INTRODUCTION
3
C&ESS Department is responsible to provide
Civil construction, Field Gathering lines & Mechanical
fabrication services to Drilling, Production, Process,
Store & other client Departments.
Two Division:
1- Civil Engineering
2- Mechanical Engineering
1. Pre-Drilling Civil Works.
2. Metalled Roads, Field Roads & Right of Ways
3. Field Camps, Boundary Walls & Fencing
4. Ware Houses, Workshops, Storage sheds etc.
5. Dispensaries
6. Water Supply Systems, Water & Sewage Treatment Plants
7. Laying of Gathering Lines
8. Fabrication and installation of Well Head Assemblies.
9. Installations for Pig Launching Assemblies
10. Fabrication and repair of Oil Storage Tanks and Caravans.
11. Maintenance of baseline field machinery.
FunctionsFunctions
4
5
Cost estimates are based on MES Schedule of Rates.
Engineering Works Procedure:
• Cost estimate and AFE approvals.
• Tender documents preparation and contract administration.
• Departmental works utilizing available resources.
• Procurement of material & services as per PPRA & PEC.
Working MethodologyWorking Methodology
CIVIL ENGINEERINGCIVIL ENGINEERING
Civil Engineering consists of Three sections
1.Engineering Operations North
• Engineering Field Party No. 2
• Engineering Field Party No. 3
2.Engineering Operations South
• Engineering Field No. 1
• Engineering Field No. 4
• Engineering Field No. 5
3.Contracts & Consultancy Services
6
Mechanical Engineering consists of two sections
1.Equipment and Field Machinery
• Workshop and Transport Section
• Base Workshop, I-9, Islamabad
• Base Workshop, KBW, Karachi
2.Fabrication and Pipeline
• Field Gathering Construction Party No. 1
• Field Gathering Constuction Party No. 2
MECHANICAL ENGINEERINGMECHANICAL ENGINEERING
Party Location District Province
EFP-1 Uch Dera Bugti Baluchistan
EFP-2 Kot Adu Muzaffar Garh Punjab
EFP-3 Fateh Jang Attock Punjab
EFP-4 Qadirpur Ghotki Sindh
EFP-5 Hyderabad Hyderabad Sindh
FGCP-1 Multan Multan Punjab
FGCP-2 Hyderabad Hyderabad Sindh
Present Locations of EFPs and FGCPsPresent Locations of EFPs and FGCPs
7
8
ENGG.WORKS DETAILENGG.WORKS DETAIL
Pre Drilling Engineering Works
Description 2011-12 2012-13 2013-14 2014-15 2015-16
Completed 20 22 22 24 28
In progress - - - - 9
In Tender
process
- - - 2
9
ENGG.WORKS DETAILENGG.WORKS DETAIL
Civil Works for Work Over Jobs
Description 2011-12 2012-13 2013-14 2014-15 2015-16
Completed 8 7 5 14 16
In progress - - - - 2
In Tender
process
- - - - 3
10
Works carried out by EFP-IWorks carried out by EFP-I
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
1 Nashpa#4 Completed 1 Kal#2 Complete. 1 Permanent Fencing at Nashpa#1. Completed.
2 Nashpa#5 Completed 2 Kal#3 Complete. 2 Permanent Fencing at Nashpa#2. Completed.
3 Nashpa#6 Completed 3 Missa Kiswal#3 Complete. 3 Permanent Fencing at Nashpa#4. Completed.
4 Nashpa#7 Completed 4 Chak Naurang#5A Complete. 4
Well operator and security guard room at
Nashpa#4.
Completed.
5 Mela#4 Completed 5 Chak Naurang South#1 5 PCC hardstanding at stock material at Nashpa. Completed.
6 Mela#5 in progress 6 Rajian#1 in progress 6 F.C. accomodation at Nashpa. Completed.
7 Chanda#4 in progress 7 Rajian#4A Complete. 7 Internal Road at Nashpa. Completed.
8 Shawa#1 Completed 8 Rajian#2 in progress 8 RCC Boundary wall at Nashpa. Completed.
9 Naurang Shah#1 Completed 9 Field development works at Nashpa. Completed.
10 Kurrum#1 Completed 10
Hardstanding for extension of existing filling
gantry.
Completed.
11 Shaikhanwala#1 Completed 11 RCC Water storage tank at Nashpa. Completed.
12 Surqamar#1 Completed 12
Temporary camps construction for LPG plant
extension at Nashpa
Completed.
13 Khawaja#1 (Re-entry) Completed 13
Fencing and watch towers at plant extension
area at Nashpa.
Completed.
14 Kohat#1 Completed 14 API pit/Skimmer tank at Nashpa. in progress
11
Works carried out by EFP-IWorks carried out by EFP-I
During Last 05 Years
15 Jabbi#1 Completed 15 Pre-casted wall at LPG plant area at Nashpa. Completed.
16 Jand#1 Completed 16
Double gate, road blocker and hydraulic barrier
at Nashpa.
Completed.
17 Jand#2 Completed 17
Dyke walls and flooring around crude storage
tanks at Nashpa.
Completed.
18 Dakhni Deep #5. Completed 18 Admin building at Nashpa. Completed.
19 Dakhni#7 Completed 19
02 class rooms with veranda for Govt. Primary
School at Awaji Banada, Nashpa.
Completed.
20 Dakhni#8 Completed 20 One way road and parking shed at Nashpa. in progress
21 Dakhni#12 Completed 21 Infra structure works at Chanda. Completed.
22 Ajuwala#1 Completed 22 Internal road at Mela. Completed.
23 Soghari#1 Completed 23 TST of internal roads at Chanda. Completed.
24 Soghari#2 Completed 24 Production office building at Dakhni. Completed.
25 Chak Naurang# X-1 Completed 25 Plice Check Post at Dakhni well #3. Completed.
26 Rajian#6 Completed 26
Metalled road (7Km) from Social welfare
dispensary to Dakhni #6.
Completed.
27 Rajian#7 Completed 27
RCC Hardstanding for Logistic work shop area at
Kot Sarang.
Completed.
12
Works carried out by EFP-IIWorks carried out by EFP-II
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
1 Kup#1 Completed 1 Bahu#5 Completed. 1
Construction of metal road,
boundry wall & cement concrete
stone paving, additional work for
annaxe at R.O Multan
Completed
2 Kalchas#1 Completed 2 Bahu#7 Completed. 2
Construction of hard
standing(flooring) at kot addu field
store
Completed
3 Bahu#5 Completed 3 Punjpir Completed. 3 Repair of fencing at Bahu-5,6,7,8 Completed
4 Bahu#6 Completed 4
Pre-drilling civil work at Barkat
wala(Heto)
Completed
5 Bahu#7 Completed 5
Water supply scheme for locals at
kalchas
Completed
6 Bahu#8 Completed 6 Evaporation pond at SS Well no 1 Completed
7 Sohni wala No-1 Completed 7
Construction of officer rest house
Annexe at R.O Multan
Completed
8 Dhodak Deep #2 A Completed 8
Renovation of banglow A-1 officer
rest house kotaddu field
Completed
9 Dhodak Deep #1 Completed 9
Construction of engine driver room
at kotaddu log field,hard standing
and roof treatment of Masjid
Completed
10
Muhammad test well
No-1(multan north -1)
Completed 10
Blasting/removing of crocked
mountain along approach road near
chapper DDK field.
Completed
11 DDk Rubly x-1 in progress 11
Repair and mantenence of store
shed at kotaddu field.
Completed
13
Works carried out by EFP-IIWorks carried out by EFP-II
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
12
Renovation/partition of banglow B-
2 at log field kotaddu
Completed
13
Urgent construction of security
post,rooms for BMP one at mari top
dera bugti.
Completed
14
Tuff tiles at nandpur/punjpeer
dehydration plant
Completed
15 Boundry wall at ss-1 nandpur Completed
16
Re construction of boundry wall at
RO-Multan
Completed
17
Const of metal road shujabaad
canal at ss-1 nandpur
Completed
18
Distemper/weather shield paint
officer & camp building(EFP_2)
Completed
19
Tiles flooring for staff transit camp
at RO-multan
Completed
20 Dismentling of punjpeer Completed
21
Comst of hardstanding around
admin building efp-2 kotaddu
Completed
22 Const of washroom at bahu-2 Completed
23
Re-habitation of admin block log-
field kotaddu
Completed
24
Civil work of const of masjid at
dhodak colony multan
Completed
25
Renovation work of staff and
officer transit camp at RO- multan
Completed
26
Bahu well no 4 bahu gas field
develment at bahu well no 4
hydraulic work
Completed
14
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
1 Nashpa#4 Completed 1 Kal#2 Complete. 1 Permanent Fencing at Nashpa#1. Completed.
2 Nashpa#5 Completed 2 Kal#3 Complete. 2 Permanent Fencing at Nashpa#2. Completed.
3 Nashpa#6 Completed 3 Missa Kiswal#3 Complete. 3 Permanent Fencing at Nashpa#4. Completed.
4 Nashpa#7 Completed 4 Chak Naurang#5A Complete. 4
Well operator and security guard room at
Nashpa#4.
Completed.
5 Mela#4 Completed 5 Chak Naurang South#1 5 PCC hardstanding at stock material at Nashpa. Completed.
6 Mela#5 in progress 6 Rajian#1 Completed. 6 F.C. accomodation at Nashpa. Completed.
7 Chanda#4 in progress 7 Rajian#4A Completed 7 Internal Road at Nashpa. Completed.
8 Shawa#1 Completed 8 Rajian#2 in progress 8 RCC Boundary wall at Nashpa. Completed.
9 Naurang Shah#1 Completed 9 Field development works at Nashpa. Completed.
10 Kurrum#1 Completed 10
Hardstanding for extension of existing filling
gantry.
Completed.
11 Shaikhanwala#1 Completed 11 RCC Water storage tank at Nashpa. Completed.
12 Surqamar#1 Completed 12
Temporary camps construction for LPG plant
extension at Nashpa
Completed.
13 Khawaja#1 (Re-entry) Completed 13
Fencing and watch towers at plant extension
area at Nashpa.
Completed.
14 Kohat#1 Completed 14 API pit/Skimmer tank at Nashpa. in progress
15
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
15 Jabbi#1 Completed 15
Pre-casted wall at LPG plant area at
Nashpa.
Completed.
16 Jand#1 Completed 16
Double gate, road blocker and
hydraulic barrier at Nashpa.
Completed.
17 Jand#2 Completed 17
Dyke walls and flooring around
crude storage tanks at Nashpa.
Completed.
18 Dakhni Deep #5. Completed 18 Admin building at Nashpa. Completed.
19 Dakhni#7 Completed 19
02 class rooms with veranda for
Govt. Primary School at Awaji
Banada, Nashpa.
Completed.
20 Dakhni#8 Completed 20
One way road and parking shed at
Nashpa.
in progress
21 Dakhni#12 Completed 21 Infra structure works at Chanda. Completed.
22 Ajuwala#1 Completed 22 Internal road at Mela. Completed.
23 Soghari#1 Completed 23 TST of internal roads at Chanda. Completed.
24 Soghari#2 Completed 24
Production office building at
Dakhni.
Completed.
25 Chak Naurang# X-1 Completed 25 Plice Check Post at Dakhni well #3. Completed.
26 Rajian#6 Completed 26
Metalled road (7Km) from Social
welfare dispensary to Dakhni #6.
Completed.
27 Rajian#7 Completed 27
RCC Hardstanding for Logistic work
shop area at Kot Sarang.
Completed.
16
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
28 Rajian#8 Completed 28
Crude storage tanks foundation
and dyke walls at Rajian#5.
Completed.
29 Rajian#9 Completed 29
Extension in social welfare
dispansary at Rajian.
Completed.
30
Govt. Rural Dispansary, at Dina,
Jehlum.
Completed.
31
Repair/maintenance of road from
Mohri Rajgan to Chak Treda at
Jehlum.
Completed.
32
Repair of main road to Rajian Oil
Field.
Completed.
33
Hard standing around weigh bridge
and RCC culvert at Mela.
Completed.
34
Cosndtruction of weigh bridge
foundation at Mela.
Completed.
35
Cosndtruction of weigh bridge
foundation at Nashpa
Completed.
36
Cosndtruction of weigh bridge
foundation at Rajian.
Completed.
37
New waste pit with skimmer tank
at Kal.
Completed.
38
Repair/upgradation of road from
Shakardra to Kharapa More, Kohat.
Completed.
39 Worshop shed at Dakhni. Completed.
40 Store shed at Dakhni. in progress
17
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
41 New residential rooms at Rajian. in progress
42
Const. of civil works for utilization
of weigh bridge at Rajian.
in progress
43
Improvement of existing Tarally
Bridge Road at Chanda.
in progress
44
Supply of utility water at Nashpa
Plant for year 2014.
in progress
45
Supply of utility water at Nashpa
Plant for year 2015.
Completed.
46
Construction of dyke wall and PCC
hardstanding for crude storage
tanks at Mela.
Completed.
47
Construction of RCC hard
standing for installation of
20000 BPD Capacity new
Separation Battery at Nashpa
Completed.
48
Construction of internal
Road at chanda plant
Completed.
49
Repair of (0.8 km)Road at
Ratta Mohara Rajian oil field.
Completed.
50
Modification of New store
shed at dakhni Plant.
Completed.
18
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
51
Construction of One Rcc
under ground water reservior
at water source Mela # 01
Completed.
52
Construction of well Operator
and security Guard Rooms at
Nashpa well # 03.
Completed.
53
Construction of Foundation
for Proplane Bullet at
Chanda Plant
Completed.
54
Concrete Flooring at Chanda
Plant
Completed.
55
New Dehydration Plant at
Nashpa
Completed.
56
Construction of Room for
Mechanical at Chanda Plant
Completed.
57
Civil Works for Re-
installation of TOC at
Sheikhan Plant
Completed.
58
Construction of Building of
Mela Dehydration Plant
Completed.
19
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
            59
Construction of Boundary
Wall & Provision of steel
Stairs for Watch
Tower at Sheikhan
Completed.
            60
Laying of Water Line at
Village Nandrakka
Completed.
            61
Compressor Foundation at
Sadqal
Completed.
            62
Renovation of MD Office and
Entrance Lobby at Head
Office
Completed.
            63
Renovation of OGTI Room at
Islamabad
Completed.
            64
Improvement of Water
Supply Scheme (Social
Welfare) Kal Oil Field
Completed.
            65
Laying of Sand Cushion /
Supply & Installation of
Geomembrane at Chak
Naurang
Completed.
            66
Re-surfacing / Wide laying of
Access Road at Rajian#5
Completed.
            67
Hardstanding at Chak
Naurang Yard
Completed.
            68
Construction of Block at
Govt. High School Rajian
Completed.
20
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
            69
RCC Approach Road Action
yard to Main Gate
Completed.
            70
Construction of 02 Rooms for
Store Office at Chak Naurang
Completed.
            71
Rising of Boundary Wall at
Dakhni
Completed.
            72
Construction of Woven Mesh
Fencing & Watch Tower at
Chak Naurang Logistic Base
Completed.
            73
Construction of Boundary
Wall at I-9 Base Store
Completed.
            74
Construction of Civil Works
for Installation of LPG/DPR
Unit at Dakhni
Completed.
            75
Civil Work for Installation of
Bullet at Dakhni Plant
Completed.
            76
Civil Works for Well Head at
Dakhni#2
Completed.
            77
Repair of Retaining Wall
Inside Dakhni Plant
Completed.
            78 Store Shed at Dakhni Plant Completed.
21
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
            79
Earth Filling RCC Road PCC
Hardstanding at Dakhni
Plant
Completed.
            80
Bathroom with Open Space
& Boundary Wall Officers
Camp EFP-III
Completed.
            81
Semi-covered Shed at I-9
Base Store
Completed.
            82
08 Number Living Rooms at
Dakhni Colony
Completed.
            83
Glazed Tiles for Corridores &
Stairs Masood Mansion, F-8
Markaz, Islamabad
Completed.
            84
Repair of Bhal Syedan Road
under Social Welfare
Completed.
22
Works carried out by EFP-IVWorks carried out by EFP-IV
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
1
PDCW well Badar #
02
Completed 1 Work Over Job QP#21 Completed 1
Rasing of Boundary Wall at QP
Plant
Completed.
2 HRL#3 Completed 2 Work Over Job QP#32 Completed 2 Wire Mesh Fencing QP # 37 Completed.
3 HRL#4 Completed 3 Work Over QP #11
Complete
d
3
Approach Road /ROWs from
Eastern Pig Launcher station to
QP Gas Field
Completed.
4 HRL#5 Completed       4
Hard Standing Cable Tranches
QP Plant
Completed.
5 HRL#6 Completed       5 Repair of Fencing at QP plant in progress
6 HRL#7 Completed       6
Hard Standing and Parking
Shed in front of Admin Block
QP Plant
Completed.
7 HRL#8 Completed       7 Refencing of QP # 30 Completed.
8 HRL#9 Completed       8 Raised Platform at well QP# 17 Completed.
9 HRL#10 Completed       9
Construction of Office Chowkidar
Room and Store Shed at Maru#01
Completed.
10 HRL#11 Completed       10
Relocation of 50MMSCED De
Hydration at QP PEL Plant
Completed.
11 PDCW QP # 48 Completed       11
Raising & repair of approach roads 
of well sites
Completed.
23
Works carried out by EFP-IVWorks carried out by EFP-IV
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
12 PDCW ERW QP # 47 Completed       12
Flood Fighting Arrangment of
OGDCL Bund.
Carried out 
yearly.
13 PDCW Sara # 04 Completed       13
Repair & Reconstruction of QP
Internal Road
Completed.
14 PDCW QP 49-A Completed       14
Well Head Assemblies of Maru
1,2,3 Reti # 01
Completed.
15 PDCW QP#46 Completed     15 Raised Platform QP#36 Completed.
16
Civil Work related to
stacking of Rig N#03
Completed       16 Permanent Fencing QP33 Completed.
17 PDCW QP#45 Completed       17 Repair of Works QP#24 Completed.
18 PDCW HRL#06 Completed       18 Completed.
19
PDCW Hadra
(Raja#01)
Completed       19 Completed.
20 PDCW QP#35 Completed       20 Repair of Fencing at QP#23& 27 Completed.
21 PDCW QP#44 Completed       21
Relocation Pirkoh Commpressor
QP Plant
Completed.
22 PDCW Maru South # 01 Completed       22 Fencing of QP # 40 Completed.
23 PDEW QP#42 (ERW-03) Completed       23
Raising/Strengthning of
OGDCL Bund.
in progress
24
Works carried out by EFP-IVWorks carried out by EFP-IV
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
24 Reti#2 Completed        
 
 
25 Ismail#1 Completed        
 
 
26 Thal East#1 Completed        
 
 
27 ThalEast#3 In progress        
 
 
28 Thal West #1
Completed
       
 
 
25
Works carried out by EFP-VWorks carried out by EFP-V
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
1 Dhacharapur#2. Completed 1 Sona#8 Completed 1
Const. of admin building , warehouse & Sec. 
Office Building C-I Kunnar Sindh
Completed
2 Saand#01 Completed 2 Thora#4 Completed 2
Const. of foundation for de-hydration plant 
at Bobi
Completed
3 Aradin#1 Completed 3 Tando Alam#20 Completed 3
Const. Up-gradation and widening of 
Kunner-Pasaki Road Distt. Hyderabad, 
Sindh
Completed
4 Pasaki#1 Completed 4 Tando Alam#16-A Completed 4
Field development civil works at 
Dacharapur # 2 distt Hyderabad Sindh
Completed
5 Pasaki#9 Completed 5 Nim West#1 Completed 5
Const. of Water tank for drinking purpose 
Tando Alam Oil Complex Sidh Hyderabad
Completed
6 Bobi#10 Completed 6 Lashari Center #5 Completed 6 Const. of Ploice post at Sinjhoro  Completed
7 Tando Qaiser#1 Completed 7 Moolan North#1 Completed 7
Const. of Workshop Office, MP.E&I 
workshop etc. Kunnar C-2
Completed
8 Jakhro West#1 Completed 8 Tando Alam#20 Completed 8
Const. of Well Head Assembly works for 09 
wells at Sinjhoro
in progress
9
Patafi#1/Hanif 
Saddiqi#1
Completed 9 Lashari#5 Completed 9
Const. of remaining civil works at rangers 
camp at TOC Hyderabad  Sindh
Completed
10 Kunner Deep#9 Completed 10 Kunner#2 Completed 10
Const. of Mosque at Daru Plant at 
Hyderabad  Sindh
Completed
11 Manna#1 Completed 11 Thora East#1 Completed 11
Const. of social welfare dispensary at Bobi 
plant sanghar Sindh
Completed
12 Chak Dim 5 #2 Completed 12 Tando Alam#17. Completed      
13 Chak 25 C#1 Completed 13 Chak 66 North East #1 Completed      
14 Pasaki Deep #4 Completed 14 Kunner #2 Completed      
15 Saand #2 Completed 15 Thora East#1 Completed      
16 Palli Deep#1 Completed 16 Thora#6 Completed      
17 Kunner#9 Completed 17 Lashari#3 Completed      
18 Jarwar#1 Completed 18 Kunner #4 Completed      
26
Works carried out by EFP-VWorks carried out by EFP-V
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
19 Pasaki Deep#5 Completed 19 Kunner#8 Completed      
20 Pasaki #10 Completed 20 Pasakhi#7 Completed      
21 Chak 3 Dim#3 Completed 21 Kunner#5 Completed      
22 Kunner Deep#10 Completed 22 Aradin#1 Completed      
23 Sinjhoro#X-1 Completed 23 Dars Deep#1 Completed      
24 Buzdar North #2 Completed 24 Chak 2 #3 Completed      
25 Tando Allah Yar East#1. Completed 25 Sono#4 Completed      
26 Suleman#2 Completed 26 Chak 2 #2 Completed      
27 Bitrism West#2 Completed 27 Tando Alam#17. Completed      
28 Bachani#1 Completed 28 Tando Alam #18 Completed      
29 Kunner #10. Completed 29 Thora Deep#1 Completed      
30 Kunner Deep#11. Completed 30 Thora#3 Completed      
31 Pasakhi Deep #6. Completed 31 Thora#4 Completed      
32 Khewari E.L.(X-1) Completed 32 Kunner#6 Completed      
33 Kunner #11 Completed 33 Nim West #1 Completed      
34 Palli#2 Completed 34 Thora East #1 Completed      
35
Soomro#1 (Daru 
Deep#1)
Completed 35 Pasakhi North#1 Completed      
36 Dachrapur#3 Completed 36 Pali Deep#1 in progress      
37 Gundanwari#1 in progress            
E&FM Section an integral part of C&ESS Department is committed:
• To Plan, co-ordinate & execute repair & maintenance of all field machinery & equipment of the
C&ESS Department
• To provide feed back services to EFPs for smooth functioning of their field workshops & water
supply.
• To plan & co-ordinate major overhauling of the machinery/equipment at Base workshops.
• To plan & co-ordinate for smooth water supply to fields & Rigs sites.
05 Numbers Field Workshops under the administrative control of respective Party
Chiefs:
EFP-1
EFP-II
EFP-III
EFP-IV
EFP-V
02 Nos Base Workshops:
I-9 Base Workshops at Islamabad.
Karachi Base Workshop, its administrative control lies with RC Karachi.
27
WORKSHOPS:
E&FM Section
During Last 03 Years
• PERMANENT WORKS
• (Majority works done through tender after approval of Engineering Works Procedure-2013)
•
• 1- COMPLETED WORKS 40
•
• 2- UNDER CONSTRUCTION WORKS 32
•
• 3- WORKS IN TENDERING STAGE 104.
• (Bid documents, Tech. Evaluation, Fin. Evaluation,
• Competent authority approval, Contract agreement
• & Work order stage)
• 4- ANNULED / CLOSED CASES/ RETENDERED- 41
•
• TOTAL WORKS 217
•
•
• PREDRILLING ENGINEERING WORKS
• (PDEWs done through tender after approval of Engineering Works Procedure-2013)
•
• 5. Tendered & awarded PDEWs 115
• 6. TOTAL PDEWs tendered & awarded of work - 115
•
• 7. TOTAL PERMANENT & PDEWs 332
• 28
Works Processed by Contract Section
# JOBS FGCP-I FGCP-II TOTAL
QTY Cost
Million Rs
QTY Cost
Million Rs
QTY Cost
Million Rs
1 Laying of Oil & Gas Pipeline 4”, 6”, 8”, 10”, 16”, 26”,
30” (& Retrival)
273 KM 750 257 KM 861.877 530
KM’s
1612
2 Installation of well head facility 37 Nos 55 25 Nos 24.69 62 Nos 117
3 Crude storage Tanks 3000, 5000, 6000, 12000, 20000
BBLS
06 Nos 8.2 17 Nos 29.75 23 Nos 38
4 Fab / Renovation of living caravans 28 Nos 20 -- -- 28 Nos 20
5 Installation of CO2 removal plant / glycol unit / tie-in
of compressor
-- -- 03 Nos 17.812 03 Nos 17.812
6 ATA’s 06 Nos 34 09 Nos 3.962 15 Nos 38
7 Installation of separation batteries (HP/MP/LP) 12 Nos
80
14 Nos
90
26 Nos
170
8 Misc Pipeline repair, installation of knock out vessels,
gathering headers, steel structures, pipe supports
200 Nos 76 Nos 276
Nos
Total
Rs 2013
Million
# JOBS QTY Cost Rs
(Million)
1 Installation of Flow line 56 KM’s 424
2 Well Head Assembly 10 Nos 15
3 Repair of Storage Tank 06 Nos 32
4 Relocation of Flare stack 01 Job 1.5
5 Repair / Renovation of Living Caravans 05 Nos 4.0
Total 476.5
During Last 03 Years
• PERMANENT WORKS
• (Majority works done through tender after approval of Engineering Works Procedure-2013)
•
• 1- COMPLETED WORKS 40
•
• 2- UNDER CONSTRUCTION WORKS 32
•
• 3- WORKS IN TENDERING STAGE 104.
• (Bid documents, Tech. Evaluation, Fin. Evaluation,
• Competent authority approval, Contract agreement
• & Work order stage)
• 4- ANNULED / CLOSED CASES/ RETENDERED- 41
•
• TOTAL WORKS 217
•
•
• PREDRILLING ENGINEERING WORKS
• (PDEWs done through tender after approval of Engineering Works Procedure-2013)
•
• 5. Tendered & awarded PDEWs 115
• 6. TOTAL PDEWs tendered & awarded of work - 115
•
• 7. TOTAL PERMANENT & PDEWs 332
• 31
Works Processed by Contract Section
STATE OF FIELD MACHINERY / EQUIPMENT
32
Bulldozers = 18 No
Motor Graders = 10 No
Shovel Loaders = 08 No
Road Rollers = 08 No
Farm Tractors = 12 No
Fork Lifter = 05 No
Water Drilling Rigs = 02 No
Generators = 24 No
Welding Plants = 21 No
Prime movers with trailers = 08 No
Dumpers = 21 No
Water Bouzers = 25 No
Trucks = 18 No
Double cabin Pickups = 08 No
Gaso Pumps = 54 No
Misc Water pumps = 57 No
Crane Mounted Trucks = 05 No
Light Trucks 4x2 = 12 No
Total = 316 No
IssuesIssues
S. No Issues Solution
1. Identification of locations
and land acquisition.
Timely identification & un-conditional
acquisition of land to start civil works.
2. Approval of AFEs. Quick approval for timely remittance of
funds for execution of works.
3. Shortage of equipment
base.
Strengthen equipment base by induction
of new machines and through hiring
where possible.
4. Shortage of qualified
engineers and
supervisory staff.
Induction of Engineers/Techs. When the
situation permits.
5. Lack of motivation. Transparent career planning of
engineers.
6. Financial discipline in
field parties.
Monthly audit of field imprest.
33
Supply of water to Production sites = 08.93 million gallons monthly
Supply of water to Process & Plants = 76.11 million gallons monthly
Supply of water to Drilling sites = 19.22 million gallons monthly
Total water supplied for one month =104.26 million gallons
Water Supply SectionWater Supply Section
34
35
Vehicle Repaired at I-9 &KBW Base WorkshopVehicle Repaired at I-9 &KBW Base Workshop
S. No. Period Service Minor
Repair
Major
Repair
Engine
Overhauling
1 2011 – 2012 1177 1279 37 05
2 2012 –2013 982 1082 18 05
3 2013 – 2014 929 1036 18 06
4 2014 – 2015 971 1102 17 02
5 2015 - 2016 849 889 13 03
Total 4908 5388 103 21

More Related Content

What's hot

Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015Keith Vary
 
cvPaoloAguzziNov16
cvPaoloAguzziNov16cvPaoloAguzziNov16
cvPaoloAguzziNov16Paolo Aguzzi
 
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16bill ure
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand Dhawan
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran
 
Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)Eduardo Parisca
 
finished lgo report
finished lgo reportfinished lgo report
finished lgo reportbelgin twist
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docMuthukumar RajaGounder
 
Cu-Boil Pot Upgrade - Closeout Presentation Rev2a
Cu-Boil Pot Upgrade - Closeout Presentation Rev2aCu-Boil Pot Upgrade - Closeout Presentation Rev2a
Cu-Boil Pot Upgrade - Closeout Presentation Rev2aBrandon Smith
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016Rolando Garcia
 

What's hot (19)

GEC presentation
GEC  presentationGEC  presentation
GEC presentation
 
CV -mosleh
CV -moslehCV -mosleh
CV -mosleh
 
RS Darwent pdf
RS Darwent pdfRS Darwent pdf
RS Darwent pdf
 
Curriculum Vitae - Rama Narayana Murty
Curriculum Vitae - Rama Narayana MurtyCurriculum Vitae - Rama Narayana Murty
Curriculum Vitae - Rama Narayana Murty
 
Resume KV 2015
Resume KV 2015Resume KV 2015
Resume KV 2015
 
cvPaoloAguzziNov16
cvPaoloAguzziNov16cvPaoloAguzziNov16
cvPaoloAguzziNov16
 
Leslie Banks 2016
Leslie Banks 2016Leslie Banks 2016
Leslie Banks 2016
 
CeeVee-13th January 2017_update
CeeVee-13th January 2017_updateCeeVee-13th January 2017_update
CeeVee-13th January 2017_update
 
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16
 
Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)Anand CV (latest Nov 2016)
Anand CV (latest Nov 2016)
 
Husin Asran_Nov'16
Husin Asran_Nov'16Husin Asran_Nov'16
Husin Asran_Nov'16
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)Eduardo parisca resume (rev 07tier)
Eduardo parisca resume (rev 07tier)
 
finished lgo report
finished lgo reportfinished lgo report
finished lgo report
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
 
Pradeep s (resume)
Pradeep s (resume)Pradeep s (resume)
Pradeep s (resume)
 
Cu-Boil Pot Upgrade - Closeout Presentation Rev2a
Cu-Boil Pot Upgrade - Closeout Presentation Rev2aCu-Boil Pot Upgrade - Closeout Presentation Rev2a
Cu-Boil Pot Upgrade - Closeout Presentation Rev2a
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 

Viewers also liked

Designing the Instructional Messages
Designing the Instructional MessagesDesigning the Instructional Messages
Designing the Instructional MessagesMawar Magenta
 
2017 Ford Fusion near Wilmington | DE Ford ^
2017 Ford Fusion near Wilmington | DE Ford ^2017 Ford Fusion near Wilmington | DE Ford ^
2017 Ford Fusion near Wilmington | DE Ford ^Carman Ford
 
421W Final_Report graphics
421W Final_Report graphics421W Final_Report graphics
421W Final_Report graphicsJikun Lian EIT
 
Herramientas WEB 2.0
Herramientas WEB 2.0Herramientas WEB 2.0
Herramientas WEB 2.0Jesus Lopez
 
French mathematical activities from Poland
French mathematical activities from PolandFrench mathematical activities from Poland
French mathematical activities from Polandmassillonprimaire
 
Direct Marketing | Maximize response rate, engagement and ROI.
Direct Marketing | Maximize response rate, engagement and ROI. Direct Marketing | Maximize response rate, engagement and ROI.
Direct Marketing | Maximize response rate, engagement and ROI. John Fischbeck
 

Viewers also liked (9)

Biosensorppt2
Biosensorppt2Biosensorppt2
Biosensorppt2
 
Designing the Instructional Messages
Designing the Instructional MessagesDesigning the Instructional Messages
Designing the Instructional Messages
 
Microscope(222)
Microscope(222)Microscope(222)
Microscope(222)
 
2017 Ford Fusion near Wilmington | DE Ford ^
2017 Ford Fusion near Wilmington | DE Ford ^2017 Ford Fusion near Wilmington | DE Ford ^
2017 Ford Fusion near Wilmington | DE Ford ^
 
421W Final_Report graphics
421W Final_Report graphics421W Final_Report graphics
421W Final_Report graphics
 
Herramientas WEB 2.0
Herramientas WEB 2.0Herramientas WEB 2.0
Herramientas WEB 2.0
 
Workshop post Turquie
Workshop post TurquieWorkshop post Turquie
Workshop post Turquie
 
French mathematical activities from Poland
French mathematical activities from PolandFrench mathematical activities from Poland
French mathematical activities from Poland
 
Direct Marketing | Maximize response rate, engagement and ROI.
Direct Marketing | Maximize response rate, engagement and ROI. Direct Marketing | Maximize response rate, engagement and ROI.
Direct Marketing | Maximize response rate, engagement and ROI.
 

Similar to Construction and Engineering Support Services Department Overview

CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONcyberyogi07
 
Curriculum vitae 2016
Curriculum vitae 2016Curriculum vitae 2016
Curriculum vitae 2016Burger Rust
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley ParsonsShane Reynolds
 
Copy of Abcede Solidanio (1)
Copy of Abcede Solidanio (1)Copy of Abcede Solidanio (1)
Copy of Abcede Solidanio (1)Abcede Solidanio
 
Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Wael Nafad
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyMike Bisland
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingVDOT Northern Virginia
 
SYED NAVEED AHMED 1
SYED NAVEED AHMED 1SYED NAVEED AHMED 1
SYED NAVEED AHMED 1naveed ahmed
 
Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASHRavi Prakash
 
Abdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber
 
A Tunnel Under Geylang River, The Story of Geylang River Diversion
A Tunnel Under Geylang River, The Story of Geylang River DiversionA Tunnel Under Geylang River, The Story of Geylang River Diversion
A Tunnel Under Geylang River, The Story of Geylang River DiversionSingapore Power Ltd
 

Similar to Construction and Engineering Support Services Department Overview (20)

DURBAN PORT COMMITTEE - 20 April
 DURBAN PORT COMMITTEE - 20 April DURBAN PORT COMMITTEE - 20 April
DURBAN PORT COMMITTEE - 20 April
 
Monthly Progress Report - September 2014
Monthly Progress Report - September 2014Monthly Progress Report - September 2014
Monthly Progress Report - September 2014
 
CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATION
 
jahangir
jahangirjahangir
jahangir
 
Esr 01 & esr-02 closing meeting
Esr 01 & esr-02 closing meetingEsr 01 & esr-02 closing meeting
Esr 01 & esr-02 closing meeting
 
the_CV-t
the_CV-tthe_CV-t
the_CV-t
 
Curriculum vitae 2016
Curriculum vitae 2016Curriculum vitae 2016
Curriculum vitae 2016
 
shane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsonsshane Reynolds - CV Worley Parsons
shane Reynolds - CV Worley Parsons
 
Sunil resume
Sunil resumeSunil resume
Sunil resume
 
Copy of Abcede Solidanio (1)
Copy of Abcede Solidanio (1)Copy of Abcede Solidanio (1)
Copy of Abcede Solidanio (1)
 
Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03Faisalaiah project (english) 3 REV.03
Faisalaiah project (english) 3 REV.03
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE Navy
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meeting
 
Factory built substation case study
Factory built substation case studyFactory built substation case study
Factory built substation case study
 
ahmed cv finall ing
ahmed cv finall ingahmed cv finall ing
ahmed cv finall ing
 
SYED NAVEED AHMED 1
SYED NAVEED AHMED 1SYED NAVEED AHMED 1
SYED NAVEED AHMED 1
 
status report.pdf
status report.pdfstatus report.pdf
status report.pdf
 
Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASH
 
Abdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrsAbdullah Jaber Civil Eng CV EXP. 5 yrs
Abdullah Jaber Civil Eng CV EXP. 5 yrs
 
A Tunnel Under Geylang River, The Story of Geylang River Diversion
A Tunnel Under Geylang River, The Story of Geylang River DiversionA Tunnel Under Geylang River, The Story of Geylang River Diversion
A Tunnel Under Geylang River, The Story of Geylang River Diversion
 

Recently uploaded

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 

Recently uploaded (20)

SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 

Construction and Engineering Support Services Department Overview

  • 1. 1
  • 2. May , 2016 2 CONSTRUCTION ANDCONSTRUCTION AND ENGINEERING SUPPORTENGINEERING SUPPORT SERVICES DEPARTMENTSERVICES DEPARTMENT
  • 3. INTRODUCTION 3 C&ESS Department is responsible to provide Civil construction, Field Gathering lines & Mechanical fabrication services to Drilling, Production, Process, Store & other client Departments. Two Division: 1- Civil Engineering 2- Mechanical Engineering
  • 4. 1. Pre-Drilling Civil Works. 2. Metalled Roads, Field Roads & Right of Ways 3. Field Camps, Boundary Walls & Fencing 4. Ware Houses, Workshops, Storage sheds etc. 5. Dispensaries 6. Water Supply Systems, Water & Sewage Treatment Plants 7. Laying of Gathering Lines 8. Fabrication and installation of Well Head Assemblies. 9. Installations for Pig Launching Assemblies 10. Fabrication and repair of Oil Storage Tanks and Caravans. 11. Maintenance of baseline field machinery. FunctionsFunctions 4
  • 5. 5 Cost estimates are based on MES Schedule of Rates. Engineering Works Procedure: • Cost estimate and AFE approvals. • Tender documents preparation and contract administration. • Departmental works utilizing available resources. • Procurement of material & services as per PPRA & PEC. Working MethodologyWorking Methodology
  • 6. CIVIL ENGINEERINGCIVIL ENGINEERING Civil Engineering consists of Three sections 1.Engineering Operations North • Engineering Field Party No. 2 • Engineering Field Party No. 3 2.Engineering Operations South • Engineering Field No. 1 • Engineering Field No. 4 • Engineering Field No. 5 3.Contracts & Consultancy Services 6 Mechanical Engineering consists of two sections 1.Equipment and Field Machinery • Workshop and Transport Section • Base Workshop, I-9, Islamabad • Base Workshop, KBW, Karachi 2.Fabrication and Pipeline • Field Gathering Construction Party No. 1 • Field Gathering Constuction Party No. 2 MECHANICAL ENGINEERINGMECHANICAL ENGINEERING
  • 7. Party Location District Province EFP-1 Uch Dera Bugti Baluchistan EFP-2 Kot Adu Muzaffar Garh Punjab EFP-3 Fateh Jang Attock Punjab EFP-4 Qadirpur Ghotki Sindh EFP-5 Hyderabad Hyderabad Sindh FGCP-1 Multan Multan Punjab FGCP-2 Hyderabad Hyderabad Sindh Present Locations of EFPs and FGCPsPresent Locations of EFPs and FGCPs 7
  • 8. 8 ENGG.WORKS DETAILENGG.WORKS DETAIL Pre Drilling Engineering Works Description 2011-12 2012-13 2013-14 2014-15 2015-16 Completed 20 22 22 24 28 In progress - - - - 9 In Tender process - - - 2
  • 9. 9 ENGG.WORKS DETAILENGG.WORKS DETAIL Civil Works for Work Over Jobs Description 2011-12 2012-13 2013-14 2014-15 2015-16 Completed 8 7 5 14 16 In progress - - - - 2 In Tender process - - - - 3
  • 10. 10 Works carried out by EFP-IWorks carried out by EFP-I During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks 1 Nashpa#4 Completed 1 Kal#2 Complete. 1 Permanent Fencing at Nashpa#1. Completed. 2 Nashpa#5 Completed 2 Kal#3 Complete. 2 Permanent Fencing at Nashpa#2. Completed. 3 Nashpa#6 Completed 3 Missa Kiswal#3 Complete. 3 Permanent Fencing at Nashpa#4. Completed. 4 Nashpa#7 Completed 4 Chak Naurang#5A Complete. 4 Well operator and security guard room at Nashpa#4. Completed. 5 Mela#4 Completed 5 Chak Naurang South#1 5 PCC hardstanding at stock material at Nashpa. Completed. 6 Mela#5 in progress 6 Rajian#1 in progress 6 F.C. accomodation at Nashpa. Completed. 7 Chanda#4 in progress 7 Rajian#4A Complete. 7 Internal Road at Nashpa. Completed. 8 Shawa#1 Completed 8 Rajian#2 in progress 8 RCC Boundary wall at Nashpa. Completed. 9 Naurang Shah#1 Completed 9 Field development works at Nashpa. Completed. 10 Kurrum#1 Completed 10 Hardstanding for extension of existing filling gantry. Completed. 11 Shaikhanwala#1 Completed 11 RCC Water storage tank at Nashpa. Completed. 12 Surqamar#1 Completed 12 Temporary camps construction for LPG plant extension at Nashpa Completed. 13 Khawaja#1 (Re-entry) Completed 13 Fencing and watch towers at plant extension area at Nashpa. Completed. 14 Kohat#1 Completed 14 API pit/Skimmer tank at Nashpa. in progress
  • 11. 11 Works carried out by EFP-IWorks carried out by EFP-I During Last 05 Years 15 Jabbi#1 Completed 15 Pre-casted wall at LPG plant area at Nashpa. Completed. 16 Jand#1 Completed 16 Double gate, road blocker and hydraulic barrier at Nashpa. Completed. 17 Jand#2 Completed 17 Dyke walls and flooring around crude storage tanks at Nashpa. Completed. 18 Dakhni Deep #5. Completed 18 Admin building at Nashpa. Completed. 19 Dakhni#7 Completed 19 02 class rooms with veranda for Govt. Primary School at Awaji Banada, Nashpa. Completed. 20 Dakhni#8 Completed 20 One way road and parking shed at Nashpa. in progress 21 Dakhni#12 Completed 21 Infra structure works at Chanda. Completed. 22 Ajuwala#1 Completed 22 Internal road at Mela. Completed. 23 Soghari#1 Completed 23 TST of internal roads at Chanda. Completed. 24 Soghari#2 Completed 24 Production office building at Dakhni. Completed. 25 Chak Naurang# X-1 Completed 25 Plice Check Post at Dakhni well #3. Completed. 26 Rajian#6 Completed 26 Metalled road (7Km) from Social welfare dispensary to Dakhni #6. Completed. 27 Rajian#7 Completed 27 RCC Hardstanding for Logistic work shop area at Kot Sarang. Completed.
  • 12. 12 Works carried out by EFP-IIWorks carried out by EFP-II During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks 1 Kup#1 Completed 1 Bahu#5 Completed. 1 Construction of metal road, boundry wall & cement concrete stone paving, additional work for annaxe at R.O Multan Completed 2 Kalchas#1 Completed 2 Bahu#7 Completed. 2 Construction of hard standing(flooring) at kot addu field store Completed 3 Bahu#5 Completed 3 Punjpir Completed. 3 Repair of fencing at Bahu-5,6,7,8 Completed 4 Bahu#6 Completed 4 Pre-drilling civil work at Barkat wala(Heto) Completed 5 Bahu#7 Completed 5 Water supply scheme for locals at kalchas Completed 6 Bahu#8 Completed 6 Evaporation pond at SS Well no 1 Completed 7 Sohni wala No-1 Completed 7 Construction of officer rest house Annexe at R.O Multan Completed 8 Dhodak Deep #2 A Completed 8 Renovation of banglow A-1 officer rest house kotaddu field Completed 9 Dhodak Deep #1 Completed 9 Construction of engine driver room at kotaddu log field,hard standing and roof treatment of Masjid Completed 10 Muhammad test well No-1(multan north -1) Completed 10 Blasting/removing of crocked mountain along approach road near chapper DDK field. Completed 11 DDk Rubly x-1 in progress 11 Repair and mantenence of store shed at kotaddu field. Completed
  • 13. 13 Works carried out by EFP-IIWorks carried out by EFP-II During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks 12 Renovation/partition of banglow B- 2 at log field kotaddu Completed 13 Urgent construction of security post,rooms for BMP one at mari top dera bugti. Completed 14 Tuff tiles at nandpur/punjpeer dehydration plant Completed 15 Boundry wall at ss-1 nandpur Completed 16 Re construction of boundry wall at RO-Multan Completed 17 Const of metal road shujabaad canal at ss-1 nandpur Completed 18 Distemper/weather shield paint officer & camp building(EFP_2) Completed 19 Tiles flooring for staff transit camp at RO-multan Completed 20 Dismentling of punjpeer Completed 21 Comst of hardstanding around admin building efp-2 kotaddu Completed 22 Const of washroom at bahu-2 Completed 23 Re-habitation of admin block log- field kotaddu Completed 24 Civil work of const of masjid at dhodak colony multan Completed 25 Renovation work of staff and officer transit camp at RO- multan Completed 26 Bahu well no 4 bahu gas field develment at bahu well no 4 hydraulic work Completed
  • 14. 14 Works carried out by EFP-IIIWorks carried out by EFP-III During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks 1 Nashpa#4 Completed 1 Kal#2 Complete. 1 Permanent Fencing at Nashpa#1. Completed. 2 Nashpa#5 Completed 2 Kal#3 Complete. 2 Permanent Fencing at Nashpa#2. Completed. 3 Nashpa#6 Completed 3 Missa Kiswal#3 Complete. 3 Permanent Fencing at Nashpa#4. Completed. 4 Nashpa#7 Completed 4 Chak Naurang#5A Complete. 4 Well operator and security guard room at Nashpa#4. Completed. 5 Mela#4 Completed 5 Chak Naurang South#1 5 PCC hardstanding at stock material at Nashpa. Completed. 6 Mela#5 in progress 6 Rajian#1 Completed. 6 F.C. accomodation at Nashpa. Completed. 7 Chanda#4 in progress 7 Rajian#4A Completed 7 Internal Road at Nashpa. Completed. 8 Shawa#1 Completed 8 Rajian#2 in progress 8 RCC Boundary wall at Nashpa. Completed. 9 Naurang Shah#1 Completed 9 Field development works at Nashpa. Completed. 10 Kurrum#1 Completed 10 Hardstanding for extension of existing filling gantry. Completed. 11 Shaikhanwala#1 Completed 11 RCC Water storage tank at Nashpa. Completed. 12 Surqamar#1 Completed 12 Temporary camps construction for LPG plant extension at Nashpa Completed. 13 Khawaja#1 (Re-entry) Completed 13 Fencing and watch towers at plant extension area at Nashpa. Completed. 14 Kohat#1 Completed 14 API pit/Skimmer tank at Nashpa. in progress
  • 15. 15 Works carried out by EFP-IIIWorks carried out by EFP-III During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks 15 Jabbi#1 Completed 15 Pre-casted wall at LPG plant area at Nashpa. Completed. 16 Jand#1 Completed 16 Double gate, road blocker and hydraulic barrier at Nashpa. Completed. 17 Jand#2 Completed 17 Dyke walls and flooring around crude storage tanks at Nashpa. Completed. 18 Dakhni Deep #5. Completed 18 Admin building at Nashpa. Completed. 19 Dakhni#7 Completed 19 02 class rooms with veranda for Govt. Primary School at Awaji Banada, Nashpa. Completed. 20 Dakhni#8 Completed 20 One way road and parking shed at Nashpa. in progress 21 Dakhni#12 Completed 21 Infra structure works at Chanda. Completed. 22 Ajuwala#1 Completed 22 Internal road at Mela. Completed. 23 Soghari#1 Completed 23 TST of internal roads at Chanda. Completed. 24 Soghari#2 Completed 24 Production office building at Dakhni. Completed. 25 Chak Naurang# X-1 Completed 25 Plice Check Post at Dakhni well #3. Completed. 26 Rajian#6 Completed 26 Metalled road (7Km) from Social welfare dispensary to Dakhni #6. Completed. 27 Rajian#7 Completed 27 RCC Hardstanding for Logistic work shop area at Kot Sarang. Completed.
  • 16. 16 Works carried out by EFP-IIIWorks carried out by EFP-III During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks 28 Rajian#8 Completed 28 Crude storage tanks foundation and dyke walls at Rajian#5. Completed. 29 Rajian#9 Completed 29 Extension in social welfare dispansary at Rajian. Completed. 30 Govt. Rural Dispansary, at Dina, Jehlum. Completed. 31 Repair/maintenance of road from Mohri Rajgan to Chak Treda at Jehlum. Completed. 32 Repair of main road to Rajian Oil Field. Completed. 33 Hard standing around weigh bridge and RCC culvert at Mela. Completed. 34 Cosndtruction of weigh bridge foundation at Mela. Completed. 35 Cosndtruction of weigh bridge foundation at Nashpa Completed. 36 Cosndtruction of weigh bridge foundation at Rajian. Completed. 37 New waste pit with skimmer tank at Kal. Completed. 38 Repair/upgradation of road from Shakardra to Kharapa More, Kohat. Completed. 39 Worshop shed at Dakhni. Completed. 40 Store shed at Dakhni. in progress
  • 17. 17 Works carried out by EFP-IIIWorks carried out by EFP-III During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks 41 New residential rooms at Rajian. in progress 42 Const. of civil works for utilization of weigh bridge at Rajian. in progress 43 Improvement of existing Tarally Bridge Road at Chanda. in progress 44 Supply of utility water at Nashpa Plant for year 2014. in progress 45 Supply of utility water at Nashpa Plant for year 2015. Completed. 46 Construction of dyke wall and PCC hardstanding for crude storage tanks at Mela. Completed. 47 Construction of RCC hard standing for installation of 20000 BPD Capacity new Separation Battery at Nashpa Completed. 48 Construction of internal Road at chanda plant Completed. 49 Repair of (0.8 km)Road at Ratta Mohara Rajian oil field. Completed. 50 Modification of New store shed at dakhni Plant. Completed.
  • 18. 18 Works carried out by EFP-IIIWorks carried out by EFP-III During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks 51 Construction of One Rcc under ground water reservior at water source Mela # 01 Completed. 52 Construction of well Operator and security Guard Rooms at Nashpa well # 03. Completed. 53 Construction of Foundation for Proplane Bullet at Chanda Plant Completed. 54 Concrete Flooring at Chanda Plant Completed. 55 New Dehydration Plant at Nashpa Completed. 56 Construction of Room for Mechanical at Chanda Plant Completed. 57 Civil Works for Re- installation of TOC at Sheikhan Plant Completed. 58 Construction of Building of Mela Dehydration Plant Completed.
  • 19. 19 Works carried out by EFP-IIIWorks carried out by EFP-III During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks             59 Construction of Boundary Wall & Provision of steel Stairs for Watch Tower at Sheikhan Completed.             60 Laying of Water Line at Village Nandrakka Completed.             61 Compressor Foundation at Sadqal Completed.             62 Renovation of MD Office and Entrance Lobby at Head Office Completed.             63 Renovation of OGTI Room at Islamabad Completed.             64 Improvement of Water Supply Scheme (Social Welfare) Kal Oil Field Completed.             65 Laying of Sand Cushion / Supply & Installation of Geomembrane at Chak Naurang Completed.             66 Re-surfacing / Wide laying of Access Road at Rajian#5 Completed.             67 Hardstanding at Chak Naurang Yard Completed.             68 Construction of Block at Govt. High School Rajian Completed.
  • 20. 20 Works carried out by EFP-IIIWorks carried out by EFP-III During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks             69 RCC Approach Road Action yard to Main Gate Completed.             70 Construction of 02 Rooms for Store Office at Chak Naurang Completed.             71 Rising of Boundary Wall at Dakhni Completed.             72 Construction of Woven Mesh Fencing & Watch Tower at Chak Naurang Logistic Base Completed.             73 Construction of Boundary Wall at I-9 Base Store Completed.             74 Construction of Civil Works for Installation of LPG/DPR Unit at Dakhni Completed.             75 Civil Work for Installation of Bullet at Dakhni Plant Completed.             76 Civil Works for Well Head at Dakhni#2 Completed.             77 Repair of Retaining Wall Inside Dakhni Plant Completed.             78 Store Shed at Dakhni Plant Completed.
  • 21. 21 Works carried out by EFP-IIIWorks carried out by EFP-III During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks             79 Earth Filling RCC Road PCC Hardstanding at Dakhni Plant Completed.             80 Bathroom with Open Space & Boundary Wall Officers Camp EFP-III Completed.             81 Semi-covered Shed at I-9 Base Store Completed.             82 08 Number Living Rooms at Dakhni Colony Completed.             83 Glazed Tiles for Corridores & Stairs Masood Mansion, F-8 Markaz, Islamabad Completed.             84 Repair of Bhal Syedan Road under Social Welfare Completed.
  • 22. 22 Works carried out by EFP-IVWorks carried out by EFP-IV During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks 1 PDCW well Badar # 02 Completed 1 Work Over Job QP#21 Completed 1 Rasing of Boundary Wall at QP Plant Completed. 2 HRL#3 Completed 2 Work Over Job QP#32 Completed 2 Wire Mesh Fencing QP # 37 Completed. 3 HRL#4 Completed 3 Work Over QP #11 Complete d 3 Approach Road /ROWs from Eastern Pig Launcher station to QP Gas Field Completed. 4 HRL#5 Completed       4 Hard Standing Cable Tranches QP Plant Completed. 5 HRL#6 Completed       5 Repair of Fencing at QP plant in progress 6 HRL#7 Completed       6 Hard Standing and Parking Shed in front of Admin Block QP Plant Completed. 7 HRL#8 Completed       7 Refencing of QP # 30 Completed. 8 HRL#9 Completed       8 Raised Platform at well QP# 17 Completed. 9 HRL#10 Completed       9 Construction of Office Chowkidar Room and Store Shed at Maru#01 Completed. 10 HRL#11 Completed       10 Relocation of 50MMSCED De Hydration at QP PEL Plant Completed. 11 PDCW QP # 48 Completed       11 Raising & repair of approach roads  of well sites Completed.
  • 23. 23 Works carried out by EFP-IVWorks carried out by EFP-IV During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks 12 PDCW ERW QP # 47 Completed       12 Flood Fighting Arrangment of OGDCL Bund. Carried out  yearly. 13 PDCW Sara # 04 Completed       13 Repair & Reconstruction of QP Internal Road Completed. 14 PDCW QP 49-A Completed       14 Well Head Assemblies of Maru 1,2,3 Reti # 01 Completed. 15 PDCW QP#46 Completed     15 Raised Platform QP#36 Completed. 16 Civil Work related to stacking of Rig N#03 Completed       16 Permanent Fencing QP33 Completed. 17 PDCW QP#45 Completed       17 Repair of Works QP#24 Completed. 18 PDCW HRL#06 Completed       18 Completed. 19 PDCW Hadra (Raja#01) Completed       19 Completed. 20 PDCW QP#35 Completed       20 Repair of Fencing at QP#23& 27 Completed. 21 PDCW QP#44 Completed       21 Relocation Pirkoh Commpressor QP Plant Completed. 22 PDCW Maru South # 01 Completed       22 Fencing of QP # 40 Completed. 23 PDEW QP#42 (ERW-03) Completed       23 Raising/Strengthning of OGDCL Bund. in progress
  • 24. 24 Works carried out by EFP-IVWorks carried out by EFP-IV During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks 24 Reti#2 Completed             25 Ismail#1 Completed             26 Thal East#1 Completed             27 ThalEast#3 In progress             28 Thal West #1 Completed            
  • 25. 25 Works carried out by EFP-VWorks carried out by EFP-V During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks 1 Dhacharapur#2. Completed 1 Sona#8 Completed 1 Const. of admin building , warehouse & Sec.  Office Building C-I Kunnar Sindh Completed 2 Saand#01 Completed 2 Thora#4 Completed 2 Const. of foundation for de-hydration plant  at Bobi Completed 3 Aradin#1 Completed 3 Tando Alam#20 Completed 3 Const. Up-gradation and widening of  Kunner-Pasaki Road Distt. Hyderabad,  Sindh Completed 4 Pasaki#1 Completed 4 Tando Alam#16-A Completed 4 Field development civil works at  Dacharapur # 2 distt Hyderabad Sindh Completed 5 Pasaki#9 Completed 5 Nim West#1 Completed 5 Const. of Water tank for drinking purpose  Tando Alam Oil Complex Sidh Hyderabad Completed 6 Bobi#10 Completed 6 Lashari Center #5 Completed 6 Const. of Ploice post at Sinjhoro  Completed 7 Tando Qaiser#1 Completed 7 Moolan North#1 Completed 7 Const. of Workshop Office, MP.E&I  workshop etc. Kunnar C-2 Completed 8 Jakhro West#1 Completed 8 Tando Alam#20 Completed 8 Const. of Well Head Assembly works for 09  wells at Sinjhoro in progress 9 Patafi#1/Hanif  Saddiqi#1 Completed 9 Lashari#5 Completed 9 Const. of remaining civil works at rangers  camp at TOC Hyderabad  Sindh Completed 10 Kunner Deep#9 Completed 10 Kunner#2 Completed 10 Const. of Mosque at Daru Plant at  Hyderabad  Sindh Completed 11 Manna#1 Completed 11 Thora East#1 Completed 11 Const. of social welfare dispensary at Bobi  plant sanghar Sindh Completed 12 Chak Dim 5 #2 Completed 12 Tando Alam#17. Completed       13 Chak 25 C#1 Completed 13 Chak 66 North East #1 Completed       14 Pasaki Deep #4 Completed 14 Kunner #2 Completed       15 Saand #2 Completed 15 Thora East#1 Completed       16 Palli Deep#1 Completed 16 Thora#6 Completed       17 Kunner#9 Completed 17 Lashari#3 Completed       18 Jarwar#1 Completed 18 Kunner #4 Completed      
  • 26. 26 Works carried out by EFP-VWorks carried out by EFP-V During Last 05 Years PDEW Work Over Job at Field Development Works S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks 19 Pasaki Deep#5 Completed 19 Kunner#8 Completed       20 Pasaki #10 Completed 20 Pasakhi#7 Completed       21 Chak 3 Dim#3 Completed 21 Kunner#5 Completed       22 Kunner Deep#10 Completed 22 Aradin#1 Completed       23 Sinjhoro#X-1 Completed 23 Dars Deep#1 Completed       24 Buzdar North #2 Completed 24 Chak 2 #3 Completed       25 Tando Allah Yar East#1. Completed 25 Sono#4 Completed       26 Suleman#2 Completed 26 Chak 2 #2 Completed       27 Bitrism West#2 Completed 27 Tando Alam#17. Completed       28 Bachani#1 Completed 28 Tando Alam #18 Completed       29 Kunner #10. Completed 29 Thora Deep#1 Completed       30 Kunner Deep#11. Completed 30 Thora#3 Completed       31 Pasakhi Deep #6. Completed 31 Thora#4 Completed       32 Khewari E.L.(X-1) Completed 32 Kunner#6 Completed       33 Kunner #11 Completed 33 Nim West #1 Completed       34 Palli#2 Completed 34 Thora East #1 Completed       35 Soomro#1 (Daru  Deep#1) Completed 35 Pasakhi North#1 Completed       36 Dachrapur#3 Completed 36 Pali Deep#1 in progress       37 Gundanwari#1 in progress            
  • 27. E&FM Section an integral part of C&ESS Department is committed: • To Plan, co-ordinate & execute repair & maintenance of all field machinery & equipment of the C&ESS Department • To provide feed back services to EFPs for smooth functioning of their field workshops & water supply. • To plan & co-ordinate major overhauling of the machinery/equipment at Base workshops. • To plan & co-ordinate for smooth water supply to fields & Rigs sites. 05 Numbers Field Workshops under the administrative control of respective Party Chiefs: EFP-1 EFP-II EFP-III EFP-IV EFP-V 02 Nos Base Workshops: I-9 Base Workshops at Islamabad. Karachi Base Workshop, its administrative control lies with RC Karachi. 27 WORKSHOPS: E&FM Section
  • 28. During Last 03 Years • PERMANENT WORKS • (Majority works done through tender after approval of Engineering Works Procedure-2013) • • 1- COMPLETED WORKS 40 • • 2- UNDER CONSTRUCTION WORKS 32 • • 3- WORKS IN TENDERING STAGE 104. • (Bid documents, Tech. Evaluation, Fin. Evaluation, • Competent authority approval, Contract agreement • & Work order stage) • 4- ANNULED / CLOSED CASES/ RETENDERED- 41 • • TOTAL WORKS 217 • • • PREDRILLING ENGINEERING WORKS • (PDEWs done through tender after approval of Engineering Works Procedure-2013) • • 5. Tendered & awarded PDEWs 115 • 6. TOTAL PDEWs tendered & awarded of work - 115 • • 7. TOTAL PERMANENT & PDEWs 332 • 28 Works Processed by Contract Section
  • 29. # JOBS FGCP-I FGCP-II TOTAL QTY Cost Million Rs QTY Cost Million Rs QTY Cost Million Rs 1 Laying of Oil & Gas Pipeline 4”, 6”, 8”, 10”, 16”, 26”, 30” (& Retrival) 273 KM 750 257 KM 861.877 530 KM’s 1612 2 Installation of well head facility 37 Nos 55 25 Nos 24.69 62 Nos 117 3 Crude storage Tanks 3000, 5000, 6000, 12000, 20000 BBLS 06 Nos 8.2 17 Nos 29.75 23 Nos 38 4 Fab / Renovation of living caravans 28 Nos 20 -- -- 28 Nos 20 5 Installation of CO2 removal plant / glycol unit / tie-in of compressor -- -- 03 Nos 17.812 03 Nos 17.812 6 ATA’s 06 Nos 34 09 Nos 3.962 15 Nos 38 7 Installation of separation batteries (HP/MP/LP) 12 Nos 80 14 Nos 90 26 Nos 170 8 Misc Pipeline repair, installation of knock out vessels, gathering headers, steel structures, pipe supports 200 Nos 76 Nos 276 Nos Total Rs 2013 Million
  • 30. # JOBS QTY Cost Rs (Million) 1 Installation of Flow line 56 KM’s 424 2 Well Head Assembly 10 Nos 15 3 Repair of Storage Tank 06 Nos 32 4 Relocation of Flare stack 01 Job 1.5 5 Repair / Renovation of Living Caravans 05 Nos 4.0 Total 476.5
  • 31. During Last 03 Years • PERMANENT WORKS • (Majority works done through tender after approval of Engineering Works Procedure-2013) • • 1- COMPLETED WORKS 40 • • 2- UNDER CONSTRUCTION WORKS 32 • • 3- WORKS IN TENDERING STAGE 104. • (Bid documents, Tech. Evaluation, Fin. Evaluation, • Competent authority approval, Contract agreement • & Work order stage) • 4- ANNULED / CLOSED CASES/ RETENDERED- 41 • • TOTAL WORKS 217 • • • PREDRILLING ENGINEERING WORKS • (PDEWs done through tender after approval of Engineering Works Procedure-2013) • • 5. Tendered & awarded PDEWs 115 • 6. TOTAL PDEWs tendered & awarded of work - 115 • • 7. TOTAL PERMANENT & PDEWs 332 • 31 Works Processed by Contract Section
  • 32. STATE OF FIELD MACHINERY / EQUIPMENT 32 Bulldozers = 18 No Motor Graders = 10 No Shovel Loaders = 08 No Road Rollers = 08 No Farm Tractors = 12 No Fork Lifter = 05 No Water Drilling Rigs = 02 No Generators = 24 No Welding Plants = 21 No Prime movers with trailers = 08 No Dumpers = 21 No Water Bouzers = 25 No Trucks = 18 No Double cabin Pickups = 08 No Gaso Pumps = 54 No Misc Water pumps = 57 No Crane Mounted Trucks = 05 No Light Trucks 4x2 = 12 No Total = 316 No
  • 33. IssuesIssues S. No Issues Solution 1. Identification of locations and land acquisition. Timely identification & un-conditional acquisition of land to start civil works. 2. Approval of AFEs. Quick approval for timely remittance of funds for execution of works. 3. Shortage of equipment base. Strengthen equipment base by induction of new machines and through hiring where possible. 4. Shortage of qualified engineers and supervisory staff. Induction of Engineers/Techs. When the situation permits. 5. Lack of motivation. Transparent career planning of engineers. 6. Financial discipline in field parties. Monthly audit of field imprest. 33
  • 34. Supply of water to Production sites = 08.93 million gallons monthly Supply of water to Process & Plants = 76.11 million gallons monthly Supply of water to Drilling sites = 19.22 million gallons monthly Total water supplied for one month =104.26 million gallons Water Supply SectionWater Supply Section 34
  • 35. 35 Vehicle Repaired at I-9 &KBW Base WorkshopVehicle Repaired at I-9 &KBW Base Workshop S. No. Period Service Minor Repair Major Repair Engine Overhauling 1 2011 – 2012 1177 1279 37 05 2 2012 –2013 982 1082 18 05 3 2013 – 2014 929 1036 18 06 4 2014 – 2015 971 1102 17 02 5 2015 - 2016 849 889 13 03 Total 4908 5388 103 21