1. ZACH W. MADDOX
zwmaddox@gmail.com
07427 393023
London
https://au.linkedin.com/pub/zachary-maddox/70/608/a11
Site Engineer, 25years old, four plus years previous construction experience for Tier 1 companies.
I am a highly adaptable individual who is proactive and an excellent team player. My values listed
below underpin who I am and how I go about my daily job. I strive for and deliver results, my work
ethic and determination is very high and above all I’m driven to succeed.
VALUES
● Respect Honesty Integrity Resilience Strong Work Ethic Initiative Loyalty Adaptability● ● ● ● ● ● ●
CAREER
Costain Skanska JV – Shift Engineer, London
Apr 2016 – Current
Project Overview Paddington – Bakerloo Pedestrian Cross Passage
Total Cost Approx. £80m
Work Overview 125m tunnelled link between Crossrail and Bakerloo line. Includes Lift shaft,
escalator and new switchroom.
SwitchRoom Construction
• Handwork tunnelling
• Temporary works (timber and steel supported digs)
• 10 x SGI ring install
• Insitu concrete works
LEIGHTONS - Site Engineer (Tier 1 Company), Australia
Apr 2015 – Sept 2015
Project Overview Ichthys LNG Project – CVL3
Total Cost Approx. $35b
Work Overview C300 & C600 Waste Treatment, compressor foundations and Bund Wall Civil
Works. Self-performed works on a cost plus contract - construction driven
by productivity in a FIFO role
C300 & C600 Civil Works (5 months)
• Extremely challenging works Liaising with multiple teams within Leightons (LCPL) and other
external subcontractors in small work areas
• FRP of Concrete foundations and Bund Wall – Temp Controlled & Self-performed
• Precast pedestal foundations install
• General Minor earthworks
• Conduit Duct Bank Construction
• Stab sand backfill to correct levels ready for service install
• Overseeing the correct Services install for areas – Incl. GRE pipes, Electrical, Instrumentation,
Conc. RCP
Concrete Co-ordination for LCPL site wide (1 months)
2. • Daily Concrete Pump Co-Ordination Meetings for LCPL
• Liaising with Client, LCPL, Concrete Supplier (Wagners) for Daily concrete pours
• Daily co-ordination & re-organising of pumps
• Preparing Daily reports monitoring concrete volumes, programme, progress for managers
• Preparing Weekly reports for team meetings
• Organizing any special requirements for LCPL with batch plant
THIESS - Grad Site Engineer (Tier 1 Company), Australia
Mar 2014 – Apr 2015
Project Overview Moreton Bay Rail Project
Total Cost Approx. 14km Rail Civil Infrastructure – $1.15b
Thiess Component - $800m Civil infrastructure (up to Rail Capping & Mast
foundations)
Work Overview Bridge Construction 300m length (14 span), Over North Pine River, Adjacent
existing live rail, Subcontractor managed works
Temporary Traffic Control Scheme install
Temporary Park Road Construction (2 coat seal)
Site Set Up
• Park closure, Fence install, Site access, Pedestrian Access, Clear & Grub
Piling Pad Construction
• Environmental controls and plan developed for construction near/over river
• Piling Pad construction through park into river (280kPa bearing pressure)
Temporary Jetty Construction over river
• Temporary jetty constructed for Piling, FRP & Girder Install over the river
• Steel Pile, steel frame, concrete slab design
• Construction next to live rail and over water
Piling
• Consisted of Bored Piles (Perm. Steel Liner & Polymer with Perm. Steel Liner)
• Wet & Dry Piling to DTMR Specification
• Challenging geotechnical conditions
• Over water, next to rail
FRP Bridge
• Column, headstock, pedestal construction
• Large Temp controlled headstock pours
• Over water, next to live rail
• Co-ordination and programming between multiple contractors
Girder Install
• 14 spans - 80 Super T Girders (30m span), 48 QR Deck Slabs (15m span)
• Lift completed with 280T Crawler & 500T Hydraulic Single lift
• Dual Crane Pass out over water lift
• Girder construction audits
• Bearing Pad inspections and beam jacking to reposition beams
• Temporary restraint install
• Permanent Fix & Epoxy bearing pads where required
Deck Slab construction
• Large single deck pours
3. THIESS - Under Grad/Grad Engineer (Tier 1 Company), Australia
Apr 2011 – Feb 2014
Project Overview Trackstar Alliance – Collaboration between Thiess (Construction PC), Aecom
(Design), Aurecom (Design)
13km extension, Greenfield Rail Civil Infrastructure
Bulk earthworks, Drainage, Bridge Construction, 2 x Stations
Project total $750m
Thiess Component - $450m Civil infrastructure (up to Rail Capping & Mast
foundations)
Queensland Rail (Client) - $300m Lay Track and all OHLE install
10 months - Road Finishing Works (Grad)
• Road Sealing (2 coat Seal DTMR Spec)
• Minor Earthworks – Emergency bay install
• Road furniture install – Gantry Signs, Guardrail
• Noise Barrier Construction – 1 km I-beam, Concrete Panel Design
• Road Closures
• Temporary Construction earth pads
• Temp Concrete barrier Install
• Working next to properties & Live traffic
• Concrete Panel Subcontractor Audits
2 years - QA (Undergrad)
• Work breakdown Structure for Major Projects
• Development of ITP’s – DTMR & QR Specifications
• NCR & RFI Processing
• On Site Audits
• Document Control – Drawing & Specification Updating
• Online Quality Control & Training
EDUCATION
University of Queensland, Australia
2010 – 2013
BEng Civil
Downlands College Toowoomba, Australia
2002 - 2008
Year 12 Certificate
SKILLS & CAPABILITIES
- Set out and survey
- Site inspections/Supervision - FRP Major & Minor Works
- Minor Earthworks - General Construction Works
- Working with MRTS Specifications - Programming (4WLAH)
- Scope of works - Work method statements
- Risk Assessments - Dig Permits & Investigation
- ITP’s - Quality Requirements
- Lift studies - Emergency Planning