Contents
1)Dam
2)Introduction
3)Location
4)Filtration plant
5) Up Gradation
6) Salient Features
7) Financial Information
8) Advantages Of Dam
9) Disadvantages of Dams
What is Dam?
Dams are massive barriers built across
rivers and streams to confine and utilize
the flow of water for human purposes
such as irrigation and generation of
hydroelectricity.
PRESENTATION
On
Kurram Garhi
Introduction
 Kurram Garhi Hydropower Plant (KGHPP) is a
small, low-head, run of the river
hydroelectric power generation station of 4.0
megawatt generation capacity (four units of 1.0
MW each), located at Kurram Garhi, a small town
in Bannu KPK province of Pakistan on the flows of
Kuchkot Canal from Kurram River.
CONTI:
 It is a small hydel power generating plant
constructed and put in commercial operation on
February 1958 with the Average Annual generating
capacity of 17 million units (GWh) of least
expensive electricity.
 Kurram Garhi Power House is situated in North-
West of Bannu district of Khyber Pukhtun-khwa at
a distance of about 09 km from Bannu City.
 It has Four (04) Horizontal Axis Francis Turbine.
Map Location
33°02′00.48″N70°31′56.09″E
Filtration plant
 A big water treatment plant purifies canal water
called kurram. The water is purified for the whole
city. The pure water then flows from Kurram
Garhi to Bannu city approximately 25 km. The
pure water is stored in a huge tank located in
Tanchi Bazar.
Up Gradation
 Prime Minister of Pakistan, during a public meeting at Bannu
on 3rd May, 2016 announced up-gradation of Kurram Garhi
Hydel Power Station.
 Rehabilitation and up-gradation of Kurram Garhi Hydel
Power Station will enhance the capacity from 3.5 MW to 5
MW and provide more reliable & consistent power to the
National Grid for another 30~40 years. Moreover, the
project will also boost the voltage profile of the local region
and help in eradicating energy shortage problems in the
area. The estimated cost of the Project is PKR 1180.851 M
and completion time is 3 years.
Installed Capacity 4 MW
Number of Units Four (04) Horizontal Axis Francis Turbine
Total Available Flow 15.8 m
3
/sec (558 cusecs)
Each Unit Design
Discharge
7.925 m
3
/sec
Gross Head 18.9 meter
Net Head 18.3 meter
Annual Energy 37 GWh
Salient Features
Base cost: PKR 991.716 Million
Total Cost: PKR 1180.851 Million
FIRR: 22.61%
EIRR: 24.58%
Financial Information
Advantages Of Dam
 Hydro Electric Power.
 Tourism and Camping.
 Still Water for Animals.
 Clean Drinking Water for Nearby Cities and Towns.
 Flooding and Water Management.
Disadvantages of Dams
 Expensive and Difficulties in Becoming Profitable.
 Affects on Water Quality and Flow.
 Failure Hazard.
 Environmental Damage.
 Limited Service Life.
 Population Relocation Problem.
Kurram garhi Dam

More Related Content

What's hot

Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Nikhil Jaipurkar
 
Procedure for-distribution-open-access, Tata Power
Procedure for-distribution-open-access, Tata PowerProcedure for-distribution-open-access, Tata Power
Procedure for-distribution-open-access, Tata PowerJay Ranvir
 
200118 chapter 8 hydromechanical
200118 chapter 8 hydromechanical200118 chapter 8 hydromechanical
200118 chapter 8 hydromechanicalBinu Karki
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCADITYA ARYAN
 
Final year project proposal on feasibility study of small hydro power
Final year project proposal on feasibility study of small hydro powerFinal year project proposal on feasibility study of small hydro power
Final year project proposal on feasibility study of small hydro powersurya paudel
 
project-186704975.pdf
project-186704975.pdfproject-186704975.pdf
project-186704975.pdfssuser1e7757
 
Hydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power PlantHydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power PlantParamjeet Singh Jamwal
 
Introduction to energy audit part 2
Introduction to energy audit part 2Introduction to energy audit part 2
Introduction to energy audit part 2ZAINI ABDUL WAHAB
 
Electricity in nepal
Electricity in nepalElectricity in nepal
Electricity in nepalAmresh Shah
 
Run of River and Pumped Storage Plants
Run of River and Pumped Storage PlantsRun of River and Pumped Storage Plants
Run of River and Pumped Storage PlantsSatish Taji
 
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,ReportMAHENDRA MEENA
 
3.1 turbine and governing
3.1 turbine and governing3.1 turbine and governing
3.1 turbine and governingkomalkishor123
 
Wind Energy Potential & Utilization in Pakistan
Wind Energy Potential & Utilization in PakistanWind Energy Potential & Utilization in Pakistan
Wind Energy Potential & Utilization in PakistanSAJID ALI RUK
 
NTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORTNTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORTAnubhav Ghosh
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC pptkirbadh
 
Performance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power PlantPerformance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power PlantGirish Gupta
 

What's hot (20)

Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)Sample DPR for Hydro Project (10 MW) (2012)
Sample DPR for Hydro Project (10 MW) (2012)
 
Procedure for-distribution-open-access, Tata Power
Procedure for-distribution-open-access, Tata PowerProcedure for-distribution-open-access, Tata Power
Procedure for-distribution-open-access, Tata Power
 
200118 chapter 8 hydromechanical
200118 chapter 8 hydromechanical200118 chapter 8 hydromechanical
200118 chapter 8 hydromechanical
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
 
Final year project proposal on feasibility study of small hydro power
Final year project proposal on feasibility study of small hydro powerFinal year project proposal on feasibility study of small hydro power
Final year project proposal on feasibility study of small hydro power
 
project-186704975.pdf
project-186704975.pdfproject-186704975.pdf
project-186704975.pdf
 
Hydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power PlantHydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power Plant
 
List of Clearances for Solar Project
List of Clearances for Solar ProjectList of Clearances for Solar Project
List of Clearances for Solar Project
 
Introduction to energy audit part 2
Introduction to energy audit part 2Introduction to energy audit part 2
Introduction to energy audit part 2
 
Electricity in nepal
Electricity in nepalElectricity in nepal
Electricity in nepal
 
Run of River and Pumped Storage Plants
Run of River and Pumped Storage PlantsRun of River and Pumped Storage Plants
Run of River and Pumped Storage Plants
 
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 
3.1 turbine and governing
3.1 turbine and governing3.1 turbine and governing
3.1 turbine and governing
 
Wind Energy Potential & Utilization in Pakistan
Wind Energy Potential & Utilization in PakistanWind Energy Potential & Utilization in Pakistan
Wind Energy Potential & Utilization in Pakistan
 
NTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORTNTPC BADARPUR SUMMER TRAINING REPORT
NTPC BADARPUR SUMMER TRAINING REPORT
 
MS Projects - 10 MW Implementation Schedule
MS Projects - 10 MW Implementation ScheduleMS Projects - 10 MW Implementation Schedule
MS Projects - 10 MW Implementation Schedule
 
Summer training in NTPC ppt
Summer training in NTPC pptSummer training in NTPC ppt
Summer training in NTPC ppt
 
Performance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power PlantPerformance Evaluation of Small Hydro Power Plant
Performance Evaluation of Small Hydro Power Plant
 
Koyna dam
Koyna damKoyna dam
Koyna dam
 
NTPC PROJECT..
NTPC PROJECT..NTPC PROJECT..
NTPC PROJECT..
 

Similar to Kurram garhi Dam

MAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORTMAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORTSuryanshu Jain
 
26900721058_OE-ME701D.pptx
26900721058_OE-ME701D.pptx26900721058_OE-ME701D.pptx
26900721058_OE-ME701D.pptxSukantaMandal17
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800PRIYANSHU KUMAR
 
Development of prototype turbine model for ultra-low head hydro power potenti...
Development of prototype turbine model for ultra-low head hydro power potenti...Development of prototype turbine model for ultra-low head hydro power potenti...
Development of prototype turbine model for ultra-low head hydro power potenti...iosrjce
 
Presentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in indiaPresentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in indiaSaikat Ghosh
 
report on the Mahi power plant
report on the Mahi power plantreport on the Mahi power plant
report on the Mahi power plantYuvraj Singh
 
Thermal power Plant presentation
Thermal power Plant presentationThermal power Plant presentation
Thermal power Plant presentationShahzaib Hussain
 
Potential_and_Types_of_Micro_Hydro_Power.pptx
Potential_and_Types_of_Micro_Hydro_Power.pptxPotential_and_Types_of_Micro_Hydro_Power.pptx
Potential_and_Types_of_Micro_Hydro_Power.pptxCarlosMaillo
 
Hydro potential of india
Hydro potential of indiaHydro potential of india
Hydro potential of indiaRohil Kumar
 
Prospect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in UttarakhandProspect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in Uttarakhandijsrd.com
 
Gulpur Hydropower Plant Project Full Report 2019
Gulpur Hydropower Plant Project Full Report 2019Gulpur Hydropower Plant Project Full Report 2019
Gulpur Hydropower Plant Project Full Report 2019HasnatAmin1
 
Yogesh 8th sem project report
Yogesh 8th sem project reportYogesh 8th sem project report
Yogesh 8th sem project reportYogesh Thakur
 
Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Sheel Shah
 

Similar to Kurram garhi Dam (20)

The report on ghazi brotha dam
The report on ghazi brotha damThe report on ghazi brotha dam
The report on ghazi brotha dam
 
Construction of PCC Parapet
Construction of PCC Parapet Construction of PCC Parapet
Construction of PCC Parapet
 
MAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORTMAHI HYDEL POWER PLANT REPORT
MAHI HYDEL POWER PLANT REPORT
 
26900721058_OE-ME701D.pptx
26900721058_OE-ME701D.pptx26900721058_OE-ME701D.pptx
26900721058_OE-ME701D.pptx
 
Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)Steam turbines and its associated systems(ntpc ramagundam)
Steam turbines and its associated systems(ntpc ramagundam)
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800
 
Development of prototype turbine model for ultra-low head hydro power potenti...
Development of prototype turbine model for ultra-low head hydro power potenti...Development of prototype turbine model for ultra-low head hydro power potenti...
Development of prototype turbine model for ultra-low head hydro power potenti...
 
C012611420
C012611420C012611420
C012611420
 
Presentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in indiaPresentation on two major hydro electric power plants in india
Presentation on two major hydro electric power plants in india
 
OmanPower&Water2017_Brochure-2
OmanPower&Water2017_Brochure-2OmanPower&Water2017_Brochure-2
OmanPower&Water2017_Brochure-2
 
report on the Mahi power plant
report on the Mahi power plantreport on the Mahi power plant
report on the Mahi power plant
 
Thermal power Plant presentation
Thermal power Plant presentationThermal power Plant presentation
Thermal power Plant presentation
 
Potential_and_Types_of_Micro_Hydro_Power.pptx
Potential_and_Types_of_Micro_Hydro_Power.pptxPotential_and_Types_of_Micro_Hydro_Power.pptx
Potential_and_Types_of_Micro_Hydro_Power.pptx
 
Hydro potential of india
Hydro potential of indiaHydro potential of india
Hydro potential of india
 
Powerful parbati
Powerful parbatiPowerful parbati
Powerful parbati
 
Prospect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in UttarakhandProspect of Small Hydro Power in Uttarakhand
Prospect of Small Hydro Power in Uttarakhand
 
Energy sector in pakistan
Energy sector in pakistanEnergy sector in pakistan
Energy sector in pakistan
 
Gulpur Hydropower Plant Project Full Report 2019
Gulpur Hydropower Plant Project Full Report 2019Gulpur Hydropower Plant Project Full Report 2019
Gulpur Hydropower Plant Project Full Report 2019
 
Yogesh 8th sem project report
Yogesh 8th sem project reportYogesh 8th sem project report
Yogesh 8th sem project report
 
Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant
 

Recently uploaded

Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 

Recently uploaded (20)

Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
9953330565 Low Rate Call Girls In Rohini Delhi NCR
9953330565 Low Rate Call Girls In Rohini  Delhi NCR9953330565 Low Rate Call Girls In Rohini  Delhi NCR
9953330565 Low Rate Call Girls In Rohini Delhi NCR
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 

Kurram garhi Dam

  • 1. Subject: FM-II (Hydraulic Machines) Topic: Kurram Garhi Dam Presentation in the respect of Sir Qamar Abbas Qazi Presenters Group Leader : Aamir Shahzad (16me40) : Abdul Raheem (16me02)
  • 2. Contents 1)Dam 2)Introduction 3)Location 4)Filtration plant 5) Up Gradation 6) Salient Features 7) Financial Information 8) Advantages Of Dam 9) Disadvantages of Dams
  • 3. What is Dam? Dams are massive barriers built across rivers and streams to confine and utilize the flow of water for human purposes such as irrigation and generation of hydroelectricity.
  • 4.
  • 6. Introduction  Kurram Garhi Hydropower Plant (KGHPP) is a small, low-head, run of the river hydroelectric power generation station of 4.0 megawatt generation capacity (four units of 1.0 MW each), located at Kurram Garhi, a small town in Bannu KPK province of Pakistan on the flows of Kuchkot Canal from Kurram River.
  • 7. CONTI:  It is a small hydel power generating plant constructed and put in commercial operation on February 1958 with the Average Annual generating capacity of 17 million units (GWh) of least expensive electricity.  Kurram Garhi Power House is situated in North- West of Bannu district of Khyber Pukhtun-khwa at a distance of about 09 km from Bannu City.  It has Four (04) Horizontal Axis Francis Turbine.
  • 9. Filtration plant  A big water treatment plant purifies canal water called kurram. The water is purified for the whole city. The pure water then flows from Kurram Garhi to Bannu city approximately 25 km. The pure water is stored in a huge tank located in Tanchi Bazar.
  • 10. Up Gradation  Prime Minister of Pakistan, during a public meeting at Bannu on 3rd May, 2016 announced up-gradation of Kurram Garhi Hydel Power Station.  Rehabilitation and up-gradation of Kurram Garhi Hydel Power Station will enhance the capacity from 3.5 MW to 5 MW and provide more reliable & consistent power to the National Grid for another 30~40 years. Moreover, the project will also boost the voltage profile of the local region and help in eradicating energy shortage problems in the area. The estimated cost of the Project is PKR 1180.851 M and completion time is 3 years.
  • 11. Installed Capacity 4 MW Number of Units Four (04) Horizontal Axis Francis Turbine Total Available Flow 15.8 m 3 /sec (558 cusecs) Each Unit Design Discharge 7.925 m 3 /sec Gross Head 18.9 meter Net Head 18.3 meter Annual Energy 37 GWh Salient Features
  • 12. Base cost: PKR 991.716 Million Total Cost: PKR 1180.851 Million FIRR: 22.61% EIRR: 24.58% Financial Information
  • 13. Advantages Of Dam  Hydro Electric Power.  Tourism and Camping.  Still Water for Animals.  Clean Drinking Water for Nearby Cities and Towns.  Flooding and Water Management.