THE TATA POWER COMPANY LTD.
Procedure for Distribution Open
Access
June, 2016
The Distribution Open Access Procedure has been made as per the requirements of the MERC
(Distribution Open Access) Regulations, 2016 issued by Maharashtra Electricity Regulatory
Commission
Tata Power-D Procedure for Distribution Open Access
2
Procedure for Distribution Open Access
In compliance with MERC (Distribution Open Access) Regulations, 2016
INDEX
A. Background
B. Eligibility for seeking Open Access
C. Time periods for availing Open Access
D. Application Format and Documentation
E. Timelines for making application
F. Scrutiny of application
G. Communication of acceptance or shortfall in application to applicant
H. Signing of Connection and Use of Distribution System Agreement
I. Installation of Special Energy Meters
J. Meter Reading
K. Revision of Contract Demand
L. Scheduling
M. Scheduling and Operation Coordination
N. Non-utilisation of Short term Open Access
O. Billing
P. Banking of Renewable Energy Generation
Q. Charges applicable for Open Access
R. Date of Effectiveness of OA Agreement
S. Submission of Generation Credit Note (GCN), Schedules, Energy Credit and
Commercial Settlements.
T. Compliances by Open Access Consumers
U. Modalities to be followed by the Distribution Licensees and the entities claiming to
be CPPs
V. Amendments
Tata Power-D Procedure for Distribution Open Access
3
Procedure for Distribution Open Access
In compliance with MERC (Distribution Open Access) Regulations, 2016
A. Background
1. Maharashtra Electricity Regulatory Commission (MERC) has notified the MERC
(Distribution Open Access) Regulations, 2016 on 30th March, 2016. This procedure is
being framed in accordance with these Regulations and shall be applicable for all
applications made to Tata Power-D for seeking open access.
2. The consumer eligible and availing open access from Tata Power-D shall comply with all
the relevant provisions pertaining to the MERC (Distribution Open Access) Regulations,
2016, State Grid code and any other procedure of SLDC related to Open Access
arrangements, failing which Tata Power-D shall be at liberty to revoke the Open Access
permission.
3. Tata Power-D may review / revise / modify / amend the provisions of these procedures
prospectively as and when considered necessary and with prior approval of the Hon’ble
Commission, and in accordance with the MERC (Distribution Open Access) Regulations,
2016 and its amendment or any general or specific Order issued by the Hon’ble
Commission from time to time, pertaining to open access arrangement.
B. Eligibility for seeking Open Access
4. A consumer, located in the Distribution Licence Area of Tata Power-D, connected to or
proposing to get connected to Tata Power-D’s distribution network, who has no dues
pending with Tata Power-D and fulfils the conditions listed in the Table 1 below, shall be
eligible for seeking Distribution Open Access. (Regulation 3.2)
Tata Power-D Procedure for Distribution Open Access
4
5. This procedure is also applicable to consumers who are taking/ proposing to take supply
from Tata Power-D but not connected to the Distribution Wires Network of Tata Power-
D. However in cases where the consumer is already having an existing open access
arrangement with the other distribution licensee, the consumer would have to apply for
open access afresh to Tata Power- D.
Table 1: Eligibility criteria for availing Open Access
Specific parameters Eligibility Conditions
Consumer’s Contract
Demand
(Applicable for
captive as well as
third party open
access)
 The Contract Demand of the Consumer seeking open
access (OA) from Tata Power-D should be equal to or more
than 1 MW.
Power to be availed
on open access.
 The maximum demand of OA consumer in each financial
year subsequent to grant of Open Access shall be equal to
or greater than 70% of the thresholds limit (1 MW).
Source related
conditions
 Individual Open Access Consumer shall be eligible for
availing supply from multiple sources of power such as
Captive Generator, Third party Generators, Trader, Power
Exchange, Other Distribution Licensee etc.
 Day ahead open access shall be permitted only if surplus
capacity is available in the concerned Distribution
Licensee’s system. Application for grant of OA shall be
made only one day prior to the date of scheduling, up to
12:00 hrs.
Notes: i. Unity power factor shall be considered for conversion from MVA / kVA to
MW / kW.
6. Individual Consumer located in Distribution Franchisee area shall also be eligible for
Open Access; however Distribution Franchisee shall not be eligible for the Open Access
except in its capacity as a Consumer.
C. Time Periods for availing Open Access
7. The open access can be availed for the following periods:
Tata Power-D Procedure for Distribution Open Access
5
Table 2: Types of Open Access
Sr. No Type of OA Time Period
I
Short Term Open Access
(STOA)
Not exceeding 1 month at a time
II
Medium Term Open Access
(MTOA)
Exceeding 3 months but not exceeding 3
years
III
Long Term Open Access
(LTOA)
Exceeding 12 years but not exceeding 25
years
D. Application Format and Documentation (Regulation 4.1 & 8 )
8. Tata Power-D shall be the Nodal Agency for making application for open access for
procurement of power within the state. The consumer shall submit the distribution
open access application to Tata Power-D. (Regulation 8.2, 8.4).
9. A consumer, who is eligible for open access as per (B) above, may apply for short term or
medium term or long term distribution open access to Tata Power-D. Separate
application shall be made for each connection / metering point and for each transaction.
10. The list of mandatory documents / formats and case specific documents / formats to be
submitted by the consumer as a part of the Distribution Open Access Applications are as
follows:
 Mandatory Documents:
i. Form of Application for Connectivity as per Annexure I
i. Connection and use of distribution system agreement as specified in Annexure II
ii. Application format for Short Term Open Access: Annexure III
Or Application format for Medium / Long Term Open Access: Annexure IV
iii. Non refundable Application Fees of Rs. 2,500 per application in cash or by demand
draft payable in favour of ”The Tata Power Company Limited”.
iv. Security Deposit as per Regulation 14.9 and 25.
v. Latest paid electricity bill of the consumer.
Tata Power-D Procedure for Distribution Open Access
6
Case Specific Documents:
i. Copy of Supply Agreement
ii. Proof of payment of Application fee
iii. Copy of Trading licence
iv. Copy of relevant document from the Power Exchange if power is sought from Power
Exchange (Registration/Membership details, Member-client agreement, etc.)
v. Single Line Diagram (SLD) to be required pertain to Injection & drawl point.
vi. SEM Commissioning certificate, if already installed.
vii. For OA through Captive Model the following additional documents would be
required.
o Memorandum of Association
o Chartered Accountant Certificate of shareholding pattern to establish equity
contribution of 26% or more by the consumers in the supplier’s power plant.
o Undertaking for not less than 51% self consumption on annual basis as per
Electricity Rules, 2005
viii. Certificate of commissioning or grid connectivity of the source generator to be
provided prior to intended date of medium term or long term open access.
ix. The application for long term open access shall be accompanied by a a bank guarantee
of Rs 10,000/- (Rupees Ten thousand) per MW of the total power to be transmitted
and Rs. 5000/- per MW in case the source is a Renewable Energy Source and shall
subsist till the execution of the Long Term Open Access Agreement in the case when
augmentation of distribution system is required, and till operationalization of Long-
term Open Access when augmentation of distribution system is not required. The bank
guarantee shall be in favour of the Distribution Licensee. In case of withdrawal of the
application by the Consumer anytime before the effectiveness of the open Access
Agreement, Tata Power-D shall be liable to encash the Bank Guarantee provided by
the consumer.
Tata Power-D Procedure for Distribution Open Access
7
Other Requirements/Information
i. Availability of capacity in the Distribution system is a mandatory requirement for
approval of open access in case of consumers not connected to Tata Power-D
network or consumers intending to enhance their Demand.
ii. The Applicant shall have to bear the cost of augmentation of distribution system, if
required.
iii. Further, a suitable piece of land or room on the Applicant’s premises, have to be
provided by the Applicant for installation of electrical plant or equipment if required
to provide connection.
iv. The completed application along with all relevant annexure has to be submitted to
the Office of Distribution Support Services at the following address.
Head - Billing & Connection Management
Distribution Support Services
Dharavi Receiving Station, Matunga Labour Camp Area,
The Tata Power Company Limited.
Mumbai – 400 019
E. Timelines for making application
11. The timelines for submitting the OA applications to Tata Power-D for grant of open access
shall be as follows:
Table 3: Timelines for making Open Access Applications
Type of OA Time Period Timeline for making application
I
Short Term
Open Access
Not exceeding 1 month
at a time
A In Advance
Upto 4 months in advance and not
later than 10th day of preceding
months. (Separate application shall
be made for each month and for
each transaction in a month)
B Day-ahead
Only 1 day prior to the date of
scheduling, upto 12:00 hours
Tata Power-D Procedure for Distribution Open Access
8
Type of OA Time Period Timeline for making application
II
Medium Term
Open Access
Exceeding 3 months but
not exceeding 3 years
Upto 1 years in advance but at least
3 months before the date from
which OA is sought
III
Long Term
Open Access
Exceeding 12 years but
not exceeding 25 years
Atleast 2 years before the date from
which OA is sought
Example: For any request for short term open access received by way of an application on
or before 10th day of December, the open access will be permitted from 1st of January. In
case Tata Power receives open access on the 11th day of December, open access shall be
considered from 1st of February.
F. Scrutiny of application
12. Upon the receipt of open access application, Tata Power shall scrutinise the application
and the supporting documents for completeness, correctness and relevance of the
application as per the following checklist:
i. Completeness of the Application form.
ii. Verification of Contracts Demand with Tata Power records;
iii. Match of the dates / duration of open access as requested and the dates / duration
of the LOI /MoU/PPA between the Consumer and Supplier;
iv. Existing dues for more than two billing cycles; and
v. Outstanding disputes related to electricity charges.
G. Communication of acceptance or shortfall in application to Applicant
13. Tata Power shall communicate to the Applicant / consumer about acceptance of
application within (5) working days of the receipt of application along with the following
information / requirements:
i. Details of any shortcoming in application or supporting documentation, with advice
to rectify the shortcoming.
Tata Power-D Procedure for Distribution Open Access
9
ii. Details of outstanding dues existing for more than two billing cycles or any
outstanding disputes related to electricity charges.
14. The acknowledgement of receipt of completed application for Open Access shall be
provided in the format as given in the Distribution Open Access Regulation 2016 in case
of short term open access.
15. Tata Power will convey grant of open access or otherwise as per the format provided in
Annexure III- ST2 in case of short term open access along with schedule of payments to
the consumer within 10 working and assign specific reason in writing if open access is not
granted.
16. Further, for medium term open access applications, Tata Power will grant or refuse open
access within 60 days, for the period stated in the application on being satisfied that the
requirements under Regulation 8 are met. In case the open access is granted for a period
less than that sought by the applicant, Tata Power shall record the reasons in writing.
17. Tata Power shall convey its decision on the grant of Long Term Open Access within 120
days if the system augmentation is not required, or within 180 days otherwise. While
granting open access on long term, Tata Power shall communicate to the Applicant the
date from which Long Term Open Access shall be granted and the details of associated
charges like wheeling charges cross subsidy surcharge, regulatory asset charges and
additional fixed charges.
18. In case of rejection of application as per above, the application processing fee of Rs
2500/- shall stand forfeited.
H. Signing of the Connection & Use of Distribution System Agreement (Regulation 6.2)
19. Long term and Medium term OA consumers shall initiate the process of signing the
‘Connection & Use of Distribution System Agreement’ within 30 days of the grant of open
access as per format as in Annexure II.
Tata Power-D Procedure for Distribution Open Access
10
20. The Agreement shall be signed by the consumer connected to Tata Power’s network, and
authorised representative of Tata Power-D before commencing with procurement of
power on open access. This Agreement shall be signed after :
o Confirming completion of all works and fulfilment of all requirement as per Statute
(including installation of SEM meters at generator end as well as Consumer end)
o Intimating the date and time of final meter reading and commencement of the
Connection & Use of Distribution System Agreement.
21. Tata Power-D shall provide at least 10 days notice to the Consumer before signing the
‘Connection & Use of Distribution System Agreement’.
I. Installation of Special Energy Meters
22. Tata Power-D shall test and install Special Energy Meter (SEM) within sixty days from
receipt of a request from the consumer or Generating station, that is capable of time-
differentiated measurement for time-block-wise active energy in accordance with State
Grid Code and with online communication facility with MSLDC for energy accounting for
consumers availing Open Access at their cost.
23. The Open Access consumer shall purchase this meter as per specifications provided by
Tata Power-D. However, installation of such meters shall be done by Tata Power-D.
J. Meter Reading
24. Final Meter reading of the consumer shall be taken by the distribution licensee from the
date of commencement of Open Access. It shall be taken in the presence of the Consumer
or his representative, and the Generating Company or Licensee from whom the
consumer intends to obtain supply of electricity, after written intimation to them.
25. Tata Power-D shall carry out the meter reading at least once in every month.
Tata Power-D Procedure for Distribution Open Access
11
K. Revision of Contract Demand (Regulation 4.2)
The Contract Demand of a consumer availing LTOA or MTOA shall be governed by the
provisions of the Electricity Supply Code and the Regulations of the commission
governing standards of performance.
Short term Open Access consumer shall not be eligible to revise the contract demand
with distribution licensee during the tenure of STOA, but may do so at the time of
applying for Open Access.
L. Scheduling (Regulation 16)
26. The scheduling of Inter-state open access transactions shall be in accordance with the
provision of the Indian Electricity Grid code
27. Intra-state Open Access transactions in respect of –
i. Full Open Access Consumers connected to Distribution System & all Generating
stations connected to transmission system - shall be scheduled by MSLDC in
accordance with the State Grid Code.
ii. Partial Open Access Consumer shall submit his Day-ahead schedule to Tata
Power-D by 10:00 am of the preceding day which shall be considered when Tata
Power-D provides data to SLDC. This schedule shall be after considering the
applicable transmission and wheeling losses. Further, the following needs to be
noted with respect to scheduling:
a. Scheduling shall not be applicable for Non-firm Renewable Energy sources.
b. Revision of schedule shall be permitted as per IEGC & State Grid Code.
M. Scheduling and Operation Coordination
28. Open Access consumer shall designate a coordinator for scheduling related activities.
29. Consumer shall submit to Tata Power-D, the contact details, Phone/Mobile number, FAX
number, email address, etc. of the coordinator appointed by him for scheduling and
Tata Power-D Procedure for Distribution Open Access
12
operations coordination and keep Tata Power-D updated in case of any changes in the
same.
30. The “Schedule with Tata Power” shall be submitted by the mode of fax and/or email to
Load Control Centre (LCC) of Tata Power at Email: pscc@tatapower.com, Fax: 022-
67175385/ Tel: 022- 25543331/022- 67175377. LCC shall incorporate this schedule of the
Open Access Consumer in the schedule of Tata Power, as the Open Access Consumer is
an embedded consumer of Tata Power.
N. Non-utilisation of Short-term Open Access
31. If the consumer, Generating station or Licensee, as the case may is unable to utilize for
more than 4 hours the full or substantial part of its allocated capacity, it shall inform the
Tata Power, & may surrender the use of such capacity but shall pay transmission and
wheeling charges applicable to the original reserved capacity & period. If the Tata Power
is able to re-allocate this capacity, the entity who has surrendered the capacity shall be
refunded transmission & wheeling charges based on the amount & period of the
reallocated capacity.
32. Tata Power may cancel or reduce the capacity allocated, to the extent that it is under-
utilised and after giving notice to the affected parties;
a) When such capacity is under-utilised for more than 3 days, or
b) When the Consumer, Generating Company or licensee as the case may be, fails to
inform Tata Power of its inability to utilize the allocated capacity.
The capacity available as a result of such surrender or reduction cancellation of capacity
may be allocated to any other STOA applicant.
O. Billing
33. Tata Power shall issue bills on a monthly basis and the consumer shall pay the bills as per
the timelines specified Electricity Supply Code.
34. In case of partial open access, the energy used from Tata Power will be billed as per
relevant MERC tariff order issued from time to time and provisions in the MERC
(Distribution Open Access) Regulations, 2016.
Tata Power-D Procedure for Distribution Open Access
13
35. For the firm power open access consumers, the energy procured from Tata Power in 15
minutes time slot shall be arrived at after deducting the power procured (as per MSLDC)
on open access in 15 minutes time slot on Open Access from the consumption metered
in 15 minutes time slot.
36. In case, 15 minutes reading at the generator end is not available for wind/solar/hydro
generation procured on open access, the same shall be adjusted in TOD slots to arrive at
power procured from Tata Power in the TOD time slots.
P. Banking of Renewable Energy Generation:
i. The surplus energy from a ‘non-firm’ Renewable energy generating station after set
off shell be banked with the Tata Power.
ii. The banking year shall be the financial year from April to March.
iii. Banking of energy shall be permitted during all 12 months of the year but credit for
banked energy shall not be permitted during the month of April, May, October &
November.
iv. The energy banked during peak TOD slots may also be drawn during off-peak TOD
slots, but the energy banked during off-peak TOD slots may not be drawn during peak
TOD slots.
Q. The charges for open access shall include the following (Regulation 14):
i. Wheeling Charges shall be payable on the basis of actual energy drawal at the
consumption end i.e. Energy at T<>D interface and shall be as determined by MERC.
Wheeling charges shall not be applicable in case a consumer or a Generating station
is connected to the transmission line directly or using dedicated lines owned by the
consumer. (Regulation 14.6).
ii. Cross Subsidy Surcharge (CSS) shall be levied to all open access consumers other than
for power purchase on open access through a captive generating plant and shall be
based on actual energy drawn at consumption end i.e. at the meter (Regulation 14.7).
CSS in case of RE source shall be stipulated by MERC from time to time. However, the
captive open access consumers have to certify their captive status at the end of each
Tata Power-D Procedure for Distribution Open Access
14
financial year. In case the captive conditions are not met CSS will be applicable on the
entire consumption through open access.
iii. Regulatory Asset charges as approved by MERC. (Regulation 14.1 (vi))
iv. Additional Surcharge, as and when approved by MERC (Regulation 14.8)
The additional surcharge shall be applicable to all consumers who have availed open
access to receive supply from a source other than the Tata Power to which they are
connected.
The additional surcharge determined on a per unit basis shall be payable monthly by
the open access consumer based on the actual energy drawn during the month
through open access.
v. MSLDC Fees (Regulation 14.1)
If the Distribution Licensee schedules power for the Open Access Customer, the SLDC
fees and charges payable by the Licensee shall be shared with the consumer based on
the ratio of scheduled demand of Open Access sought to the total demand of
Distribution Licensee on a pro-rata basis for Long-term and Medium-term Open Access
consumer.
vi. Scheduling and other operating charges (Regulation 14.1)
The scheduling and other operating charges shall be levied by Distribution Licensee
for Open Access consumer at the same rate as approved by the Commission for
Open Access consumers in the Order of MSLDC Fees & Charges and Schedule of
charges. Monthly Operating Charges of Rs 2500 per Month will be applicable as per
Schedule of charges.
vii. Transmission Charges (for partial OA consumer as per Regulation 14.1(v)) As
Approved by MERC from Time to Time through InSTS Tariff Order:
viii. Imbalance Charges
The treatment of imbalance in case on firm / infirm power shall be as follows:
Table 7: Imbalance Charges
Event Chargeability
Over drawal Energy Charge
Higher of the following:
Tata Power-D Procedure for Distribution Open Access
15
a. System Marginal Charges + Other Incidental Charges
(Other Incidental Charges shall include Net UI charges, Additional UI)
b. Variable Charge of Temporary Tariff Category
Demand Charge
Penal Demand Charge shall be levied in case of OA consumer Contract
Demand
Under
drawal
 Tata Power shall not pay any charges to OA consumer.
 If any penal charges are levied on Tata Power then the same shall
be applicable to OA consumer on prorated basis.
Surplus
Energy from
RE source
 It shall be banked with Tata Power after set off (Regulation 20)
 Banking charges shall be adjusted in kind @ 2% of the energy
banked.
 The unutilised banked energy at the end of the financial year,
limited to 10% of actual total generation by such RE source shall be
purchase by the Tata Power at its pooled cost of power purchase for
that year.
ix. Reactive Energy Charge (Regulation 21)
The computation of Reactive Energy Charge shall be in following manner:
Table 9: Reactive Energy Charge
Consumer Chargeability
OA Consumer
having load 5 MW
or more
In accordance with provisions stipulated in the State Grid Code
and MYT Regulations, 2015
OA Consumer
having load less
than 5 MW
Shall be calculated on Power Factor basis as specified by the
Commission
Renewable Energy
Generating
Stations
Shall be in accordance with the charges approved by the
commission in its relevant Tariff Orders.
x. Additional Security Deposit: (Regulation 14.9)
Tata Power-D Procedure for Distribution Open Access
16
i. The consumer will be required to furnish an additional security deposit for wheeling
equivalent to one month’s billing for wheeling charge, CSS and additional surcharge
on the charges of wheeling. In case of short term open access, the Tata Power shall
collect an additional Security deposit for wheeling commensurate with the duration
of OA instead of on the basis of one month’s billing.
ii. The amount of additional security deposit may be adjusted when the amount of
additional security required or surplus security held exceeds 10% of the balance with
the Tata Power, in accordance with Regulation 14.9 of the Regulations.
iii. In case of new Consumer opting for Open Access along with connectivity for the first
time Tata Power shall calculate the additional security deposit based on the
anticipated use of the distribution system for wheeling of electricity and raise the
demand accordingly.
iv. Tata Power shall send a notice to the Consumer for deposit of additional Security
Deposit and the same shall be required to be deposited by the consumer within
fifteen (15) days from the receipt of the notice.
v. Additional Security Deposit can be made in the form of Cash, Irrevocable Letter of
Credit (L/C) or unconditional Bank Guarantee (BG). Cash deposit shall be entitled to
earn interest at Bank Rate of the reserve bank of india and interest will be credited
back to Consumer account as per prevailing practice.
xi. Demand less than 70% of Contracted Demand through Open Access (Regulation
3.2)
In case, the Open Access consumer fails to achieve the maximum demand of 70% of the
Contracted Demand through Open Access for 3 consecutive months, Tata Power-D shall
levy a penalty equal to 2 times wheeling charges for the period during which such
exceptional event was recorded. In such case Tata Power-D shall initiate the process of
reassessment and reinstatement / reduction of Contract Demand if the consumer has not
complied this condition for 3 consecutive months.
Tata Power-D Procedure for Distribution Open Access
17
xii. Late / Default in Payment
a) In case the payment of any bill for charges payable under these Regulations is
delayed by an Open Access customer beyond the due date, without prejudice
to any action under the Act or any other regulation thereunder, a late payment
surcharge at the rate of 1.25 per cent (%) per month shall be levied.
b) Non-payment of any charge or sum of money payable by an Open Access
consumer under these Regulations shall be considered non-compliance of
these Regulations. The Distribution Licensee may discontinue Open Access after
giving the consumer an advance notice of fifteen days without prejudice to its
right to recover such charges as per provisions of the Act and also MSLDC may
direct Distribution Licensee to disconnect such entity from the grid.
xiii. Any other applicable charge (Regulation 14.1(vi))
Surcharge or other sum recoverable from the consumer under the act or any Regulation
or order of the Commission.
R. Date of Effectiveness of Open Access (OA) Agreement
a. The OA Agreement executed between, the consumer and Tata Power shall be
effective from the commencement date of Open Access as requested in the
Application and contained in the Open Access Agreement, which date should
necessarily conform to the timelines for submission of application given in Para ‘E’
above.
b. In case of short term open access, the date of effectiveness shall be the start date
of open access mentioned in the Consent issued by Tata Power-D in Annexure III-
ST2 provided in the Regulations.
c. Irrespective of which date the Consumer schedules power (in case of firm source)
/ provides Generation Credit Note (GCN) (in case of non-firm source), Open Access
shall commence from the Effective Date as per paragraph Q(a) & (b) above for all
commercial purposes.
Tata Power-D Procedure for Distribution Open Access
18
d. However, in case the Consumer is unable to schedule power due to permission of
open access not being available from MSLDC / STU / Other Distribution Licensee
for any reason, it shall be the responsibility of the Consumer to approach Tata
Power-D with a written request to cancel (or suspend for a given period), the
permission of open access given by Tata Power-D, in order to avoid commercial
implications resulting from imbalance charges.
e. The written request provided above must, in all cases of open access, be provided
by the Consumer within 15 days of the date of effectiveness of open access as per
paragraph Q(a) & (b) above, otherwise the same shall not be considered.
f. For operational purposes and in order to avoid the complications of pro-rata
billing, Consumers are advised to requisition open access from the 1st day of a
month or commence scheduling of power under the OA Agreement from the 1st
day of a month, as the case may be.
S. Submission of Generation Credit Note (GCN), Schedules, Energy Credit and Commercial
Settlements.
i. Energy accounting and settlement shall be carried out on 15 minutes time block basis for
firm power Open Access consumers and and ToD wise for non-firm power open access
consumers.
ii. From the energy / demand recorded in the Consumer meter, scheduled OA entitlement
shall first be adjusted to arrive at energy / demand consumption from Tata Power-D.
iii. The credit of OA energy, supply energy under Contracted Demand and imbalance charges
shall be as per the Regulations.
iv. Non- Firm Power: Tata Power will raise the bill on open access consumer before 5th day
of the month. Consumer shall submit to Tata Power the monthly Generation Credit Note
(GCN). If the data is not submitted by the 5th day of every month, Tata Power shall bill the
Consumer considering NIL energy credit. Whenever the Consumer provides the GCN with
the data and when SLDC provides the credit of the same to Tata Power-D in the Intra-
Tata Power-D Procedure for Distribution Open Access
19
State energy accounting, the bill for the respective month shall be revised and financial
credit will be provided in the subsequent billing cycles.
v. Firm Power:
i. In case generator of the Consumer is a State Pool Participant: The Credit of energy
based on the implemented 15 min. schedules finalized by MSLDC will be provided by
the consumer in the monthly billing.
ii. In case generator is not a State Pool Participant: The Credit of energy will be based
on actual 15 min. injection to be based on the GCN to be provided by the 5th of every
month, for the previous month. In case the GCN is not provided by the Consumer on
the 5th day of the month, Tata Power shall bill the Consumer considering NIL energy
credit. Whenever the Consumer provides the GCN with the data and when SLDC
provides the credit of the same to Tata Power in the Intra-State energy accounting,
the bill for the respective month shall be revised and financial credit will be provided
in the subsequent billing cycles.
iii. In case of Open Access from Captive Power Plant, Consumer shall by 30th April of
each financial year, submit a certificate issued by the SLDC or the Distribution
Licensee providing Generation Credit Note about the percentage of generation
allocated from the generating plant to the Consumer in such financial year.
iv. In case of single generator supplying power to multiple consumers, the GCN issued
to the generator must indicate the percentage or generation allocated to the each
consumer separately.
T. Compliances by Open Access Consumers
i. The open access consumer shall comply with the provisions of the Open Access
Regulations of MERC, State Grid Code and all other relevant Regulations, Laws &
norms or amendments thereof.
Tata Power-D Procedure for Distribution Open Access
20
ii. In addition, the open access consumer shall comply with the provisions of the
Balancing and Settlement Code.
U. MERC has issued the order in the matter of Petition of Maharashtra State Electricity
Distribution Co. Ltd. proposing Bank Guarantee / Letter of Credit equivalent to Cross-
Subsidy Surcharge and Additional Surcharge from Captive Generators as payment security
before providing Open Access, in case no. 23 of 2017 dated 17 January, 2018.
In the said order, MERC has set out the following modalities to be followed by the
Distribution Licensees and the entities claiming to be CPPs:
A. Shareholding Pattern:
1. When Open Access is first sought, details of the shareholding pattern of the
claimed CPP shall be submitted.
2. The above details of shareholding patterns should be supported by a Chartered
Accountant (CA)’s Certificate.
3. In the event of any change in the shareholding pattern during the financial year,
the revised shareholding should be intimated to Tata Power-D within 10 days, with
CA certification.
4. The CA’s Certificate should contain details of all shareholders, including the
Captive Users, their voting rights and period of shareholding (from & to)
5. In case there is no change in the shareholding pattern during the financial year,
the Generators should provide an undertaking to that effect along with the CA
Certificate as at the end of the year.
B. Metering:
1. Each CPP Generating Unit shall have a separate Special Energy Meter (SEM) as per
the specifications in the Central Electricity Authority (CEA) (Installation and
Operation of Meters) Regulations, 2006 as amended from time to time.
Tata Power-D Procedure for Distribution Open Access
21
2. The CPP should submit the details of all the unit wise meters to the Tata Power-D,
like meters at generator terminal, meter for unit wise auxiliary consumption,
meters at EHV side of the generator terminal, meters recording the consumption
at the outgoing feeders and the consumption of captive consumers etc.
3. Downloading of monthly data of all these meters, Sealing of respective meters and
their testing etc. shall be jointly undertaken by the Generator and Tata Power-D,
and the State Transmission Utility (STU) (if relevant).
4. The general practice adopted for any HT consumer monthly meter reading should
be followed.
5. The SEM meters should be tested periodically as per the prescribed testing
procedures jointly with Tata Power-D. It should be periodically tested once in 5
years and also these meters shall be tested whenever the energy and other
quantities recorded by the meter are abnormal or inconsistent
6. Tripping events of the CPP Generating Unit and transmission line should be
informed to the Tata Power-D and MSLDC along with the period of outage.
7. Power from the non-CPP Units shall not be injected into the grid without
appropriate permissions of the respective authorities.
8. By the 30th of April, the Generator shall submit all the relevant data required for
establishing its CPP status in the previous financial year.
9. The data shall include the quantum of generation at the Generator Terminal,
auxiliary consumption, consumption recorded at the EHV side of the Generator
Transformer, the consumption recorded at the outgoing feeders and the
consumption of captive consumers grossed up at the Generator Terminal level
(along with the necessary computations).
10. This data shall be provided for each month of the financial year, in Excel format.
11. The Tata Power-D shall seek clarifications, if any, and confirm the CPP status or
otherwise by 31 May. In case any clarifications required are not received or are
inadequate, then the Tata Power-D and the Distribution Licensee(s) shall jointly
decide on the CPP status and inform the Generator accordingly.
12. If the Generator is not satisfied with the status as determined by the Distribution
Licensee(s), it may approach the Commission by 15 June. In that event, the
Tata Power-D Procedure for Distribution Open Access
22
Distribution Licensee(s) shall not levy CSS and Additional Surcharge, if any, till the
final decision of the Commission.
13. If the Generator does not approach the Commission by 15 June with any dispute
regarding its CPP status, the Distribution Licensee(s) may proceed to levy the CSS
and Additional surcharge, if any, with applicable interest. This shall be without
prejudice to the Generator’s statutory right to approach the Commission for
adjudication of its dispute after that date.
V. Amendments
Amendments to the procedure shall be issued by Tata Power-D from time to time in
accordance to the General or Specific orders of MERC or as a result of any amendments
in the DOA Regulations or as Tata Power may deem fit so long as they are consistent with
the regulation.

More Related Content

What's hot

Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorVijay Menghani
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Gensol Engineering Limited
 
NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)Ravi Pohani
 
Tariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorTariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorIPPAI
 
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)shyamies11
 
Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra Gensol Engineering Limited
 
ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)shyamies11
 
Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003rapper44
 
Procedure for distribution open access
Procedure for distribution open accessProcedure for distribution open access
Procedure for distribution open accessJay Ranvir
 
From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...Amitava Nag
 
The power purchase agreement (ppa) presentation
The power purchase agreement (ppa) presentationThe power purchase agreement (ppa) presentation
The power purchase agreement (ppa) presentationAudrey Mwala
 
Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...
Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...
Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...Alok Ghildiyal
 
Open Access Charges - Gujarat State
Open Access Charges - Gujarat StateOpen Access Charges - Gujarat State
Open Access Charges - Gujarat StateSOWBHAGYA RAO
 

What's hot (20)

Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power Sector
 
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019Comparison of Solar-Wind Hybrid Policies-07.02.2019
Comparison of Solar-Wind Hybrid Policies-07.02.2019
 
NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)NPTI 15th batch Indian electricity grid code (IEGC)
NPTI 15th batch Indian electricity grid code (IEGC)
 
Tariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorTariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power Sector
 
Indian Electricity Grid Code
Indian Electricity Grid CodeIndian Electricity Grid Code
Indian Electricity Grid Code
 
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
 
Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra Feasibility of Solar Project with Open Access in Maharashtra
Feasibility of Solar Project with Open Access in Maharashtra
 
ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)
 
Power Purchase Agreement PPA
Power Purchase Agreement PPA Power Purchase Agreement PPA
Power Purchase Agreement PPA
 
Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003Presentation On Salient Features Of The Electricity Act , 2003
Presentation On Salient Features Of The Electricity Act , 2003
 
Procedure for distribution open access
Procedure for distribution open accessProcedure for distribution open access
Procedure for distribution open access
 
Floating Solar PV - An Introduction
Floating Solar PV -  An Introduction Floating Solar PV -  An Introduction
Floating Solar PV - An Introduction
 
DSM.pptx
DSM.pptxDSM.pptx
DSM.pptx
 
From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...
 
The power purchase agreement (ppa) presentation
The power purchase agreement (ppa) presentationThe power purchase agreement (ppa) presentation
The power purchase agreement (ppa) presentation
 
Availability Based Tariff and UI charges
Availability Based Tariff and UI chargesAvailability Based Tariff and UI charges
Availability Based Tariff and UI charges
 
Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...
Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...
Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...
 
Indian Power Sector
Indian Power SectorIndian Power Sector
Indian Power Sector
 
OPEN ACCESS REGULATION
OPEN ACCESS REGULATIONOPEN ACCESS REGULATION
OPEN ACCESS REGULATION
 
Open Access Charges - Gujarat State
Open Access Charges - Gujarat StateOpen Access Charges - Gujarat State
Open Access Charges - Gujarat State
 

Similar to Procedure for-distribution-open-access, Tata Power

Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)Jay Ranvir
 
MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...Harish Sharma
 
CERC Regulations_latest policy and rules.pptx
CERC Regulations_latest policy and rules.pptxCERC Regulations_latest policy and rules.pptx
CERC Regulations_latest policy and rules.pptxSANJAY651548
 
Net energy metering manual for three schemes
Net energy metering manual for three schemesNet energy metering manual for three schemes
Net energy metering manual for three schemesPrivate Consultants
 
DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...
DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...
DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...Bhalindra Bath - projects & M&A law
 
Order 163 of 2017-12062018
Order 163 of 2017-12062018Order 163 of 2017-12062018
Order 163 of 2017-12062018Jay Ranvir
 
Availing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reformsAvailing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reformsAbdul Haseeb
 
Practice directions rts net metering regulations 2015
Practice directions  rts  net metering regulations 2015Practice directions  rts  net metering regulations 2015
Practice directions rts net metering regulations 2015Jay Ranvir
 
The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008ZAINI ABDUL WAHAB
 
78/2009 Local Loop Unbundling Regulations
78/2009 Local Loop Unbundling Regulations78/2009 Local Loop Unbundling Regulations
78/2009 Local Loop Unbundling Regulationstraoman
 
COE POG draft for public comment 4.3.12
COE POG draft for public comment 4.3.12COE POG draft for public comment 4.3.12
COE POG draft for public comment 4.3.12cityofevanston
 
Rf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal powerRf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal powerPratap Malempati
 
Net Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and ProcedureNet Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and ProcedureSALMAN SAEED
 
2015 Connecticut Legislative Session Presentation (2)
2015 Connecticut Legislative Session Presentation (2)2015 Connecticut Legislative Session Presentation (2)
2015 Connecticut Legislative Session Presentation (2)Nicholas Cicale
 
Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Gurparvesh kaur
 
Introduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptxIntroduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptxmsounak95
 
Electricity Tariff (1).pptx
Electricity Tariff (1).pptxElectricity Tariff (1).pptx
Electricity Tariff (1).pptxsuman943324
 
Electricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxElectricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxmsounak95
 
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...Bhalindra Bath - projects & M&A law
 

Similar to Procedure for-distribution-open-access, Tata Power (20)

Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)Procedure for implementation of short term open access (stoa)
Procedure for implementation of short term open access (stoa)
 
Connectivity
ConnectivityConnectivity
Connectivity
 
MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...
 
CERC Regulations_latest policy and rules.pptx
CERC Regulations_latest policy and rules.pptxCERC Regulations_latest policy and rules.pptx
CERC Regulations_latest policy and rules.pptx
 
Net energy metering manual for three schemes
Net energy metering manual for three schemesNet energy metering manual for three schemes
Net energy metering manual for three schemes
 
DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...
DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...
DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...
 
Order 163 of 2017-12062018
Order 163 of 2017-12062018Order 163 of 2017-12062018
Order 163 of 2017-12062018
 
Availing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reformsAvailing the Net metering facility: impact of BOI's reforms
Availing the Net metering facility: impact of BOI's reforms
 
Practice directions rts net metering regulations 2015
Practice directions  rts  net metering regulations 2015Practice directions  rts  net metering regulations 2015
Practice directions rts net metering regulations 2015
 
The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008The implementation of Efficient Management of Electrical Energy Regulations 2008
The implementation of Efficient Management of Electrical Energy Regulations 2008
 
78/2009 Local Loop Unbundling Regulations
78/2009 Local Loop Unbundling Regulations78/2009 Local Loop Unbundling Regulations
78/2009 Local Loop Unbundling Regulations
 
COE POG draft for public comment 4.3.12
COE POG draft for public comment 4.3.12COE POG draft for public comment 4.3.12
COE POG draft for public comment 4.3.12
 
Rf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal powerRf s for supply of 5000 mw of round the-clock power - re + thermal power
Rf s for supply of 5000 mw of round the-clock power - re + thermal power
 
Net Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and ProcedureNet Metering-NEPRA & DISCOS Rules/Regulations and Procedure
Net Metering-NEPRA & DISCOS Rules/Regulations and Procedure
 
2015 Connecticut Legislative Session Presentation (2)
2015 Connecticut Legislative Session Presentation (2)2015 Connecticut Legislative Session Presentation (2)
2015 Connecticut Legislative Session Presentation (2)
 
Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )
 
Introduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptxIntroduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptx
 
Electricity Tariff (1).pptx
Electricity Tariff (1).pptxElectricity Tariff (1).pptx
Electricity Tariff (1).pptx
 
Electricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptxElectricity Act (Amendment) Bill 2022.pptx
Electricity Act (Amendment) Bill 2022.pptx
 
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
URN 14D 328 - applying for a Contract for Difference this October 2014 under ...
 

More from Jay Ranvir

Solar net metering policy
Solar net metering policySolar net metering policy
Solar net metering policyJay Ranvir
 
Open access mp
Open access mpOpen access mp
Open access mpJay Ranvir
 
Profile on the production retreaded tyre
Profile on the production retreaded tyreProfile on the production retreaded tyre
Profile on the production retreaded tyreJay Ranvir
 
Tyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading ProcessTyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading ProcessJay Ranvir
 
Open Access Charges Rajasthan
Open Access Charges RajasthanOpen Access Charges Rajasthan
Open Access Charges RajasthanJay Ranvir
 
Response to msedcl demands
Response to msedcl demandsResponse to msedcl demands
Response to msedcl demandsJay Ranvir
 
Ppa agreement draft
Ppa agreement draftPpa agreement draft
Ppa agreement draftJay Ranvir
 
Notified f &amp;s regulations 2018
Notified f &amp;s  regulations 2018Notified f &amp;s  regulations 2018
Notified f &amp;s regulations 2018Jay Ranvir
 
Detailed comparison of capex vs opex
Detailed comparison of capex vs opexDetailed comparison of capex vs opex
Detailed comparison of capex vs opexJay Ranvir
 
Plastics to oil report
Plastics to oil reportPlastics to oil report
Plastics to oil reportJay Ranvir
 
Detail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plantDetail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plantJay Ranvir
 
Model ppa for renewable energy sources
Model ppa for renewable energy sourcesModel ppa for renewable energy sources
Model ppa for renewable energy sourcesJay Ranvir
 
Verification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligationVerification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligationJay Ranvir
 
Short term open access status for march 17
Short term open access status for march 17Short term open access status for march 17
Short term open access status for march 17Jay Ranvir
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)Jay Ranvir
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)Jay Ranvir
 
Forecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyForecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyJay Ranvir
 
Ppa model presentation
Ppa model presentationPpa model presentation
Ppa model presentationJay Ranvir
 
Applicable charges for group captive open access up solar
Applicable charges for group captive open access up solarApplicable charges for group captive open access up solar
Applicable charges for group captive open access up solarJay Ranvir
 

More from Jay Ranvir (20)

Solar net metering policy
Solar net metering policySolar net metering policy
Solar net metering policy
 
Open access mp
Open access mpOpen access mp
Open access mp
 
Profile on the production retreaded tyre
Profile on the production retreaded tyreProfile on the production retreaded tyre
Profile on the production retreaded tyre
 
Tyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading ProcessTyre Retreading by Hot Retreading Process
Tyre Retreading by Hot Retreading Process
 
Ch21
Ch21Ch21
Ch21
 
Open Access Charges Rajasthan
Open Access Charges RajasthanOpen Access Charges Rajasthan
Open Access Charges Rajasthan
 
Response to msedcl demands
Response to msedcl demandsResponse to msedcl demands
Response to msedcl demands
 
Ppa agreement draft
Ppa agreement draftPpa agreement draft
Ppa agreement draft
 
Notified f &amp;s regulations 2018
Notified f &amp;s  regulations 2018Notified f &amp;s  regulations 2018
Notified f &amp;s regulations 2018
 
Detailed comparison of capex vs opex
Detailed comparison of capex vs opexDetailed comparison of capex vs opex
Detailed comparison of capex vs opex
 
Plastics to oil report
Plastics to oil reportPlastics to oil report
Plastics to oil report
 
Detail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plantDetail information of 5 t pyrolysis plant
Detail information of 5 t pyrolysis plant
 
Model ppa for renewable energy sources
Model ppa for renewable energy sourcesModel ppa for renewable energy sources
Model ppa for renewable energy sources
 
Verification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligationVerification of compliance of renewable purchase obligation
Verification of compliance of renewable purchase obligation
 
Short term open access status for march 17
Short term open access status for march 17Short term open access status for march 17
Short term open access status for march 17
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)
 
The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)The indian-sunshine-the-solar-energy-landscape-in-india (1)
The indian-sunshine-the-solar-energy-landscape-in-india (1)
 
Forecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind EnergyForecasting, scheduling and imbalance handling for Solar Wind Energy
Forecasting, scheduling and imbalance handling for Solar Wind Energy
 
Ppa model presentation
Ppa model presentationPpa model presentation
Ppa model presentation
 
Applicable charges for group captive open access up solar
Applicable charges for group captive open access up solarApplicable charges for group captive open access up solar
Applicable charges for group captive open access up solar
 

Recently uploaded

Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝
Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝
Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝thapagita
 
Call US Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...
Call US  Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...Call US  Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...
Call US Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...Pooja Nehwal
 
▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂
▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂
▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂door45step
 
Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7
Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7
Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7Ayesha Khan
 
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls Service
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls ServiceCall Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls Service
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls ServiceAyesha Khan
 
Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...
Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...
Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...aakahthapa70
 
Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7
Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7
Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7Ayesha Khan
 
(9599264170) ↫ Call Girls In Rk Puram ↫ Delhi NCR
(9599264170) ↫ Call Girls In Rk Puram ↫ Delhi NCR(9599264170) ↫ Call Girls In Rk Puram ↫ Delhi NCR
(9599264170) ↫ Call Girls In Rk Puram ↫ Delhi NCREscort Service
 
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...aakahthapa70
 
Russian Call Girls in Goa %(9316020077)# Russian Call Girls in Goa By Russi...
Russian Call Girls  in Goa %(9316020077)# Russian Call Girls  in Goa By Russi...Russian Call Girls  in Goa %(9316020077)# Russian Call Girls  in Goa By Russi...
Russian Call Girls in Goa %(9316020077)# Russian Call Girls in Goa By Russi...Goa Call Girls Service Goa escort agency
 
100% Real Call Girls In Hazrat Nizamuddin Railway Station Delhi | Just Call 9...
100% Real Call Girls In Hazrat Nizamuddin Railway Station Delhi | Just Call 9...100% Real Call Girls In Hazrat Nizamuddin Railway Station Delhi | Just Call 9...
100% Real Call Girls In Hazrat Nizamuddin Railway Station Delhi | Just Call 9...Delhi Escorts Service
 
🔝Call Girls In INA Colony Call Us ➥ 8800357707 In Call Out Call Both With Hig...
🔝Call Girls In INA Colony Call Us ➥ 8800357707 In Call Out Call Both With Hig...🔝Call Girls In INA Colony Call Us ➥ 8800357707 In Call Out Call Both With Hig...
🔝Call Girls In INA Colony Call Us ➥ 8800357707 In Call Out Call Both With Hig...monikaservice1
 
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Availablenitugupta1209
 
Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...
Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...
Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...Ayesha Khan
 
Call Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vip
Call Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vipCall Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vip
Call Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vipAyesha Khan
 
Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...
Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...
Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...Ayesha Khan
 
Call Girls In Naraina (Delhi) +91-9667422720 Escorts Service
Call Girls In Naraina (Delhi) +91-9667422720 Escorts ServiceCall Girls In Naraina (Delhi) +91-9667422720 Escorts Service
Call Girls In Naraina (Delhi) +91-9667422720 Escorts ServiceLipikasharma29
 
KAKINADA CALL GIRL 92628/71154 KAKINADA C
KAKINADA CALL GIRL 92628/71154 KAKINADA CKAKINADA CALL GIRL 92628/71154 KAKINADA C
KAKINADA CALL GIRL 92628/71154 KAKINADA CNiteshKumar82226
 

Recently uploaded (20)

Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝
Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝
Call Girls In Dwarka Delhi 💯Call Us 🔝9711014705🔝
 
Call US Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...
Call US  Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...Call US  Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...
Call US Pooja📞 9892124323 ✅Call Girls In Mira Road ( Mumbai ) secure service...
 
▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂
▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂
▶ ●─Cash On Delivery Call Girls In ( Sector 63 Noida )꧁❤⎝8375860717⎠❤꧂
 
Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7
Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7
Call Girls In Lahore || 03010449222 ||Lahore Call Girl Available 24/7
 
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls Service
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls ServiceCall Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls Service
Call Girls in Lahore || 03090999379 || Get 30% Off on Hot Call Girls Service
 
Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...
Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...
Call Girls In {Aerocity Delhi} 98733@20244 Indian Russian High Profile Girls ...
 
Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7
Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7
Call Girls in Karachi || 03081633338 || 50+ Hot Sexy Girls Available 24/7
 
(9599264170) ↫ Call Girls In Rk Puram ↫ Delhi NCR
(9599264170) ↫ Call Girls In Rk Puram ↫ Delhi NCR(9599264170) ↫ Call Girls In Rk Puram ↫ Delhi NCR
(9599264170) ↫ Call Girls In Rk Puram ↫ Delhi NCR
 
9953056974 Call Girls In Ashok Nagar, Escorts (Delhi) NCR.
9953056974 Call Girls In Ashok Nagar, Escorts (Delhi) NCR.9953056974 Call Girls In Ashok Nagar, Escorts (Delhi) NCR.
9953056974 Call Girls In Ashok Nagar, Escorts (Delhi) NCR.
 
CALL GIRLS IN GOA & ESCORTS SERVICE +919540619990
CALL GIRLS IN GOA & ESCORTS SERVICE +919540619990CALL GIRLS IN GOA & ESCORTS SERVICE +919540619990
CALL GIRLS IN GOA & ESCORTS SERVICE +919540619990
 
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...
Call Girls In {{Connaught Place Delhi}}96679@38988 Indian Russian High Profil...
 
Russian Call Girls in Goa %(9316020077)# Russian Call Girls in Goa By Russi...
Russian Call Girls  in Goa %(9316020077)# Russian Call Girls  in Goa By Russi...Russian Call Girls  in Goa %(9316020077)# Russian Call Girls  in Goa By Russi...
Russian Call Girls in Goa %(9316020077)# Russian Call Girls in Goa By Russi...
 
100% Real Call Girls In Hazrat Nizamuddin Railway Station Delhi | Just Call 9...
100% Real Call Girls In Hazrat Nizamuddin Railway Station Delhi | Just Call 9...100% Real Call Girls In Hazrat Nizamuddin Railway Station Delhi | Just Call 9...
100% Real Call Girls In Hazrat Nizamuddin Railway Station Delhi | Just Call 9...
 
🔝Call Girls In INA Colony Call Us ➥ 8800357707 In Call Out Call Both With Hig...
🔝Call Girls In INA Colony Call Us ➥ 8800357707 In Call Out Call Both With Hig...🔝Call Girls In INA Colony Call Us ➥ 8800357707 In Call Out Call Both With Hig...
🔝Call Girls In INA Colony Call Us ➥ 8800357707 In Call Out Call Both With Hig...
 
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available
9811611494,Low Rate Call Girls In Connaught Place Delhi 24hrs Available
 
Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...
Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...
Call Girls In Islamabad || 03274885999 || 24/7 Service Islamabad Call Girls &...
 
Call Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vip
Call Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vipCall Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vip
Call Girls in Lahore || 03081633338 || 50+ ❤️ Sexy Girls Babes for Sexual - vip
 
Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...
Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...
Book Call Girls in Lahore || 03070433345 || Young, Hot, Sexy, VIP Girls Avail...
 
Call Girls In Naraina (Delhi) +91-9667422720 Escorts Service
Call Girls In Naraina (Delhi) +91-9667422720 Escorts ServiceCall Girls In Naraina (Delhi) +91-9667422720 Escorts Service
Call Girls In Naraina (Delhi) +91-9667422720 Escorts Service
 
KAKINADA CALL GIRL 92628/71154 KAKINADA C
KAKINADA CALL GIRL 92628/71154 KAKINADA CKAKINADA CALL GIRL 92628/71154 KAKINADA C
KAKINADA CALL GIRL 92628/71154 KAKINADA C
 

Procedure for-distribution-open-access, Tata Power

  • 1. THE TATA POWER COMPANY LTD. Procedure for Distribution Open Access June, 2016 The Distribution Open Access Procedure has been made as per the requirements of the MERC (Distribution Open Access) Regulations, 2016 issued by Maharashtra Electricity Regulatory Commission
  • 2. Tata Power-D Procedure for Distribution Open Access 2 Procedure for Distribution Open Access In compliance with MERC (Distribution Open Access) Regulations, 2016 INDEX A. Background B. Eligibility for seeking Open Access C. Time periods for availing Open Access D. Application Format and Documentation E. Timelines for making application F. Scrutiny of application G. Communication of acceptance or shortfall in application to applicant H. Signing of Connection and Use of Distribution System Agreement I. Installation of Special Energy Meters J. Meter Reading K. Revision of Contract Demand L. Scheduling M. Scheduling and Operation Coordination N. Non-utilisation of Short term Open Access O. Billing P. Banking of Renewable Energy Generation Q. Charges applicable for Open Access R. Date of Effectiveness of OA Agreement S. Submission of Generation Credit Note (GCN), Schedules, Energy Credit and Commercial Settlements. T. Compliances by Open Access Consumers U. Modalities to be followed by the Distribution Licensees and the entities claiming to be CPPs V. Amendments
  • 3. Tata Power-D Procedure for Distribution Open Access 3 Procedure for Distribution Open Access In compliance with MERC (Distribution Open Access) Regulations, 2016 A. Background 1. Maharashtra Electricity Regulatory Commission (MERC) has notified the MERC (Distribution Open Access) Regulations, 2016 on 30th March, 2016. This procedure is being framed in accordance with these Regulations and shall be applicable for all applications made to Tata Power-D for seeking open access. 2. The consumer eligible and availing open access from Tata Power-D shall comply with all the relevant provisions pertaining to the MERC (Distribution Open Access) Regulations, 2016, State Grid code and any other procedure of SLDC related to Open Access arrangements, failing which Tata Power-D shall be at liberty to revoke the Open Access permission. 3. Tata Power-D may review / revise / modify / amend the provisions of these procedures prospectively as and when considered necessary and with prior approval of the Hon’ble Commission, and in accordance with the MERC (Distribution Open Access) Regulations, 2016 and its amendment or any general or specific Order issued by the Hon’ble Commission from time to time, pertaining to open access arrangement. B. Eligibility for seeking Open Access 4. A consumer, located in the Distribution Licence Area of Tata Power-D, connected to or proposing to get connected to Tata Power-D’s distribution network, who has no dues pending with Tata Power-D and fulfils the conditions listed in the Table 1 below, shall be eligible for seeking Distribution Open Access. (Regulation 3.2)
  • 4. Tata Power-D Procedure for Distribution Open Access 4 5. This procedure is also applicable to consumers who are taking/ proposing to take supply from Tata Power-D but not connected to the Distribution Wires Network of Tata Power- D. However in cases where the consumer is already having an existing open access arrangement with the other distribution licensee, the consumer would have to apply for open access afresh to Tata Power- D. Table 1: Eligibility criteria for availing Open Access Specific parameters Eligibility Conditions Consumer’s Contract Demand (Applicable for captive as well as third party open access)  The Contract Demand of the Consumer seeking open access (OA) from Tata Power-D should be equal to or more than 1 MW. Power to be availed on open access.  The maximum demand of OA consumer in each financial year subsequent to grant of Open Access shall be equal to or greater than 70% of the thresholds limit (1 MW). Source related conditions  Individual Open Access Consumer shall be eligible for availing supply from multiple sources of power such as Captive Generator, Third party Generators, Trader, Power Exchange, Other Distribution Licensee etc.  Day ahead open access shall be permitted only if surplus capacity is available in the concerned Distribution Licensee’s system. Application for grant of OA shall be made only one day prior to the date of scheduling, up to 12:00 hrs. Notes: i. Unity power factor shall be considered for conversion from MVA / kVA to MW / kW. 6. Individual Consumer located in Distribution Franchisee area shall also be eligible for Open Access; however Distribution Franchisee shall not be eligible for the Open Access except in its capacity as a Consumer. C. Time Periods for availing Open Access 7. The open access can be availed for the following periods:
  • 5. Tata Power-D Procedure for Distribution Open Access 5 Table 2: Types of Open Access Sr. No Type of OA Time Period I Short Term Open Access (STOA) Not exceeding 1 month at a time II Medium Term Open Access (MTOA) Exceeding 3 months but not exceeding 3 years III Long Term Open Access (LTOA) Exceeding 12 years but not exceeding 25 years D. Application Format and Documentation (Regulation 4.1 & 8 ) 8. Tata Power-D shall be the Nodal Agency for making application for open access for procurement of power within the state. The consumer shall submit the distribution open access application to Tata Power-D. (Regulation 8.2, 8.4). 9. A consumer, who is eligible for open access as per (B) above, may apply for short term or medium term or long term distribution open access to Tata Power-D. Separate application shall be made for each connection / metering point and for each transaction. 10. The list of mandatory documents / formats and case specific documents / formats to be submitted by the consumer as a part of the Distribution Open Access Applications are as follows:  Mandatory Documents: i. Form of Application for Connectivity as per Annexure I i. Connection and use of distribution system agreement as specified in Annexure II ii. Application format for Short Term Open Access: Annexure III Or Application format for Medium / Long Term Open Access: Annexure IV iii. Non refundable Application Fees of Rs. 2,500 per application in cash or by demand draft payable in favour of ”The Tata Power Company Limited”. iv. Security Deposit as per Regulation 14.9 and 25. v. Latest paid electricity bill of the consumer.
  • 6. Tata Power-D Procedure for Distribution Open Access 6 Case Specific Documents: i. Copy of Supply Agreement ii. Proof of payment of Application fee iii. Copy of Trading licence iv. Copy of relevant document from the Power Exchange if power is sought from Power Exchange (Registration/Membership details, Member-client agreement, etc.) v. Single Line Diagram (SLD) to be required pertain to Injection & drawl point. vi. SEM Commissioning certificate, if already installed. vii. For OA through Captive Model the following additional documents would be required. o Memorandum of Association o Chartered Accountant Certificate of shareholding pattern to establish equity contribution of 26% or more by the consumers in the supplier’s power plant. o Undertaking for not less than 51% self consumption on annual basis as per Electricity Rules, 2005 viii. Certificate of commissioning or grid connectivity of the source generator to be provided prior to intended date of medium term or long term open access. ix. The application for long term open access shall be accompanied by a a bank guarantee of Rs 10,000/- (Rupees Ten thousand) per MW of the total power to be transmitted and Rs. 5000/- per MW in case the source is a Renewable Energy Source and shall subsist till the execution of the Long Term Open Access Agreement in the case when augmentation of distribution system is required, and till operationalization of Long- term Open Access when augmentation of distribution system is not required. The bank guarantee shall be in favour of the Distribution Licensee. In case of withdrawal of the application by the Consumer anytime before the effectiveness of the open Access Agreement, Tata Power-D shall be liable to encash the Bank Guarantee provided by the consumer.
  • 7. Tata Power-D Procedure for Distribution Open Access 7 Other Requirements/Information i. Availability of capacity in the Distribution system is a mandatory requirement for approval of open access in case of consumers not connected to Tata Power-D network or consumers intending to enhance their Demand. ii. The Applicant shall have to bear the cost of augmentation of distribution system, if required. iii. Further, a suitable piece of land or room on the Applicant’s premises, have to be provided by the Applicant for installation of electrical plant or equipment if required to provide connection. iv. The completed application along with all relevant annexure has to be submitted to the Office of Distribution Support Services at the following address. Head - Billing & Connection Management Distribution Support Services Dharavi Receiving Station, Matunga Labour Camp Area, The Tata Power Company Limited. Mumbai – 400 019 E. Timelines for making application 11. The timelines for submitting the OA applications to Tata Power-D for grant of open access shall be as follows: Table 3: Timelines for making Open Access Applications Type of OA Time Period Timeline for making application I Short Term Open Access Not exceeding 1 month at a time A In Advance Upto 4 months in advance and not later than 10th day of preceding months. (Separate application shall be made for each month and for each transaction in a month) B Day-ahead Only 1 day prior to the date of scheduling, upto 12:00 hours
  • 8. Tata Power-D Procedure for Distribution Open Access 8 Type of OA Time Period Timeline for making application II Medium Term Open Access Exceeding 3 months but not exceeding 3 years Upto 1 years in advance but at least 3 months before the date from which OA is sought III Long Term Open Access Exceeding 12 years but not exceeding 25 years Atleast 2 years before the date from which OA is sought Example: For any request for short term open access received by way of an application on or before 10th day of December, the open access will be permitted from 1st of January. In case Tata Power receives open access on the 11th day of December, open access shall be considered from 1st of February. F. Scrutiny of application 12. Upon the receipt of open access application, Tata Power shall scrutinise the application and the supporting documents for completeness, correctness and relevance of the application as per the following checklist: i. Completeness of the Application form. ii. Verification of Contracts Demand with Tata Power records; iii. Match of the dates / duration of open access as requested and the dates / duration of the LOI /MoU/PPA between the Consumer and Supplier; iv. Existing dues for more than two billing cycles; and v. Outstanding disputes related to electricity charges. G. Communication of acceptance or shortfall in application to Applicant 13. Tata Power shall communicate to the Applicant / consumer about acceptance of application within (5) working days of the receipt of application along with the following information / requirements: i. Details of any shortcoming in application or supporting documentation, with advice to rectify the shortcoming.
  • 9. Tata Power-D Procedure for Distribution Open Access 9 ii. Details of outstanding dues existing for more than two billing cycles or any outstanding disputes related to electricity charges. 14. The acknowledgement of receipt of completed application for Open Access shall be provided in the format as given in the Distribution Open Access Regulation 2016 in case of short term open access. 15. Tata Power will convey grant of open access or otherwise as per the format provided in Annexure III- ST2 in case of short term open access along with schedule of payments to the consumer within 10 working and assign specific reason in writing if open access is not granted. 16. Further, for medium term open access applications, Tata Power will grant or refuse open access within 60 days, for the period stated in the application on being satisfied that the requirements under Regulation 8 are met. In case the open access is granted for a period less than that sought by the applicant, Tata Power shall record the reasons in writing. 17. Tata Power shall convey its decision on the grant of Long Term Open Access within 120 days if the system augmentation is not required, or within 180 days otherwise. While granting open access on long term, Tata Power shall communicate to the Applicant the date from which Long Term Open Access shall be granted and the details of associated charges like wheeling charges cross subsidy surcharge, regulatory asset charges and additional fixed charges. 18. In case of rejection of application as per above, the application processing fee of Rs 2500/- shall stand forfeited. H. Signing of the Connection & Use of Distribution System Agreement (Regulation 6.2) 19. Long term and Medium term OA consumers shall initiate the process of signing the ‘Connection & Use of Distribution System Agreement’ within 30 days of the grant of open access as per format as in Annexure II.
  • 10. Tata Power-D Procedure for Distribution Open Access 10 20. The Agreement shall be signed by the consumer connected to Tata Power’s network, and authorised representative of Tata Power-D before commencing with procurement of power on open access. This Agreement shall be signed after : o Confirming completion of all works and fulfilment of all requirement as per Statute (including installation of SEM meters at generator end as well as Consumer end) o Intimating the date and time of final meter reading and commencement of the Connection & Use of Distribution System Agreement. 21. Tata Power-D shall provide at least 10 days notice to the Consumer before signing the ‘Connection & Use of Distribution System Agreement’. I. Installation of Special Energy Meters 22. Tata Power-D shall test and install Special Energy Meter (SEM) within sixty days from receipt of a request from the consumer or Generating station, that is capable of time- differentiated measurement for time-block-wise active energy in accordance with State Grid Code and with online communication facility with MSLDC for energy accounting for consumers availing Open Access at their cost. 23. The Open Access consumer shall purchase this meter as per specifications provided by Tata Power-D. However, installation of such meters shall be done by Tata Power-D. J. Meter Reading 24. Final Meter reading of the consumer shall be taken by the distribution licensee from the date of commencement of Open Access. It shall be taken in the presence of the Consumer or his representative, and the Generating Company or Licensee from whom the consumer intends to obtain supply of electricity, after written intimation to them. 25. Tata Power-D shall carry out the meter reading at least once in every month.
  • 11. Tata Power-D Procedure for Distribution Open Access 11 K. Revision of Contract Demand (Regulation 4.2) The Contract Demand of a consumer availing LTOA or MTOA shall be governed by the provisions of the Electricity Supply Code and the Regulations of the commission governing standards of performance. Short term Open Access consumer shall not be eligible to revise the contract demand with distribution licensee during the tenure of STOA, but may do so at the time of applying for Open Access. L. Scheduling (Regulation 16) 26. The scheduling of Inter-state open access transactions shall be in accordance with the provision of the Indian Electricity Grid code 27. Intra-state Open Access transactions in respect of – i. Full Open Access Consumers connected to Distribution System & all Generating stations connected to transmission system - shall be scheduled by MSLDC in accordance with the State Grid Code. ii. Partial Open Access Consumer shall submit his Day-ahead schedule to Tata Power-D by 10:00 am of the preceding day which shall be considered when Tata Power-D provides data to SLDC. This schedule shall be after considering the applicable transmission and wheeling losses. Further, the following needs to be noted with respect to scheduling: a. Scheduling shall not be applicable for Non-firm Renewable Energy sources. b. Revision of schedule shall be permitted as per IEGC & State Grid Code. M. Scheduling and Operation Coordination 28. Open Access consumer shall designate a coordinator for scheduling related activities. 29. Consumer shall submit to Tata Power-D, the contact details, Phone/Mobile number, FAX number, email address, etc. of the coordinator appointed by him for scheduling and
  • 12. Tata Power-D Procedure for Distribution Open Access 12 operations coordination and keep Tata Power-D updated in case of any changes in the same. 30. The “Schedule with Tata Power” shall be submitted by the mode of fax and/or email to Load Control Centre (LCC) of Tata Power at Email: pscc@tatapower.com, Fax: 022- 67175385/ Tel: 022- 25543331/022- 67175377. LCC shall incorporate this schedule of the Open Access Consumer in the schedule of Tata Power, as the Open Access Consumer is an embedded consumer of Tata Power. N. Non-utilisation of Short-term Open Access 31. If the consumer, Generating station or Licensee, as the case may is unable to utilize for more than 4 hours the full or substantial part of its allocated capacity, it shall inform the Tata Power, & may surrender the use of such capacity but shall pay transmission and wheeling charges applicable to the original reserved capacity & period. If the Tata Power is able to re-allocate this capacity, the entity who has surrendered the capacity shall be refunded transmission & wheeling charges based on the amount & period of the reallocated capacity. 32. Tata Power may cancel or reduce the capacity allocated, to the extent that it is under- utilised and after giving notice to the affected parties; a) When such capacity is under-utilised for more than 3 days, or b) When the Consumer, Generating Company or licensee as the case may be, fails to inform Tata Power of its inability to utilize the allocated capacity. The capacity available as a result of such surrender or reduction cancellation of capacity may be allocated to any other STOA applicant. O. Billing 33. Tata Power shall issue bills on a monthly basis and the consumer shall pay the bills as per the timelines specified Electricity Supply Code. 34. In case of partial open access, the energy used from Tata Power will be billed as per relevant MERC tariff order issued from time to time and provisions in the MERC (Distribution Open Access) Regulations, 2016.
  • 13. Tata Power-D Procedure for Distribution Open Access 13 35. For the firm power open access consumers, the energy procured from Tata Power in 15 minutes time slot shall be arrived at after deducting the power procured (as per MSLDC) on open access in 15 minutes time slot on Open Access from the consumption metered in 15 minutes time slot. 36. In case, 15 minutes reading at the generator end is not available for wind/solar/hydro generation procured on open access, the same shall be adjusted in TOD slots to arrive at power procured from Tata Power in the TOD time slots. P. Banking of Renewable Energy Generation: i. The surplus energy from a ‘non-firm’ Renewable energy generating station after set off shell be banked with the Tata Power. ii. The banking year shall be the financial year from April to March. iii. Banking of energy shall be permitted during all 12 months of the year but credit for banked energy shall not be permitted during the month of April, May, October & November. iv. The energy banked during peak TOD slots may also be drawn during off-peak TOD slots, but the energy banked during off-peak TOD slots may not be drawn during peak TOD slots. Q. The charges for open access shall include the following (Regulation 14): i. Wheeling Charges shall be payable on the basis of actual energy drawal at the consumption end i.e. Energy at T<>D interface and shall be as determined by MERC. Wheeling charges shall not be applicable in case a consumer or a Generating station is connected to the transmission line directly or using dedicated lines owned by the consumer. (Regulation 14.6). ii. Cross Subsidy Surcharge (CSS) shall be levied to all open access consumers other than for power purchase on open access through a captive generating plant and shall be based on actual energy drawn at consumption end i.e. at the meter (Regulation 14.7). CSS in case of RE source shall be stipulated by MERC from time to time. However, the captive open access consumers have to certify their captive status at the end of each
  • 14. Tata Power-D Procedure for Distribution Open Access 14 financial year. In case the captive conditions are not met CSS will be applicable on the entire consumption through open access. iii. Regulatory Asset charges as approved by MERC. (Regulation 14.1 (vi)) iv. Additional Surcharge, as and when approved by MERC (Regulation 14.8) The additional surcharge shall be applicable to all consumers who have availed open access to receive supply from a source other than the Tata Power to which they are connected. The additional surcharge determined on a per unit basis shall be payable monthly by the open access consumer based on the actual energy drawn during the month through open access. v. MSLDC Fees (Regulation 14.1) If the Distribution Licensee schedules power for the Open Access Customer, the SLDC fees and charges payable by the Licensee shall be shared with the consumer based on the ratio of scheduled demand of Open Access sought to the total demand of Distribution Licensee on a pro-rata basis for Long-term and Medium-term Open Access consumer. vi. Scheduling and other operating charges (Regulation 14.1) The scheduling and other operating charges shall be levied by Distribution Licensee for Open Access consumer at the same rate as approved by the Commission for Open Access consumers in the Order of MSLDC Fees & Charges and Schedule of charges. Monthly Operating Charges of Rs 2500 per Month will be applicable as per Schedule of charges. vii. Transmission Charges (for partial OA consumer as per Regulation 14.1(v)) As Approved by MERC from Time to Time through InSTS Tariff Order: viii. Imbalance Charges The treatment of imbalance in case on firm / infirm power shall be as follows: Table 7: Imbalance Charges Event Chargeability Over drawal Energy Charge Higher of the following:
  • 15. Tata Power-D Procedure for Distribution Open Access 15 a. System Marginal Charges + Other Incidental Charges (Other Incidental Charges shall include Net UI charges, Additional UI) b. Variable Charge of Temporary Tariff Category Demand Charge Penal Demand Charge shall be levied in case of OA consumer Contract Demand Under drawal  Tata Power shall not pay any charges to OA consumer.  If any penal charges are levied on Tata Power then the same shall be applicable to OA consumer on prorated basis. Surplus Energy from RE source  It shall be banked with Tata Power after set off (Regulation 20)  Banking charges shall be adjusted in kind @ 2% of the energy banked.  The unutilised banked energy at the end of the financial year, limited to 10% of actual total generation by such RE source shall be purchase by the Tata Power at its pooled cost of power purchase for that year. ix. Reactive Energy Charge (Regulation 21) The computation of Reactive Energy Charge shall be in following manner: Table 9: Reactive Energy Charge Consumer Chargeability OA Consumer having load 5 MW or more In accordance with provisions stipulated in the State Grid Code and MYT Regulations, 2015 OA Consumer having load less than 5 MW Shall be calculated on Power Factor basis as specified by the Commission Renewable Energy Generating Stations Shall be in accordance with the charges approved by the commission in its relevant Tariff Orders. x. Additional Security Deposit: (Regulation 14.9)
  • 16. Tata Power-D Procedure for Distribution Open Access 16 i. The consumer will be required to furnish an additional security deposit for wheeling equivalent to one month’s billing for wheeling charge, CSS and additional surcharge on the charges of wheeling. In case of short term open access, the Tata Power shall collect an additional Security deposit for wheeling commensurate with the duration of OA instead of on the basis of one month’s billing. ii. The amount of additional security deposit may be adjusted when the amount of additional security required or surplus security held exceeds 10% of the balance with the Tata Power, in accordance with Regulation 14.9 of the Regulations. iii. In case of new Consumer opting for Open Access along with connectivity for the first time Tata Power shall calculate the additional security deposit based on the anticipated use of the distribution system for wheeling of electricity and raise the demand accordingly. iv. Tata Power shall send a notice to the Consumer for deposit of additional Security Deposit and the same shall be required to be deposited by the consumer within fifteen (15) days from the receipt of the notice. v. Additional Security Deposit can be made in the form of Cash, Irrevocable Letter of Credit (L/C) or unconditional Bank Guarantee (BG). Cash deposit shall be entitled to earn interest at Bank Rate of the reserve bank of india and interest will be credited back to Consumer account as per prevailing practice. xi. Demand less than 70% of Contracted Demand through Open Access (Regulation 3.2) In case, the Open Access consumer fails to achieve the maximum demand of 70% of the Contracted Demand through Open Access for 3 consecutive months, Tata Power-D shall levy a penalty equal to 2 times wheeling charges for the period during which such exceptional event was recorded. In such case Tata Power-D shall initiate the process of reassessment and reinstatement / reduction of Contract Demand if the consumer has not complied this condition for 3 consecutive months.
  • 17. Tata Power-D Procedure for Distribution Open Access 17 xii. Late / Default in Payment a) In case the payment of any bill for charges payable under these Regulations is delayed by an Open Access customer beyond the due date, without prejudice to any action under the Act or any other regulation thereunder, a late payment surcharge at the rate of 1.25 per cent (%) per month shall be levied. b) Non-payment of any charge or sum of money payable by an Open Access consumer under these Regulations shall be considered non-compliance of these Regulations. The Distribution Licensee may discontinue Open Access after giving the consumer an advance notice of fifteen days without prejudice to its right to recover such charges as per provisions of the Act and also MSLDC may direct Distribution Licensee to disconnect such entity from the grid. xiii. Any other applicable charge (Regulation 14.1(vi)) Surcharge or other sum recoverable from the consumer under the act or any Regulation or order of the Commission. R. Date of Effectiveness of Open Access (OA) Agreement a. The OA Agreement executed between, the consumer and Tata Power shall be effective from the commencement date of Open Access as requested in the Application and contained in the Open Access Agreement, which date should necessarily conform to the timelines for submission of application given in Para ‘E’ above. b. In case of short term open access, the date of effectiveness shall be the start date of open access mentioned in the Consent issued by Tata Power-D in Annexure III- ST2 provided in the Regulations. c. Irrespective of which date the Consumer schedules power (in case of firm source) / provides Generation Credit Note (GCN) (in case of non-firm source), Open Access shall commence from the Effective Date as per paragraph Q(a) & (b) above for all commercial purposes.
  • 18. Tata Power-D Procedure for Distribution Open Access 18 d. However, in case the Consumer is unable to schedule power due to permission of open access not being available from MSLDC / STU / Other Distribution Licensee for any reason, it shall be the responsibility of the Consumer to approach Tata Power-D with a written request to cancel (or suspend for a given period), the permission of open access given by Tata Power-D, in order to avoid commercial implications resulting from imbalance charges. e. The written request provided above must, in all cases of open access, be provided by the Consumer within 15 days of the date of effectiveness of open access as per paragraph Q(a) & (b) above, otherwise the same shall not be considered. f. For operational purposes and in order to avoid the complications of pro-rata billing, Consumers are advised to requisition open access from the 1st day of a month or commence scheduling of power under the OA Agreement from the 1st day of a month, as the case may be. S. Submission of Generation Credit Note (GCN), Schedules, Energy Credit and Commercial Settlements. i. Energy accounting and settlement shall be carried out on 15 minutes time block basis for firm power Open Access consumers and and ToD wise for non-firm power open access consumers. ii. From the energy / demand recorded in the Consumer meter, scheduled OA entitlement shall first be adjusted to arrive at energy / demand consumption from Tata Power-D. iii. The credit of OA energy, supply energy under Contracted Demand and imbalance charges shall be as per the Regulations. iv. Non- Firm Power: Tata Power will raise the bill on open access consumer before 5th day of the month. Consumer shall submit to Tata Power the monthly Generation Credit Note (GCN). If the data is not submitted by the 5th day of every month, Tata Power shall bill the Consumer considering NIL energy credit. Whenever the Consumer provides the GCN with the data and when SLDC provides the credit of the same to Tata Power-D in the Intra-
  • 19. Tata Power-D Procedure for Distribution Open Access 19 State energy accounting, the bill for the respective month shall be revised and financial credit will be provided in the subsequent billing cycles. v. Firm Power: i. In case generator of the Consumer is a State Pool Participant: The Credit of energy based on the implemented 15 min. schedules finalized by MSLDC will be provided by the consumer in the monthly billing. ii. In case generator is not a State Pool Participant: The Credit of energy will be based on actual 15 min. injection to be based on the GCN to be provided by the 5th of every month, for the previous month. In case the GCN is not provided by the Consumer on the 5th day of the month, Tata Power shall bill the Consumer considering NIL energy credit. Whenever the Consumer provides the GCN with the data and when SLDC provides the credit of the same to Tata Power in the Intra-State energy accounting, the bill for the respective month shall be revised and financial credit will be provided in the subsequent billing cycles. iii. In case of Open Access from Captive Power Plant, Consumer shall by 30th April of each financial year, submit a certificate issued by the SLDC or the Distribution Licensee providing Generation Credit Note about the percentage of generation allocated from the generating plant to the Consumer in such financial year. iv. In case of single generator supplying power to multiple consumers, the GCN issued to the generator must indicate the percentage or generation allocated to the each consumer separately. T. Compliances by Open Access Consumers i. The open access consumer shall comply with the provisions of the Open Access Regulations of MERC, State Grid Code and all other relevant Regulations, Laws & norms or amendments thereof.
  • 20. Tata Power-D Procedure for Distribution Open Access 20 ii. In addition, the open access consumer shall comply with the provisions of the Balancing and Settlement Code. U. MERC has issued the order in the matter of Petition of Maharashtra State Electricity Distribution Co. Ltd. proposing Bank Guarantee / Letter of Credit equivalent to Cross- Subsidy Surcharge and Additional Surcharge from Captive Generators as payment security before providing Open Access, in case no. 23 of 2017 dated 17 January, 2018. In the said order, MERC has set out the following modalities to be followed by the Distribution Licensees and the entities claiming to be CPPs: A. Shareholding Pattern: 1. When Open Access is first sought, details of the shareholding pattern of the claimed CPP shall be submitted. 2. The above details of shareholding patterns should be supported by a Chartered Accountant (CA)’s Certificate. 3. In the event of any change in the shareholding pattern during the financial year, the revised shareholding should be intimated to Tata Power-D within 10 days, with CA certification. 4. The CA’s Certificate should contain details of all shareholders, including the Captive Users, their voting rights and period of shareholding (from & to) 5. In case there is no change in the shareholding pattern during the financial year, the Generators should provide an undertaking to that effect along with the CA Certificate as at the end of the year. B. Metering: 1. Each CPP Generating Unit shall have a separate Special Energy Meter (SEM) as per the specifications in the Central Electricity Authority (CEA) (Installation and Operation of Meters) Regulations, 2006 as amended from time to time.
  • 21. Tata Power-D Procedure for Distribution Open Access 21 2. The CPP should submit the details of all the unit wise meters to the Tata Power-D, like meters at generator terminal, meter for unit wise auxiliary consumption, meters at EHV side of the generator terminal, meters recording the consumption at the outgoing feeders and the consumption of captive consumers etc. 3. Downloading of monthly data of all these meters, Sealing of respective meters and their testing etc. shall be jointly undertaken by the Generator and Tata Power-D, and the State Transmission Utility (STU) (if relevant). 4. The general practice adopted for any HT consumer monthly meter reading should be followed. 5. The SEM meters should be tested periodically as per the prescribed testing procedures jointly with Tata Power-D. It should be periodically tested once in 5 years and also these meters shall be tested whenever the energy and other quantities recorded by the meter are abnormal or inconsistent 6. Tripping events of the CPP Generating Unit and transmission line should be informed to the Tata Power-D and MSLDC along with the period of outage. 7. Power from the non-CPP Units shall not be injected into the grid without appropriate permissions of the respective authorities. 8. By the 30th of April, the Generator shall submit all the relevant data required for establishing its CPP status in the previous financial year. 9. The data shall include the quantum of generation at the Generator Terminal, auxiliary consumption, consumption recorded at the EHV side of the Generator Transformer, the consumption recorded at the outgoing feeders and the consumption of captive consumers grossed up at the Generator Terminal level (along with the necessary computations). 10. This data shall be provided for each month of the financial year, in Excel format. 11. The Tata Power-D shall seek clarifications, if any, and confirm the CPP status or otherwise by 31 May. In case any clarifications required are not received or are inadequate, then the Tata Power-D and the Distribution Licensee(s) shall jointly decide on the CPP status and inform the Generator accordingly. 12. If the Generator is not satisfied with the status as determined by the Distribution Licensee(s), it may approach the Commission by 15 June. In that event, the
  • 22. Tata Power-D Procedure for Distribution Open Access 22 Distribution Licensee(s) shall not levy CSS and Additional Surcharge, if any, till the final decision of the Commission. 13. If the Generator does not approach the Commission by 15 June with any dispute regarding its CPP status, the Distribution Licensee(s) may proceed to levy the CSS and Additional surcharge, if any, with applicable interest. This shall be without prejudice to the Generator’s statutory right to approach the Commission for adjudication of its dispute after that date. V. Amendments Amendments to the procedure shall be issued by Tata Power-D from time to time in accordance to the General or Specific orders of MERC or as a result of any amendments in the DOA Regulations or as Tata Power may deem fit so long as they are consistent with the regulation.