More Related Content
Similar to Kyle Resume (20)
Kyle Resume
- 1. 6700 Rinconada Dr., Citrus Heights, CA 95610, (916)878-6171, varneyk125@gmail.com
Kyle Varney
Objective To acquire a SystemsEngineer,ManufacturingSupervisor,orEngineeringTechnicianjobin
the fieldof electronics.
Professional
Highlights
06/2015-Present: Staff Engineer – SkyCatch, Inc.
Responsibleforcreatingandmaintainingthesystemslevelandcableleveldrawings.
ResponsibleforcreatingallBOM’s(Buildof Materials)andallconfigurationcontroldocuments.
WorkedonvariousR&Dactivitiesforqualificationandvalidationofproduct.
Createdacostreductionplanfortheproductasthecompanytransitionedfromstartupto
productionmanufacturer.
ServedasRMA technicianwhereIwasresponsibleforpreparingrootcauseanalysis,repair,
andreturnof customerdamageditems.
Severalprocedureswrittentohelpstreamlineprocessaswellasimprovingqualityinthesame
effort.
Extremelycompetentdronepilot.Abletobuild,fly,diagnose,andrepairissuesidentifiedat
anystage inthebuild.
FluentinallMSOfficeproductsincludingVisioandmostERP/MRPsystems.
2012-06/2015: System Engineer – ART, Inc.
Responsibleforcreatingandmaintainingthesystemslevelandcableleveldrawings.
WorkedasaFieldServiceRepresentativeservingengineeringandtechnicianfunctionson
platformssuchasE4-BandCessnaCitations.
Responsibleforcreatingandmaintaining fiberopticsystemsandconfigurations.
Createdamulti-modefiberoptictesterforfieldvalidationandcharacterizationof fiber
cables/systemspreandpostinstallations.
Extensivetravelrepresentingthecompanyasanengineeringresourcewhilestillabletoserve
technicianfunctionsduetoextensiveproductknowledge.
Severalprocedureswrittentohelpstreamlineprocessaswellasimprovingqualityinthesame
effort.
FluentinallMSOfficeproductsincludingVisio.
2010-2012: First Article Build (FAB) – ART, Inc.
Incharge orreviewingengineeringreleasedrawingsandBuildof Materials(BOMs)forerrors.
Workedwith engineeringtodefinebestbuildpractices(i.e.parts,process,cableroutings,
requirements,ect.)
BuiltFABunits,redlinedapplicabledrawings,deliveredproductthroughQualityAssurance
(QA) andtothetestdepartment.
Designedandbuiltautomatedtestfixturestotimesavingsof200-400% tostreamline
efficiencyandproductquality.
PromotedtoEngineeringdepartmentafterexcellinginFAB.
2007-2010: Electronics Assembler– ART, Inc.
- 2. 6700 Rinconada Dr., Citrus Heights, CA 95610, (916)878-6171, varneyk125@gmail.com
Kyle Varney
J-Standardcertifiedinsoldering.
Trainedinproperuseofcrimpingtools.
Trainedinassemblyof variousfiberopticcables.
Incharge orcreating,training,andmaintainingofcompanyElectrostaticDischarge(ESD)
policy.
Topperformerinmanufacturingallyearsworkingindepartment.
PromotedtoworkinFirstArticleBuildandexcellinginmanufacturing.
2004-2005: Material Control– ART, Inc.
Usedorganizationalskillandelectronicsproductknowledgetoorganizeandmanagematerial.
Extensiveproductknowledgeusedtostreamlinematerialpurchasingprocess.
PromotedtoElectronicsAssemblerafterquicklyexcellinginstockroom.
Skills Extensiveelectronicproduct
knowledge
J-Standardcertifiedinsoldering
TrainedinproperuseofDVM
Trainedinproperuseofcrimpers
FluentinallMSOfficeproducts
Trainedinfiberopticcableassembly
andtest
FluentinuseofMSVisio
FluentinmostERPprograms
Highlevelunderstandingof companyprocess’s
Extremelyself-sufficientworker.
Extremelyquicklearner
Employment
History
Staff Engineer SkyCatch, Inc., EDH, CA 06/2015-Present
SystemsEngineer Alpha Research & Tech., EDH, CA 2012-2015
FirstArticle Build Alpha Research & Tech., EDH, CA 2010-2012
ElectronicsAssembler Alpha Research & Tech., EDH, CA 2007-2010
Material Control Alpha Research & Tech., EDH, CA 2004-2005
References Referencesare available onrequest.