1. A Proposal of final year project on
Prefeasibility study of Katti Khola small hydropower plant
MID WESTERN UNIVERSITY
CENTRAL CAMPUS OF ENGINEERING
HYDRO POWER INSTRUCTION COMMITTEE
BIRENDRA NAGAR, SURKHET
By:
1. Barmesh Raut Chandrawamsi (03)
2. Dipak Raut (14)
3. Madan Prasad Acharya (22)
4. Surya Paudel (43) ‘C’
5. Umesh Baduwal (46)
1
3. 3
1. Introduction
1.1. Background:
Nepal being water rich country has huge potentiality to hydropower energy production
Since 1911AD, 500 kW power generation at Pharping(chandra jyoti)
Dr. Hari Man Shrestha
The theoretical hydropower potential of Nepal is 83,000 MW
Economically=42,000 mw
Technically =43000mw
According to NEA 2018/19 annual report
Nepal has developed only around 1,182.215MW
Economical
Sapta koshi =10860 mw
Sapta Gandaki =5270 mw
Karnali and mahakali =25125 mw
Southern rivers = 878 mw
Total generated capacity of small HPP=563394KW
Isolated capacity=4536
4. 4
1. Introduction
1.2. Introduction
Small Hydropower plant: Although definitions vary, DOE defines small hydropower as projects that
generate 10 MW or less of power.
Types of hydropower project
Storage HPP
Diversion HPP
Run of River (RoR) HPP
Peak Run of River (PRoR) HPP
Pumped Storage HPP
Classification of hydropower according to generation capacity
Pico <5kw
Micro 5-10 kw
Mini 100kw-1000kw(1mw)
Small 1mw-10mw
Medium 10mw-100mw
Larger above 100mw
5. 5
1. Introduction
Why small hydropower plant?
Easy to find developer due to its low initial cost
Involves less social, economical, political, and technical issues
Easily available project
Less man power and technology required
Less chances of failure and hazard risk
Low construction time
More effective in operation and maintenance
Useful in isolated areas
6. 6
1. Introduction
1.3 Specification &Location of Project.
Title of project: Prefeasibility study of katti Khola
hydropower Project
According to DOED:
Category: Small hydropower Project
Type: Run of River hydropower Project (RoR)
Potentiality: 2.978 MW
Location: katti khola Dailekh , Nepal
Probable discharge :4 m3/s
probable Head: 100m
Intake : 28o 48' 41“N , 81o 48' 06“E
Outlet: 28o 47’ 00”N, 81o 45' 28“E
above data is according to DOED
7. 7
1. Introduction
1.3. Objective:
To fulfill the requirements of the final year project of BE Hydropower
To gain theoretical and practical knowledge of hydropower engineering.
To learn detail design, estimation and structural analysis of small hydropower project.
To analysis geology, hydrology and hydraulic of small HPP.
To learn to various software’s such as GIS, CAD, STAAD PRO, SAP.
To learn a good sense of ethics and team work.
8. 8
2.Literature Review:
The project is prepare in complete conformity with various stipulation in Indian Standards, Code of
practice for plain and reinforced concrete IS 456:2000, Design Aids for reinforced concrete to IS
456:2000(SP-16), Criteria Earthquake Resistant design structures IS 1893:2016, Ductile detailing of
reinforced Concrete Structures subjected to seismic forces- code of practice IS 13920:1993, steel code
IS 800:2000.
The following literature are being followed:
1.For civil design
Micro hydropower manual (Adam Hanry)
Fundamental of hydropower(Sanjiv Baral)
Manual on barrage and weirs(central board of irrigation )
Guideline for design oh HPP (DOED)
2.For Hydraulics
Fluid Mechanics and Hydraulics (PN Modi & S.M Seth)
Flow in open channel (K Subramanya)
Fluid Mechanics and Hydraulics (R.K Bansal)
3.For Hydrology
Engineering Hydrology (S.Baral & K.N. Dulal)
4.For Geology
Engineering and Hydrology (Tribhuvan University)
5.For Estimation
Estimating and Costing (B.N Dutta)
6.For Surveying
A Text Book of surveying and levelling (R.Agor)
For further required data we will concern with respective department & their web sites.
10. 10 3.Methodology
Project site selection
Definition of the problem &
setting objectives.
Design calculation of the structural
components from the data collected
Review of the theoretical aspects of
the project
Preparation of the drawings of the
components based on design calculation.Discussion with experts & supervisor
Preparation of the final report.
3.1. Methodology I:
11. 11 3.Methodology
3.2. Survey and data collection Methodology
1. Detailed desk study and collection of requires maps
2. Detailed field survey of area about 3-4 km as per DOED guidelines
3. Estimation of optimum head available
4. Plotting of topo map using survey data
5. Hydrological data collection from (DHM)
6. Basic geological study in field as per requirement's
7. Discharge measurement of river as per guidelines
8. Estimation of optimum discharge available.
9. Collection of Hydrological data from DHM and calculating hydrological components.
12. 12
3.3 Design and drafting framework
Design and Drafting
framework
3
Discussion
with experts &
supervisor
2
Collection of
requires
software’s
5
Preparing Detail
Drawing and
reporting it in
well manner
4
Design of head
work ,convey
system ,penstock
, powerhouse &
tailrace
1
Collection of
Required
data
13. 13 3.Methodology
3.4. Project Planning
Distribution of work
Group discussion
Topic selection
Topic submission
Proposal writing
Surveying and data collection
Drawing of topo maps
Design and drawing using computer aided software’s
Analysis and design of structures (any one)
Estimation of project
Preparation of detailed drawing
Rate and quality analysis
Preparation of project Report
14. 14 3.4. GANTT Chart:
Works
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Week 15
Group discussion
Topic selection
Topic submission
Proposal writing
Surveying and data collection
Drawing of topo maps
Design and drawing using
computer aided software’s
Analysis and design of
structures (any one)
Estimation of project
Preparation of detailed drawing
Rate and quality analysis
Preparation of project Report
Periods
15. 15 4.Require Instruments and software’s
1.Survey instruments:
Total station
Measuring tape
Reflector
Ranging rod
Staff
Pegs
GPS
Tripod stand etc.
2.Other instrument:
Current meter
Geological compass (Brunton compass)
Mallet hammer
Hydrochloric acid(Hcl)/sulfuric acid(H2So4)
First aid kit
3.Software’s:
Auto Cad
Sap
Excel
MS-word
STAAD Pro
SW DTM
16. 5.Expected Outcomes
It is expected to conduct a complete prefeasibility study of katti
khola hydropower project by following proper guidelines and data.
16