers • Preparing Weekly reports for team meetings • Organizing any special requirements for LCPL with batch plant THIESS - Grad Site Engineer (Tier 1 Company), Australia Mar 2014 – Apr 2015 Project Overview Moreton Bay Rail Project Total Cost Approx. 14km Rail Civil Infrastructure – $1.15b Thiess Component - $800m Civil infrastructure (up to Rail Capping & Mast foundations) Work Overview Bridge Construction 300m length (14 span), Over North Pine River, Adjacent existing live rail, Subcontractor managed works Temporary Traffic Control Scheme install Temporary Park Road Construction (2 coat seal) Site Set Up • Park closure, Fence install, Site access, Pedestrian Access, Clear & Grub Piling Pad Construction • Environmental controls and plan developed for construction near/over river • Piling Pad construction through park into river (280kPa bearing pressure) Temporary Jetty Construction over river • Temporary jetty constructed for Piling, FRP & Girder Install over the river • Steel Pile, steel frame, concrete slab design • Construction next to live rail and over water Piling • Consisted of Bored Piles (Perm. Steel Liner & Polymer with Perm. Steel Liner) • Wet & Dry Piling to DTMR Specification • Challenging geotechnical conditions • Over water, next to rail FRP Bridge • Column, headstock, pedestal construction • Large Temp controlled headstock pours • Over water, next to live rail • Co-ordination and programming between multiple contractors Girder Install • 14 spans - 80 Super T Girders (30m span), 48 QR Deck Slabs (15m span) • Lift completed with 280T Crawler & 500T Hydraulic Single lift • Dual Crane Pass out over water lift • Girder construction audits • Bearing Pad inspections and beam jacking to reposition beams • Temporary restraint install • Permanent Fix & Epoxy bearing pads where required Deck Slab construction • Large single deck pours
  • 3. THIESS - Under Grad/Grad Engineer (Tier 1 Company), Australia Apr 2011 – Feb 2014 Project Overview Trackstar Alliance – Collaboration between Thiess (Construction PC), Aecom (Design), Aurecom (Design) 13km extension, Greenfield Rail Civil Infrastructure Bulk earthworks, Drainage, Bridge Construction, 2 x Stations Project total $750m Thiess Component - $450m Civil infrastructure (up to Rail Capping & Mast foundations) Queensland Rail (Client) - $300m Lay Track and all OHLE install 10 months - Road Finishing Works (Grad) • Road Sealing (2 coat Seal DTMR Spec) • Minor Earthworks – Emergency bay install • Road furniture install – Gantry Signs, Guardrail • Noise Barrier Construction – 1 km I-beam, Concrete Panel Design • Road Closures • Temporary Construction earth pads • Temp Concrete barrier Install • Working next to properties & Live traffic • Concrete Panel Subcontractor Audits 2 years - QA (Undergrad) • Work breakdown Structure for Major Projects • Development of ITP’s – DTMR & QR Specifications • NCR & RFI Processing • On Site Audits • Document Control – Drawing & Specification Updating • Online Quality Control & Training EDUCATION University of Queensland, Australia 2010 – 2013 BEng Civil Downlands College Toowoomba, Australia 2002 - 2008 Year 12 Certificate SKILLS & CAPABILITIES - Set out and survey - Site inspections/Supervision - FRP Major & Minor Works - Minor Earthworks - General Construction Works - Working with MRTS Specifications - Programming (4WLAH) - Scope of works - Work method statements - Risk Assessments - Dig Permits & Investigation - ITP’s - Quality Requirements - Lift studies - Emergency Planning
  • 4. - Safety Management - SWMS Review - Implementing Road Closures - Quality Assurance - Daily costings - Forecast & Accruals - Quantity Take Offs - Daily Diary - Weekly Reporting - Managing Subcontractors & Contracts - Managing Clients & building relations - Material Procurement - Lifts - Concrete Volumes & Onsite Ordering/Supervision - Work Pack Formulation REFEREES Richard Gilligan – Shift Manager, CSJV – 07961638653, richard.gilligan@blljv.co.uk James Donaghey – Superintendent, Theiss - 0411 331 009 Carlton Brogan - Construction Manager, Theiss - 3897 7512, cbrogan@thiess.com Tony Friscic - Construction Manager, Leighton Contractors, Ichthys LNG Project Darwin – 0404 494 952, tony.friscic@leicon.com.au