NOVA DESIGN BUILD : ALL SITES STATUS REPORT
S.NO Project
Design
Procuement
Execution
T A S K S Status Action By
Initial
Committed
Date
Revised
Committed Date Remarks / Dependent Works
Sowmya Annex Reviewed on 05-09-2022
E-1 Annex C C P VYNIL FLOORING ( 25 sqmts) fixing pending Eshwar 18-07-22 open
E-2 Annex C C P Structural Glazing works One Glass Pan pending + Sealent filling Shakeel 15-07-22 open Bottom Grove cutting needed
E-3 Annex C C Fire Fighting - Hose Real Tapping in all floors Hussain informed vendor
E-4 Annex C C Pinup board for consultation rooms cleared by MD today Shakeel in process
E-5 Annex C P - Rubber Matts at panel Room Advised the Electrical Contractor Anup
E-6 Annex C Green Paint for Earthing strip at Panel room Information and NA Anup Spec request
E-7 Annex C All Bed Head Panel Internal Cu flexable pipes are requested in place of PVC pipes;
communicated to vendor accordingly to change
Anup Spec change request
E-8 Annex C Gysers - Racold Make is suggested Binu/Sudheer specs
E-9 Annex C C - Terrace Flooring : [LL Scope] due to which our false ceiling is
getting damage in 2 locations
Jay shekar
E-10 Annex C C O Terrace Masonry Works : LL Scope Jay shekar
Main & Linac Block Issues
E-1 Linac Linac - louvers to be modified with lesser opening
[but rejected by end user]
we need to explore alternate option
Anup 15-07-22 open
E-2 Linac Linac - front Alum Water Patti to have for the elevation Anup 15-07-22 open
E-3 Mainblock Bus Coupler Repair / Repacement Needed at Sowmya Main
Block Power Panel
Binu open
E-4 Mainblock Water Stagnation in toilets of RM 1,2,8,9,11 Maintainace Binu open
E-5 Linac Gas Meters needed for lines of Linac Block Trail pipe in copper only Binu open
#REF! Mainblock External Drain lines [further fastner materials indend made] Purchase open
BANNU WARANGAL
E-1 WNP staircase plastering yet to be takenup Raju
E-2 WNP west side external plastering second coat in progress will be done by 07-09 Raju
E-3 WNP p Metal doors will come by 06-09-22 anup
E-4 WNP UPVC WINDOWS WEST SIDE PENDING Raju
E-5 WNP GRANITE FLOORING IN STAIRCASE [3RD AND 4TH FLOOR] planned to complete by weekend Raju
E-6 WNP INTERNAL SS RAILING to be floated anup
E-7 WNP Lift : gova work to be takenup for painting and electrical works Raju
E-8 WNP External Painting works in progress Raju
E-9 WNP p Elevation fixed glass enquired floated anup
OMEGA KURNOOL
D-1 OK - - -
D-1 OK P DIRTY CORRIDOR PLATFORM AND STEPS JAY
E-1 OK C C P Electrical - Low Side B-1 conduit balance; B-2 linac conduit balance keethi
E-2 OK C C P Plumbing Sewer lines in 4th floor balance; Plumbing lines 3rd
and 4th flr balance
keethi
E-3 OK C C P HVAC Re work completed with cassate AC's.
copper lines to be initate.
keethi
E-4 OK C C P Fire Fire Package done; Hydrants only pending keethi
E-5 OK C C P Medical gas 4th floor only pending; Manifold area identified keethi
E-6 OK C C P Electrical - High Side Transformer [in progress] & Panels keethi
E-7 OK C C P Electrical - Captive Power DG Sets & UPS
E-6 OK C C - wooden door frames Materials to be supplied VeeraReddy
Jay Sekhar Sharma coordinated with Durga Prasad
Garu. Mr Subba Rao assured that they will
complete the works by Weekend
LL Scope
05-09-2022 1 of 2
NOVA DESIGN BUILD : ALL SITES STATUS REPORT
S.NO Project
Design
Procuement
Execution
T A S K S Status Action By
Initial
Committed
Date
Revised
Committed Date Remarks / Dependent Works
E-7 OK C P - Metal doors order Anup
E-8 OK C - - wood door shutters VeeraReddy
E-9 OK C C - Flooring - Tandur completed VeeraReddy
E-10 OK C - - Flooring - Granite cill work in progress VeeraReddy
E-11 OK C P - Flooring - Vitirified materials supplied VeeraReddy
E-12 OK C - - Flooring - Vynil flooring Indent to be Placed Anup
E-13 OK C C P External Plastering West side in progress [65% completed] VeeraReddy client is doing this work
Mahendra Hills
E-1 MH C C P Retaining wall works Shuttering in progress Nagaraj
E-2 MH C C P Brick Work Present kept on hold Nagaraj
MLA HOUSE
D-1 MLA P 1ST SLAB DETAIL REQUESTED ON 29/07 JAY closed
D-2 MLA P SUMP DETAIL REQUESTED ON 29/07 JAY
RAKESH VILLA
D-1 RV4 P P FLOORING STONE APPROVAL [supply of 2'x3'] REQUESTED ON 29/07 MD
D-2 RV4 P P JONARY WORKS IN PROGRESS JAY
E-1 RV4 P P P External MASONRY IN PROGRESS WILL BE COMPLETED BY WEEKEND ANUP
E-2 RV4 P P P ELECTRICAL WORKS CONDUIT WORKS DONE ANUP closed
DR KIRANS HOUSE
D-1 KH P BRICK WORK VAKDEVI
D-2 KH P PATHWAY TILES / STONE FLOORING VAKDEVI
D-3 KH P RESTORE EXISITING WOODEN ROOF AT DOOR VAKDEVI
D-4 KH P MODULAR KITCHEN VAKDEVI
D-5 KH P BED ROOM WARDROB LAMINATE TO BE REPLACED VAKDEVI
D-6 KH P ANTIQUE DOOR FIXING VAKDEVI
D-7 KH P PHE FITTINGS NEED TO BE CHANGED VAKDEVI
D-8 KH P SHOWER CUBICAL TO BE CHANGED VAKDEVI
D-9 KH P ALL DOWNLIGHTS TO BE CHANGED VAKDEVI
D-10 KH P LIGHTING FOR ENTRANCE DOOR - WIRING TO BE DONE VAKDEVI
D-11 KH P WALL PAPERS TO BE PROPOSED IF REQUIRED VAKDEVI
05-09-2022 2 of 2

More Related Content

Similar to status report.pdf

Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16bill ure
 
CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021 CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021 Crosstown TO
 
ICI FINAL REPORT PDF
ICI FINAL REPORT PDFICI FINAL REPORT PDF
ICI FINAL REPORT PDFClement Seong
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2syed abdul wahab
 
CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONcyberyogi07
 
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)Crosstown TO
 
Avenue & Chaplin CLC - Construction Update: January 5, 2022
Avenue & Chaplin CLC - Construction Update: January 5, 2022Avenue & Chaplin CLC - Construction Update: January 5, 2022
Avenue & Chaplin CLC - Construction Update: January 5, 2022Crosstown TO
 
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022Crosstown TO
 
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020Crosstown TO
 
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...Rodger McKinley
 
Brentcliffe to Victoria Park - March 4, 2021
Brentcliffe to Victoria Park - March 4, 2021Brentcliffe to Victoria Park - March 4, 2021
Brentcliffe to Victoria Park - March 4, 2021Crosstown TO
 
Leaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdfLeaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdfCrosstown TO
 
Fairbank-Oakwood Construction Update - September 2021
Fairbank-Oakwood Construction Update - September 2021Fairbank-Oakwood Construction Update - September 2021
Fairbank-Oakwood Construction Update - September 2021Crosstown TO
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Studygrahamelanders
 

Similar to status report.pdf (20)

Uniworld garden-2 up date
Uniworld garden-2 up dateUniworld garden-2 up date
Uniworld garden-2 up date
 
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16
 
CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021 CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021
 
ICI FINAL REPORT PDF
ICI FINAL REPORT PDFICI FINAL REPORT PDF
ICI FINAL REPORT PDF
 
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
Ahmed Al Balawi-Sea Water Cooling System For Jubail 2
 
CONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATIONCONSTRUCTION PRESENTATION
CONSTRUCTION PRESENTATION
 
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
CLC presentation deck Brentcliffe to Victoria Park (July 9 2020)
 
Avenue & Chaplin CLC - Construction Update: January 5, 2022
Avenue & Chaplin CLC - Construction Update: January 5, 2022Avenue & Chaplin CLC - Construction Update: January 5, 2022
Avenue & Chaplin CLC - Construction Update: January 5, 2022
 
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
Brentcliffe to Victoria Park CLC Meeting - Presentation - Jan 13, 2022
 
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
 
A CLARK 16
A CLARK 16A CLARK 16
A CLARK 16
 
CV souvanna.2.2
CV souvanna.2.2CV souvanna.2.2
CV souvanna.2.2
 
Monthly Progress Report - September 2014
Monthly Progress Report - September 2014Monthly Progress Report - September 2014
Monthly Progress Report - September 2014
 
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
 
VK-Resume
VK-ResumeVK-Resume
VK-Resume
 
ICI FINAL REPORT
ICI FINAL REPORTICI FINAL REPORT
ICI FINAL REPORT
 
Brentcliffe to Victoria Park - March 4, 2021
Brentcliffe to Victoria Park - March 4, 2021Brentcliffe to Victoria Park - March 4, 2021
Brentcliffe to Victoria Park - March 4, 2021
 
Leaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdfLeaside-Laird CLC - May 9 2022 - Revised.pdf
Leaside-Laird CLC - May 9 2022 - Revised.pdf
 
Fairbank-Oakwood Construction Update - September 2021
Fairbank-Oakwood Construction Update - September 2021Fairbank-Oakwood Construction Update - September 2021
Fairbank-Oakwood Construction Update - September 2021
 
Freelance project management commercial - Case Study
Freelance project management commercial - Case StudyFreelance project management commercial - Case Study
Freelance project management commercial - Case Study
 

Recently uploaded

Captain america painting competition -- 13
Captain america painting competition -- 13Captain america painting competition -- 13
Captain america painting competition -- 13Su Yan-Jen
 
Norco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdf
Norco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdfNorco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdf
Norco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdfRebeccaPontieri
 
Hosewife Bangalore Just VIP Btm Layout 100% Genuine at your Door Step
Hosewife Bangalore Just VIP Btm Layout 100% Genuine at your Door StepHosewife Bangalore Just VIP Btm Layout 100% Genuine at your Door Step
Hosewife Bangalore Just VIP Btm Layout 100% Genuine at your Door Stepdarmandersingh4580
 
obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...
obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...
obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...yulianti213969
 
The Adventurer's Guide Book by Amoré van der Linde
The Adventurer's Guide Book by Amoré van der LindeThe Adventurer's Guide Book by Amoré van der Linde
The Adventurer's Guide Book by Amoré van der Lindethatsamorevdl
 
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样aqwaz
 
Neighborhood Guide To Atlanta’s Awe-Inspiring Art Galleries
Neighborhood Guide To Atlanta’s Awe-Inspiring Art GalleriesNeighborhood Guide To Atlanta’s Awe-Inspiring Art Galleries
Neighborhood Guide To Atlanta’s Awe-Inspiring Art Galleriesconnectcontemporary
 
一比一原版西悉尼大学毕业证(UWS毕业证)成绩单如可办理
一比一原版西悉尼大学毕业证(UWS毕业证)成绩单如可办理一比一原版西悉尼大学毕业证(UWS毕业证)成绩单如可办理
一比一原版西悉尼大学毕业证(UWS毕业证)成绩单如可办理awuboo
 
Tagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdf
Tagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdfTagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdf
Tagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdferintagarino1
 
(She)nanigans - Spring / Summer 2024 Lookbook
(She)nanigans - Spring / Summer 2024 Lookbook(She)nanigans - Spring / Summer 2024 Lookbook
(She)nanigans - Spring / Summer 2024 Lookbookshenanigansofficials
 
obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...
obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...
obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...yulianti213969
 
prodtion diary updated.pptxrfhkfjgjggjkgjk
prodtion diary updated.pptxrfhkfjgjggjkgjkprodtion diary updated.pptxrfhkfjgjggjkgjk
prodtion diary updated.pptxrfhkfjgjggjkgjkLeonBraley
 
一比一定制英国赫特福德大学毕业证学位证书
一比一定制英国赫特福德大学毕业证学位证书一比一定制英国赫特福德大学毕业证学位证书
一比一定制英国赫特福德大学毕业证学位证书AS
 
Tagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdf
Tagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdfTagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdf
Tagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdferintagarino1
 
Gabriel Van Konynenburg _ Portfolio Visual
Gabriel Van Konynenburg _ Portfolio VisualGabriel Van Konynenburg _ Portfolio Visual
Gabriel Van Konynenburg _ Portfolio Visualgabbyvan28
 
Sun day thang 4 sun life team trung dai
Sun day thang 4 sun life team trung daiSun day thang 4 sun life team trung dai
Sun day thang 4 sun life team trung daiGiangTra20
 
My scariest moment presentation-part one
My scariest moment presentation-part oneMy scariest moment presentation-part one
My scariest moment presentation-part oneatetteh2001
 
K_ E_ S_ Retail Store Scavenger Hunt.pptx
K_ E_ S_ Retail Store Scavenger Hunt.pptxK_ E_ S_ Retail Store Scavenger Hunt.pptx
K_ E_ S_ Retail Store Scavenger Hunt.pptxKenSmith311760
 

Recently uploaded (20)

Captain america painting competition -- 13
Captain america painting competition -- 13Captain america painting competition -- 13
Captain america painting competition -- 13
 
Norco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdf
Norco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdfNorco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdf
Norco College - M4MH Athlete Pilot - 4.30.24 - Presentation.pdf
 
Hosewife Bangalore Just VIP Btm Layout 100% Genuine at your Door Step
Hosewife Bangalore Just VIP Btm Layout 100% Genuine at your Door StepHosewife Bangalore Just VIP Btm Layout 100% Genuine at your Door Step
Hosewife Bangalore Just VIP Btm Layout 100% Genuine at your Door Step
 
obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...
obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...
obat aborsi wonogiri wa 081336238223 jual obat aborsi cytotec asli di wonogir...
 
The Adventurer's Guide Book by Amoré van der Linde
The Adventurer's Guide Book by Amoré van der LindeThe Adventurer's Guide Book by Amoré van der Linde
The Adventurer's Guide Book by Amoré van der Linde
 
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
一比一原版(MQU毕业证书)麦考瑞大学毕业证成绩单原件一模一样
 
Kiff
KiffKiff
Kiff
 
Neighborhood Guide To Atlanta’s Awe-Inspiring Art Galleries
Neighborhood Guide To Atlanta’s Awe-Inspiring Art GalleriesNeighborhood Guide To Atlanta’s Awe-Inspiring Art Galleries
Neighborhood Guide To Atlanta’s Awe-Inspiring Art Galleries
 
一比一原版西悉尼大学毕业证(UWS毕业证)成绩单如可办理
一比一原版西悉尼大学毕业证(UWS毕业证)成绩单如可办理一比一原版西悉尼大学毕业证(UWS毕业证)成绩单如可办理
一比一原版西悉尼大学毕业证(UWS毕业证)成绩单如可办理
 
Tagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdf
Tagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdfTagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdf
Tagarino_14510147_Assessment 2B ThresholdProcess Journal FINAL.pdf
 
(She)nanigans - Spring / Summer 2024 Lookbook
(She)nanigans - Spring / Summer 2024 Lookbook(She)nanigans - Spring / Summer 2024 Lookbook
(She)nanigans - Spring / Summer 2024 Lookbook
 
obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...
obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...
obat aborsi klaten wa 081336238223 jual obat aborsi cytotec asli di klaten54-...
 
prodtion diary updated.pptxrfhkfjgjggjkgjk
prodtion diary updated.pptxrfhkfjgjggjkgjkprodtion diary updated.pptxrfhkfjgjggjkgjk
prodtion diary updated.pptxrfhkfjgjggjkgjk
 
一比一定制英国赫特福德大学毕业证学位证书
一比一定制英国赫特福德大学毕业证学位证书一比一定制英国赫特福德大学毕业证学位证书
一比一定制英国赫特福德大学毕业证学位证书
 
Tagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdf
Tagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdfTagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdf
Tagarino_14510147_Process Journal AS1 Inhabiting the WallDesign.pdf
 
Gabriel Van Konynenburg _ Portfolio Visual
Gabriel Van Konynenburg _ Portfolio VisualGabriel Van Konynenburg _ Portfolio Visual
Gabriel Van Konynenburg _ Portfolio Visual
 
Sun day thang 4 sun life team trung dai
Sun day thang 4 sun life team trung daiSun day thang 4 sun life team trung dai
Sun day thang 4 sun life team trung dai
 
My scariest moment presentation-part one
My scariest moment presentation-part oneMy scariest moment presentation-part one
My scariest moment presentation-part one
 
K_ E_ S_ Retail Store Scavenger Hunt.pptx
K_ E_ S_ Retail Store Scavenger Hunt.pptxK_ E_ S_ Retail Store Scavenger Hunt.pptx
K_ E_ S_ Retail Store Scavenger Hunt.pptx
 
Apotik Jual Obat Aborsi asli Malang, Wa : 085180626899 - Penjual obat Cytotec...
Apotik Jual Obat Aborsi asli Malang, Wa : 085180626899 - Penjual obat Cytotec...Apotik Jual Obat Aborsi asli Malang, Wa : 085180626899 - Penjual obat Cytotec...
Apotik Jual Obat Aborsi asli Malang, Wa : 085180626899 - Penjual obat Cytotec...
 

status report.pdf

  • 1. NOVA DESIGN BUILD : ALL SITES STATUS REPORT S.NO Project Design Procuement Execution T A S K S Status Action By Initial Committed Date Revised Committed Date Remarks / Dependent Works Sowmya Annex Reviewed on 05-09-2022 E-1 Annex C C P VYNIL FLOORING ( 25 sqmts) fixing pending Eshwar 18-07-22 open E-2 Annex C C P Structural Glazing works One Glass Pan pending + Sealent filling Shakeel 15-07-22 open Bottom Grove cutting needed E-3 Annex C C Fire Fighting - Hose Real Tapping in all floors Hussain informed vendor E-4 Annex C C Pinup board for consultation rooms cleared by MD today Shakeel in process E-5 Annex C P - Rubber Matts at panel Room Advised the Electrical Contractor Anup E-6 Annex C Green Paint for Earthing strip at Panel room Information and NA Anup Spec request E-7 Annex C All Bed Head Panel Internal Cu flexable pipes are requested in place of PVC pipes; communicated to vendor accordingly to change Anup Spec change request E-8 Annex C Gysers - Racold Make is suggested Binu/Sudheer specs E-9 Annex C C - Terrace Flooring : [LL Scope] due to which our false ceiling is getting damage in 2 locations Jay shekar E-10 Annex C C O Terrace Masonry Works : LL Scope Jay shekar Main & Linac Block Issues E-1 Linac Linac - louvers to be modified with lesser opening [but rejected by end user] we need to explore alternate option Anup 15-07-22 open E-2 Linac Linac - front Alum Water Patti to have for the elevation Anup 15-07-22 open E-3 Mainblock Bus Coupler Repair / Repacement Needed at Sowmya Main Block Power Panel Binu open E-4 Mainblock Water Stagnation in toilets of RM 1,2,8,9,11 Maintainace Binu open E-5 Linac Gas Meters needed for lines of Linac Block Trail pipe in copper only Binu open #REF! Mainblock External Drain lines [further fastner materials indend made] Purchase open BANNU WARANGAL E-1 WNP staircase plastering yet to be takenup Raju E-2 WNP west side external plastering second coat in progress will be done by 07-09 Raju E-3 WNP p Metal doors will come by 06-09-22 anup E-4 WNP UPVC WINDOWS WEST SIDE PENDING Raju E-5 WNP GRANITE FLOORING IN STAIRCASE [3RD AND 4TH FLOOR] planned to complete by weekend Raju E-6 WNP INTERNAL SS RAILING to be floated anup E-7 WNP Lift : gova work to be takenup for painting and electrical works Raju E-8 WNP External Painting works in progress Raju E-9 WNP p Elevation fixed glass enquired floated anup OMEGA KURNOOL D-1 OK - - - D-1 OK P DIRTY CORRIDOR PLATFORM AND STEPS JAY E-1 OK C C P Electrical - Low Side B-1 conduit balance; B-2 linac conduit balance keethi E-2 OK C C P Plumbing Sewer lines in 4th floor balance; Plumbing lines 3rd and 4th flr balance keethi E-3 OK C C P HVAC Re work completed with cassate AC's. copper lines to be initate. keethi E-4 OK C C P Fire Fire Package done; Hydrants only pending keethi E-5 OK C C P Medical gas 4th floor only pending; Manifold area identified keethi E-6 OK C C P Electrical - High Side Transformer [in progress] & Panels keethi E-7 OK C C P Electrical - Captive Power DG Sets & UPS E-6 OK C C - wooden door frames Materials to be supplied VeeraReddy Jay Sekhar Sharma coordinated with Durga Prasad Garu. Mr Subba Rao assured that they will complete the works by Weekend LL Scope 05-09-2022 1 of 2
  • 2. NOVA DESIGN BUILD : ALL SITES STATUS REPORT S.NO Project Design Procuement Execution T A S K S Status Action By Initial Committed Date Revised Committed Date Remarks / Dependent Works E-7 OK C P - Metal doors order Anup E-8 OK C - - wood door shutters VeeraReddy E-9 OK C C - Flooring - Tandur completed VeeraReddy E-10 OK C - - Flooring - Granite cill work in progress VeeraReddy E-11 OK C P - Flooring - Vitirified materials supplied VeeraReddy E-12 OK C - - Flooring - Vynil flooring Indent to be Placed Anup E-13 OK C C P External Plastering West side in progress [65% completed] VeeraReddy client is doing this work Mahendra Hills E-1 MH C C P Retaining wall works Shuttering in progress Nagaraj E-2 MH C C P Brick Work Present kept on hold Nagaraj MLA HOUSE D-1 MLA P 1ST SLAB DETAIL REQUESTED ON 29/07 JAY closed D-2 MLA P SUMP DETAIL REQUESTED ON 29/07 JAY RAKESH VILLA D-1 RV4 P P FLOORING STONE APPROVAL [supply of 2'x3'] REQUESTED ON 29/07 MD D-2 RV4 P P JONARY WORKS IN PROGRESS JAY E-1 RV4 P P P External MASONRY IN PROGRESS WILL BE COMPLETED BY WEEKEND ANUP E-2 RV4 P P P ELECTRICAL WORKS CONDUIT WORKS DONE ANUP closed DR KIRANS HOUSE D-1 KH P BRICK WORK VAKDEVI D-2 KH P PATHWAY TILES / STONE FLOORING VAKDEVI D-3 KH P RESTORE EXISITING WOODEN ROOF AT DOOR VAKDEVI D-4 KH P MODULAR KITCHEN VAKDEVI D-5 KH P BED ROOM WARDROB LAMINATE TO BE REPLACED VAKDEVI D-6 KH P ANTIQUE DOOR FIXING VAKDEVI D-7 KH P PHE FITTINGS NEED TO BE CHANGED VAKDEVI D-8 KH P SHOWER CUBICAL TO BE CHANGED VAKDEVI D-9 KH P ALL DOWNLIGHTS TO BE CHANGED VAKDEVI D-10 KH P LIGHTING FOR ENTRANCE DOOR - WIRING TO BE DONE VAKDEVI D-11 KH P WALL PAPERS TO BE PROPOSED IF REQUIRED VAKDEVI 05-09-2022 2 of 2