1. Name: Kevin R Norton
Address: 10 Seabird Close
Caister-On-Sea
Norfolk, NR30 5SQ
Telephone No.: 01493 720354
Mobile: 07778772762
Nationality: BRITISH
Status: MARRIED
Email: Kevinnorton353@hotmail.com
QUALIFICATIONS
Over thirty years’ experience in Oil and Gas Projects and Construction of Topsides, Drilling
Derricks, Land Rigs, Sub Sea Structures. Responsible for the management and supervision of
multi discipline trades of up to 450 personnel. Experience in fabrication of offshore projects.
Management and liaison with Client personnel this included detailed schedule planning,
reporting, and subsequent manning levels to achieve project deadlines.
Fabrication Experience In. ASME, AWS, API 4F and EEMUA 158. EEMUA 197.
Quality Assurance Internal Auditors Course Cert No 9738.
The Institution of Occupational Safety & Health Cert No 7047.
WORK HISTORY
Mar 15 – Apr 2015 Harland & Wolff
Employed as Construction Manager
Over seeing Structural Upgrade on Byford Dolphin in Belfast
Northern Ireland
Jan 14 – Dec 2014 ACN Offshore
Employed as Construction Manager
Responsible for Engineering Department overseeing Project
Managers and Project Engineers and also Tendering and
Proposals to Clients. Also setting up company 9001 2008
18001 2007 accreditations both achieved in 2014
Sept 12 - Jan 14 CLS Offshore Ltd
Employed as Onshore Operations Manager
Responsible for Engineering Department overseeing Project
Managers and Project Engineers and also Tendering and
Proposals to Clients.
2. Jan 08 – Sept 12 CLS Offshore Ltd
Employed as Fabrication Manager controlling all aspects of the
fabrication workshop. Reporting to the Managing Director for the
scheduling and delivery of contracts and client requirements.
Fabrication of Drilling structures to API 4 F. Pipework fabrication
to ASME B31.3and BS 4515.
June 07 – Dec 08 CLS Offshore Ltd / RWE Npower.
Employed as Project Engineer on power station raising capital
projects for new builds and plant modifications through tendering
process to contract award and overseeing fabrication and site
installation for Power Station owned by RWE Npower.
Nov 05 – June 07 CLS Offshore Ltd.
Employed as Project Co-ordinator Overseeing fabrication
workshop and coordinating third party sub-contractors and
overseeing onsite installation projects. Fabrication of Drilling
structures to API, Pipework fabrication to ASME B31.3and BS
4515.
Aug 05 – Nov 05 Amec Oil Gas Services.
Employed as Construction supervisor overseeing sub-contractors
working on terminal shutdown at Centrica storage facility. HP /
LP vent header modifications.
May 04 - April 05 Swift Engineering, Baku.
Employed as Fabrication Manager overseeing fabrication work
and site installations. Reporting to the Operation Manager.
June 02 – March 04 Morinoak International Limited. (Varco Company)
Employed as Fabrication Manager for fabrication of Drilling
Structures. Reporting to the Varco Vice President of Eastern
Operations on all aspects of manufacturing and production.
Fabrication of Drilling Structures to API 4 F. Thunderhorse
Drilling Derrick for BP. Drilling Derrick for Ensco 106.NDC 34
Fast Moving Drilling Land Rig for ADNOC.
May 01 - Jun 02 CLS Engineering Limited.
Employed as Fabrication Manager controlling all aspects of the
fabrication workshop responsible to the Managing Directors for
the scheduling and delivery of contracts. Fabrication sub-sea
pipework to 4515. Fabrication of Sub-sea Protection Frames for
Technip.
Jan 01 - May 01 Amec Process & Energy.
Employed as Construction Supervisor on Brigantine Project for
Shell Bacton Gas Terminal. Installation of New Build Pipework
and Pipe racks for New Glycol Separator.
3. Feb 00 - Jan 01 UK Construction Limited.
Employed as Construction Supervisor overseeing installation of
pipework on new Power Station constructed in Great Yarmouth
Dec 98 - Feb 00 Integrated Testing Services Limited.
Employed as the Hydro testing Co-ordinator seconded to Barmac
on Elf Elgin Franklin Production Jack-Up Project, overseeing the
accurate compilation of Hydro test work packsand reporting to the
Barmac Construction Manager.
Mar 98 - Nov 98 Integrated Testing Services Limited.
Employed as Supervisor overseeing Hydro testing, chemical
cleaning and oil flushing associated with the new compressors for
the Interconnector Gas Terminal reporting to the main Contractors
Construction Manager.
Aug 97 - Mar 98 Morinoak International Limited, Houston.
Employed as Company Representative overseeing the fabrication
of the drilling derrick for Global Marine Houston Texas in
accordance with API Specification 4F. Responsible for the control
and co-ordination of all project management activities including
the administration and review of all project documentation
planning and reporting.
May 93 - July 9 DeGroot Offshore Limited.
Employed as Head of Production responsible for the fabrication
facility on all major onshore projects. Liaison with all department
heads to co-ordinate and schedule project requirements reporting
directly to the General Manager. Fabrication Subsea Protection
Frame for Ranger Oil. Fabrication of 800 Ton Pancake Deck for
Amoco. Fabrication of PAU from 350 Tons TO 600 Tons for
Paladon
Aug 91 - May 93 Strachen & Henshaw Limited.
Employed asConstruction Managerresponsible for the fabrication
facility on all major onshore projects. Liaison with all department
heads to co-ordinate and schedule project requirements reporting
directly to the General Manager. Fabrication of Sulphate Removal
Module 650 Ton for AGIP Tiffany Project.
4. Feb 91 - Aug 91 Babcock’s Construction Limited.
Section Engineer responsible for installation of stainless steel
pipework on Sizewell B Nuclear Power Station.
Jan 89 - Feb 91 Turmeric Limited.
Employed asConstruction Managerresponsible for the fabrication
facility on all major onshore projects. Liaison with all department
heads to co-ordinate and schedule project requirements reporting
directly to the General Manager.Fabrication of Drilling Structures
to API 4F for BP Shell Amoco Maritime Hydraulics Sedco Forex.
Mar 86 - Jan 89 DeGroot Offshore Limited.
Workshop Manager responsible for site and workshop fabrication
facility for multi-disciplined trades on offshore projects: Shell
Forex, Leman Field, K & N Tie-In, F & G Sand Separators and
Amoco 23C Refurbishment.
Oct 85 - Mar 86 WM Press Offshore.
General Foreman on main contract at Shell Bacton Gas Terminal,
responsible for pipefitting and multi-disciplined trades. Also
responsible for pipework installation on Phillips Bacton Gas
Terminal.
Sep 83 - Oct 85 Turmeric Limited.
Employed as Senior Company Representative on the Rough
Storage Hook-Up Project, responsible for multi-disciplined trades
and supervision. Client liaison to the project requirements for
British Gas.
Apr 83 - Sep 83 Brown & Root Limited.
Employed as Foreman on pipework installation on Marathon Brae
A Hook-Up, responsible for multi-disciplined trades of up to 50
personnel.
1982 – 1983 McAlpine Humberoak.
General Foreman on fabrication of Valve and Tee Covers for
subsea pipeline for British National Oil Company. Responsible for
supervision and multi-disciplined trades.
1979 – 1982 Turmeric Limited.
Offshore Field Supervisor responsible for multi-disciplined trades
and supervision of 5 offshore platforms in the Hewett Field. On
5. fire and gas installations, pipe and structural and commissioning
of new system.
1977 –1979 McDermott East Anglia.
General Forman responsible for multi-disciplined trades on
Amoco 27 Alpha and 18 Alpha Compression Hook-Up in the
Leman and Inde fields.
1976 – 1977 Skipper International.
Foreman responsible for pipe spool fabrication for offshore hook-
up on the Shell Inde L platform.
1975 – 1976 McDermott Oceanic Offshore.
Pipefitter Foreman on the Heather A Hook-Up for Union Oil.
1973 – 1975 Sea & Land Pipelines.
Pipefitter and Chargehand on various offshore module projects for
Amoco and Shell Southern Operations.
1970 – 1973 E C Burrell Engineering.
Pipefitter and Plater Welder.
1966 – 1970 Coventry Gauge & Tool.
Time served apprenticeship Fitter Welder.
References can be supplied upon request.