Resume
- 1. 1
Resume
Wayne E. Armstrong
205 Pebble Beach Court, Sarnia, ON, N7W 1C6
Cell 519-384-0116
Objective: A ConstructionManagementpositionwhere Icanapplymy experience andknowledge
gainedfrommanyyearsin the industry.
EXPERIENCE
Jan 2013-July 2015 ConstructionManager,EasternRegion,Enbridge PipelinesInc.
Witha staff of craft inspectors,costanalysts,QA andsafetyadvisor,managedmultiple
contractors inLeak DetectionandFlow Restriction projects acrossSouthernOntario.
Witha staff of craft inspectors,costanalysts,QA andsafetyadvisor,managedthe Line 7
expansionandLine 9Bexpansion/reversal projectinSarnia,KeyserandBryanston.
Keyresponsibilities
Ensuredall workwas carriedout safelyandincompliance withthe Enbridge safetymanual.
Liaisedwithsite, outside regulators,Engineering,vendors andmultiplecontractorstoensure
schedule adherence and QA/QCrequirementswere met.
Outage planningtohave site maintenance,contractorsandthirdparty commissioningavailable
duringthe outage windows.
June 2012-Nov 2012 ConstructionManager,SNCLavalinon Bio-Ambersite,Sarnia
Managed the initial geo-technical workandwater/sewertie-insforthe Bio-Ambersite.
Keyresponsibilities
Co-ordinatedwithEngineering,contractors,cityandsite to install/testthe potablewatersupply
and sanitarysewerconnections.
June 2009-June 2012 ConstructionManager,SNCLavalinonShell RefinerySite,Corunna
Witha staff of craft inspectors,costanalysts,QA andsafetyadvisor,managedthe construction
of an 8.9MM gallonstormpondforeffluentcollection,treatmentandrelease.
Co-ordinatedwithEngineering,contractorsandsite toinstall the pond,1 Km of 72” concrete
sewers,forebayandwetwell alongwiththe associated dischargepipingandpumps toallow
discharge to the St.ClairRiver.
- 2. 2
Keyresponsibilities
Co-ordinatedoperationsandmaintenance assistance forpermitting,electrical tie-insand
startup/turnover.
June 2004-June 2009 ConstructionManager,Worley-Parsons atShell RefinerySite,Corunna
Managed multipleonsite constructionprojectsonall units forcapital projectsonthe flare
systemupgrade,newflare stack,productloading,230KV metering andasbestosabatement.
Workedwithsite,Engineeringandcontractorstoensure schedule adherence andcostcontrol.
1998-2004 ConstructionSupervisor,ChemfabIndustries
Supervised electrical construction andcommissioningactivitiesatvarioussites includingNova
St. Clair(coldfeedreactor),NuGro(Methylene Urea),Shell (GHTunit),Dow Chemical (Ethylene-
Styrene Interpolymer),ImperialOil (Co-genplant).
1990-1998 ConstructionSupervisor,Variouscompanies
SupervisedconstructionforKilborn,AltairEng.andDMW at varioussites.
1984-1990 I&C Technologist,CILCourtright
Designed, installedandcommissioned control systemsinCourtright,VanWertOHand Danville
IL for ammoniastorage facilities.
1982-1984 TJ Instrumentation,varioussites
PerformedconstructionandstartupactivitiesatShell Refinery,LanxessButyl ll,Suncor
Hydrocracker.
1979-1982 AbuDhabi National Oil Company,AbuDhabi,UAE
Taught industrial control toCompanyemployeesforentrylevel technicians.
1973-1979 OntarioHydro,Bruce site
Taught control systemstoemployeesandstaff forBHWP.
1970-1973 I&C TechnologistImperial OilLtd.Sarnia
Designedin-plantminorcontrol systemsinthe GasCracker and otherESSOChemical units.
EDUCATION
ElectronicTechnology, LambtonCollege,Sarnia
Referencesuponrequest.