PROJECT CHARTER

PROJECT OVERVIEW

Identification
The project is known as “(Steel fabrication product design).” The project is focus on the
replacement of the Metal fabricated design with STEEL FABRICATED DESIGN.
Project Background
The referendum of tender was held in November 2010 by getting the approval from client at
the reasonable budget. staff had been working with lead consultant of organization to
continued design work.
Purpose/Business Need
A project is required to establish an understanding of the expectation of client and to help
the colony. The benefits of the project:1. Improved amenities for the residents.
2. Improved safety and accessibility.
3. Development of society.
4. To match the international standard of living.
Project Scope
The scope of work or deliveries for this project includes:
1. Manufacturing of new steel design.
2. Innovative and attractive product.
3. Link to existing and future renovation of colony.
4. Improved safety.
5. Utility relocation.
6. Decommissioning of existing design.
7. Improve the standard of society.
Scope Exclusion:
The following are excluded from the project scope of work- servicing or enhancement of
adjacent properties, design fabrication for future construction, servicing of old design etc.

Project Objectives
a. The project aims to develop the new and innovative design for the
residents.
b. The project also aims to improve the living standard of society and
provide the safety for the residents.
Sponsorship, Ownership and Responsibilities

Role
Project
Sponsor

Steering
Committee

Project
Manager

Responsibilities




Ultimate decision-maker
Provide project oversight and guidance
Review/approve some project elements




Commits department resources
Approves major funding and resource
allocation strategies, and significant
changes to funding/resource allocation
Resolves conflicts and issues
Provides direction to the Project Manager
Review project deliverables
Manages project in accordance to the
project plan
Serves as liaison to the Steering Committee
Receive guidance from Steering Committee
Supervises consultants
Supervise vendor(s)
Provide overall project direction
Direct/lead team members toward project
objectives
Handle problem resolution
Manages the project budget














Project
Participants













Subject
Matter
Experts




Participant(s)
Dilipbuildconpvt.ltd.
management and Paras Industry

Area Managers
Production manager
Head of finance department

Project Manager

Understand the user needs and business
processes of their area
Act as consumer advocate in representing
their area
Communicate project goals, status and
progress throughout the project to
personnel in their area
Review and approve project deliverables
Creates or helps create work products
Coordinates participation of work groups,
individuals and stakeholders
Provide knowledge and recommendations
Helps identify and remove project barriers
Assure quality of products that will meet
the project goals and objectives
Identify risks and issues and help in
resolutions

To be identified by Steering
Committee

Lend expertise and guidance as needed
Fabrication expert of organization

To be identified by Steering
Committee

Designer
Welder
Fabrication specialist
Accountant
Purchase manager
Labour
Program manager
Project manager
PROJECT APPROACH

PHASE I
The schedule for this phase consider the time required for detailed design, steel
manufacturing and fabrication equipment and machinery allocation, machine
operators, designer, raw material purchasing and testing, labour allocation, budget
allocation for every activity, risk analysis and deadline set up for project completion.
PHASE II
Production process of steel design started according to client expectation and as per the
standard.
PHASE III
The testing of product and design as per safety standard. Aging testing of developed
design.
PHASE IV
Necessary changes in design. Final assembling of design, cutting and welding.
PHASE V
Products and designs fabrication at minor level. Painting of products and designs. Delivery
of product.
Project Resources
There is a minimal impact on the financial aspect on this project as this is more of a stream
lining of the processes and procedures.
The different departments involved will just have to adjust to the new workflow in order for
this project to be a success.
Commitment among the three departments, namely, manufacturing department,
fabrication and operation and design is the most important resource in the successful
implementation of this project.

Risk Assessment

Risk

Risk Level

Likelihood
of Event

Mitigation Strategy

L/M/H
Project Size
Person Hours

H: Overcapacity

Certainty

Assigned Project Manager,
engaged consultant,
Risk

Risk Level

Likelihood
of Event

Mitigation Strategy

L/M/H
comprehensive project
management approach and
communications plan
Estimated Project
Schedule

H: Over 2 months

Certainty

Created comprehensive project
timeline with frequent baseline
reviews

Incearse in Future cost of
steel

H: more than 25%

frequently

Stored steel for 6 month as per
the requirement.

Project Scope Creep

L: Scope generally defined,
subject to revision

Unlikely

Scope intially defined in project
plan, reviewed monthly by three
groups (Project Manager and
Steering Committee) to prevent
undetected scope creep

Market condition for
manufacturing

L: Well defined

Unlikely

Secure general contractor as
early as possible to work with
design-ssist team.

Machinary breakdown

M: identified

likely

Contingency plan for emergancy

Steering Committee
existence

L: Identified and
enthusiastic

Unlikely

Frequently seek feedback to
ensure continued support

Absence of Commitment
Level/Attitude of Users

L: Understands value &
supports project

Unlikely

Frequently seek feedback to
ensure continued support

Physical Location of Team
prevents effective
management

M: Team is dispersed
among several sites

Likely

Use of Intranet project website,
comprehensive Communications
Plan

Project Team’s Shared
Work Experience creates
poor working relationship

M: Some have worked
together before

Somewhat
likely

Comprehensive Communications
Plan

Quality Management
Procedures unclear

L: Well-defined and
accepted

Unlikely

N/A

Project Leadership

Project Staffing

Project Control
The project will be using Microsoft Office Project 2007 for which the company already has acquired
licenses prior to this project in preparation for use on different projects implemented and to be
implemented by the company.
Each department involved in the project will have an officer in charge that is able to access their MS
Office Project 2007 to view and update the progress on their assigned tasks.
The use of the existing email system will be a commonly used way of communication to update, get
updates, and do follow ups in the deliverables of each department involved.
A weekly meeting is to be held by the project team, which composed of Area managers, managers
assigned to work on the. An emergency meeting is to be held when necessary.

Project Schedule
Work Breakdown Schedule

WBS

Task Name

Duration

Start

Finish

Prece
dence

Resource Names

1.start

0d

11/1/2010

2.steel design fabrication project

2d

Mon 11/1/10

Tue 11/2/10

3.tender

2d

Wed
11/3/10

Thu 11/4/10

2

program manager

4.project planning and budget
allocation

1w

Fri 11/5/10

Tue 11/16/10

3

project manager

5.product design

2d

Mon 11/22/10

4

designer

6.machinary required

2d

Thu 11/25/10

5

purchase manager

7.raw material

2d

Mon 11/29/10

6

material manager

8.labour

2d

Mon 11/29/10

6

Employee

9.production

20d

Mon 12/27/10

"7,8"

Employee

10.cutting

2d

Thu 12/30/10

9

cutter

11.welding

2d

Thu 12/30/10

9

welder

12.Fabrication and paint

3d

13.Delivery and billing

2d

Thu 1/6/11

Mon 1/10/11

12

14.End

0d

Mon 1/10/11

Mon 1/10/11

13

GANTT Chart

Wed
11/17/10
Mon
11/22/10
Thu
11/25/10
Thu
11/25/10
Mon
11/29/10
Mon
12/27/10
Mon
12/27/10
Thu
12/30/10

Thu 1/6/11

designer and consultant and
program manager

"10,11"

"fabrication specilist,painter"
"delivery boy,accountant"
Network Diagram

Cost Budgeting
The overall cost of designing and manufacturing is estimated Rs. 50lacs and assuming no change in to
current economic conditions and specifically steel prices and availability of qualified labour. This a
cost estimated as provided in October 2010 and includes acontingency of 15%.

Cost breakdown:
Cost of raw materials: 25lacs
Manpower Cost: 4lacs
Consulting Cost: 1lacs
Operating cost: 5lacs
Fixed cost: 3 lacs
Inventory cost: 3 lacs
Other cost: 2lacs

Profit :
Revenue –all cost andExpenses
50lacs- 43lacs = 7lacs

ROI:
Profit / investment
7/ 50 = 14%
APPROVALS

I have read the above Project Plan and will abide by its terms and conditions and
pledge my full commitment and support for the Project Plan.
Project Sponsor: __________________________________________ Date: ____________________
Project Manager: __________________________________________ Date: ____________________

Steering Committee: ________________________________________ Date: ____________________
Steering Committee: ________________________________________ Date: ____________________
Steering Committee: ________________________________________ Date: ____________________
Steering Committee: ________________________________________ Date: ____________________

More Related Content

What's hot

projec kickoff presentation template
 projec kickoff presentation template projec kickoff presentation template
projec kickoff presentation templatedadiiskandar4
 
Risk management plan for Human Resource Software
Risk management plan for Human Resource SoftwareRisk management plan for Human Resource Software
Risk management plan for Human Resource SoftwareDavid Bustin
 
PMO (Project Management Office)
PMO (Project Management Office)PMO (Project Management Office)
PMO (Project Management Office)Dilawar Abbas
 
Setting up a pmo
Setting up a pmoSetting up a pmo
Setting up a pmocrmackenzie
 
Project charter presentation
Project charter presentationProject charter presentation
Project charter presentationKunal Gudwani
 
Project Closure Process Steps PowerPoint Presentation Slides
Project Closure Process Steps PowerPoint Presentation Slides Project Closure Process Steps PowerPoint Presentation Slides
Project Closure Process Steps PowerPoint Presentation Slides SlideTeam
 
Project Execution PowerPoint Presentation Slides
Project Execution PowerPoint Presentation SlidesProject Execution PowerPoint Presentation Slides
Project Execution PowerPoint Presentation SlidesSlideTeam
 
Project Management Proposal Template Powerpoint Presentation Slides
Project Management Proposal Template Powerpoint Presentation SlidesProject Management Proposal Template Powerpoint Presentation Slides
Project Management Proposal Template Powerpoint Presentation SlidesSlideTeam
 
PMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickPMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickJim Kendrick
 
Project charter sample
Project charter sampleProject charter sample
Project charter sampleGregory Weiss
 
Top 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers MakeTop 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers Makejoshnankivel
 
Project Charter - Outreach Events for the Company
Project Charter - Outreach Events for the CompanyProject Charter - Outreach Events for the Company
Project Charter - Outreach Events for the CompanyTimothy Cochran
 
Project Management Plan One Pager Presentation Report Infographic Ppt Pdf Doc...
Project Management Plan One Pager Presentation Report Infographic Ppt Pdf Doc...Project Management Plan One Pager Presentation Report Infographic Ppt Pdf Doc...
Project Management Plan One Pager Presentation Report Infographic Ppt Pdf Doc...SlideTeam
 
Estimating Cost & Time.ppt
Estimating Cost & Time.pptEstimating Cost & Time.ppt
Estimating Cost & Time.ppt341741357
 
Preliminary Scope Statement New
Preliminary Scope Statement NewPreliminary Scope Statement New
Preliminary Scope Statement NewMelanieRos
 
Project Management Report
Project Management ReportProject Management Report
Project Management ReportSANKET SENAPATI
 
Project charterexample (1) (1)
Project charterexample (1) (1)Project charterexample (1) (1)
Project charterexample (1) (1)owaishazara
 
Project management office value
Project management office valueProject management office value
Project management office valueHumanWare
 

What's hot (20)

projec kickoff presentation template
 projec kickoff presentation template projec kickoff presentation template
projec kickoff presentation template
 
Risk management plan for Human Resource Software
Risk management plan for Human Resource SoftwareRisk management plan for Human Resource Software
Risk management plan for Human Resource Software
 
PMO (Project Management Office)
PMO (Project Management Office)PMO (Project Management Office)
PMO (Project Management Office)
 
Setting up a pmo
Setting up a pmoSetting up a pmo
Setting up a pmo
 
Project charter-template
Project charter-templateProject charter-template
Project charter-template
 
Project charter presentation
Project charter presentationProject charter presentation
Project charter presentation
 
Project Closure Process Steps PowerPoint Presentation Slides
Project Closure Process Steps PowerPoint Presentation Slides Project Closure Process Steps PowerPoint Presentation Slides
Project Closure Process Steps PowerPoint Presentation Slides
 
Project Execution PowerPoint Presentation Slides
Project Execution PowerPoint Presentation SlidesProject Execution PowerPoint Presentation Slides
Project Execution PowerPoint Presentation Slides
 
Project Management Proposal Template Powerpoint Presentation Slides
Project Management Proposal Template Powerpoint Presentation SlidesProject Management Proposal Template Powerpoint Presentation Slides
Project Management Proposal Template Powerpoint Presentation Slides
 
PMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - KendrickPMO Performance Measurement and Metrics - Kendrick
PMO Performance Measurement and Metrics - Kendrick
 
Project charter sample
Project charter sampleProject charter sample
Project charter sample
 
Top 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers MakeTop 7 WBS Mistakes Project Managers Make
Top 7 WBS Mistakes Project Managers Make
 
Project Charter - Outreach Events for the Company
Project Charter - Outreach Events for the CompanyProject Charter - Outreach Events for the Company
Project Charter - Outreach Events for the Company
 
Project Closure Checklist
Project Closure ChecklistProject Closure Checklist
Project Closure Checklist
 
Project Management Plan One Pager Presentation Report Infographic Ppt Pdf Doc...
Project Management Plan One Pager Presentation Report Infographic Ppt Pdf Doc...Project Management Plan One Pager Presentation Report Infographic Ppt Pdf Doc...
Project Management Plan One Pager Presentation Report Infographic Ppt Pdf Doc...
 
Estimating Cost & Time.ppt
Estimating Cost & Time.pptEstimating Cost & Time.ppt
Estimating Cost & Time.ppt
 
Preliminary Scope Statement New
Preliminary Scope Statement NewPreliminary Scope Statement New
Preliminary Scope Statement New
 
Project Management Report
Project Management ReportProject Management Report
Project Management Report
 
Project charterexample (1) (1)
Project charterexample (1) (1)Project charterexample (1) (1)
Project charterexample (1) (1)
 
Project management office value
Project management office valueProject management office value
Project management office value
 

Viewers also liked

E Commerce Project Charter
E Commerce Project CharterE Commerce Project Charter
E Commerce Project Charterbrianbish10795
 
Project charter tugas uas project management
Project charter   tugas uas project managementProject charter   tugas uas project management
Project charter tugas uas project managementDoni Andriansyah
 
Office Group Project Charter
Office Group   Project CharterOffice Group   Project Charter
Office Group Project Charterptetang
 
Webpage design full project of project management
Webpage design full project of project managementWebpage design full project of project management
Webpage design full project of project managementArefeen Hridoy
 
Project management
Project managementProject management
Project managementSrija Kumar
 
E-Commerce Project
E-Commerce ProjectE-Commerce Project
E-Commerce ProjectSindoor Naik
 
e-commerce web site project
e-commerce web site projecte-commerce web site project
e-commerce web site projectMahmudul Hasan
 
M6 - E Commerce - Final Project
M6 - E Commerce - Final ProjectM6 - E Commerce - Final Project
M6 - E Commerce - Final ProjectJamie Hutt
 
Project 5 E-Commerce
Project 5   E-CommerceProject 5   E-Commerce
Project 5 E-CommerceDenese Doby
 
Himanshu Sharma E-commerce project
Himanshu Sharma E-commerce projectHimanshu Sharma E-commerce project
Himanshu Sharma E-commerce projectdezyneecole
 
Project charter trackit
Project charter trackitProject charter trackit
Project charter trackitCahya Adhi
 
Website Redesign and CMS Migrations - 2013 AMP Annual Meeting
Website Redesign and CMS Migrations - 2013 AMP Annual MeetingWebsite Redesign and CMS Migrations - 2013 AMP Annual Meeting
Website Redesign and CMS Migrations - 2013 AMP Annual MeetingVanguard Technology
 
E Commerce - Final Project
E Commerce - Final ProjectE Commerce - Final Project
E Commerce - Final ProjectJamie Hutt
 
Risk management plan
Risk management planRisk management plan
Risk management planKashif Mastan
 
Paperless Office Project
Paperless Office ProjectPaperless Office Project
Paperless Office ProjectSiddharth Shah
 
eSewa - E-COMMERCE PROJECT REPORT
eSewa - E-COMMERCE PROJECT REPORTeSewa - E-COMMERCE PROJECT REPORT
eSewa - E-COMMERCE PROJECT REPORTAyush Man Tamrakar
 

Viewers also liked (20)

E Commerce Project Charter
E Commerce Project CharterE Commerce Project Charter
E Commerce Project Charter
 
Project charter tugas uas project management
Project charter   tugas uas project managementProject charter   tugas uas project management
Project charter tugas uas project management
 
Office Group Project Charter
Office Group   Project CharterOffice Group   Project Charter
Office Group Project Charter
 
Webpage design full project of project management
Webpage design full project of project managementWebpage design full project of project management
Webpage design full project of project management
 
Arrow Consulting PMP
Arrow Consulting PMPArrow Consulting PMP
Arrow Consulting PMP
 
Project charter template
Project charter templateProject charter template
Project charter template
 
Project management
Project managementProject management
Project management
 
E-Commerce Project
E-Commerce ProjectE-Commerce Project
E-Commerce Project
 
e-commerce web site project
e-commerce web site projecte-commerce web site project
e-commerce web site project
 
M6 - E Commerce - Final Project
M6 - E Commerce - Final ProjectM6 - E Commerce - Final Project
M6 - E Commerce - Final Project
 
Project e commerce
Project e commerceProject e commerce
Project e commerce
 
Project 5 E-Commerce
Project 5   E-CommerceProject 5   E-Commerce
Project 5 E-Commerce
 
Himanshu Sharma E-commerce project
Himanshu Sharma E-commerce projectHimanshu Sharma E-commerce project
Himanshu Sharma E-commerce project
 
Project charter trackit
Project charter trackitProject charter trackit
Project charter trackit
 
Website Redesign and CMS Migrations - 2013 AMP Annual Meeting
Website Redesign and CMS Migrations - 2013 AMP Annual MeetingWebsite Redesign and CMS Migrations - 2013 AMP Annual Meeting
Website Redesign and CMS Migrations - 2013 AMP Annual Meeting
 
E Commerce - Final Project
E Commerce - Final ProjectE Commerce - Final Project
E Commerce - Final Project
 
Risk management plan
Risk management planRisk management plan
Risk management plan
 
Paperless Office Project
Paperless Office ProjectPaperless Office Project
Paperless Office Project
 
eSewa - E-COMMERCE PROJECT REPORT
eSewa - E-COMMERCE PROJECT REPORTeSewa - E-COMMERCE PROJECT REPORT
eSewa - E-COMMERCE PROJECT REPORT
 
Asia next volume3_vietnam
Asia next volume3_vietnamAsia next volume3_vietnam
Asia next volume3_vietnam
 

Similar to Project charter j

Project management
Project managementProject management
Project managementBenjamin Tan
 
Lecture 2. project management – Description (1)
Lecture 2. project management – Description (1)Lecture 2. project management – Description (1)
Lecture 2. project management – Description (1)Dania Abdel-aziz
 
Project management Report - GROUP
Project management Report - GROUPProject management Report - GROUP
Project management Report - GROUPKeshav Seewraz
 
Part of a suite of support materials for the BSB Busines.docx
Part of a suite of support materials for the BSB Busines.docxPart of a suite of support materials for the BSB Busines.docx
Part of a suite of support materials for the BSB Busines.docxdanhaley45372
 
Project Management.Project 1
Project Management.Project 1Project Management.Project 1
Project Management.Project 1suzzanekan
 
Defining and documenting a project
Defining and documenting a projectDefining and documenting a project
Defining and documenting a projectJing Fan Koh
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1zerospaces_
 
Project Management Project 1 Report
Project Management Project 1 Report Project Management Project 1 Report
Project Management Project 1 Report Sharon Yu Jung Lim
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)Pinky Chan
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1JamesMoy7
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Work breakdown structure WBS Columbia Southe.docx
Work breakdown structure WBS Columbia Southe.docxWork breakdown structure WBS Columbia Southe.docx
Work breakdown structure WBS Columbia Southe.docxericbrooks84875
 
Project and project management
Project and project managementProject and project management
Project and project managementwodato
 
Project management plan
Project management planProject management plan
Project management planDonny Olson
 

Similar to Project charter j (20)

Project background
Project backgroundProject background
Project background
 
Project management
Project managementProject management
Project management
 
Lecture 2. project management – Description (1)
Lecture 2. project management – Description (1)Lecture 2. project management – Description (1)
Lecture 2. project management – Description (1)
 
Project management Report - GROUP
Project management Report - GROUPProject management Report - GROUP
Project management Report - GROUP
 
Part of a suite of support materials for the BSB Busines.docx
Part of a suite of support materials for the BSB Busines.docxPart of a suite of support materials for the BSB Busines.docx
Part of a suite of support materials for the BSB Busines.docx
 
Project Management.Project 1
Project Management.Project 1Project Management.Project 1
Project Management.Project 1
 
Defining and documenting a project
Defining and documenting a projectDefining and documenting a project
Defining and documenting a project
 
Project Management Project 1
Project Management Project 1Project Management Project 1
Project Management Project 1
 
Project Management Project 1 Report
Project Management Project 1 Report Project Management Project 1 Report
Project Management Project 1 Report
 
The Project Brief(group)
The Project Brief(group)The Project Brief(group)
The Project Brief(group)
 
ICIP2G
ICIP2GICIP2G
ICIP2G
 
Latest project background 1
Latest project background 1Latest project background 1
Latest project background 1
 
Construction process
Construction processConstruction process
Construction process
 
Running head PMPM .docx
Running head PMPM                                          .docxRunning head PMPM                                          .docx
Running head PMPM .docx
 
Work breakdown structure WBS Columbia Southe.docx
Work breakdown structure WBS Columbia Southe.docxWork breakdown structure WBS Columbia Southe.docx
Work breakdown structure WBS Columbia Southe.docx
 
Ppts
PptsPpts
Ppts
 
project management
project managementproject management
project management
 
Project and project management
Project and project managementProject and project management
Project and project management
 
Topic 1.ppt
Topic 1.pptTopic 1.ppt
Topic 1.ppt
 
Project management plan
Project management planProject management plan
Project management plan
 

Recently uploaded

Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 

Recently uploaded (20)

Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 

Project charter j

  • 1. Project Charter Project Plan Steel fabrication design for Creation Date: Last Revised: Version: 1.0 UOB Steel manufacturing and fabrication 10/30/2010
  • 2. PROJECT CHARTER PROJECT OVERVIEW Identification The project is known as “(Steel fabrication product design).” The project is focus on the replacement of the Metal fabricated design with STEEL FABRICATED DESIGN. Project Background The referendum of tender was held in November 2010 by getting the approval from client at the reasonable budget. staff had been working with lead consultant of organization to continued design work. Purpose/Business Need A project is required to establish an understanding of the expectation of client and to help the colony. The benefits of the project:1. Improved amenities for the residents. 2. Improved safety and accessibility. 3. Development of society. 4. To match the international standard of living. Project Scope The scope of work or deliveries for this project includes: 1. Manufacturing of new steel design. 2. Innovative and attractive product. 3. Link to existing and future renovation of colony. 4. Improved safety. 5. Utility relocation. 6. Decommissioning of existing design. 7. Improve the standard of society. Scope Exclusion: The following are excluded from the project scope of work- servicing or enhancement of adjacent properties, design fabrication for future construction, servicing of old design etc. Project Objectives a. The project aims to develop the new and innovative design for the residents. b. The project also aims to improve the living standard of society and provide the safety for the residents.
  • 3. Sponsorship, Ownership and Responsibilities Role Project Sponsor Steering Committee Project Manager Responsibilities    Ultimate decision-maker Provide project oversight and guidance Review/approve some project elements   Commits department resources Approves major funding and resource allocation strategies, and significant changes to funding/resource allocation Resolves conflicts and issues Provides direction to the Project Manager Review project deliverables Manages project in accordance to the project plan Serves as liaison to the Steering Committee Receive guidance from Steering Committee Supervises consultants Supervise vendor(s) Provide overall project direction Direct/lead team members toward project objectives Handle problem resolution Manages the project budget             Project Participants           Subject Matter Experts   Participant(s) Dilipbuildconpvt.ltd. management and Paras Industry Area Managers Production manager Head of finance department Project Manager Understand the user needs and business processes of their area Act as consumer advocate in representing their area Communicate project goals, status and progress throughout the project to personnel in their area Review and approve project deliverables Creates or helps create work products Coordinates participation of work groups, individuals and stakeholders Provide knowledge and recommendations Helps identify and remove project barriers Assure quality of products that will meet the project goals and objectives Identify risks and issues and help in resolutions To be identified by Steering Committee Lend expertise and guidance as needed Fabrication expert of organization To be identified by Steering Committee Designer Welder Fabrication specialist Accountant Purchase manager Labour Program manager Project manager
  • 4. PROJECT APPROACH PHASE I The schedule for this phase consider the time required for detailed design, steel manufacturing and fabrication equipment and machinery allocation, machine operators, designer, raw material purchasing and testing, labour allocation, budget allocation for every activity, risk analysis and deadline set up for project completion. PHASE II Production process of steel design started according to client expectation and as per the standard. PHASE III The testing of product and design as per safety standard. Aging testing of developed design. PHASE IV Necessary changes in design. Final assembling of design, cutting and welding. PHASE V Products and designs fabrication at minor level. Painting of products and designs. Delivery of product. Project Resources There is a minimal impact on the financial aspect on this project as this is more of a stream lining of the processes and procedures. The different departments involved will just have to adjust to the new workflow in order for this project to be a success. Commitment among the three departments, namely, manufacturing department, fabrication and operation and design is the most important resource in the successful implementation of this project. Risk Assessment Risk Risk Level Likelihood of Event Mitigation Strategy L/M/H Project Size Person Hours H: Overcapacity Certainty Assigned Project Manager, engaged consultant,
  • 5. Risk Risk Level Likelihood of Event Mitigation Strategy L/M/H comprehensive project management approach and communications plan Estimated Project Schedule H: Over 2 months Certainty Created comprehensive project timeline with frequent baseline reviews Incearse in Future cost of steel H: more than 25% frequently Stored steel for 6 month as per the requirement. Project Scope Creep L: Scope generally defined, subject to revision Unlikely Scope intially defined in project plan, reviewed monthly by three groups (Project Manager and Steering Committee) to prevent undetected scope creep Market condition for manufacturing L: Well defined Unlikely Secure general contractor as early as possible to work with design-ssist team. Machinary breakdown M: identified likely Contingency plan for emergancy Steering Committee existence L: Identified and enthusiastic Unlikely Frequently seek feedback to ensure continued support Absence of Commitment Level/Attitude of Users L: Understands value & supports project Unlikely Frequently seek feedback to ensure continued support Physical Location of Team prevents effective management M: Team is dispersed among several sites Likely Use of Intranet project website, comprehensive Communications Plan Project Team’s Shared Work Experience creates poor working relationship M: Some have worked together before Somewhat likely Comprehensive Communications Plan Quality Management Procedures unclear L: Well-defined and accepted Unlikely N/A Project Leadership Project Staffing Project Control The project will be using Microsoft Office Project 2007 for which the company already has acquired licenses prior to this project in preparation for use on different projects implemented and to be implemented by the company. Each department involved in the project will have an officer in charge that is able to access their MS Office Project 2007 to view and update the progress on their assigned tasks.
  • 6. The use of the existing email system will be a commonly used way of communication to update, get updates, and do follow ups in the deliverables of each department involved. A weekly meeting is to be held by the project team, which composed of Area managers, managers assigned to work on the. An emergency meeting is to be held when necessary. Project Schedule Work Breakdown Schedule WBS Task Name Duration Start Finish Prece dence Resource Names 1.start 0d 11/1/2010 2.steel design fabrication project 2d Mon 11/1/10 Tue 11/2/10 3.tender 2d Wed 11/3/10 Thu 11/4/10 2 program manager 4.project planning and budget allocation 1w Fri 11/5/10 Tue 11/16/10 3 project manager 5.product design 2d Mon 11/22/10 4 designer 6.machinary required 2d Thu 11/25/10 5 purchase manager 7.raw material 2d Mon 11/29/10 6 material manager 8.labour 2d Mon 11/29/10 6 Employee 9.production 20d Mon 12/27/10 "7,8" Employee 10.cutting 2d Thu 12/30/10 9 cutter 11.welding 2d Thu 12/30/10 9 welder 12.Fabrication and paint 3d 13.Delivery and billing 2d Thu 1/6/11 Mon 1/10/11 12 14.End 0d Mon 1/10/11 Mon 1/10/11 13 GANTT Chart Wed 11/17/10 Mon 11/22/10 Thu 11/25/10 Thu 11/25/10 Mon 11/29/10 Mon 12/27/10 Mon 12/27/10 Thu 12/30/10 Thu 1/6/11 designer and consultant and program manager "10,11" "fabrication specilist,painter" "delivery boy,accountant"
  • 7. Network Diagram Cost Budgeting The overall cost of designing and manufacturing is estimated Rs. 50lacs and assuming no change in to current economic conditions and specifically steel prices and availability of qualified labour. This a cost estimated as provided in October 2010 and includes acontingency of 15%. Cost breakdown: Cost of raw materials: 25lacs Manpower Cost: 4lacs Consulting Cost: 1lacs Operating cost: 5lacs Fixed cost: 3 lacs Inventory cost: 3 lacs Other cost: 2lacs Profit : Revenue –all cost andExpenses 50lacs- 43lacs = 7lacs ROI: Profit / investment 7/ 50 = 14% APPROVALS I have read the above Project Plan and will abide by its terms and conditions and pledge my full commitment and support for the Project Plan.
  • 8. Project Sponsor: __________________________________________ Date: ____________________ Project Manager: __________________________________________ Date: ____________________ Steering Committee: ________________________________________ Date: ____________________ Steering Committee: ________________________________________ Date: ____________________ Steering Committee: ________________________________________ Date: ____________________ Steering Committee: ________________________________________ Date: ____________________