Issue 4, May 2006Contract 421 - ECP to Nicoll Highway
The Kallang/ Paya Lebar Expressway (KPE) project is
Singapore’s most complex expressway project to date.
With 9 kilometres of underground tunnels to construct,
engineers have had to face challenges ranging from
deep marine clay valleys, a network of underground
utilities, tunnel construction under the operational
east-west MRT line, and tunnel construction under the
Geylang River. For Contract 421, the tunnel works at the
Geylang River has offered the greatest challenge to the
project team.
As part of the preparation work for the river diversion,
a cofferdam was constructed on the north bank of the
Geylang River (see figure 1). The tunnel structure was
then built within the cofferdam. Temporary works for
the future main river diversion were then installed and
Geylang River was diverted to the north side and on top
of the completed KPE tunnel structure. This phase of
work was completed in June 2004.
After the successful diversion of the Geylang River over
the completed tunnel on the north bank, double sheet
pile cofferdams were installed across the old river course
and filled with sand (see figure 2). Another sheet pile wall
was then installed within which excavation for the KPE
tunnel can be carried out. Water was then pumped out
from the area within the cofferdam to allow excavation
of the tunnel to begin (see figure 3).
The Story of Geylang River diversion
We have adopted a Top-Down Construction method for the Geylang
River section due to the deep soft ground. The sequence of works
involves excavation and installation of steel struts to the level of the
tunnel roof slab, followed by the construction and casting of the
tunnel roof slab. The 3m thick tunnel roof slab provides a massive and
rigid support across the excavation site. Excavation below the roof
slab is then carried out through access openings left in the tunnel
roof slab. The excavation is taken down layer by layer to the tunnel
base slab. The base slab will then be concreted. The side walls of the
tunnels are then constructed between the roof and the base. Once
the full tunnel structure is completed, the access openings on the roof
slabs are sealed (see figure 4). The river is then diverted back to its
original alignment and the river walls reconstructed (see figures 5 &
6).
Progress Update
About 85% of the tunnel roof at the Geylang River section has been
completed. To ensure the stability of the works, a jet grout block is
being installed in front of the PUB substation. Jet grout piling is
expected to be completed in April 2006. Following this, the remaining
section of the roof will be completed and the next stage of excavation
below the tunnel roof progressed across the entire area. The project
team is planning to complete the tunnel across the Geylang River
within the next 10 months.
Excavation under the tunnel roof slab at the Geylang River
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 6
As Good As New
Works in other areas have progressed well.
We reinstated Stadium Walk / Stadium
Crescenton15February2006.Weareinthe
process of handing back the reconstructed
Kallang Practice Track and football
field to the Singapore Sports Council.
Reinstatement works at the Stadium
Boulevard / Stadium Drive junction are in
progress and will be completed by June
2006. The reinstatement of the stadium
area between Jalan Benaan Kapal and
Nicoll Highway is almost complete. Our
engineers are working hard to ensure
that the area near car park ‘F’ and Stadium
Drive would be ready for the National Day
event.
The winding temporary Stadium Drive will
be realigned to its final location sometime
in June 2006 after the backfilling of the KPE
and CCL tunnels below the road junction.
Motorists will soon have a smoother ride in
and out of the stadium area.
South of the ECP
Another completed section is the KPE
tunnel below the Ventilation Building ‘A’.
The remaining works to the building are
erection of the perimeter fencing and
landscaping for the area.This is being done
by the National Parks Board.
Works at North of ECP
Kallang Practice Track & football field have been reinstated
North of the ECP
Just north of the ECP, the construction of Slip Road ‘A’ tunnel structure
connecting the ECP to the north bound KPE tunnel is in progress.
Construction of Slip Road ‘B’, the exit slip road from KPE south
bound tunnel joining ECP (Changi direction) is going at full pace
and sheet-piling works are nearly completed. Excavation works
and structural works are progressing well. Jet grout piles for soil
improvement are being installed in the pump sump and shallow end of
the slip road due to presence of soft material below the tunnel structure.
Construction of the main tunnel between the ECP and Tanjong Rhu
is also in full swing. Excavation and strutting works have reached the
tunnel formation level. The casting of the first base slab at one of the
widest excavation in the KPE road interchange has been completed.
On 18 January 2006, KPE project team
conducted a series of hot smoke tests in
the KPE tunnel at KPE slip road “D” under
the East Coast Parkway (ECP).
The tests allowed our engineers to
verify the effectiveness of the tunnel fire
protection and ventilation systems in the
event of a fire within the KPE tunnel.
For the first test, six numbers of A1 size steel trays
containing 9 litres of kerosene were ignited to
simulate a 5 MW fire. Two minutes from the onset
of the fire, two tunnel ventilation fans located in
the ventilation building were activated to extract
the smoke generated from the fire. Smoke from
the fire was effectively channelled away from
the escape path and was extracted and removed
through the KPE ventilation building “A” located
South of the ECP.
6 nos. of A1 size steel trays & 9 litres of
kerosene were used to produce a
5 MW fire
A steel enclosure was built to protectthe tunnel interior during the test
Smoke b
portal a
w
Ventilation Building ‘A’ is one of the six ventilation buildings along the KPE alignment
bellowed out from the tunnel
after the six trays of kerosene
were ignited within the tunnel
Smoke from the fire was successfully extracted out through the exhaust stacks of the ventilation
building within minutes of the fire being detected in the tunnel by the Linear Heat Detectors
For the second test, the same procedures
were repeated except that the speed of
the tunnel ventilation fans was varied to
operate together with the jet fans in the
tunnel.
For both tests, the Fibre Optic Linear
Heat Detector proved to be effective in
detecting the rise in tunnel temperature
and activating the alarm. The Linear Heat
Detectors were able to detect heat from the
hot smoke within 45 seconds.
The tunnel ventilation fans and tunnel jet
fans were successful in extracting the smoke
away from the escape path within minutes
during a fire. All in all, the tests were a great
success!
If you have feedback or suggestions, please contact:
Mr Michael Yap,
Deputy Manager, Community Relations, Land Transport Authority
mobile: 9831 4546 tel: 6396 1600 email: michael_yap@lta.gov.sg
Mr Arran Tan
Public Relations Officer of SembCorp Engineers and Constructors
mobile: 9857 8777
FEEDBACK
Land Transport Authority
No. 1 Hampshire Road, Singapore 219428
Customer Service Line: 1800 225 5582 Fax: 6396 1148 Website: www.lta.gov.sg
A group photograph with our guests taken inside the KPE Contract 422 completed tunnel
On Saturday, 7 January 2006, 25
guests comprising members of
the Tanjong Rhu Neighbourhood
Committee (NC), condominium
managers and residents in
the Tanjong Rhu area and
representatives of Mountbatten
Constituency Office visited the
KPE tunnel. The visit was jointly
organised by the Mountbatten
Constituency Office and the Land
Transport Authority.
Mr Lee Chian Heng, Senior Project
Manager for KPE Contract 421
conducted a short briefing before
leading the visitors for a site tour
at the Geylang River site and a
short tour of the KPE Contract 422
completed tunnel. Our guests were
shown some of the key Electrical &
Mechanical installations and safety
features at the completed Contract
422tunnel.Withthiscloseencounter
and guided tour of KPE site, our
guests gained a better appreciation
of the scale and complexity of the
construction work at the Geylang
River, as well as received an update
of the construction progress directly
from the KPE team.
Mr Ronnie Lim, Chairman of the
Tanjong Rhu NC, thanked the KPE
team for organising the site visit. He
expressed the members’ appreciation
of the opportunity to visit the KPE
site.
Mr Chuah Han Leong, Deputy Director,
KPE pointing out to the visitors, some
of the unique E&M features in
the KPE tunnel
Senior Project Manager,
Mr Lee Chian Heng (second from left)
leading our guests for the visit to the
Geylang River site

More Related Content

What's hot

Brentcliffe-Victoria Park Construction Liaison Committee Meeting - October 2017
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - October 2017Brentcliffe-Victoria Park Construction Liaison Committee Meeting - October 2017
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - October 2017Crosstown TO
 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...Crosstown TO
 
Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Crosstown TO
 
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017Crosstown TO
 
Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018Brittany Maxwell
 
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Crosstown TO
 
Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017Crosstown TO
 
Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...
Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...
Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...Crosstown TO
 
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017Crosstown TO
 
Brentcliffe - Vctoria Park Construction Liaison Committee Meeting - March 2018
Brentcliffe - Vctoria Park Construction Liaison Committee Meeting -  March 2018 Brentcliffe - Vctoria Park Construction Liaison Committee Meeting -  March 2018
Brentcliffe - Vctoria Park Construction Liaison Committee Meeting - March 2018 Crosstown TO
 
GLASS, Ian (Mar15)
GLASS, Ian (Mar15)GLASS, Ian (Mar15)
GLASS, Ian (Mar15)ian glass
 
West Open House - Progress Update Sept 2014
West Open House - Progress Update Sept 2014West Open House - Progress Update Sept 2014
West Open House - Progress Update Sept 2014Crosstown TO
 
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017Crosstown TO
 
Leaside & Laird Stations Construction Liaison Committee - October 2017
Leaside & Laird Stations Construction Liaison Committee - October 2017Leaside & Laird Stations Construction Liaison Committee - October 2017
Leaside & Laird Stations Construction Liaison Committee - October 2017Crosstown TO
 
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Crosstown TO
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Crosstown TO
 
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017Crosstown TO
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Crosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017Crosstown TO
 

What's hot (20)

Brentcliffe-Victoria Park Construction Liaison Committee Meeting - October 2017
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - October 2017Brentcliffe-Victoria Park Construction Liaison Committee Meeting - October 2017
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - October 2017
 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...
 
Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017Eglinton and Mt Pleasant Stations Open House - October 2017
Eglinton and Mt Pleasant Stations Open House - October 2017
 
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
 
Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018
 
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
 
Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017
 
Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...
Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...
Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...
 
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017
 
Brentcliffe - Vctoria Park Construction Liaison Committee Meeting - March 2018
Brentcliffe - Vctoria Park Construction Liaison Committee Meeting -  March 2018 Brentcliffe - Vctoria Park Construction Liaison Committee Meeting -  March 2018
Brentcliffe - Vctoria Park Construction Liaison Committee Meeting - March 2018
 
GLASS, Ian (Mar15)
GLASS, Ian (Mar15)GLASS, Ian (Mar15)
GLASS, Ian (Mar15)
 
West Open House - Progress Update Sept 2014
West Open House - Progress Update Sept 2014West Open House - Progress Update Sept 2014
West Open House - Progress Update Sept 2014
 
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
Eglinton- Mount Pleasant Construction Liaison Committee Meeting - July 2017
 
Leaside & Laird Stations Construction Liaison Committee - October 2017
Leaside & Laird Stations Construction Liaison Committee - October 2017Leaside & Laird Stations Construction Liaison Committee - October 2017
Leaside & Laird Stations Construction Liaison Committee - October 2017
 
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
Eglinton & Mount Pleasant Construction Liaison Committee - November 2017
 
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
Brentcliffe - Victoria Park Construction Liaison Committee - September 2017
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017
 
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
Pharmacy to Kennedy Construction Liaison Committee Meeting - July 2017
 

Viewers also liked

Structural survey, inspection and evaluation using LS technology
Structural survey, inspection and evaluation using LS technologyStructural survey, inspection and evaluation using LS technology
Structural survey, inspection and evaluation using LS technologyMichael Xinogalos
 
Neelum jehlum hydropower project
Neelum jehlum hydropower projectNeelum jehlum hydropower project
Neelum jehlum hydropower projectMuhammad Aqeel
 
Sustainability and Safety in Tunnels
Sustainability and Safety in TunnelsSustainability and Safety in Tunnels
Sustainability and Safety in TunnelsFathi Tarada
 
Road Tunnel Fire-Life Safety and CFD Modeling
Road Tunnel Fire-Life Safety and CFD ModelingRoad Tunnel Fire-Life Safety and CFD Modeling
Road Tunnel Fire-Life Safety and CFD ModelingWSP
 
Tunnel ventilation ppt tunnel asia 2013
Tunnel ventilation ppt tunnel asia 2013Tunnel ventilation ppt tunnel asia 2013
Tunnel ventilation ppt tunnel asia 2013Hitesh Khanna
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Hitesh Khanna
 
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014Hitesh Khanna
 

Viewers also liked (9)

Structural survey, inspection and evaluation using LS technology
Structural survey, inspection and evaluation using LS technologyStructural survey, inspection and evaluation using LS technology
Structural survey, inspection and evaluation using LS technology
 
Neelum jehlum hydropower project
Neelum jehlum hydropower projectNeelum jehlum hydropower project
Neelum jehlum hydropower project
 
Sustainability and Safety in Tunnels
Sustainability and Safety in TunnelsSustainability and Safety in Tunnels
Sustainability and Safety in Tunnels
 
Kashmir rail project
Kashmir rail projectKashmir rail project
Kashmir rail project
 
Road Tunnel Fire-Life Safety and CFD Modeling
Road Tunnel Fire-Life Safety and CFD ModelingRoad Tunnel Fire-Life Safety and CFD Modeling
Road Tunnel Fire-Life Safety and CFD Modeling
 
Tunnel ventilation ppt tunnel asia 2013
Tunnel ventilation ppt tunnel asia 2013Tunnel ventilation ppt tunnel asia 2013
Tunnel ventilation ppt tunnel asia 2013
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
 
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014
TUNNEL VENTILATION AND SAFETY - PAPAR PRESENTED AT IPWE SEMINAR 2014
 
Submerged tunnel ppt
Submerged tunnel pptSubmerged tunnel ppt
Submerged tunnel ppt
 

Similar to A Tunnel Under Geylang River, The Story of Geylang River Diversion

ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptxAditya Mane
 
Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Crosstown TO
 
Western works final
Western works final Western works final
Western works final Crosstown TO
 
Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019Crosstown TO
 
Tunnel Construction info.pdf
Tunnel Construction info.pdfTunnel Construction info.pdf
Tunnel Construction info.pdfHamzaQayyum27
 
Brentcliffe-Victoria Park CLC Meeting - May 6, 2021
Brentcliffe-Victoria Park CLC Meeting - May 6, 2021Brentcliffe-Victoria Park CLC Meeting - May 6, 2021
Brentcliffe-Victoria Park CLC Meeting - May 6, 2021Crosstown TO
 
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting - ...
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting  - ...Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting  - ...
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting - ...Crosstown TO
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases ISven Maedler
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCrosstown TO
 
Central East Crosstown Open House Presentation
Central East Crosstown Open House PresentationCentral East Crosstown Open House Presentation
Central East Crosstown Open House PresentationCrosstown TO
 
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017Crosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingCrosstown TO
 
PIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase IPIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase ISven Maedler
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingCrosstown TO
 
UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15ADAM DUKE
 
Pharmacy to kennedy construction liaison committee meeting - June 2018
Pharmacy to kennedy construction liaison committee meeting - June 2018Pharmacy to kennedy construction liaison committee meeting - June 2018
Pharmacy to kennedy construction liaison committee meeting - June 2018Crosstown TO
 
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017Crosstown TO
 
Meeting of the brossard good neighbourly relations committee september 21 2016
Meeting of the brossard good neighbourly relations committee   september 21 2016Meeting of the brossard good neighbourly relations committee   september 21 2016
Meeting of the brossard good neighbourly relations committee september 21 2016Pont Samuel-De Champlain Bridge
 

Similar to A Tunnel Under Geylang River, The Story of Geylang River Diversion (20)

ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
ATAL TUNNEL.pptx
ATAL TUNNEL.pptxATAL TUNNEL.pptx
ATAL TUNNEL.pptx
 
laos-tj-2016
laos-tj-2016laos-tj-2016
laos-tj-2016
 
Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017
 
Western works final
Western works final Western works final
Western works final
 
Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019
 
Tunnel Construction info.pdf
Tunnel Construction info.pdfTunnel Construction info.pdf
Tunnel Construction info.pdf
 
Brentcliffe-Victoria Park CLC Meeting - May 6, 2021
Brentcliffe-Victoria Park CLC Meeting - May 6, 2021Brentcliffe-Victoria Park CLC Meeting - May 6, 2021
Brentcliffe-Victoria Park CLC Meeting - May 6, 2021
 
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting - ...
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting  - ...Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting  - ...
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting - ...
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases I
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open House
 
Central East Crosstown Open House Presentation
Central East Crosstown Open House PresentationCentral East Crosstown Open House Presentation
Central East Crosstown Open House Presentation
 
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee Meeting
 
PIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase IPIS Uyo - Ikot Ekpene Road Phase I
PIS Uyo - Ikot Ekpene Road Phase I
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15
 
Pharmacy to kennedy construction liaison committee meeting - June 2018
Pharmacy to kennedy construction liaison committee meeting - June 2018Pharmacy to kennedy construction liaison committee meeting - June 2018
Pharmacy to kennedy construction liaison committee meeting - June 2018
 
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
 
Meeting of the brossard good neighbourly relations committee september 21 2016
Meeting of the brossard good neighbourly relations committee   september 21 2016Meeting of the brossard good neighbourly relations committee   september 21 2016
Meeting of the brossard good neighbourly relations committee september 21 2016
 

More from Singapore Power Ltd

Fire In The Belly! SG Trains Trainspotters!
Fire In The Belly! SG Trains Trainspotters!Fire In The Belly! SG Trains Trainspotters!
Fire In The Belly! SG Trains Trainspotters!Singapore Power Ltd
 
How To Encourage Pedestrians To Use A New Underpass?
How To Encourage Pedestrians To Use A New Underpass?How To Encourage Pedestrians To Use A New Underpass?
How To Encourage Pedestrians To Use A New Underpass?Singapore Power Ltd
 
Are We The Most Sheltered People
Are We The Most Sheltered PeopleAre We The Most Sheltered People
Are We The Most Sheltered PeopleSingapore Power Ltd
 
"Shared Vision" - Briefing for PA held on 19 may 2010
"Shared Vision" - Briefing for PA held on 19 may 2010"Shared Vision" - Briefing for PA held on 19 may 2010
"Shared Vision" - Briefing for PA held on 19 may 2010Singapore Power Ltd
 
Public Relation is not a "Wayang Show"
Public Relation is not a "Wayang Show"Public Relation is not a "Wayang Show"
Public Relation is not a "Wayang Show"Singapore Power Ltd
 
7 steps to building a stronger corporate brand
7 steps to building a stronger corporate brand7 steps to building a stronger corporate brand
7 steps to building a stronger corporate brandSingapore Power Ltd
 
7 steps to building a stronger corporate brand
7 steps to building a stronger corporate brand7 steps to building a stronger corporate brand
7 steps to building a stronger corporate brandSingapore Power Ltd
 
Customer satisfaction survey analysis of results
Customer satisfaction survey analysis of resultsCustomer satisfaction survey analysis of results
Customer satisfaction survey analysis of resultsSingapore Power Ltd
 
Closer: Circle Line Tunnel Breakthrough
Closer: Circle Line Tunnel BreakthroughCloser: Circle Line Tunnel Breakthrough
Closer: Circle Line Tunnel BreakthroughSingapore Power Ltd
 
Sights & Sound Of A Community Carnival
Sights & Sound Of A Community CarnivalSights & Sound Of A Community Carnival
Sights & Sound Of A Community CarnivalSingapore Power Ltd
 

More from Singapore Power Ltd (16)

Fire In The Belly! SG Trains Trainspotters!
Fire In The Belly! SG Trains Trainspotters!Fire In The Belly! SG Trains Trainspotters!
Fire In The Belly! SG Trains Trainspotters!
 
War On Dengue
War On DengueWar On Dengue
War On Dengue
 
Playing to a full house
Playing to a full housePlaying to a full house
Playing to a full house
 
How To Encourage Pedestrians To Use A New Underpass?
How To Encourage Pedestrians To Use A New Underpass?How To Encourage Pedestrians To Use A New Underpass?
How To Encourage Pedestrians To Use A New Underpass?
 
Are We The Most Sheltered People
Are We The Most Sheltered PeopleAre We The Most Sheltered People
Are We The Most Sheltered People
 
"Shared Vision" - Briefing for PA held on 19 may 2010
"Shared Vision" - Briefing for PA held on 19 may 2010"Shared Vision" - Briefing for PA held on 19 may 2010
"Shared Vision" - Briefing for PA held on 19 may 2010
 
Public Relation is not a "Wayang Show"
Public Relation is not a "Wayang Show"Public Relation is not a "Wayang Show"
Public Relation is not a "Wayang Show"
 
7 steps to building a stronger corporate brand
7 steps to building a stronger corporate brand7 steps to building a stronger corporate brand
7 steps to building a stronger corporate brand
 
7 steps to building a stronger corporate brand
7 steps to building a stronger corporate brand7 steps to building a stronger corporate brand
7 steps to building a stronger corporate brand
 
Customer satisfaction survey analysis of results
Customer satisfaction survey analysis of resultsCustomer satisfaction survey analysis of results
Customer satisfaction survey analysis of results
 
Closer: Circle Line Tunnel Breakthrough
Closer: Circle Line Tunnel BreakthroughCloser: Circle Line Tunnel Breakthrough
Closer: Circle Line Tunnel Breakthrough
 
Off The Beaten Track
Off The Beaten TrackOff The Beaten Track
Off The Beaten Track
 
Sights & Sound Of A Community Carnival
Sights & Sound Of A Community CarnivalSights & Sound Of A Community Carnival
Sights & Sound Of A Community Carnival
 
At The Heart Of The Community
At The Heart Of The CommunityAt The Heart Of The Community
At The Heart Of The Community
 
A Public Communication Story
A Public Communication StoryA Public Communication Story
A Public Communication Story
 
We Keep Shoppers Moving
We Keep Shoppers MovingWe Keep Shoppers Moving
We Keep Shoppers Moving
 

Recently uploaded

Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfSamirsinh Parmar
 
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
A PPT on digital India initiative by Government of India
A PPT on digital India initiative by Government of IndiaA PPT on digital India initiative by Government of India
A PPT on digital India initiative by Government of IndiaMiteshKumar471773
 
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...SUHANI PANDEY
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)Congressional Budget Office
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisChristina Parmionova
 
Government e Marketplace GeM Presentation
Government e Marketplace GeM PresentationGovernment e Marketplace GeM Presentation
Government e Marketplace GeM Presentationgememarket11
 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...SUHANI PANDEY
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
SMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptxSMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptx
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptxShovan Prita Paul .
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learningNAP Global Network
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...SUHANI PANDEY
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterChristina Parmionova
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlEdouardHusson
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'NAP Global Network
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Dipal Arora
 

Recently uploaded (20)

Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
 
A PPT on digital India initiative by Government of India
A PPT on digital India initiative by Government of IndiaA PPT on digital India initiative by Government of India
A PPT on digital India initiative by Government of India
 
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
Nanded City ? Russian Call Girls Pune - 450+ Call Girl Cash Payment 800573673...
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
Government e Marketplace GeM Presentation
Government e Marketplace GeM PresentationGovernment e Marketplace GeM Presentation
Government e Marketplace GeM Presentation
 
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
VIP Model Call Girls Shikrapur ( Pune ) Call ON 8005736733 Starting From 5K t...
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
SMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptxSMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptx
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
VIP Model Call Girls Narhe ( Pune ) Call ON 8005736733 Starting From 5K to 25...
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 

A Tunnel Under Geylang River, The Story of Geylang River Diversion

  • 1. Issue 4, May 2006Contract 421 - ECP to Nicoll Highway The Kallang/ Paya Lebar Expressway (KPE) project is Singapore’s most complex expressway project to date. With 9 kilometres of underground tunnels to construct, engineers have had to face challenges ranging from deep marine clay valleys, a network of underground utilities, tunnel construction under the operational east-west MRT line, and tunnel construction under the Geylang River. For Contract 421, the tunnel works at the Geylang River has offered the greatest challenge to the project team. As part of the preparation work for the river diversion, a cofferdam was constructed on the north bank of the Geylang River (see figure 1). The tunnel structure was then built within the cofferdam. Temporary works for the future main river diversion were then installed and Geylang River was diverted to the north side and on top of the completed KPE tunnel structure. This phase of work was completed in June 2004. After the successful diversion of the Geylang River over the completed tunnel on the north bank, double sheet pile cofferdams were installed across the old river course and filled with sand (see figure 2). Another sheet pile wall was then installed within which excavation for the KPE tunnel can be carried out. Water was then pumped out from the area within the cofferdam to allow excavation of the tunnel to begin (see figure 3). The Story of Geylang River diversion
  • 2. We have adopted a Top-Down Construction method for the Geylang River section due to the deep soft ground. The sequence of works involves excavation and installation of steel struts to the level of the tunnel roof slab, followed by the construction and casting of the tunnel roof slab. The 3m thick tunnel roof slab provides a massive and rigid support across the excavation site. Excavation below the roof slab is then carried out through access openings left in the tunnel roof slab. The excavation is taken down layer by layer to the tunnel base slab. The base slab will then be concreted. The side walls of the tunnels are then constructed between the roof and the base. Once the full tunnel structure is completed, the access openings on the roof slabs are sealed (see figure 4). The river is then diverted back to its original alignment and the river walls reconstructed (see figures 5 & 6). Progress Update About 85% of the tunnel roof at the Geylang River section has been completed. To ensure the stability of the works, a jet grout block is being installed in front of the PUB substation. Jet grout piling is expected to be completed in April 2006. Following this, the remaining section of the roof will be completed and the next stage of excavation below the tunnel roof progressed across the entire area. The project team is planning to complete the tunnel across the Geylang River within the next 10 months. Excavation under the tunnel roof slab at the Geylang River Figure 1 Figure 2 Figure 3 Figure 4 Figure 5 Figure 6
  • 3. As Good As New Works in other areas have progressed well. We reinstated Stadium Walk / Stadium Crescenton15February2006.Weareinthe process of handing back the reconstructed Kallang Practice Track and football field to the Singapore Sports Council. Reinstatement works at the Stadium Boulevard / Stadium Drive junction are in progress and will be completed by June 2006. The reinstatement of the stadium area between Jalan Benaan Kapal and Nicoll Highway is almost complete. Our engineers are working hard to ensure that the area near car park ‘F’ and Stadium Drive would be ready for the National Day event. The winding temporary Stadium Drive will be realigned to its final location sometime in June 2006 after the backfilling of the KPE and CCL tunnels below the road junction. Motorists will soon have a smoother ride in and out of the stadium area. South of the ECP Another completed section is the KPE tunnel below the Ventilation Building ‘A’. The remaining works to the building are erection of the perimeter fencing and landscaping for the area.This is being done by the National Parks Board. Works at North of ECP Kallang Practice Track & football field have been reinstated North of the ECP Just north of the ECP, the construction of Slip Road ‘A’ tunnel structure connecting the ECP to the north bound KPE tunnel is in progress. Construction of Slip Road ‘B’, the exit slip road from KPE south bound tunnel joining ECP (Changi direction) is going at full pace and sheet-piling works are nearly completed. Excavation works and structural works are progressing well. Jet grout piles for soil improvement are being installed in the pump sump and shallow end of the slip road due to presence of soft material below the tunnel structure. Construction of the main tunnel between the ECP and Tanjong Rhu is also in full swing. Excavation and strutting works have reached the tunnel formation level. The casting of the first base slab at one of the widest excavation in the KPE road interchange has been completed.
  • 4. On 18 January 2006, KPE project team conducted a series of hot smoke tests in the KPE tunnel at KPE slip road “D” under the East Coast Parkway (ECP). The tests allowed our engineers to verify the effectiveness of the tunnel fire protection and ventilation systems in the event of a fire within the KPE tunnel. For the first test, six numbers of A1 size steel trays containing 9 litres of kerosene were ignited to simulate a 5 MW fire. Two minutes from the onset of the fire, two tunnel ventilation fans located in the ventilation building were activated to extract the smoke generated from the fire. Smoke from the fire was effectively channelled away from the escape path and was extracted and removed through the KPE ventilation building “A” located South of the ECP. 6 nos. of A1 size steel trays & 9 litres of kerosene were used to produce a 5 MW fire A steel enclosure was built to protectthe tunnel interior during the test Smoke b portal a w Ventilation Building ‘A’ is one of the six ventilation buildings along the KPE alignment
  • 5. bellowed out from the tunnel after the six trays of kerosene were ignited within the tunnel Smoke from the fire was successfully extracted out through the exhaust stacks of the ventilation building within minutes of the fire being detected in the tunnel by the Linear Heat Detectors For the second test, the same procedures were repeated except that the speed of the tunnel ventilation fans was varied to operate together with the jet fans in the tunnel. For both tests, the Fibre Optic Linear Heat Detector proved to be effective in detecting the rise in tunnel temperature and activating the alarm. The Linear Heat Detectors were able to detect heat from the hot smoke within 45 seconds. The tunnel ventilation fans and tunnel jet fans were successful in extracting the smoke away from the escape path within minutes during a fire. All in all, the tests were a great success! If you have feedback or suggestions, please contact: Mr Michael Yap, Deputy Manager, Community Relations, Land Transport Authority mobile: 9831 4546 tel: 6396 1600 email: michael_yap@lta.gov.sg Mr Arran Tan Public Relations Officer of SembCorp Engineers and Constructors mobile: 9857 8777 FEEDBACK Land Transport Authority No. 1 Hampshire Road, Singapore 219428 Customer Service Line: 1800 225 5582 Fax: 6396 1148 Website: www.lta.gov.sg
  • 6. A group photograph with our guests taken inside the KPE Contract 422 completed tunnel On Saturday, 7 January 2006, 25 guests comprising members of the Tanjong Rhu Neighbourhood Committee (NC), condominium managers and residents in the Tanjong Rhu area and representatives of Mountbatten Constituency Office visited the KPE tunnel. The visit was jointly organised by the Mountbatten Constituency Office and the Land Transport Authority. Mr Lee Chian Heng, Senior Project Manager for KPE Contract 421 conducted a short briefing before leading the visitors for a site tour at the Geylang River site and a short tour of the KPE Contract 422 completed tunnel. Our guests were shown some of the key Electrical & Mechanical installations and safety features at the completed Contract 422tunnel.Withthiscloseencounter and guided tour of KPE site, our guests gained a better appreciation of the scale and complexity of the construction work at the Geylang River, as well as received an update of the construction progress directly from the KPE team. Mr Ronnie Lim, Chairman of the Tanjong Rhu NC, thanked the KPE team for organising the site visit. He expressed the members’ appreciation of the opportunity to visit the KPE site. Mr Chuah Han Leong, Deputy Director, KPE pointing out to the visitors, some of the unique E&M features in the KPE tunnel Senior Project Manager, Mr Lee Chian Heng (second from left) leading our guests for the visit to the Geylang River site