Traffic problem in Wajirabad road,
Delhi
SIGNATURE BRIDGE
India’s first “Signature Bridge ”being constructed across the Yamuna at Wazirabad promises to be a
great attraction of Delhi. An ambitious project of the Delhi tourism, the cable-stayed bridge will link
National Highway number one near existing T-point at Wazirabad on Western bank and Marginal
Bund Road at Khajuri Khas on eastern bank of the river Yamuna, thus connecting North Delhi with
East Delhi. With a length of about 575 meters and a height of 175 meters the proposed Signature
Bridge would have a bow-shaped pylon in the middle. Two high towers will be there to provide
double cable support in the inner periphery of the carriageway. Equipped with eight lanes, this
engineering masterpiece will have 1.2 meter wide central verge, space for anchoring cables,
maintenance walkway and crash barrier on either side of the central verge. The deck will be
composite (steel and concrete) while pylon will be in steel.
Once operational the Signature Bridge will eventually improve access between North and west Delhi
for the commuters, who have to pass through the narrow lane on the present bridge in Wazirabad,
leading to heavy traffic jam in the peak hours. Also, to facilitate the movement of vehicular traffic
new express lanes will be constructed to connect Ring Road with the bridge.
Signature bridge: An artistic view
Overview of project
PROJECT NAME : Signature Bridge(Yamuna bridge at Wazirabad)
CLIENT : Delhi Tourism & Transportation Development Corporation Ltd.
AGENCY : J.V. of M/s Gammon India & Construtora Cidade, Tensacciai
DESIGN CONSULTANT : J.V. of M/s. Schlaich Bergermann Und Partner, Construma
Consultancy pvt ltd.Mumbai
PROOF CONDULTANT : J.V. of M/s. Systra, Virlogeux & Tandon Consultants .
SUB-CONSULTANT : Ratan J.Batliboi Architects, Mumbai, Department of
EARTHQUAKE ANALYSIS :- IIT Roorkee & structural engg. Research center ,Chennai.
LISENCE NO : CLA/c/13N/10
PERIOD OF CONSTRUCTION: 20/3/2013 to 19/08/2016 (ESTIMATED)
COST OF PROJECT : 1591 crore (revised)
TOTAL LENGTH : 575m (8 lanes) 35.2m wide
PYLON HEIGHT : 154 (5400 ton)
FOUNDATIONS : 6 open and 18 well foundations
Materials used in construction :-
1. Concrete ( M35 and M50 for kerb and deck
M35 in well, M30 in pile.
1. steel and concrete (Composite section )
2. Steel bars (Fe 415 and Fe 500 reinforcement, TMT AND CRS bars)
3. Coarse aggregate and fine aggregate
Shear Connectors
Shear connectors on the top flanges of steel girders provide the mean to achieve
composite action between slab and girder, thus increasing both stiffness and
strength. The shear flow between steel beam and reinforced concrete deck slab is
a natural consequence of requirement for composite action.
Placement of deck slab over shear connector
Test on Aggregates
Sieve analysis of aggregates
Silt content
Moisture content
Flakiness and elongation test
Impact value
Abrasion value
Crushing value
Water Ph / Cl / SO3
Cement physical Test
Specific density and gravity
Water testing
TMT bars
Silt content test of soil
There are two types of harmful substances preset in fine aggregates i.e. organic matter
produced by decay of vegetable matter and/or clay and silt,
which form coating thus preventing a good bond between
cement and the aggregates. If present in large quantities,
result in the increase water-cement ratio and finally affecting
the strength of concrete. Field test is generally conducted in order
to determine the volumetric percentage of silt in natural sand for
percentage up to 8%, otherwise more detailed test as prescribed by
standard code are required to be conducted.
Cube test
The test shall be conducted at recognized ages of the test specimens,
the most usual being 7 days and 28 days. Where it may be necessary to
obtain the strength tests at 1 day and 3 days can also be made. The ages
shall be calculated from the time of the addition of water to the dry
ingredients.
Size of Cubes- 150mm*150mm*150mm
These specimens are tested by compression testing
machine after 7 days curing or 28 days curing. Load
should be applied gradually at the rate of 140 kg/cm2
per minute till the Specimens fails. Load at the failure
divided by area of specimen gives the compressive
strength of concrete.
Aggregate impact value
This test is done to determine the aggregate impact
value of coarse aggregates. The apparatus used for
determining aggregate impact value of coarse
aggregates is Impact testing machine A cylindrical
metal measure of 75mm dia. and 50mm depth,
A tamping rod of 10mm circular cross section and
230mm length, rounded at one end and Oven.
PILE FOUNDATION
• Our Structure is rested on a weak soil formation which can’t resist the
loads coming from our proposed building, so we have to choose pile
foundation.
Pile cap
Piles
Weak soil
Bearing stratum
Pilling Steps
Survey: The surveyor set out the center of the bored pile location.
Utility diversion: A circular pit of diameter 1700mm and depth 1500 mm shall be manually excavated at the location to ensure
that the utilities are present.
Checks for Pile vertically and position: During the process of boring following checks should be made:
Check the verticality of the casing during installation by plumbing from two perpendicular directions.
Check of the eccentricity of the borehole after installation of casing. If the eccentricity is more than 50mm then reinstallation is
done.
The verticality of the casing is checked continuously until the toe is reached and is kept within a tolerance of 50mm.
Variation in dimension is limited to +50mm and - 10mm.
Variation of level at the top should not be beyond +25mm.
Boring of soil-Boring is carried out with the help of a rig up to the required depth. The verticality of the hole to be bored is kept
on monitored and later checked before the lowering of the reinforcement cage.
Installation of temporary casing to stabilize the upper bore, a temporary steel casing of length 2.5- 3m is installed:
A 1000mm diameter hole is drilled using hydraulic boring machine up to a depth of 3-4m.
The casing should then be lowered in the hole with the help of a crane.
The casing is then driven in to the ground with the help of a rotatory machine until about 300mm is left above the ground. The
rig is then used to progress the excavation to the bottom of the casing pipe and then suitable polymer system is added before
further excavation.
Bentonite should be added continuously during excavation. And the depth is measured with the help of the sounding tape.
Cleaning of base:
Boring is stopped when the toe of the pile level is reached. The borehole is cleaned carefully and the soil is removed.
The depth is checked before the lowering of the cage.
Fabrication and installation of reinforcement cage:
Cutting and bending of bars shall be carried out with approved schedule in fabrication yard or on the site. Tie wires shall be
used for binding the bars. Circular concrete spacers shall be provided of the same grade of the pile. Vertical distance between
each layer of spacers shall be 4m. The reinforcement cages shall be lowered in the borehole using steel slings and shackles.
Cages shall be spliced on the fabrication bed and lowered in the trench.
Concrete with slump in the range 175+25mm shall be supplied from batching plant. All concrete delivered shall be visually
inspected and checked against delivery note before being tested and used. Before a pouring is started two delivery trucks
should be available at site.
Concrete shall be placed using pipes.
Pipes are joined towards into the hole. The end of the pipe should not be more than 300 mm above the bottom of the pile to
ensure that free fall of concrete shall not be more than 1.5m.
The concrete shall be discharged from the delivery truck to a hopper connected to the pipes. As the level of the concrete in
the borehole rises, the s shall be withdrawn accordingly to aid the flow of concrete. Section of the pipe shall be dismantled
from the top as the pipe is withdrawn.
During concreting, the level of concrete inside the borehole shall be monitored either with a weighted tape or chain. Encasing
shall be withdrawn after initial setting of concrete
Casing in pile
20mm dia bars are used.
pitch of helical striupps are 200mm
4 master ring, 3 pair square ring, 16 longitudional bar
dia of helical bar 10mm
length of cage – 8.8mm
dia of cage – 1050mm
Size of helical bar – 10mm
lap length – 72* dia of bar
Pile load test
Done after 28 days of construction.
Acceptable limit of penetration should not be less than
12mm.
There should be a overbound of 1 or 2 mm.
Loads applied as per loading of girder.
Reinforcement in pile cap
Batching plant
Signature bridge batching plant has a capacity to deliver a 60 cubic
meter per hour. The batching mixer mixes the following cement, sand,
aggregate , admixture, fly ash and water.
Casting Yard
In casting Yard, deck slab and bridge kerb, welding works were made.
Deck Slab
deck slab used in site comprised of M50 grade concrete. 32mm steel
bars of Fe500.
Kerbs
kerb is a stone or concrete forming an edge between a pavement and a roadway, so
that the pavement is somewhat above the level of road.
signature bridge short presentation

More Related Content

What's hot

What's hot (20)

Shore pile
Shore pileShore pile
Shore pile
 
Construction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly AreasConstruction Challenges For Bridges In Hilly Areas
Construction Challenges For Bridges In Hilly Areas
 
Summer Internship Presentation of Building
Summer Internship Presentation of Building Summer Internship Presentation of Building
Summer Internship Presentation of Building
 
Viaduct
Viaduct Viaduct
Viaduct
 
Metro Construction
Metro ConstructionMetro Construction
Metro Construction
 
Earthquake resistance in buildings
Earthquake resistance in buildingsEarthquake resistance in buildings
Earthquake resistance in buildings
 
Metro presentation
Metro presentationMetro presentation
Metro presentation
 
case study for leaning tower of pisa ,infinity tower, dam failure
case study for leaning tower of pisa ,infinity tower, dam failurecase study for leaning tower of pisa ,infinity tower, dam failure
case study for leaning tower of pisa ,infinity tower, dam failure
 
Training report ON BRIDGE
Training report ON BRIDGETraining report ON BRIDGE
Training report ON BRIDGE
 
Pile foundation ppt
Pile foundation pptPile foundation ppt
Pile foundation ppt
 
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)TRAINING REPORT ON  COSTRUCTION OF FLYOVER FROM  MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Training Report on Bridge Construction
Training Report on Bridge ConstructionTraining Report on Bridge Construction
Training Report on Bridge Construction
 
Casting yard
Casting yardCasting yard
Casting yard
 
Bridge report
Bridge reportBridge report
Bridge report
 
building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)building consturction training report at cpwd (MNIT)
building consturction training report at cpwd (MNIT)
 
project report on earth quake resisting building
project report on earth quake resisting buildingproject report on earth quake resisting building
project report on earth quake resisting building
 
Civil Internship Presentation
Civil Internship Presentation Civil Internship Presentation
Civil Internship Presentation
 

Similar to signature bridge short presentation

Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sections
juwes
 
Bored cast insitu
Bored cast insituBored cast insitu
Bored cast insitu
LingWei11
 
Industrial Training Report1
Industrial Training Report1Industrial Training Report1
Industrial Training Report1
Er Naveen Kumar
 

Similar to signature bridge short presentation (20)

Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
 
Intership in DMRC
Intership in DMRCIntership in DMRC
Intership in DMRC
 
mbl
mblmbl
mbl
 
ppt on sub structure construction.pptx
ppt on sub structure construction.pptxppt on sub structure construction.pptx
ppt on sub structure construction.pptx
 
Construction Sequence.pptx
Construction Sequence.pptxConstruction Sequence.pptx
Construction Sequence.pptx
 
Cut and cover_sections
Cut and cover_sectionsCut and cover_sections
Cut and cover_sections
 
Transmission tower
Transmission towerTransmission tower
Transmission tower
 
Anantpur Report
Anantpur ReportAnantpur Report
Anantpur Report
 
Precast Six lane flyover project
Precast Six lane flyover projectPrecast Six lane flyover project
Precast Six lane flyover project
 
Saurabhk601
Saurabhk601Saurabhk601
Saurabhk601
 
training1 (1).pptx
training1 (1).pptxtraining1 (1).pptx
training1 (1).pptx
 
Bored cast insitu
Bored cast insituBored cast insitu
Bored cast insitu
 
Industrial Training Report1
Industrial Training Report1Industrial Training Report1
Industrial Training Report1
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...
 
Railway over bridge
Railway over bridgeRailway over bridge
Railway over bridge
 
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO PRESENTATION ON CASTING YARD OF LUCKNOW METRO
PRESENTATION ON CASTING YARD OF LUCKNOW METRO
 
Board pile method
Board pile methodBoard pile method
Board pile method
 
Road, Culvert & Bridge Training
Road, Culvert & Bridge TrainingRoad, Culvert & Bridge Training
Road, Culvert & Bridge Training
 
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTIONANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
ANALYSIS OF PRE-STRESSED BRIDGE CONSTRUCTION
 

Recently uploaded

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 

signature bridge short presentation

  • 2. Traffic problem in Wajirabad road, Delhi
  • 3. SIGNATURE BRIDGE India’s first “Signature Bridge ”being constructed across the Yamuna at Wazirabad promises to be a great attraction of Delhi. An ambitious project of the Delhi tourism, the cable-stayed bridge will link National Highway number one near existing T-point at Wazirabad on Western bank and Marginal Bund Road at Khajuri Khas on eastern bank of the river Yamuna, thus connecting North Delhi with East Delhi. With a length of about 575 meters and a height of 175 meters the proposed Signature Bridge would have a bow-shaped pylon in the middle. Two high towers will be there to provide double cable support in the inner periphery of the carriageway. Equipped with eight lanes, this engineering masterpiece will have 1.2 meter wide central verge, space for anchoring cables, maintenance walkway and crash barrier on either side of the central verge. The deck will be composite (steel and concrete) while pylon will be in steel. Once operational the Signature Bridge will eventually improve access between North and west Delhi for the commuters, who have to pass through the narrow lane on the present bridge in Wazirabad, leading to heavy traffic jam in the peak hours. Also, to facilitate the movement of vehicular traffic new express lanes will be constructed to connect Ring Road with the bridge.
  • 4. Signature bridge: An artistic view
  • 5. Overview of project PROJECT NAME : Signature Bridge(Yamuna bridge at Wazirabad) CLIENT : Delhi Tourism & Transportation Development Corporation Ltd. AGENCY : J.V. of M/s Gammon India & Construtora Cidade, Tensacciai DESIGN CONSULTANT : J.V. of M/s. Schlaich Bergermann Und Partner, Construma Consultancy pvt ltd.Mumbai PROOF CONDULTANT : J.V. of M/s. Systra, Virlogeux & Tandon Consultants . SUB-CONSULTANT : Ratan J.Batliboi Architects, Mumbai, Department of EARTHQUAKE ANALYSIS :- IIT Roorkee & structural engg. Research center ,Chennai. LISENCE NO : CLA/c/13N/10 PERIOD OF CONSTRUCTION: 20/3/2013 to 19/08/2016 (ESTIMATED) COST OF PROJECT : 1591 crore (revised) TOTAL LENGTH : 575m (8 lanes) 35.2m wide PYLON HEIGHT : 154 (5400 ton) FOUNDATIONS : 6 open and 18 well foundations
  • 6. Materials used in construction :- 1. Concrete ( M35 and M50 for kerb and deck M35 in well, M30 in pile. 1. steel and concrete (Composite section ) 2. Steel bars (Fe 415 and Fe 500 reinforcement, TMT AND CRS bars) 3. Coarse aggregate and fine aggregate
  • 7. Shear Connectors Shear connectors on the top flanges of steel girders provide the mean to achieve composite action between slab and girder, thus increasing both stiffness and strength. The shear flow between steel beam and reinforced concrete deck slab is a natural consequence of requirement for composite action.
  • 8. Placement of deck slab over shear connector
  • 9.
  • 10. Test on Aggregates Sieve analysis of aggregates Silt content Moisture content Flakiness and elongation test Impact value Abrasion value Crushing value Water Ph / Cl / SO3 Cement physical Test Specific density and gravity Water testing TMT bars
  • 11.
  • 12. Silt content test of soil There are two types of harmful substances preset in fine aggregates i.e. organic matter produced by decay of vegetable matter and/or clay and silt, which form coating thus preventing a good bond between cement and the aggregates. If present in large quantities, result in the increase water-cement ratio and finally affecting the strength of concrete. Field test is generally conducted in order to determine the volumetric percentage of silt in natural sand for percentage up to 8%, otherwise more detailed test as prescribed by standard code are required to be conducted.
  • 13. Cube test The test shall be conducted at recognized ages of the test specimens, the most usual being 7 days and 28 days. Where it may be necessary to obtain the strength tests at 1 day and 3 days can also be made. The ages shall be calculated from the time of the addition of water to the dry ingredients. Size of Cubes- 150mm*150mm*150mm
  • 14. These specimens are tested by compression testing machine after 7 days curing or 28 days curing. Load should be applied gradually at the rate of 140 kg/cm2 per minute till the Specimens fails. Load at the failure divided by area of specimen gives the compressive strength of concrete.
  • 15. Aggregate impact value This test is done to determine the aggregate impact value of coarse aggregates. The apparatus used for determining aggregate impact value of coarse aggregates is Impact testing machine A cylindrical metal measure of 75mm dia. and 50mm depth, A tamping rod of 10mm circular cross section and 230mm length, rounded at one end and Oven.
  • 16. PILE FOUNDATION • Our Structure is rested on a weak soil formation which can’t resist the loads coming from our proposed building, so we have to choose pile foundation. Pile cap Piles Weak soil Bearing stratum
  • 17. Pilling Steps Survey: The surveyor set out the center of the bored pile location. Utility diversion: A circular pit of diameter 1700mm and depth 1500 mm shall be manually excavated at the location to ensure that the utilities are present. Checks for Pile vertically and position: During the process of boring following checks should be made: Check the verticality of the casing during installation by plumbing from two perpendicular directions. Check of the eccentricity of the borehole after installation of casing. If the eccentricity is more than 50mm then reinstallation is done. The verticality of the casing is checked continuously until the toe is reached and is kept within a tolerance of 50mm. Variation in dimension is limited to +50mm and - 10mm. Variation of level at the top should not be beyond +25mm. Boring of soil-Boring is carried out with the help of a rig up to the required depth. The verticality of the hole to be bored is kept on monitored and later checked before the lowering of the reinforcement cage. Installation of temporary casing to stabilize the upper bore, a temporary steel casing of length 2.5- 3m is installed: A 1000mm diameter hole is drilled using hydraulic boring machine up to a depth of 3-4m. The casing should then be lowered in the hole with the help of a crane. The casing is then driven in to the ground with the help of a rotatory machine until about 300mm is left above the ground. The rig is then used to progress the excavation to the bottom of the casing pipe and then suitable polymer system is added before further excavation. Bentonite should be added continuously during excavation. And the depth is measured with the help of the sounding tape.
  • 18. Cleaning of base: Boring is stopped when the toe of the pile level is reached. The borehole is cleaned carefully and the soil is removed. The depth is checked before the lowering of the cage. Fabrication and installation of reinforcement cage: Cutting and bending of bars shall be carried out with approved schedule in fabrication yard or on the site. Tie wires shall be used for binding the bars. Circular concrete spacers shall be provided of the same grade of the pile. Vertical distance between each layer of spacers shall be 4m. The reinforcement cages shall be lowered in the borehole using steel slings and shackles. Cages shall be spliced on the fabrication bed and lowered in the trench. Concrete with slump in the range 175+25mm shall be supplied from batching plant. All concrete delivered shall be visually inspected and checked against delivery note before being tested and used. Before a pouring is started two delivery trucks should be available at site. Concrete shall be placed using pipes. Pipes are joined towards into the hole. The end of the pipe should not be more than 300 mm above the bottom of the pile to ensure that free fall of concrete shall not be more than 1.5m. The concrete shall be discharged from the delivery truck to a hopper connected to the pipes. As the level of the concrete in the borehole rises, the s shall be withdrawn accordingly to aid the flow of concrete. Section of the pipe shall be dismantled from the top as the pipe is withdrawn. During concreting, the level of concrete inside the borehole shall be monitored either with a weighted tape or chain. Encasing shall be withdrawn after initial setting of concrete
  • 19. Casing in pile 20mm dia bars are used. pitch of helical striupps are 200mm 4 master ring, 3 pair square ring, 16 longitudional bar dia of helical bar 10mm length of cage – 8.8mm dia of cage – 1050mm Size of helical bar – 10mm lap length – 72* dia of bar
  • 20. Pile load test Done after 28 days of construction. Acceptable limit of penetration should not be less than 12mm. There should be a overbound of 1 or 2 mm. Loads applied as per loading of girder.
  • 21.
  • 23. Batching plant Signature bridge batching plant has a capacity to deliver a 60 cubic meter per hour. The batching mixer mixes the following cement, sand, aggregate , admixture, fly ash and water.
  • 24. Casting Yard In casting Yard, deck slab and bridge kerb, welding works were made.
  • 25. Deck Slab deck slab used in site comprised of M50 grade concrete. 32mm steel bars of Fe500.
  • 26. Kerbs kerb is a stone or concrete forming an edge between a pavement and a roadway, so that the pavement is somewhat above the level of road.