SlideShare a Scribd company logo
1 of 27
A
seminar on
Practical Training
At
“NORTH WESTERN RAILWAY ”
(JAIPUR)
PRESENTED BY:
SOURABH BADBADWAL
4th year, EE
PCE/EE/12/146
DEPARTMENT OF ELECTRICAL ENGINEERING
POORNIMA COLLEGE OF ENGINEERING
ISI-6 RIICO INSTITUTIONALAREA,
JAIPUR -302022
SUBMITTED TO:
Mr. AMIT KUMAR JAIN
Dept. Of Electrical Engg.
2015-16
1
2
1. History Of Indian Railway
2. Types of Traction System
3. Non Electric traction system coaches
4. System Of Track Electrification
5. Power Supply For Jaipur Railway Station
6. Control Panel
7. AC generator
8. Single Line Diagram of non AC coaches
9. AC System and AC coaches load.
10. Major Equipments.
11. Conclusion.
3
 Indian Railway was introduced in madras in 1832. First train in
Indian Railway between Mumbai to Thana on 16th April 1853.Now
17 zones in Indian Railway one is NWR Jaipur and Jaipur Junction
established in 1875 and in 2002 it made a NWR zone .
 One of India’s most famous and luxurious train The Palace On
Wheels stop at Jaipur.
 Indian railway is second biggest electrified system in the world after
Russia. In India 21,000KM of total routes are electrified.
4
 Indian Railways work under only one management.
 It is a lifeline of country.
 It is biggest civilian employer in the world.
 No strike in last 35 years in spite of 17 lakh workers.
 Always targeted by public durring any rally,agitation etc.
 Indian Railways is the world's ninth largest organisation, by
number of employees, with over 1.4 million employees.
 The number of zones in Indian Railways increased from six
to eight in 1951, nine in 1952 and sixteen in 2003. Presently
there are 17 zones & 69 divisions.
 The total area that is covered by Indian Railways is 1,13,115
kms (76,096 miles as on 31.03.2010).
5
System of Traction :
1. Non Electric traction system
Ex. Direct steam engine drive.
2. Electric traction system.
a) Self-contained locomotives.
b) Electric Vehicle fed from distribution
networks.
6
 Advantages and Disadvantages of non electric traction
system over electric traction system-
Advantages Disadvantages
1.Capital cost. 1. Cleanliness.
2.Failure of power. 2. Starting time.
3.Interference to communication lines. 3. Braking.
4.Limitation. 4. limitation of fuel.
5.Problem of Regeration. 5. Maintenance cost.
7
8
 On the self generating two type air conditioned coaches, Chair cars
and compressor coaches, 2 brush less alternators of 18 KW
capacities each provided.
 The DC outputs from the two alternators are paralleled with the
battery.
 In mid on generating coaches usually 30KVA brush less alternator
used and generation is at 415V,3-phase,50 cycles. And in EOG
coaches power at 750V AC or 415V AC stepped down 110V AC.
 Express trains having heavy load use EOG coaches. Both EOG and
MOG coaches the lights and fan are operated 110V AC.
9
Flow Chart
Alternator RRU & ERRU
Battery BankInverter
Power Pannel
Control Pannel
Equipments
AC Plant
10
 The track electrification system are categorized
into:
1. DC system.
2. Single phase AC system.
3. Three phase AC system.
4. Composite system
a) Single phase-Three phase system.
b) Single phase-Direct current system.
11
 The electrical power supplies arrangement for the station:
 Light , fan , LED display and other electrical equipment.
 To junction offices, DRM office and railway colonies.
 The panels are:
o Loco colony panel.
o Station panel.
o Ganpati nagar panel.
12
13
14
15
Name of
Motor
Motor
Ratings
No. of
Motors
Blower 1.5 HP 1
Compress
or
7 HP 2
Condense
r
1.5 HP 2
Motor types used in AC
Coaches
16
 Brushless Alternators : -
 Induction type Alternators used in non AC coaches are
4.5KW/37.5A/120V DC.18KW 2 unit in parallel with
RRU,battery, brush less alternators are used on AC
coaches.
 The brushless alternator with the help of static rectifier
cum regulator unit is capable of developing voltage
from minimum speed to maximum speed.
17
Alternators Image:
18
 Rectifier Cum Regulator Unit : -
 RRU is connected just beside the alternator to rectify the output of
the generator.
 A magnetic amplifier is connected which convert the 3-phase input
to 110V DC
 A safety fuse of 10amp is connected to prevent the RRU box from
abnormal conditions.
 The RRU has following functions:
1. To rectify the 3-phase AC output of the alternator through DC full
wave bridge rectifier.
2. Regulator the voltage generated by the alternator at the set value.
3. Regulating the output current.
19
 Battery and Battery Charging Terminals: -
 The output of the RRU is given to battery box to charge the battery .
 In a non AC coaches a battery box consist of 18 cells(6V/120Ah each)
,In AC coaches 2 battery box 56 cells(2V/1100Ah each) used.
 BCT is provided for external charging of the batteries at stations or
maintenance lines.
 Used Battery in train is VRLA (Valve Regulated Lead Acid) types
advantages -
1. Topping up with water is not required.
2. Periodical checking of specific gravity is not required.
3. Regular maintenance to avoid sulphation of terminals and connections
not required
20
 Rotary Junction Box : -
 Rotary Junction Box is provided inside the coaches.
 It is used to arrange and control the power supply to various
circuit of the coaches (e.g. light, fan) with the help of rotary
switches and HRC fuses.
 4 Rotary switches are connected in Rotary Junction Box:
1. The first switch is used to supply 70% light load in coach.
2. The second switch is used to supply 30% light load in coach.
3. The third switch is used to supply fan load in coach.
4. The fourth switch is known as EFT switch.
21
22
 Fluorescent Tube Light : -
 It is a 2 feet long,18 Watt fluorescent tube light
provided in the coach for the sitting gallery light
and 11watt for toilet light.
 It works at 110V DC supply.
 It gives good light with 30% and 70% power
supply.
23
 Emergency Feed Terminals : -
 It is provided at the both end of the coach to feed the
additional supply to the adjacent coach in case of
emergency.
 Supply from the healthy coach may be extended to
him/dark coach by connecting wire(1.5x2 meter) for
supply to the positive and negative terminals of the EFT.
24
Conclusion:
ONE TEAM
ONE DREAM
GO AHEAD
ZERO FAILURE
25
“Practical training is most important for each and every
student along with theoretical knowledge”.
26
27

More Related Content

What's hot

Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineeringYogesh Jadoun
 
Electric traction
Electric tractionElectric traction
Electric tractionManish Sahu
 
Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)shovandey07
 
Electric locomotive ppt
Electric locomotive pptElectric locomotive ppt
Electric locomotive pptSubhash kumar
 
Traction system
Traction systemTraction system
Traction systematul giri
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-systemMasterhead Jack
 
Summer Training Report of WCR Kota(EE)
Summer Training Report of WCR Kota(EE)Summer Training Report of WCR Kota(EE)
Summer Training Report of WCR Kota(EE)Chirag Jain
 
Electric traction system
Electric traction systemElectric traction system
Electric traction systemAmitKumar6931
 
Distribution of power supply in indian railway
Distribution of power supply in indian railwayDistribution of power supply in indian railway
Distribution of power supply in indian railwaySurajit Mondal
 
Electric Traction System
Electric  Traction  SystemElectric  Traction  System
Electric Traction Systemsahotaharman
 
Ppt on Kharagpur railway
Ppt on Kharagpur railwayPpt on Kharagpur railway
Ppt on Kharagpur railwaySURAJBHAKTA4
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting bookfiroj shaik
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)99sunilkumar
 

What's hot (20)

Railway training
Railway trainingRailway training
Railway training
 
Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineering
 
J DJ
J DJJ DJ
J DJ
 
Dauleshupadhyay
DauleshupadhyayDauleshupadhyay
Dauleshupadhyay
 
Electric traction
Electric tractionElectric traction
Electric traction
 
Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)Vocational training Report (Train Lighting)
Vocational training Report (Train Lighting)
 
Electric locomotive ppt
Electric locomotive pptElectric locomotive ppt
Electric locomotive ppt
 
Traction system
Traction systemTraction system
Traction system
 
33016052 electric-traction-system
33016052 electric-traction-system33016052 electric-traction-system
33016052 electric-traction-system
 
Summer Training Report of WCR Kota(EE)
Summer Training Report of WCR Kota(EE)Summer Training Report of WCR Kota(EE)
Summer Training Report of WCR Kota(EE)
 
Electric traction system
Electric traction systemElectric traction system
Electric traction system
 
J D J
J D JJ D J
J D J
 
Eletric traction
Eletric tractionEletric traction
Eletric traction
 
Distribution of power supply in indian railway
Distribution of power supply in indian railwayDistribution of power supply in indian railway
Distribution of power supply in indian railway
 
Electric locomotive
Electric locomotiveElectric locomotive
Electric locomotive
 
Electric Traction System
Electric  Traction  SystemElectric  Traction  System
Electric Traction System
 
Ppt on Kharagpur railway
Ppt on Kharagpur railwayPpt on Kharagpur railway
Ppt on Kharagpur railway
 
1302580505523 train lighting book
1302580505523 train lighting book1302580505523 train lighting book
1302580505523 train lighting book
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)
 
Railway ppt
Railway pptRailway ppt
Railway ppt
 

Viewers also liked

Viewers also liked (16)

Power control of a wind energy conversion system
Power control of a wind energy conversion systemPower control of a wind energy conversion system
Power control of a wind energy conversion system
 
PPT
PPTPPT
PPT
 
For ppt presentation
For ppt presentationFor ppt presentation
For ppt presentation
 
Rail-net Indian railway internet
Rail-net Indian railway internetRail-net Indian railway internet
Rail-net Indian railway internet
 
mahindra & mahindra ppt report
mahindra & mahindra ppt reportmahindra & mahindra ppt report
mahindra & mahindra ppt report
 
Briquetting Press Machine Project Report
Briquetting Press Machine Project ReportBriquetting Press Machine Project Report
Briquetting Press Machine Project Report
 
Rotary Vane Pump
Rotary Vane Pump Rotary Vane Pump
Rotary Vane Pump
 
Mejia Thermal power Station(Seminar)
Mejia Thermal power Station(Seminar)Mejia Thermal power Station(Seminar)
Mejia Thermal power Station(Seminar)
 
Gearboxes in auto
Gearboxes in autoGearboxes in auto
Gearboxes in auto
 
Gear Box Nirjhar
Gear Box NirjharGear Box Nirjhar
Gear Box Nirjhar
 
Gearbox in automobile
Gearbox  in automobile Gearbox  in automobile
Gearbox in automobile
 
Automatic transmission system ppt
Automatic transmission system pptAutomatic transmission system ppt
Automatic transmission system ppt
 
Indian Railways ppt.
Indian Railways ppt.Indian Railways ppt.
Indian Railways ppt.
 
India PPT
India PPTIndia PPT
India PPT
 
Solar pumps ppt
Solar pumps pptSolar pumps ppt
Solar pumps ppt
 
pumps and its types-ppt
pumps and its types-pptpumps and its types-ppt
pumps and its types-ppt
 

Similar to ppt of summer traning nwr jaipur

Summer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfSummer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfAbhisheksamal22
 
Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)shovandey07
 
Railway coaches
Railway coachesRailway coaches
Railway coachesnoor patel
 
AWPnMNai2WYl8BLH499.pptx
AWPnMNai2WYl8BLH499.pptxAWPnMNai2WYl8BLH499.pptx
AWPnMNai2WYl8BLH499.pptxVishuBaniyan
 
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
SUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPURSUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPUR
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPURShivesh Ranjan
 
electriclocomotive-180426201206.pdf
electriclocomotive-180426201206.pdfelectriclocomotive-180426201206.pdf
electriclocomotive-180426201206.pdfVara Prasad
 
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhiyoy18481
 
VOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORTVOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORTamitietlko
 
Railay internship report
Railay internship reportRailay internship report
Railay internship reportsubham gahir
 
SEMINAR-2015 (abhishek)
SEMINAR-2015 (abhishek)SEMINAR-2015 (abhishek)
SEMINAR-2015 (abhishek)Abhishek Karan
 
Utilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdfUtilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdfhomanathmore
 
Electric traction
Electric tractionElectric traction
Electric tractionDipak Meher
 
POH seminar ppt bhusawal
POH seminar ppt bhusawalPOH seminar ppt bhusawal
POH seminar ppt bhusawalDhiraj Mahajan
 
electric locomotive
electric locomotiveelectric locomotive
electric locomotivesiva1501
 

Similar to ppt of summer traning nwr jaipur (20)

Northern western raiways ppt
Northern western raiways pptNorthern western raiways ppt
Northern western raiways ppt
 
Summer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdfSummer internship Railway Electrical.pdf
Summer internship Railway Electrical.pdf
 
Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)Vocational Training Report (Rajdhani Express)
Vocational Training Report (Rajdhani Express)
 
Railway coaches
Railway coachesRailway coaches
Railway coaches
 
AWPnMNai2WYl8BLH499.pptx
AWPnMNai2WYl8BLH499.pptxAWPnMNai2WYl8BLH499.pptx
AWPnMNai2WYl8BLH499.pptx
 
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
SUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPURSUMMER TRAINNING  REPORT ELECTRIC LOCOSHED  KANPUR
SUMMER TRAINNING REPORT ELECTRIC LOCOSHED KANPUR
 
electriclocomotive-180426201206.pdf
electriclocomotive-180426201206.pdfelectriclocomotive-180426201206.pdf
electriclocomotive-180426201206.pdf
 
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
 
Projectreportonvocational 141120000656-conversion-gate02
Projectreportonvocational 141120000656-conversion-gate02Projectreportonvocational 141120000656-conversion-gate02
Projectreportonvocational 141120000656-conversion-gate02
 
VOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORTVOCATIONAL TRAINING REPORT
VOCATIONAL TRAINING REPORT
 
Railay internship report
Railay internship reportRailay internship report
Railay internship report
 
SEMINAR-2015 (abhishek)
SEMINAR-2015 (abhishek)SEMINAR-2015 (abhishek)
SEMINAR-2015 (abhishek)
 
Utilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdfUtilization of electrical energy Unit 4 ElectricTraction.pdf
Utilization of electrical energy Unit 4 ElectricTraction.pdf
 
Bharat singh 1
Bharat singh 1Bharat singh 1
Bharat singh 1
 
Traction motor
Traction motorTraction motor
Traction motor
 
Electric traction
Electric tractionElectric traction
Electric traction
 
POH seminar bhusawal
POH seminar bhusawal POH seminar bhusawal
POH seminar bhusawal
 
POH seminar ppt bhusawal
POH seminar ppt bhusawalPOH seminar ppt bhusawal
POH seminar ppt bhusawal
 
electric locomotive
electric locomotiveelectric locomotive
electric locomotive
 
Rj final ppt
Rj final pptRj final ppt
Rj final ppt
 

Recently uploaded

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...Call girls in Ahmedabad High profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 

Recently uploaded (20)

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 

ppt of summer traning nwr jaipur

  • 1. A seminar on Practical Training At “NORTH WESTERN RAILWAY ” (JAIPUR) PRESENTED BY: SOURABH BADBADWAL 4th year, EE PCE/EE/12/146 DEPARTMENT OF ELECTRICAL ENGINEERING POORNIMA COLLEGE OF ENGINEERING ISI-6 RIICO INSTITUTIONALAREA, JAIPUR -302022 SUBMITTED TO: Mr. AMIT KUMAR JAIN Dept. Of Electrical Engg. 2015-16 1
  • 2. 2
  • 3. 1. History Of Indian Railway 2. Types of Traction System 3. Non Electric traction system coaches 4. System Of Track Electrification 5. Power Supply For Jaipur Railway Station 6. Control Panel 7. AC generator 8. Single Line Diagram of non AC coaches 9. AC System and AC coaches load. 10. Major Equipments. 11. Conclusion. 3
  • 4.  Indian Railway was introduced in madras in 1832. First train in Indian Railway between Mumbai to Thana on 16th April 1853.Now 17 zones in Indian Railway one is NWR Jaipur and Jaipur Junction established in 1875 and in 2002 it made a NWR zone .  One of India’s most famous and luxurious train The Palace On Wheels stop at Jaipur.  Indian railway is second biggest electrified system in the world after Russia. In India 21,000KM of total routes are electrified. 4
  • 5.  Indian Railways work under only one management.  It is a lifeline of country.  It is biggest civilian employer in the world.  No strike in last 35 years in spite of 17 lakh workers.  Always targeted by public durring any rally,agitation etc.  Indian Railways is the world's ninth largest organisation, by number of employees, with over 1.4 million employees.  The number of zones in Indian Railways increased from six to eight in 1951, nine in 1952 and sixteen in 2003. Presently there are 17 zones & 69 divisions.  The total area that is covered by Indian Railways is 1,13,115 kms (76,096 miles as on 31.03.2010). 5
  • 6. System of Traction : 1. Non Electric traction system Ex. Direct steam engine drive. 2. Electric traction system. a) Self-contained locomotives. b) Electric Vehicle fed from distribution networks. 6
  • 7.  Advantages and Disadvantages of non electric traction system over electric traction system- Advantages Disadvantages 1.Capital cost. 1. Cleanliness. 2.Failure of power. 2. Starting time. 3.Interference to communication lines. 3. Braking. 4.Limitation. 4. limitation of fuel. 5.Problem of Regeration. 5. Maintenance cost. 7
  • 8. 8
  • 9.  On the self generating two type air conditioned coaches, Chair cars and compressor coaches, 2 brush less alternators of 18 KW capacities each provided.  The DC outputs from the two alternators are paralleled with the battery.  In mid on generating coaches usually 30KVA brush less alternator used and generation is at 415V,3-phase,50 cycles. And in EOG coaches power at 750V AC or 415V AC stepped down 110V AC.  Express trains having heavy load use EOG coaches. Both EOG and MOG coaches the lights and fan are operated 110V AC. 9
  • 10. Flow Chart Alternator RRU & ERRU Battery BankInverter Power Pannel Control Pannel Equipments AC Plant 10
  • 11.  The track electrification system are categorized into: 1. DC system. 2. Single phase AC system. 3. Three phase AC system. 4. Composite system a) Single phase-Three phase system. b) Single phase-Direct current system. 11
  • 12.  The electrical power supplies arrangement for the station:  Light , fan , LED display and other electrical equipment.  To junction offices, DRM office and railway colonies.  The panels are: o Loco colony panel. o Station panel. o Ganpati nagar panel. 12
  • 13. 13
  • 14. 14
  • 15. 15
  • 16. Name of Motor Motor Ratings No. of Motors Blower 1.5 HP 1 Compress or 7 HP 2 Condense r 1.5 HP 2 Motor types used in AC Coaches 16
  • 17.  Brushless Alternators : -  Induction type Alternators used in non AC coaches are 4.5KW/37.5A/120V DC.18KW 2 unit in parallel with RRU,battery, brush less alternators are used on AC coaches.  The brushless alternator with the help of static rectifier cum regulator unit is capable of developing voltage from minimum speed to maximum speed. 17
  • 19.  Rectifier Cum Regulator Unit : -  RRU is connected just beside the alternator to rectify the output of the generator.  A magnetic amplifier is connected which convert the 3-phase input to 110V DC  A safety fuse of 10amp is connected to prevent the RRU box from abnormal conditions.  The RRU has following functions: 1. To rectify the 3-phase AC output of the alternator through DC full wave bridge rectifier. 2. Regulator the voltage generated by the alternator at the set value. 3. Regulating the output current. 19
  • 20.  Battery and Battery Charging Terminals: -  The output of the RRU is given to battery box to charge the battery .  In a non AC coaches a battery box consist of 18 cells(6V/120Ah each) ,In AC coaches 2 battery box 56 cells(2V/1100Ah each) used.  BCT is provided for external charging of the batteries at stations or maintenance lines.  Used Battery in train is VRLA (Valve Regulated Lead Acid) types advantages - 1. Topping up with water is not required. 2. Periodical checking of specific gravity is not required. 3. Regular maintenance to avoid sulphation of terminals and connections not required 20
  • 21.  Rotary Junction Box : -  Rotary Junction Box is provided inside the coaches.  It is used to arrange and control the power supply to various circuit of the coaches (e.g. light, fan) with the help of rotary switches and HRC fuses.  4 Rotary switches are connected in Rotary Junction Box: 1. The first switch is used to supply 70% light load in coach. 2. The second switch is used to supply 30% light load in coach. 3. The third switch is used to supply fan load in coach. 4. The fourth switch is known as EFT switch. 21
  • 22. 22
  • 23.  Fluorescent Tube Light : -  It is a 2 feet long,18 Watt fluorescent tube light provided in the coach for the sitting gallery light and 11watt for toilet light.  It works at 110V DC supply.  It gives good light with 30% and 70% power supply. 23
  • 24.  Emergency Feed Terminals : -  It is provided at the both end of the coach to feed the additional supply to the adjacent coach in case of emergency.  Supply from the healthy coach may be extended to him/dark coach by connecting wire(1.5x2 meter) for supply to the positive and negative terminals of the EFT. 24
  • 25. Conclusion: ONE TEAM ONE DREAM GO AHEAD ZERO FAILURE 25 “Practical training is most important for each and every student along with theoretical knowledge”.