solarcasestudy
Customer
Parry Group
Location
Draycott, Derbyshire
Technology
135kWp roof mounted Solar PV System
casestudiecasestudiecasestudiecasestudiecasestudiecasestudiecasestudie
THE QUOTATION PROCESS
After initial contact was made a DAS
Technology Business Development Manager
met with the Directors of Parry Group to
discuss the benefits of Solar PV and what it
could deliver for them.
The next stage was a detailed assessment
of their requirements and then a bespoke
quotation was created by DAS design team
ensuring the roof space was maximum to
give the best return for Parry.
casestudiescasestudies
casestudiescasestudiesTHE PAPERWORK
Siemens Energy Efficiency Financing in
conjunction with The Carbon Trust secured
funding for Parry Group to enable the install
to happen with no initial cost from the client.
After successfully passing their EPC and full
site survey the installation was given the go
ahead.
SITE ASSESSMENT
Before any installation took place our Project
Manager and Technical Manager visited
site to discuss Parry Group’s requirements.
At this stage the specific installation
requirements were discussed these included
cable runs and equipment locations. With
this being a working factory personnel and
working hours needed to be taken into
account during the installation. With all the
information from a detailed site survey, a
health and safety plan was created. This
plan was agreed with the clients to ensure
the installation process had minimal impact
on their day to day business operations.
casestudiescasestudiesINSTALLATION PROCESS
DAS engineers installed a 135kWp Solar PV
roof mounted system which was made up
of 540 panels. The panels where fitted onto
two of Parry Groups factory roofs - 144 on
roof 1 and 396 on roof 2.
During the installation DAS engineers faced
a number of challenges. Parry Group wanted
to maximise the roof spaces and have
installed as many panels as possible without
blocking any of the natural light provided by
the roofs sky lights. This issue was taken
into account and addressed at design stage
of the quotation process.
A special lift was used on site to move the
large amount of panels needed to complete
the install.
As ever the installation was handled
successfully and carried out in record
time, even the snow didn’t impact on the
installation too much.
Parry Group will now enjoy up to 50+% on
their electricity spends for years to coming.
Along with receiving excellent feed in tariff
payments providing the company with an
extra income for the next twenty years.
casestudiescasestudiesCLIENT COMMENTS
To say we are happy with the
outcome of this installation would be
a very big understatement indeed.
Not only was the process itself
painless, quick and all but disruption
free, it has also saved us a substantial
amount on our energy bills while
requiring relatively little capital outlay.
DAS Technology have essentially
performed a modern day miracle for
our business.
Roger Ismay , Divisional Director –
Parry Group
casestudiescasestudies
0844 414 6637
solar@dastechnology.co.uk
DAS_Technology
facebook/DASTechnology
DASTechnologyUK
Have an online chat with one of our team at www.dastechnology.co.uk
Or of course write to us at:
DAS Technology Ltd 2 Hamilton Place Oakham Business Park
Mansfield Nottinghamshire NG18 5FA
If you would like to receive a free no obligation survey on your
building please contact us on
solar@dastechnology.co.uk
DAS_Technology
facebook/DASTechnology
DASTechnologyUK
0844 414 6637

More Related Content

What's hot

Dce product overview
Dce  product overview  Dce  product overview
Dce product overview
bill_taylor
 
lee coopers cv1
lee coopers cv1lee coopers cv1
lee coopers cv1
lee cooper
 
Anesco Presentation CANDI
Anesco Presentation CANDIAnesco Presentation CANDI
Anesco Presentation CANDI
Rob Gibson
 
Project management
Project managementProject management
Project management
Mazen Kattan
 
NolesFlyerHighQuality
NolesFlyerHighQualityNolesFlyerHighQuality
NolesFlyerHighQuality
darin noles
 
Resume MRoyse 10_16
Resume MRoyse 10_16Resume MRoyse 10_16
Resume MRoyse 10_16
Martin Royse
 
ND Capabilities - Jeremy Davis
ND Capabilities - Jeremy DavisND Capabilities - Jeremy Davis
ND Capabilities - Jeremy Davis
Jeremy Davis
 

What's hot (20)

Dce product overview
Dce  product overview  Dce  product overview
Dce product overview
 
haydn2016e
haydn2016ehaydn2016e
haydn2016e
 
CaseStudy_OnLine_Design
CaseStudy_OnLine_DesignCaseStudy_OnLine_Design
CaseStudy_OnLine_Design
 
lee coopers cv1
lee coopers cv1lee coopers cv1
lee coopers cv1
 
Cambridge Solar Ltd Company Presentation
Cambridge Solar Ltd Company PresentationCambridge Solar Ltd Company Presentation
Cambridge Solar Ltd Company Presentation
 
Anesco Presentation CANDI
Anesco Presentation CANDIAnesco Presentation CANDI
Anesco Presentation CANDI
 
Project management
Project managementProject management
Project management
 
NolesFlyerHighQuality
NolesFlyerHighQualityNolesFlyerHighQuality
NolesFlyerHighQuality
 
Increase AEP by 2% With Improved Wind Measurement
Increase AEP by 2% With Improved Wind MeasurementIncrease AEP by 2% With Improved Wind Measurement
Increase AEP by 2% With Improved Wind Measurement
 
Tsai cheng wen resume
Tsai cheng wen resumeTsai cheng wen resume
Tsai cheng wen resume
 
Resume
ResumeResume
Resume
 
Power Performance Measurements: Cheaper Faster Better
Power Performance Measurements: Cheaper Faster BetterPower Performance Measurements: Cheaper Faster Better
Power Performance Measurements: Cheaper Faster Better
 
Cost Benefit Analysis and Argument in Favor of Replacement of Mechanical Turb...
Cost Benefit Analysis and Argument in Favor of Replacement of Mechanical Turb...Cost Benefit Analysis and Argument in Favor of Replacement of Mechanical Turb...
Cost Benefit Analysis and Argument in Favor of Replacement of Mechanical Turb...
 
Blazemaster Cost Saving Report
Blazemaster Cost Saving ReportBlazemaster Cost Saving Report
Blazemaster Cost Saving Report
 
SHANNA LANDRY
SHANNA LANDRYSHANNA LANDRY
SHANNA LANDRY
 
Modular Solutions Introduction
Modular Solutions IntroductionModular Solutions Introduction
Modular Solutions Introduction
 
Root Cause Analysis: Understand Why Electronic Parts Fail In Your Wind Turbine
Root Cause Analysis: Understand Why Electronic Parts Fail In Your Wind TurbineRoot Cause Analysis: Understand Why Electronic Parts Fail In Your Wind Turbine
Root Cause Analysis: Understand Why Electronic Parts Fail In Your Wind Turbine
 
Resume MRoyse 10_16
Resume MRoyse 10_16Resume MRoyse 10_16
Resume MRoyse 10_16
 
Davie Hill QHSE Manager Case Studies
Davie Hill QHSE Manager  Case StudiesDavie Hill QHSE Manager  Case Studies
Davie Hill QHSE Manager Case Studies
 
ND Capabilities - Jeremy Davis
ND Capabilities - Jeremy DavisND Capabilities - Jeremy Davis
ND Capabilities - Jeremy Davis
 

Viewers also liked

New & Emerging | Basheer Khan | Mobile computing insights and recommendations...
New & Emerging | Basheer Khan | Mobile computing insights and recommendations...New & Emerging | Basheer Khan | Mobile computing insights and recommendations...
New & Emerging | Basheer Khan | Mobile computing insights and recommendations...
InSync2011
 
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdfNew & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
InSync2011
 
Makalah bahan bangunan part.2
Makalah bahan bangunan part.2Makalah bahan bangunan part.2
Makalah bahan bangunan part.2
Mufid Rahmadi
 
The origin of clay
The origin of clayThe origin of clay
The origin of clay
dargilles
 
Bahan Bangunan: Penutup Atap
Bahan Bangunan: Penutup AtapBahan Bangunan: Penutup Atap
Bahan Bangunan: Penutup Atap
Ega Abdi Satrio
 
Clay mineralogy sivakugan
Clay mineralogy sivakuganClay mineralogy sivakugan
Clay mineralogy sivakugan
Zakee Kazmee
 
Parts Of Speech And Sentence Structure Notes
Parts Of Speech And Sentence Structure NotesParts Of Speech And Sentence Structure Notes
Parts Of Speech And Sentence Structure Notes
guesta3142
 
Introduction to clay
Introduction to clayIntroduction to clay
Introduction to clay
Lela Pohlmann
 

Viewers also liked (20)

New & Emerging | Basheer Khan | Mobile computing insights and recommendations...
New & Emerging | Basheer Khan | Mobile computing insights and recommendations...New & Emerging | Basheer Khan | Mobile computing insights and recommendations...
New & Emerging | Basheer Khan | Mobile computing insights and recommendations...
 
Green Roof Technology Spring Magazine
Green Roof Technology Spring MagazineGreen Roof Technology Spring Magazine
Green Roof Technology Spring Magazine
 
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdfNew & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
New & Emerging _ KrisDowney _ Simplifying the Change Process.pdf
 
Squared roof technology
Squared roof technologySquared roof technology
Squared roof technology
 
Wood Roof Trusses: Advanced Technology in Building Design
Wood Roof Trusses: Advanced Technology in Building DesignWood Roof Trusses: Advanced Technology in Building Design
Wood Roof Trusses: Advanced Technology in Building Design
 
Makalah bahan bangunan part.2
Makalah bahan bangunan part.2Makalah bahan bangunan part.2
Makalah bahan bangunan part.2
 
Building Contruction I
Building Contruction IBuilding Contruction I
Building Contruction I
 
Teknologi bahan kayu presentation
Teknologi bahan kayu presentationTeknologi bahan kayu presentation
Teknologi bahan kayu presentation
 
Department:textile engineering, City University Bangladesh, topic: Geo textile
Department:textile engineering, City University Bangladesh, topic: Geo textileDepartment:textile engineering, City University Bangladesh, topic: Geo textile
Department:textile engineering, City University Bangladesh, topic: Geo textile
 
The origin of clay
The origin of clayThe origin of clay
The origin of clay
 
Jenis - Jenis Bahan Material
Jenis - Jenis Bahan MaterialJenis - Jenis Bahan Material
Jenis - Jenis Bahan Material
 
Bahan Bangunan: Penutup Atap
Bahan Bangunan: Penutup AtapBahan Bangunan: Penutup Atap
Bahan Bangunan: Penutup Atap
 
Clay mineralogy sivakugan
Clay mineralogy sivakuganClay mineralogy sivakugan
Clay mineralogy sivakugan
 
Geosynthetics- Types, and their use in Retaining Walls
Geosynthetics- Types, and their use in Retaining WallsGeosynthetics- Types, and their use in Retaining Walls
Geosynthetics- Types, and their use in Retaining Walls
 
Parts Of Speech And Sentence Structure Notes
Parts Of Speech And Sentence Structure NotesParts Of Speech And Sentence Structure Notes
Parts Of Speech And Sentence Structure Notes
 
Geosynthetics Applications in Civil Engineering by Sirmoi_Geosynthetics EA Ltd
Geosynthetics Applications in Civil Engineering by Sirmoi_Geosynthetics EA LtdGeosynthetics Applications in Civil Engineering by Sirmoi_Geosynthetics EA Ltd
Geosynthetics Applications in Civil Engineering by Sirmoi_Geosynthetics EA Ltd
 
Introduction to clay
Introduction to clayIntroduction to clay
Introduction to clay
 
Geosynthetics
GeosyntheticsGeosynthetics
Geosynthetics
 
Clay Minerals And Soil Structure
Clay Minerals And Soil StructureClay Minerals And Soil Structure
Clay Minerals And Soil Structure
 
Ceramics and clay products
Ceramics and clay productsCeramics and clay products
Ceramics and clay products
 

Similar to Parry casestudy

Proconsultores Telecommunication Presentation
Proconsultores Telecommunication PresentationProconsultores Telecommunication Presentation
Proconsultores Telecommunication Presentation
Joaquim Almeida
 
Airodek notable projects
Airodek   notable projectsAirodek   notable projects
Airodek notable projects
jd_stu
 
David Padgett resume
David Padgett resumeDavid Padgett resume
David Padgett resume
Dave Padgett
 
Keith Larkin Resume
Keith Larkin ResumeKeith Larkin Resume
Keith Larkin Resume
larkink
 
HS Lee Dec03 2015K
HS Lee Dec03 2015KHS Lee Dec03 2015K
HS Lee Dec03 2015K
Hansang Lee
 

Similar to Parry casestudy (20)

Solarking free commercial solar pv
Solarking free commercial solar pvSolarking free commercial solar pv
Solarking free commercial solar pv
 
Davie Hill QHSE Manager Case Studies
Davie Hill QHSE Manager  Case StudiesDavie Hill QHSE Manager  Case Studies
Davie Hill QHSE Manager Case Studies
 
Target Solar: commercial brochure for Solar Panel Power Systems, battery & In...
Target Solar: commercial brochure for Solar Panel Power Systems, battery & In...Target Solar: commercial brochure for Solar Panel Power Systems, battery & In...
Target Solar: commercial brochure for Solar Panel Power Systems, battery & In...
 
projdoc(1).docx
projdoc(1).docxprojdoc(1).docx
projdoc(1).docx
 
Proconsultores Telecommunication Presentation
Proconsultores Telecommunication PresentationProconsultores Telecommunication Presentation
Proconsultores Telecommunication Presentation
 
Proconsultores Telecommunication Presentation
Proconsultores Telecommunication PresentationProconsultores Telecommunication Presentation
Proconsultores Telecommunication Presentation
 
Airodek notable projects
Airodek   notable projectsAirodek   notable projects
Airodek notable projects
 
Siemens
SiemensSiemens
Siemens
 
Breaking New Ground in Efficiency
Breaking New Ground in EfficiencyBreaking New Ground in Efficiency
Breaking New Ground in Efficiency
 
MNC-14
MNC-14MNC-14
MNC-14
 
New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal New Mexico Statewide Standards for Solar PV and Solar Thermal
New Mexico Statewide Standards for Solar PV and Solar Thermal
 
From Measurement to Insight: Putting DevOps Metrics To Work
From Measurement to Insight: Putting DevOps Metrics To WorkFrom Measurement to Insight: Putting DevOps Metrics To Work
From Measurement to Insight: Putting DevOps Metrics To Work
 
Electromechanical Contractors in Egypt
Electromechanical Contractors in EgyptElectromechanical Contractors in Egypt
Electromechanical Contractors in Egypt
 
David Padgett resume
David Padgett resumeDavid Padgett resume
David Padgett resume
 
Keith Larkin Resume
Keith Larkin ResumeKeith Larkin Resume
Keith Larkin Resume
 
CRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GACRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GA
 
Panasas Delivers Seismic Data 10x Faster to Geophysical Development Corp.
Panasas Delivers Seismic Data 10x Faster to Geophysical Development Corp.Panasas Delivers Seismic Data 10x Faster to Geophysical Development Corp.
Panasas Delivers Seismic Data 10x Faster to Geophysical Development Corp.
 
Corporate Presentation
Corporate Presentation Corporate Presentation
Corporate Presentation
 
HS Lee Dec03 2015K
HS Lee Dec03 2015KHS Lee Dec03 2015K
HS Lee Dec03 2015K
 
Small Commercial Solar: Grow Your Business With This Untapped Sector
Small Commercial Solar: Grow Your Business With This Untapped SectorSmall Commercial Solar: Grow Your Business With This Untapped Sector
Small Commercial Solar: Grow Your Business With This Untapped Sector
 

Recently uploaded

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Recently uploaded (20)

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 

Parry casestudy

  • 1. solarcasestudy Customer Parry Group Location Draycott, Derbyshire Technology 135kWp roof mounted Solar PV System casestudiecasestudiecasestudiecasestudiecasestudiecasestudiecasestudie
  • 2. THE QUOTATION PROCESS After initial contact was made a DAS Technology Business Development Manager met with the Directors of Parry Group to discuss the benefits of Solar PV and what it could deliver for them. The next stage was a detailed assessment of their requirements and then a bespoke quotation was created by DAS design team ensuring the roof space was maximum to give the best return for Parry. casestudiescasestudies
  • 3. casestudiescasestudiesTHE PAPERWORK Siemens Energy Efficiency Financing in conjunction with The Carbon Trust secured funding for Parry Group to enable the install to happen with no initial cost from the client. After successfully passing their EPC and full site survey the installation was given the go ahead. SITE ASSESSMENT Before any installation took place our Project Manager and Technical Manager visited site to discuss Parry Group’s requirements. At this stage the specific installation requirements were discussed these included cable runs and equipment locations. With this being a working factory personnel and working hours needed to be taken into account during the installation. With all the information from a detailed site survey, a health and safety plan was created. This plan was agreed with the clients to ensure the installation process had minimal impact on their day to day business operations.
  • 4. casestudiescasestudiesINSTALLATION PROCESS DAS engineers installed a 135kWp Solar PV roof mounted system which was made up of 540 panels. The panels where fitted onto two of Parry Groups factory roofs - 144 on roof 1 and 396 on roof 2. During the installation DAS engineers faced a number of challenges. Parry Group wanted to maximise the roof spaces and have installed as many panels as possible without blocking any of the natural light provided by the roofs sky lights. This issue was taken into account and addressed at design stage of the quotation process. A special lift was used on site to move the large amount of panels needed to complete the install. As ever the installation was handled successfully and carried out in record time, even the snow didn’t impact on the installation too much. Parry Group will now enjoy up to 50+% on their electricity spends for years to coming. Along with receiving excellent feed in tariff payments providing the company with an extra income for the next twenty years.
  • 5. casestudiescasestudiesCLIENT COMMENTS To say we are happy with the outcome of this installation would be a very big understatement indeed. Not only was the process itself painless, quick and all but disruption free, it has also saved us a substantial amount on our energy bills while requiring relatively little capital outlay. DAS Technology have essentially performed a modern day miracle for our business. Roger Ismay , Divisional Director – Parry Group
  • 6. casestudiescasestudies 0844 414 6637 solar@dastechnology.co.uk DAS_Technology facebook/DASTechnology DASTechnologyUK Have an online chat with one of our team at www.dastechnology.co.uk Or of course write to us at: DAS Technology Ltd 2 Hamilton Place Oakham Business Park Mansfield Nottinghamshire NG18 5FA If you would like to receive a free no obligation survey on your building please contact us on solar@dastechnology.co.uk DAS_Technology facebook/DASTechnology DASTechnologyUK 0844 414 6637