The document provides details of the Construction and Engineering Support Services Department of an oil and gas company. It has two divisions: Civil Engineering and Mechanical Engineering. Civil Engineering oversees pre-drilling civil works, roads, camps, warehouses, water systems and more. Mechanical Engineering handles equipment, fabrication, and pipelines. The document lists ongoing and completed projects of the Engineering Field Parties, including wells, plants, roads, buildings and infrastructure works. It provides location details and multi-year summaries of the works.
2. May , 2016
2
CONSTRUCTION ANDCONSTRUCTION AND
ENGINEERING SUPPORTENGINEERING SUPPORT
SERVICES DEPARTMENTSERVICES DEPARTMENT
3. INTRODUCTION
3
C&ESS Department is responsible to provide
Civil construction, Field Gathering lines & Mechanical
fabrication services to Drilling, Production, Process,
Store & other client Departments.
Two Division:
1- Civil Engineering
2- Mechanical Engineering
4. 1. Pre-Drilling Civil Works.
2. Metalled Roads, Field Roads & Right of Ways
3. Field Camps, Boundary Walls & Fencing
4. Ware Houses, Workshops, Storage sheds etc.
5. Dispensaries
6. Water Supply Systems, Water & Sewage Treatment Plants
7. Laying of Gathering Lines
8. Fabrication and installation of Well Head Assemblies.
9. Installations for Pig Launching Assemblies
10. Fabrication and repair of Oil Storage Tanks and Caravans.
11. Maintenance of baseline field machinery.
FunctionsFunctions
4
5. 5
Cost estimates are based on MES Schedule of Rates.
Engineering Works Procedure:
• Cost estimate and AFE approvals.
• Tender documents preparation and contract administration.
• Departmental works utilizing available resources.
• Procurement of material & services as per PPRA & PEC.
Working MethodologyWorking Methodology
6. CIVIL ENGINEERINGCIVIL ENGINEERING
Civil Engineering consists of Three sections
1.Engineering Operations North
• Engineering Field Party No. 2
• Engineering Field Party No. 3
2.Engineering Operations South
• Engineering Field No. 1
• Engineering Field No. 4
• Engineering Field No. 5
3.Contracts & Consultancy Services
6
Mechanical Engineering consists of two sections
1.Equipment and Field Machinery
• Workshop and Transport Section
• Base Workshop, I-9, Islamabad
• Base Workshop, KBW, Karachi
2.Fabrication and Pipeline
• Field Gathering Construction Party No. 1
• Field Gathering Constuction Party No. 2
MECHANICAL ENGINEERINGMECHANICAL ENGINEERING
7. Party Location District Province
EFP-1 Uch Dera Bugti Baluchistan
EFP-2 Kot Adu Muzaffar Garh Punjab
EFP-3 Fateh Jang Attock Punjab
EFP-4 Qadirpur Ghotki Sindh
EFP-5 Hyderabad Hyderabad Sindh
FGCP-1 Multan Multan Punjab
FGCP-2 Hyderabad Hyderabad Sindh
Present Locations of EFPs and FGCPsPresent Locations of EFPs and FGCPs
7
8. 8
ENGG.WORKS DETAILENGG.WORKS DETAIL
Pre Drilling Engineering Works
Description 2011-12 2012-13 2013-14 2014-15 2015-16
Completed 20 22 22 24 28
In progress - - - - 9
In Tender
process
- - - 2
9. 9
ENGG.WORKS DETAILENGG.WORKS DETAIL
Civil Works for Work Over Jobs
Description 2011-12 2012-13 2013-14 2014-15 2015-16
Completed 8 7 5 14 16
In progress - - - - 2
In Tender
process
- - - - 3
10. 10
Works carried out by EFP-IWorks carried out by EFP-I
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
1 Nashpa#4 Completed 1 Kal#2 Complete. 1 Permanent Fencing at Nashpa#1. Completed.
2 Nashpa#5 Completed 2 Kal#3 Complete. 2 Permanent Fencing at Nashpa#2. Completed.
3 Nashpa#6 Completed 3 Missa Kiswal#3 Complete. 3 Permanent Fencing at Nashpa#4. Completed.
4 Nashpa#7 Completed 4 Chak Naurang#5A Complete. 4
Well operator and security guard room at
Nashpa#4.
Completed.
5 Mela#4 Completed 5 Chak Naurang South#1 5 PCC hardstanding at stock material at Nashpa. Completed.
6 Mela#5 in progress 6 Rajian#1 in progress 6 F.C. accomodation at Nashpa. Completed.
7 Chanda#4 in progress 7 Rajian#4A Complete. 7 Internal Road at Nashpa. Completed.
8 Shawa#1 Completed 8 Rajian#2 in progress 8 RCC Boundary wall at Nashpa. Completed.
9 Naurang Shah#1 Completed 9 Field development works at Nashpa. Completed.
10 Kurrum#1 Completed 10
Hardstanding for extension of existing filling
gantry.
Completed.
11 Shaikhanwala#1 Completed 11 RCC Water storage tank at Nashpa. Completed.
12 Surqamar#1 Completed 12
Temporary camps construction for LPG plant
extension at Nashpa
Completed.
13 Khawaja#1 (Re-entry) Completed 13
Fencing and watch towers at plant extension
area at Nashpa.
Completed.
14 Kohat#1 Completed 14 API pit/Skimmer tank at Nashpa. in progress
11. 11
Works carried out by EFP-IWorks carried out by EFP-I
During Last 05 Years
15 Jabbi#1 Completed 15 Pre-casted wall at LPG plant area at Nashpa. Completed.
16 Jand#1 Completed 16
Double gate, road blocker and hydraulic barrier
at Nashpa.
Completed.
17 Jand#2 Completed 17
Dyke walls and flooring around crude storage
tanks at Nashpa.
Completed.
18 Dakhni Deep #5. Completed 18 Admin building at Nashpa. Completed.
19 Dakhni#7 Completed 19
02 class rooms with veranda for Govt. Primary
School at Awaji Banada, Nashpa.
Completed.
20 Dakhni#8 Completed 20 One way road and parking shed at Nashpa. in progress
21 Dakhni#12 Completed 21 Infra structure works at Chanda. Completed.
22 Ajuwala#1 Completed 22 Internal road at Mela. Completed.
23 Soghari#1 Completed 23 TST of internal roads at Chanda. Completed.
24 Soghari#2 Completed 24 Production office building at Dakhni. Completed.
25 Chak Naurang# X-1 Completed 25 Plice Check Post at Dakhni well #3. Completed.
26 Rajian#6 Completed 26
Metalled road (7Km) from Social welfare
dispensary to Dakhni #6.
Completed.
27 Rajian#7 Completed 27
RCC Hardstanding for Logistic work shop area at
Kot Sarang.
Completed.
12. 12
Works carried out by EFP-IIWorks carried out by EFP-II
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
1 Kup#1 Completed 1 Bahu#5 Completed. 1
Construction of metal road,
boundry wall & cement concrete
stone paving, additional work for
annaxe at R.O Multan
Completed
2 Kalchas#1 Completed 2 Bahu#7 Completed. 2
Construction of hard
standing(flooring) at kot addu field
store
Completed
3 Bahu#5 Completed 3 Punjpir Completed. 3 Repair of fencing at Bahu-5,6,7,8 Completed
4 Bahu#6 Completed 4
Pre-drilling civil work at Barkat
wala(Heto)
Completed
5 Bahu#7 Completed 5
Water supply scheme for locals at
kalchas
Completed
6 Bahu#8 Completed 6 Evaporation pond at SS Well no 1 Completed
7 Sohni wala No-1 Completed 7
Construction of officer rest house
Annexe at R.O Multan
Completed
8 Dhodak Deep #2 A Completed 8
Renovation of banglow A-1 officer
rest house kotaddu field
Completed
9 Dhodak Deep #1 Completed 9
Construction of engine driver room
at kotaddu log field,hard standing
and roof treatment of Masjid
Completed
10
Muhammad test well
No-1(multan north -1)
Completed 10
Blasting/removing of crocked
mountain along approach road near
chapper DDK field.
Completed
11 DDk Rubly x-1 in progress 11
Repair and mantenence of store
shed at kotaddu field.
Completed
13. 13
Works carried out by EFP-IIWorks carried out by EFP-II
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
12
Renovation/partition of banglow B-
2 at log field kotaddu
Completed
13
Urgent construction of security
post,rooms for BMP one at mari top
dera bugti.
Completed
14
Tuff tiles at nandpur/punjpeer
dehydration plant
Completed
15 Boundry wall at ss-1 nandpur Completed
16
Re construction of boundry wall at
RO-Multan
Completed
17
Const of metal road shujabaad
canal at ss-1 nandpur
Completed
18
Distemper/weather shield paint
officer & camp building(EFP_2)
Completed
19
Tiles flooring for staff transit camp
at RO-multan
Completed
20 Dismentling of punjpeer Completed
21
Comst of hardstanding around
admin building efp-2 kotaddu
Completed
22 Const of washroom at bahu-2 Completed
23
Re-habitation of admin block log-
field kotaddu
Completed
24
Civil work of const of masjid at
dhodak colony multan
Completed
25
Renovation work of staff and
officer transit camp at RO- multan
Completed
26
Bahu well no 4 bahu gas field
develment at bahu well no 4
hydraulic work
Completed
14. 14
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
1 Nashpa#4 Completed 1 Kal#2 Complete. 1 Permanent Fencing at Nashpa#1. Completed.
2 Nashpa#5 Completed 2 Kal#3 Complete. 2 Permanent Fencing at Nashpa#2. Completed.
3 Nashpa#6 Completed 3 Missa Kiswal#3 Complete. 3 Permanent Fencing at Nashpa#4. Completed.
4 Nashpa#7 Completed 4 Chak Naurang#5A Complete. 4
Well operator and security guard room at
Nashpa#4.
Completed.
5 Mela#4 Completed 5 Chak Naurang South#1 5 PCC hardstanding at stock material at Nashpa. Completed.
6 Mela#5 in progress 6 Rajian#1 Completed. 6 F.C. accomodation at Nashpa. Completed.
7 Chanda#4 in progress 7 Rajian#4A Completed 7 Internal Road at Nashpa. Completed.
8 Shawa#1 Completed 8 Rajian#2 in progress 8 RCC Boundary wall at Nashpa. Completed.
9 Naurang Shah#1 Completed 9 Field development works at Nashpa. Completed.
10 Kurrum#1 Completed 10
Hardstanding for extension of existing filling
gantry.
Completed.
11 Shaikhanwala#1 Completed 11 RCC Water storage tank at Nashpa. Completed.
12 Surqamar#1 Completed 12
Temporary camps construction for LPG plant
extension at Nashpa
Completed.
13 Khawaja#1 (Re-entry) Completed 13
Fencing and watch towers at plant extension
area at Nashpa.
Completed.
14 Kohat#1 Completed 14 API pit/Skimmer tank at Nashpa. in progress
15. 15
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
15 Jabbi#1 Completed 15
Pre-casted wall at LPG plant area at
Nashpa.
Completed.
16 Jand#1 Completed 16
Double gate, road blocker and
hydraulic barrier at Nashpa.
Completed.
17 Jand#2 Completed 17
Dyke walls and flooring around
crude storage tanks at Nashpa.
Completed.
18 Dakhni Deep #5. Completed 18 Admin building at Nashpa. Completed.
19 Dakhni#7 Completed 19
02 class rooms with veranda for
Govt. Primary School at Awaji
Banada, Nashpa.
Completed.
20 Dakhni#8 Completed 20
One way road and parking shed at
Nashpa.
in progress
21 Dakhni#12 Completed 21 Infra structure works at Chanda. Completed.
22 Ajuwala#1 Completed 22 Internal road at Mela. Completed.
23 Soghari#1 Completed 23 TST of internal roads at Chanda. Completed.
24 Soghari#2 Completed 24
Production office building at
Dakhni.
Completed.
25 Chak Naurang# X-1 Completed 25 Plice Check Post at Dakhni well #3. Completed.
26 Rajian#6 Completed 26
Metalled road (7Km) from Social
welfare dispensary to Dakhni #6.
Completed.
27 Rajian#7 Completed 27
RCC Hardstanding for Logistic work
shop area at Kot Sarang.
Completed.
16. 16
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
28 Rajian#8 Completed 28
Crude storage tanks foundation
and dyke walls at Rajian#5.
Completed.
29 Rajian#9 Completed 29
Extension in social welfare
dispansary at Rajian.
Completed.
30
Govt. Rural Dispansary, at Dina,
Jehlum.
Completed.
31
Repair/maintenance of road from
Mohri Rajgan to Chak Treda at
Jehlum.
Completed.
32
Repair of main road to Rajian Oil
Field.
Completed.
33
Hard standing around weigh bridge
and RCC culvert at Mela.
Completed.
34
Cosndtruction of weigh bridge
foundation at Mela.
Completed.
35
Cosndtruction of weigh bridge
foundation at Nashpa
Completed.
36
Cosndtruction of weigh bridge
foundation at Rajian.
Completed.
37
New waste pit with skimmer tank
at Kal.
Completed.
38
Repair/upgradation of road from
Shakardra to Kharapa More, Kohat.
Completed.
39 Worshop shed at Dakhni. Completed.
40 Store shed at Dakhni. in progress
17. 17
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
41 New residential rooms at Rajian. in progress
42
Const. of civil works for utilization
of weigh bridge at Rajian.
in progress
43
Improvement of existing Tarally
Bridge Road at Chanda.
in progress
44
Supply of utility water at Nashpa
Plant for year 2014.
in progress
45
Supply of utility water at Nashpa
Plant for year 2015.
Completed.
46
Construction of dyke wall and PCC
hardstanding for crude storage
tanks at Mela.
Completed.
47
Construction of RCC hard
standing for installation of
20000 BPD Capacity new
Separation Battery at Nashpa
Completed.
48
Construction of internal
Road at chanda plant
Completed.
49
Repair of (0.8 km)Road at
Ratta Mohara Rajian oil field.
Completed.
50
Modification of New store
shed at dakhni Plant.
Completed.
18. 18
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
51
Construction of One Rcc
under ground water reservior
at water source Mela # 01
Completed.
52
Construction of well Operator
and security Guard Rooms at
Nashpa well # 03.
Completed.
53
Construction of Foundation
for Proplane Bullet at
Chanda Plant
Completed.
54
Concrete Flooring at Chanda
Plant
Completed.
55
New Dehydration Plant at
Nashpa
Completed.
56
Construction of Room for
Mechanical at Chanda Plant
Completed.
57
Civil Works for Re-
installation of TOC at
Sheikhan Plant
Completed.
58
Construction of Building of
Mela Dehydration Plant
Completed.
19. 19
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
59
Construction of Boundary
Wall & Provision of steel
Stairs for Watch
Tower at Sheikhan
Completed.
60
Laying of Water Line at
Village Nandrakka
Completed.
61
Compressor Foundation at
Sadqal
Completed.
62
Renovation of MD Office and
Entrance Lobby at Head
Office
Completed.
63
Renovation of OGTI Room at
Islamabad
Completed.
64
Improvement of Water
Supply Scheme (Social
Welfare) Kal Oil Field
Completed.
65
Laying of Sand Cushion /
Supply & Installation of
Geomembrane at Chak
Naurang
Completed.
66
Re-surfacing / Wide laying of
Access Road at Rajian#5
Completed.
67
Hardstanding at Chak
Naurang Yard
Completed.
68
Construction of Block at
Govt. High School Rajian
Completed.
20. 20
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
69
RCC Approach Road Action
yard to Main Gate
Completed.
70
Construction of 02 Rooms for
Store Office at Chak Naurang
Completed.
71
Rising of Boundary Wall at
Dakhni
Completed.
72
Construction of Woven Mesh
Fencing & Watch Tower at
Chak Naurang Logistic Base
Completed.
73
Construction of Boundary
Wall at I-9 Base Store
Completed.
74
Construction of Civil Works
for Installation of LPG/DPR
Unit at Dakhni
Completed.
75
Civil Work for Installation of
Bullet at Dakhni Plant
Completed.
76
Civil Works for Well Head at
Dakhni#2
Completed.
77
Repair of Retaining Wall
Inside Dakhni Plant
Completed.
78 Store Shed at Dakhni Plant Completed.
21. 21
Works carried out by EFP-IIIWorks carried out by EFP-III
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
79
Earth Filling RCC Road PCC
Hardstanding at Dakhni
Plant
Completed.
80
Bathroom with Open Space
& Boundary Wall Officers
Camp EFP-III
Completed.
81
Semi-covered Shed at I-9
Base Store
Completed.
82
08 Number Living Rooms at
Dakhni Colony
Completed.
83
Glazed Tiles for Corridores &
Stairs Masood Mansion, F-8
Markaz, Islamabad
Completed.
84
Repair of Bhal Syedan Road
under Social Welfare
Completed.
22. 22
Works carried out by EFP-IVWorks carried out by EFP-IV
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
1
PDCW well Badar #
02
Completed 1 Work Over Job QP#21 Completed 1
Rasing of Boundary Wall at QP
Plant
Completed.
2 HRL#3 Completed 2 Work Over Job QP#32 Completed 2 Wire Mesh Fencing QP # 37 Completed.
3 HRL#4 Completed 3 Work Over QP #11
Complete
d
3
Approach Road /ROWs from
Eastern Pig Launcher station to
QP Gas Field
Completed.
4 HRL#5 Completed 4
Hard Standing Cable Tranches
QP Plant
Completed.
5 HRL#6 Completed 5 Repair of Fencing at QP plant in progress
6 HRL#7 Completed 6
Hard Standing and Parking
Shed in front of Admin Block
QP Plant
Completed.
7 HRL#8 Completed 7 Refencing of QP # 30 Completed.
8 HRL#9 Completed 8 Raised Platform at well QP# 17 Completed.
9 HRL#10 Completed 9
Construction of Office Chowkidar
Room and Store Shed at Maru#01
Completed.
10 HRL#11 Completed 10
Relocation of 50MMSCED De
Hydration at QP PEL Plant
Completed.
11 PDCW QP # 48 Completed 11
Raising & repair of approach roads
of well sites
Completed.
23. 23
Works carried out by EFP-IVWorks carried out by EFP-IV
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
12 PDCW ERW QP # 47 Completed 12
Flood Fighting Arrangment of
OGDCL Bund.
Carried out
yearly.
13 PDCW Sara # 04 Completed 13
Repair & Reconstruction of QP
Internal Road
Completed.
14 PDCW QP 49-A Completed 14
Well Head Assemblies of Maru
1,2,3 Reti # 01
Completed.
15 PDCW QP#46 Completed 15 Raised Platform QP#36 Completed.
16
Civil Work related to
stacking of Rig N#03
Completed 16 Permanent Fencing QP33 Completed.
17 PDCW QP#45 Completed 17 Repair of Works QP#24 Completed.
18 PDCW HRL#06 Completed 18 Completed.
19
PDCW Hadra
(Raja#01)
Completed 19 Completed.
20 PDCW QP#35 Completed 20 Repair of Fencing at QP#23& 27 Completed.
21 PDCW QP#44 Completed 21
Relocation Pirkoh Commpressor
QP Plant
Completed.
22 PDCW Maru South # 01 Completed 22 Fencing of QP # 40 Completed.
23 PDEW QP#42 (ERW-03) Completed 23
Raising/Strengthning of
OGDCL Bund.
in progress
24. 24
Works carried out by EFP-IVWorks carried out by EFP-IV
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
24 Reti#2 Completed
25 Ismail#1 Completed
26 Thal East#1 Completed
27 ThalEast#3 In progress
28 Thal West #1
Completed
25. 25
Works carried out by EFP-VWorks carried out by EFP-V
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
1 Dhacharapur#2. Completed 1 Sona#8 Completed 1
Const. of admin building , warehouse & Sec.
Office Building C-I Kunnar Sindh
Completed
2 Saand#01 Completed 2 Thora#4 Completed 2
Const. of foundation for de-hydration plant
at Bobi
Completed
3 Aradin#1 Completed 3 Tando Alam#20 Completed 3
Const. Up-gradation and widening of
Kunner-Pasaki Road Distt. Hyderabad,
Sindh
Completed
4 Pasaki#1 Completed 4 Tando Alam#16-A Completed 4
Field development civil works at
Dacharapur # 2 distt Hyderabad Sindh
Completed
5 Pasaki#9 Completed 5 Nim West#1 Completed 5
Const. of Water tank for drinking purpose
Tando Alam Oil Complex Sidh Hyderabad
Completed
6 Bobi#10 Completed 6 Lashari Center #5 Completed 6 Const. of Ploice post at Sinjhoro Completed
7 Tando Qaiser#1 Completed 7 Moolan North#1 Completed 7
Const. of Workshop Office, MP.E&I
workshop etc. Kunnar C-2
Completed
8 Jakhro West#1 Completed 8 Tando Alam#20 Completed 8
Const. of Well Head Assembly works for 09
wells at Sinjhoro
in progress
9
Patafi#1/Hanif
Saddiqi#1
Completed 9 Lashari#5 Completed 9
Const. of remaining civil works at rangers
camp at TOC Hyderabad Sindh
Completed
10 Kunner Deep#9 Completed 10 Kunner#2 Completed 10
Const. of Mosque at Daru Plant at
Hyderabad Sindh
Completed
11 Manna#1 Completed 11 Thora East#1 Completed 11
Const. of social welfare dispensary at Bobi
plant sanghar Sindh
Completed
12 Chak Dim 5 #2 Completed 12 Tando Alam#17. Completed
13 Chak 25 C#1 Completed 13 Chak 66 North East #1 Completed
14 Pasaki Deep #4 Completed 14 Kunner #2 Completed
15 Saand #2 Completed 15 Thora East#1 Completed
16 Palli Deep#1 Completed 16 Thora#6 Completed
17 Kunner#9 Completed 17 Lashari#3 Completed
18 Jarwar#1 Completed 18 Kunner #4 Completed
26. 26
Works carried out by EFP-VWorks carried out by EFP-V
During Last 05 Years
PDEW Work Over Job at Field Development Works
S.No. Name of Project Remarks S.No. Name of Project Remarks S.No. Name of Project Remarks
19 Pasaki Deep#5 Completed 19 Kunner#8 Completed
20 Pasaki #10 Completed 20 Pasakhi#7 Completed
21 Chak 3 Dim#3 Completed 21 Kunner#5 Completed
22 Kunner Deep#10 Completed 22 Aradin#1 Completed
23 Sinjhoro#X-1 Completed 23 Dars Deep#1 Completed
24 Buzdar North #2 Completed 24 Chak 2 #3 Completed
25 Tando Allah Yar East#1. Completed 25 Sono#4 Completed
26 Suleman#2 Completed 26 Chak 2 #2 Completed
27 Bitrism West#2 Completed 27 Tando Alam#17. Completed
28 Bachani#1 Completed 28 Tando Alam #18 Completed
29 Kunner #10. Completed 29 Thora Deep#1 Completed
30 Kunner Deep#11. Completed 30 Thora#3 Completed
31 Pasakhi Deep #6. Completed 31 Thora#4 Completed
32 Khewari E.L.(X-1) Completed 32 Kunner#6 Completed
33 Kunner #11 Completed 33 Nim West #1 Completed
34 Palli#2 Completed 34 Thora East #1 Completed
35
Soomro#1 (Daru
Deep#1)
Completed 35 Pasakhi North#1 Completed
36 Dachrapur#3 Completed 36 Pali Deep#1 in progress
37 Gundanwari#1 in progress
27. E&FM Section an integral part of C&ESS Department is committed:
• To Plan, co-ordinate & execute repair & maintenance of all field machinery & equipment of the
C&ESS Department
• To provide feed back services to EFPs for smooth functioning of their field workshops & water
supply.
• To plan & co-ordinate major overhauling of the machinery/equipment at Base workshops.
• To plan & co-ordinate for smooth water supply to fields & Rigs sites.
05 Numbers Field Workshops under the administrative control of respective Party
Chiefs:
EFP-1
EFP-II
EFP-III
EFP-IV
EFP-V
02 Nos Base Workshops:
I-9 Base Workshops at Islamabad.
Karachi Base Workshop, its administrative control lies with RC Karachi.
27
WORKSHOPS:
E&FM Section
28. During Last 03 Years
• PERMANENT WORKS
• (Majority works done through tender after approval of Engineering Works Procedure-2013)
•
• 1- COMPLETED WORKS 40
•
• 2- UNDER CONSTRUCTION WORKS 32
•
• 3- WORKS IN TENDERING STAGE 104.
• (Bid documents, Tech. Evaluation, Fin. Evaluation,
• Competent authority approval, Contract agreement
• & Work order stage)
• 4- ANNULED / CLOSED CASES/ RETENDERED- 41
•
• TOTAL WORKS 217
•
•
• PREDRILLING ENGINEERING WORKS
• (PDEWs done through tender after approval of Engineering Works Procedure-2013)
•
• 5. Tendered & awarded PDEWs 115
• 6. TOTAL PDEWs tendered & awarded of work - 115
•
• 7. TOTAL PERMANENT & PDEWs 332
• 28
Works Processed by Contract Section
29. # JOBS FGCP-I FGCP-II TOTAL
QTY Cost
Million Rs
QTY Cost
Million Rs
QTY Cost
Million Rs
1 Laying of Oil & Gas Pipeline 4”, 6”, 8”, 10”, 16”, 26”,
30” (& Retrival)
273 KM 750 257 KM 861.877 530
KM’s
1612
2 Installation of well head facility 37 Nos 55 25 Nos 24.69 62 Nos 117
3 Crude storage Tanks 3000, 5000, 6000, 12000, 20000
BBLS
06 Nos 8.2 17 Nos 29.75 23 Nos 38
4 Fab / Renovation of living caravans 28 Nos 20 -- -- 28 Nos 20
5 Installation of CO2 removal plant / glycol unit / tie-in
of compressor
-- -- 03 Nos 17.812 03 Nos 17.812
6 ATA’s 06 Nos 34 09 Nos 3.962 15 Nos 38
7 Installation of separation batteries (HP/MP/LP) 12 Nos
80
14 Nos
90
26 Nos
170
8 Misc Pipeline repair, installation of knock out vessels,
gathering headers, steel structures, pipe supports
200 Nos 76 Nos 276
Nos
Total
Rs 2013
Million
30. # JOBS QTY Cost Rs
(Million)
1 Installation of Flow line 56 KM’s 424
2 Well Head Assembly 10 Nos 15
3 Repair of Storage Tank 06 Nos 32
4 Relocation of Flare stack 01 Job 1.5
5 Repair / Renovation of Living Caravans 05 Nos 4.0
Total 476.5
31. During Last 03 Years
• PERMANENT WORKS
• (Majority works done through tender after approval of Engineering Works Procedure-2013)
•
• 1- COMPLETED WORKS 40
•
• 2- UNDER CONSTRUCTION WORKS 32
•
• 3- WORKS IN TENDERING STAGE 104.
• (Bid documents, Tech. Evaluation, Fin. Evaluation,
• Competent authority approval, Contract agreement
• & Work order stage)
• 4- ANNULED / CLOSED CASES/ RETENDERED- 41
•
• TOTAL WORKS 217
•
•
• PREDRILLING ENGINEERING WORKS
• (PDEWs done through tender after approval of Engineering Works Procedure-2013)
•
• 5. Tendered & awarded PDEWs 115
• 6. TOTAL PDEWs tendered & awarded of work - 115
•
• 7. TOTAL PERMANENT & PDEWs 332
• 31
Works Processed by Contract Section
32. STATE OF FIELD MACHINERY / EQUIPMENT
32
Bulldozers = 18 No
Motor Graders = 10 No
Shovel Loaders = 08 No
Road Rollers = 08 No
Farm Tractors = 12 No
Fork Lifter = 05 No
Water Drilling Rigs = 02 No
Generators = 24 No
Welding Plants = 21 No
Prime movers with trailers = 08 No
Dumpers = 21 No
Water Bouzers = 25 No
Trucks = 18 No
Double cabin Pickups = 08 No
Gaso Pumps = 54 No
Misc Water pumps = 57 No
Crane Mounted Trucks = 05 No
Light Trucks 4x2 = 12 No
Total = 316 No
33. IssuesIssues
S. No Issues Solution
1. Identification of locations
and land acquisition.
Timely identification & un-conditional
acquisition of land to start civil works.
2. Approval of AFEs. Quick approval for timely remittance of
funds for execution of works.
3. Shortage of equipment
base.
Strengthen equipment base by induction
of new machines and through hiring
where possible.
4. Shortage of qualified
engineers and
supervisory staff.
Induction of Engineers/Techs. When the
situation permits.
5. Lack of motivation. Transparent career planning of
engineers.
6. Financial discipline in
field parties.
Monthly audit of field imprest.
33
34. Supply of water to Production sites = 08.93 million gallons monthly
Supply of water to Process & Plants = 76.11 million gallons monthly
Supply of water to Drilling sites = 19.22 million gallons monthly
Total water supplied for one month =104.26 million gallons
Water Supply SectionWater Supply Section
34
35. 35
Vehicle Repaired at I-9 &KBW Base WorkshopVehicle Repaired at I-9 &KBW Base Workshop
S. No. Period Service Minor
Repair
Major
Repair
Engine
Overhauling
1 2011 – 2012 1177 1279 37 05
2 2012 –2013 982 1082 18 05
3 2013 – 2014 929 1036 18 06
4 2014 – 2015 971 1102 17 02
5 2015 - 2016 849 889 13 03
Total 4908 5388 103 21