ELECTRIC LOCOMOTIVE WORKSHOP 
BHUSAWAL (P.O.H.)
Submitted By: 
DHIRAJ U. MAHAJAN 
Prof. B.A.WANI Prof: K. R. Patil 
(GUIDE) (H.O.D) 
KCE SOCIETY COLLEGE OF ENGINEERING & 
INFORMATION TECHNOLOGY 
JALGAON (2012-13) 
Submitted To 
DEPARTMENT OF ELECTRICAL 
ENGINEERING.
 History of Railway 
Introduction of POH 
Types of loco 
Loco contents 
Section of ELW 
Functions of the equipments used in loco 
 Conclusion
HISTORY OF INDIAN RAILWAY :- 
 On 16th April, 1853, the first train service 
was started in India. 
The first train consisting of steam engine and 
some coaches. It travel between Bombay and Thane 
in about 1:25 hours time. The railway track was 56 
kms stretched. 
On 15th August, 1854, the 2nd train service 
commenced between Howrah and Hubli.
On the 1st July, 1856, the 3rd train service in India and 
first in South India commenced between Vyasarpadi and 
Walajah Road 
The Indian railway about 11,000 trains every day, 
serving 6,990 railway station and carry about 411 
million tonnes of good traffic in the year.
DIFFERENT GAUGES ON THE WORLD RAILWAY 
Sr. no. Types of gauges Gauge in 
mm 
Names of Country 
1 Standard Gauge 1434 England, USA, Canada 
Europe 
2 Broad Gauge (W) 1676 India, Pakistan, Brazil, 
Argentina 
3 Cap gauge 1067 África, Japan, Java, 
Australia, New Zealand 
4 Meter Gauge 1000 India, France, Switzerland, 
Argentina 
5 Narrow Gauge 762 India
INTRODUCTION TO P.O.H. 
Bhusawal 
On year 1974, Electric Locomotive Workshop 
was set up in Bhusawal. 
Electric locomotive workshop Bhusawal was set 
up at a cost of Rs.3.52 corers in the year 1974 
This P.O.H second workshop of electrical 
locomotives . 
The biggest locomotives workshop Bhusawal.
CAPACITY OF E.L.W. BHUSAWAL 
 As newly establishment ELW bhusawal 
carry out 5 loco per month but now a days 
they carry out 12 loco per month. 
Every locomotive brought here every six year 
or 600000 of run for periodic overhauling 
(POH). 
As new locomotive comes after 9 years on 
900000 KM of run.
 The production and designing of new 
loco had done only in Chittranjan 
locomotive workshop (CLW)
TYPES OF LOCO AND GEAR RATIO 
Type of loco Gear ratio 
WAM4 58/21 
WAG5 62/15 
WAP1/3 58/21 
WAP4 58/23 
WAM4 TAO 58/21 
WCAM-1/2 58/21 or 61/16 
WAG5-HITACHI 64/18 
WAG7-HITACHI 65/17 
WCG2 74/18 
WAG9 77/15 
Where 
W- Broad Gauge 
A- A.C. Electric loco 
M- Mixed Service 
G- Goods Loco 
CA- AC & DC LOCO 
All these loco comes in (ELW) Bhusawal for periodic overhauling.
WAM4 
WAG5
WAP1/3 
WAP4
WCG2 
WCG9
ONE LOCOMOTIVE CONTAINS MAIN 
EQUIPMENT Sr. No. Name of Equipment Quantity 
1 Body 1 
2 Bogie 2 
3 Wheel set 6 
4 Traction Motor 6 
5 Transformer 1 
6 D.I. 1 
7 B. A. panel 2 
8 Rectifier 2 
9 Compressor 2/3 
10 Exhauster (except air break)2 
11 SMGR 1 
12 MVMT(Blower for T.M.) 2 
13 RPS 1 
14 DBR 1 
15 MPS(Blower for SL) 2 
16 S.L. 2 
17 S.J. 3 set 
18 Arno 1 
19 Baby Compressor 1 
20 Battery Charger 1
Sr. No. Name of Equipment Quantity 
21 Batteries 10 
22 RTPR 2 
23 Main reservoir 5 
24 M.P. 2 
25 Buffers 4 
26 C.B.C. 2 
27 Pantograph 2 
28 CABS 2 
29 Brake arrangement 5 
30 H o m 2 
31 Head light 2 
32 Marker Height 4 
33 Parking Light 4 
34 Flasher 2 
35 Total valves 40 
36 Brake cylinder 8/12 
37 R.C. Panel 1 
38 Sand boxes 8/10/12/16 
39 HOM Switch 1
SHORT DESCRIPTION, FUNCTIONS OF THE 
EQUIPMENTS USED IN A LOCO 
1) Arno - 
In loco there are many three phase induction 
motor because at their advantages then single phase 
motor but OHE supply 25 KV is single phase. 
To convert single phase supply into three 
phases Arno is used. The Arno converter is designed a 
type of three phase squirrel cage induction motor.
2) Transformer – 
To provide different voltage supply to TM 
transformer with tab changer is used. In this transformer 
laminated core is magnetic circuit is made having three 
legs. One of the leg having auto winding and with this tab 
changing connector having laminated core. Another leg is 
low voltage winding in their auxiliary circuit is supplied (380 
V) constantly to drive 12 auxiliaries in loco. And others are 
primary and secondary winding. 
CAPACITY - 3469 KV 
WEIGHT - 6880 KG 
TOTAL - 11.5 
TONNES 
TAP CHANGER WEIGHT - 0.5 
TONNES 
OIL WEIGHT - 1.7 
TONNES 
OIL CONTAIN - 2000 
LITRES
3) Pantograph – 
The most important function of pantograph is to make contact with OHE or 
cater nary wire and collect all supply from OHE (I.e. 25 KV) 
Full panto is made up of hallow 
aluminium pipe and strips and it can be 
hold easily with 7 Kg contact pressure. The 
whole panto is controlled by two spring. The 
springs are fitted at the piston at 
servomotor. 
The time period of touching should 65 to 
19 sec. And lowering time for panto is max. 
10 sec. The height of OHE from base of 
panto is between 1.75 to 2 meter
4) Rectifier – 
Rectifier is used for converting AC into DC and 
the process is known as rectification. The rectifier 
uses silicon and germanium diode. It is a bridge 
rectifier and have simply p-n junction.
5) Body - 
This is the main convert at locomotive. This 
is made of very high strength of metal sheet. 
It is also called as spinal cord of loco. It 
protects all the equipment in loco form air. 
Rain or dust etc. 
It contains 2 cabs and all lighting system.
6) M.P. - 
It is called as master controller. We may call it as brain of 
loco. When complete loco is ready and it doesn’t move without 
M.P. 
 M.P. contains control switches driver 
handle, shunting handle, panto switch, R.F 
switch and etc. It has 32 notches. As the 
notches are increased the speed of loco is 
also increased.
7) T.M. - 
Traction motor is the main part of the loco. Without T. M. loco is unable to 
move. Traction motor wants pure D.C. supply. 
It has two main parts- 
1) Armature 
2) Winding
Following are the sections in ELW 
Bhusawal :- 
Erection Section 
Bogie Section 
Wheel Section 
Recalling Section 
Traction motor Section 
Transformer Section 
Test room Section 
Pneumatic Section 
Machine shop Section 
R & M Section 
B.A Panel Section 
Mill Wright Section 
Static Section 
White metal Section 
Inspection Section 
Test Laboratory 
Test room (Relay) 
E.P Contactor section 
Rewinding Section
DIFFERENT SECTIONS AND 
RESPECTIVE FUNCTION OF ELW 
•Erection Section :- 
When loco comes in ELW for POH it is 
comes to erection for dismantle. Assembling and 
dismantling of all loco parts is carried out in this section. 
After dismantling all parts are dispatched to respective 
section for maintenance after completing all maintenance 
work assembling of loco is done. 
•R and M section – 
When loco is damaged or burned then repair and 
maintenance is carried out in this section. It contain – 
i] Press machine for bending 
ii] Sharing machine for cutting
• Pneumatic Section – 
There are 40 different valves are fitted in a loco. All 
leakage or any problem are removed in this section and make 
them fully efficient. In this section also overhauling of horn is 
done. As all loco circuit is electro pneumatic. Pneumatic section 
is the heart of loco and ELW. 
• Bogie Section :- 
After dismantling loco bogie is send to this section 
by erection section. In this section all parts are attached from 
bogie frame is send for inspecting cracks. Here wheels and 
traction motor are detached from bogie and send them to 
respective section, where overhauling of parts is done. 
•Wheel Section :- 
In this section wheel comes from bogie sections. Here 
axle box and set are dismantle and necessary operation are 
done on wheel disc and axle box, with help of different 
machines.
• Traction Motor Section :- 
In this section relating traction motor all maintenance 
including bearing and armature maintenance is carried out. 
Different test are carried out on T.M. in this section. 
 H.V. Test :- 
In this test 2.5 KV voltage applied to T.M. see the 
leakage current. 
 Run Test :- 
In this test rated supply is given to motor and run it for 
2 hours. In between these vibration in motor, temp. And motor, 
noise in rotor are observed. After completing tests if armature 
and field winding are found OK. Then they are assembled. If 
there is any disturb in field winding replacement 
A] Same resistance 
B] Same inductance 
C] No one winding open 
D] No winding grounded
• Transformer section – 
In this section maintenance of transformer is done. 
following function are done in this section. 
I] dismantling all parts of transformer 
ii] Checking insulation of winding 
iii] Breaking down voltage test on insulating oil 
IV] Cleaning bushing 
v] Cleaning winding 
vi] Replacement oil 
vii] Cleaning fins of cooling 
viii] H.V. test 
In HV test 380 V supply is given to auxiliary winding 
so 25 KV we get across primary and by changing 
taps the voltage across each tap is taken and check 
for temperature rise.
•Test Lab - 
Test lab is the most important part of ELW, Bhusawal when the new 
equipment comes in ELW. All testing of sample piece is done here. After 
certification of this department all stock is distributed to respective section. 
Various tests are done in this section some of them are as follows: 
•Non destructive Testing (NDT) – 
•Ultrasonic testing 
•RPDT (Red, penetrate dye test) 
Ultrasonic Testing – 
It is carried with the help of ultrasonic flow detector machine 
used. This principle behind ultrasonic testing is based on piezoelectric 
effect. 
 RPDT - 
The kit is having 3 can – 
•Cleaner 
•Red dye 
•Developer 
Principle based on capillary action.
CONCLUSION 
The Industrial training helps student to experience working 
environment of industry & evoked in yourself technical 
thinking and develop ability to understand basic factor. 
So this training taught many new technique & procedure 
of such a big organization. 
It helped me to learn co-ordination between department, 
organizations and communication between different levels of 
organization.
POH seminar bhusawal

More Related Content

What's hot

Training report of Electric Loco Shed
Training report of Electric Loco ShedTraining report of Electric Loco Shed
Training report of Electric Loco ShedAarti Ojha
 
CLW VOCATIONAL TRAINING REPORT- 2018
CLW VOCATIONAL TRAINING REPORT- 2018CLW VOCATIONAL TRAINING REPORT- 2018
CLW VOCATIONAL TRAINING REPORT- 2018SohagSarkar2
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)99sunilkumar
 
railway workshop jodhpur
railway workshop jodhpurrailway workshop jodhpur
railway workshop jodhpurkalumutha
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive pptShrey Sandiman
 
Summer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadSummer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadVishal Dubey
 
PRESENTATION ON DIESEL TRACTION CENTRE GONDA
PRESENTATION ON DIESEL TRACTION CENTRE GONDA PRESENTATION ON DIESEL TRACTION CENTRE GONDA
PRESENTATION ON DIESEL TRACTION CENTRE GONDA ABDUS SAMAD
 
Air brake system of locomotive
Air brake system of locomotiveAir brake system of locomotive
Air brake system of locomotiveAkash Singh
 
Electrical loco tripshed,sawai madhopur
Electrical loco tripshed,sawai madhopurElectrical loco tripshed,sawai madhopur
Electrical loco tripshed,sawai madhopurAkash Karol
 
Railway locomotive
Railway locomotiveRailway locomotive
Railway locomotiveRinku Sharma
 
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATIONINDUSTRIAL ENGINEERING
 
Summer Training Presentation, DLW Varanasi
Summer Training Presentation, DLW VaranasiSummer Training Presentation, DLW Varanasi
Summer Training Presentation, DLW VaranasiSHAILESH SHUKLA
 
Railway workshop jodhpur
Railway workshop jodhpurRailway workshop jodhpur
Railway workshop jodhpurMAHESH SONI
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final studentsPiyush Saini
 
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDINTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDPruthvi Raj
 
1550091 634842733511023750
1550091 6348427335110237501550091 634842733511023750
1550091 634842733511023750Mdtarique Anwar
 

What's hot (20)

Training report of Electric Loco Shed
Training report of Electric Loco ShedTraining report of Electric Loco Shed
Training report of Electric Loco Shed
 
CLW VOCATIONAL TRAINING REPORT- 2018
CLW VOCATIONAL TRAINING REPORT- 2018CLW VOCATIONAL TRAINING REPORT- 2018
CLW VOCATIONAL TRAINING REPORT- 2018
 
60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)60015688 ashish-loco-summer (1)
60015688 ashish-loco-summer (1)
 
railway workshop jodhpur
railway workshop jodhpurrailway workshop jodhpur
railway workshop jodhpur
 
Indian Railway locomotive ppt
Indian Railway locomotive pptIndian Railway locomotive ppt
Indian Railway locomotive ppt
 
Summer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, GhaziabadSummer Training at Electrical LOCO shed, Ghaziabad
Summer Training at Electrical LOCO shed, Ghaziabad
 
Indian Railway
Indian Railway Indian Railway
Indian Railway
 
PRESENTATION ON DIESEL TRACTION CENTRE GONDA
PRESENTATION ON DIESEL TRACTION CENTRE GONDA PRESENTATION ON DIESEL TRACTION CENTRE GONDA
PRESENTATION ON DIESEL TRACTION CENTRE GONDA
 
Air brake system of locomotive
Air brake system of locomotiveAir brake system of locomotive
Air brake system of locomotive
 
Electrical loco tripshed,sawai madhopur
Electrical loco tripshed,sawai madhopurElectrical loco tripshed,sawai madhopur
Electrical loco tripshed,sawai madhopur
 
Railway locomotive
Railway locomotiveRailway locomotive
Railway locomotive
 
Niraj ppt
Niraj pptNiraj ppt
Niraj ppt
 
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
NORTHERN RAILWAY EMU CAR SHED INDUSTRIAL TRAINING PRESENTATION
 
Summer Training Presentation, DLW Varanasi
Summer Training Presentation, DLW VaranasiSummer Training Presentation, DLW Varanasi
Summer Training Presentation, DLW Varanasi
 
Railway workshop jodhpur
Railway workshop jodhpurRailway workshop jodhpur
Railway workshop jodhpur
 
electrical locomotive report for final students
electrical locomotive report for final studentselectrical locomotive report for final students
electrical locomotive report for final students
 
Engine control
Engine controlEngine control
Engine control
 
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHEDINTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
INTERNSHIP PROJECT ON DIESEL LOCMOTIVE AT KAZIPET DIESEL SHED
 
1550091 634842733511023750
1550091 6348427335110237501550091 634842733511023750
1550091 634842733511023750
 
Electric locomotive
Electric locomotiveElectric locomotive
Electric locomotive
 

Similar to POH seminar bhusawal

Ppt presentation on 4 weeks EE DLW Summer Traning
 Ppt presentation on 4 weeks  EE DLW Summer Traning Ppt presentation on 4 weeks  EE DLW Summer Traning
Ppt presentation on 4 weeks EE DLW Summer TraningGaurav Singh
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...SUBHAMOY SINGHA ROY
 
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptxdokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx7009AKASHMODANWAL
 
Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)babai das
 
Railway workshop jhansi
Railway workshop jhansiRailway workshop jhansi
Railway workshop jhansiAnkur Savita
 
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...Devendra Kumar
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training ReportVishal Singh
 
Noida Metro Rail Corporation
Noida Metro Rail CorporationNoida Metro Rail Corporation
Noida Metro Rail CorporationAnkit Chaudhary
 
Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineeringYogesh Jadoun
 
railway workshop jodhpur
railway workshop jodhpur railway workshop jodhpur
railway workshop jodhpur kalumutha
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewRidwanul Hoque
 
DLW varanasi summer training report
DLW varanasi summer training reportDLW varanasi summer training report
DLW varanasi summer training reportshubham chaurasiya
 
Parel carshed training
Parel carshed trainingParel carshed training
Parel carshed trainingAjinkya Gorde
 

Similar to POH seminar bhusawal (20)

Ppt presentation on 4 weeks EE DLW Summer Traning
 Ppt presentation on 4 weeks  EE DLW Summer Traning Ppt presentation on 4 weeks  EE DLW Summer Traning
Ppt presentation on 4 weeks EE DLW Summer Traning
 
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway    electr...
Goverment Of India Trainee at Kanchrapara Workshop, Eastern Railway electr...
 
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptxdokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
dokumen.tips_ppt-presentation-on-4-weeks-ee-dlw-summer-traning.pptx
 
Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)Kanchrapara Railway workshop Project(Short)
Kanchrapara Railway workshop Project(Short)
 
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
INDUSTRIAL TRAINING REPORT ON DIESEL LOCOMOTIVE TECHNOLOGY REPORT 2015 (LUCKNOW)
 
Railway workshop jhansi
Railway workshop jhansiRailway workshop jhansi
Railway workshop jhansi
 
Northern western raiways ppt
Northern western raiways pptNorthern western raiways ppt
Northern western raiways ppt
 
Wajahat ppt on ac shop
Wajahat ppt on ac shopWajahat ppt on ac shop
Wajahat ppt on ac shop
 
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
Industrial training report on dlw varanasi for Main Receiving Substation, Tra...
 
Railway ppt
Railway pptRailway ppt
Railway ppt
 
J D J
J D JJ D J
J D J
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
 
Projectreportonvocational 141120000656-conversion-gate02
Projectreportonvocational 141120000656-conversion-gate02Projectreportonvocational 141120000656-conversion-gate02
Projectreportonvocational 141120000656-conversion-gate02
 
Noida Metro Rail Corporation
Noida Metro Rail CorporationNoida Metro Rail Corporation
Noida Metro Rail Corporation
 
Railway summer training report electrical engineering
Railway summer training report electrical engineeringRailway summer training report electrical engineering
Railway summer training report electrical engineering
 
railway workshop jodhpur
railway workshop jodhpur railway workshop jodhpur
railway workshop jodhpur
 
Railway training
Railway trainingRailway training
Railway training
 
Bangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants OverviewBangladesh Power Stations & Power Plants Overview
Bangladesh Power Stations & Power Plants Overview
 
DLW varanasi summer training report
DLW varanasi summer training reportDLW varanasi summer training report
DLW varanasi summer training report
 
Parel carshed training
Parel carshed trainingParel carshed training
Parel carshed training
 

Recently uploaded

Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,Virag Sontakke
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitolTechU
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...jaredbarbolino94
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 

Recently uploaded (20)

Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,भारत-रोम व्यापार.pptx, Indo-Roman Trade,
भारत-रोम व्यापार.pptx, Indo-Roman Trade,
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
 
Capitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptxCapitol Tech U Doctoral Presentation - April 2024.pptx
Capitol Tech U Doctoral Presentation - April 2024.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...Historical philosophical, theoretical, and legal foundations of special and i...
Historical philosophical, theoretical, and legal foundations of special and i...
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 

POH seminar bhusawal

  • 1.
  • 2. ELECTRIC LOCOMOTIVE WORKSHOP BHUSAWAL (P.O.H.)
  • 3. Submitted By: DHIRAJ U. MAHAJAN Prof. B.A.WANI Prof: K. R. Patil (GUIDE) (H.O.D) KCE SOCIETY COLLEGE OF ENGINEERING & INFORMATION TECHNOLOGY JALGAON (2012-13) Submitted To DEPARTMENT OF ELECTRICAL ENGINEERING.
  • 4.  History of Railway Introduction of POH Types of loco Loco contents Section of ELW Functions of the equipments used in loco  Conclusion
  • 5. HISTORY OF INDIAN RAILWAY :-  On 16th April, 1853, the first train service was started in India. The first train consisting of steam engine and some coaches. It travel between Bombay and Thane in about 1:25 hours time. The railway track was 56 kms stretched. On 15th August, 1854, the 2nd train service commenced between Howrah and Hubli.
  • 6. On the 1st July, 1856, the 3rd train service in India and first in South India commenced between Vyasarpadi and Walajah Road The Indian railway about 11,000 trains every day, serving 6,990 railway station and carry about 411 million tonnes of good traffic in the year.
  • 7. DIFFERENT GAUGES ON THE WORLD RAILWAY Sr. no. Types of gauges Gauge in mm Names of Country 1 Standard Gauge 1434 England, USA, Canada Europe 2 Broad Gauge (W) 1676 India, Pakistan, Brazil, Argentina 3 Cap gauge 1067 África, Japan, Java, Australia, New Zealand 4 Meter Gauge 1000 India, France, Switzerland, Argentina 5 Narrow Gauge 762 India
  • 8. INTRODUCTION TO P.O.H. Bhusawal On year 1974, Electric Locomotive Workshop was set up in Bhusawal. Electric locomotive workshop Bhusawal was set up at a cost of Rs.3.52 corers in the year 1974 This P.O.H second workshop of electrical locomotives . The biggest locomotives workshop Bhusawal.
  • 9. CAPACITY OF E.L.W. BHUSAWAL  As newly establishment ELW bhusawal carry out 5 loco per month but now a days they carry out 12 loco per month. Every locomotive brought here every six year or 600000 of run for periodic overhauling (POH). As new locomotive comes after 9 years on 900000 KM of run.
  • 10.  The production and designing of new loco had done only in Chittranjan locomotive workshop (CLW)
  • 11. TYPES OF LOCO AND GEAR RATIO Type of loco Gear ratio WAM4 58/21 WAG5 62/15 WAP1/3 58/21 WAP4 58/23 WAM4 TAO 58/21 WCAM-1/2 58/21 or 61/16 WAG5-HITACHI 64/18 WAG7-HITACHI 65/17 WCG2 74/18 WAG9 77/15 Where W- Broad Gauge A- A.C. Electric loco M- Mixed Service G- Goods Loco CA- AC & DC LOCO All these loco comes in (ELW) Bhusawal for periodic overhauling.
  • 15. ONE LOCOMOTIVE CONTAINS MAIN EQUIPMENT Sr. No. Name of Equipment Quantity 1 Body 1 2 Bogie 2 3 Wheel set 6 4 Traction Motor 6 5 Transformer 1 6 D.I. 1 7 B. A. panel 2 8 Rectifier 2 9 Compressor 2/3 10 Exhauster (except air break)2 11 SMGR 1 12 MVMT(Blower for T.M.) 2 13 RPS 1 14 DBR 1 15 MPS(Blower for SL) 2 16 S.L. 2 17 S.J. 3 set 18 Arno 1 19 Baby Compressor 1 20 Battery Charger 1
  • 16. Sr. No. Name of Equipment Quantity 21 Batteries 10 22 RTPR 2 23 Main reservoir 5 24 M.P. 2 25 Buffers 4 26 C.B.C. 2 27 Pantograph 2 28 CABS 2 29 Brake arrangement 5 30 H o m 2 31 Head light 2 32 Marker Height 4 33 Parking Light 4 34 Flasher 2 35 Total valves 40 36 Brake cylinder 8/12 37 R.C. Panel 1 38 Sand boxes 8/10/12/16 39 HOM Switch 1
  • 17. SHORT DESCRIPTION, FUNCTIONS OF THE EQUIPMENTS USED IN A LOCO 1) Arno - In loco there are many three phase induction motor because at their advantages then single phase motor but OHE supply 25 KV is single phase. To convert single phase supply into three phases Arno is used. The Arno converter is designed a type of three phase squirrel cage induction motor.
  • 18. 2) Transformer – To provide different voltage supply to TM transformer with tab changer is used. In this transformer laminated core is magnetic circuit is made having three legs. One of the leg having auto winding and with this tab changing connector having laminated core. Another leg is low voltage winding in their auxiliary circuit is supplied (380 V) constantly to drive 12 auxiliaries in loco. And others are primary and secondary winding. CAPACITY - 3469 KV WEIGHT - 6880 KG TOTAL - 11.5 TONNES TAP CHANGER WEIGHT - 0.5 TONNES OIL WEIGHT - 1.7 TONNES OIL CONTAIN - 2000 LITRES
  • 19. 3) Pantograph – The most important function of pantograph is to make contact with OHE or cater nary wire and collect all supply from OHE (I.e. 25 KV) Full panto is made up of hallow aluminium pipe and strips and it can be hold easily with 7 Kg contact pressure. The whole panto is controlled by two spring. The springs are fitted at the piston at servomotor. The time period of touching should 65 to 19 sec. And lowering time for panto is max. 10 sec. The height of OHE from base of panto is between 1.75 to 2 meter
  • 20. 4) Rectifier – Rectifier is used for converting AC into DC and the process is known as rectification. The rectifier uses silicon and germanium diode. It is a bridge rectifier and have simply p-n junction.
  • 21. 5) Body - This is the main convert at locomotive. This is made of very high strength of metal sheet. It is also called as spinal cord of loco. It protects all the equipment in loco form air. Rain or dust etc. It contains 2 cabs and all lighting system.
  • 22. 6) M.P. - It is called as master controller. We may call it as brain of loco. When complete loco is ready and it doesn’t move without M.P.  M.P. contains control switches driver handle, shunting handle, panto switch, R.F switch and etc. It has 32 notches. As the notches are increased the speed of loco is also increased.
  • 23. 7) T.M. - Traction motor is the main part of the loco. Without T. M. loco is unable to move. Traction motor wants pure D.C. supply. It has two main parts- 1) Armature 2) Winding
  • 24. Following are the sections in ELW Bhusawal :- Erection Section Bogie Section Wheel Section Recalling Section Traction motor Section Transformer Section Test room Section Pneumatic Section Machine shop Section R & M Section B.A Panel Section Mill Wright Section Static Section White metal Section Inspection Section Test Laboratory Test room (Relay) E.P Contactor section Rewinding Section
  • 25. DIFFERENT SECTIONS AND RESPECTIVE FUNCTION OF ELW •Erection Section :- When loco comes in ELW for POH it is comes to erection for dismantle. Assembling and dismantling of all loco parts is carried out in this section. After dismantling all parts are dispatched to respective section for maintenance after completing all maintenance work assembling of loco is done. •R and M section – When loco is damaged or burned then repair and maintenance is carried out in this section. It contain – i] Press machine for bending ii] Sharing machine for cutting
  • 26. • Pneumatic Section – There are 40 different valves are fitted in a loco. All leakage or any problem are removed in this section and make them fully efficient. In this section also overhauling of horn is done. As all loco circuit is electro pneumatic. Pneumatic section is the heart of loco and ELW. • Bogie Section :- After dismantling loco bogie is send to this section by erection section. In this section all parts are attached from bogie frame is send for inspecting cracks. Here wheels and traction motor are detached from bogie and send them to respective section, where overhauling of parts is done. •Wheel Section :- In this section wheel comes from bogie sections. Here axle box and set are dismantle and necessary operation are done on wheel disc and axle box, with help of different machines.
  • 27. • Traction Motor Section :- In this section relating traction motor all maintenance including bearing and armature maintenance is carried out. Different test are carried out on T.M. in this section.  H.V. Test :- In this test 2.5 KV voltage applied to T.M. see the leakage current.  Run Test :- In this test rated supply is given to motor and run it for 2 hours. In between these vibration in motor, temp. And motor, noise in rotor are observed. After completing tests if armature and field winding are found OK. Then they are assembled. If there is any disturb in field winding replacement A] Same resistance B] Same inductance C] No one winding open D] No winding grounded
  • 28. • Transformer section – In this section maintenance of transformer is done. following function are done in this section. I] dismantling all parts of transformer ii] Checking insulation of winding iii] Breaking down voltage test on insulating oil IV] Cleaning bushing v] Cleaning winding vi] Replacement oil vii] Cleaning fins of cooling viii] H.V. test In HV test 380 V supply is given to auxiliary winding so 25 KV we get across primary and by changing taps the voltage across each tap is taken and check for temperature rise.
  • 29. •Test Lab - Test lab is the most important part of ELW, Bhusawal when the new equipment comes in ELW. All testing of sample piece is done here. After certification of this department all stock is distributed to respective section. Various tests are done in this section some of them are as follows: •Non destructive Testing (NDT) – •Ultrasonic testing •RPDT (Red, penetrate dye test) Ultrasonic Testing – It is carried with the help of ultrasonic flow detector machine used. This principle behind ultrasonic testing is based on piezoelectric effect.  RPDT - The kit is having 3 can – •Cleaner •Red dye •Developer Principle based on capillary action.
  • 30. CONCLUSION The Industrial training helps student to experience working environment of industry & evoked in yourself technical thinking and develop ability to understand basic factor. So this training taught many new technique & procedure of such a big organization. It helped me to learn co-ordination between department, organizations and communication between different levels of organization.