PROJECT DEFINITION

“A group of activities that have to be performed in a
      logical sequence to meet preset objectives
                outlined by the client”
                        OR
“ Temporary endeavors undertaken to create unique
           products, services or results ”




                                                        2
PROJECT


The core of the project design therefore is deciding

  •WHAT to improve or change
  •HOW the project can bring about or contribute
  to the improvement or change




                                                  3
Characteristics of a Typical Project

   All projects are concerned with Change – creating
    something new;
   All projects exist for a limited and defined period of
    time: their lifespan consists of a set of activities with a
    beginning date and a target end date (deadline);
   These activities must be performed in a logical order;
   All projects have clear and measurable objectives,
    targets or goals. These objectives must be achieved
    within specific constraints, especially time and costs
    (budget);
   Each project is a new and unique process.
                                                                  4
What is Project Management?
  Project Management is the application of knowledge,
 skills, tools and techniques to project activities in order to
 meet or exceed stakeholder needs and expectations
 from the project.


Purpose of Project Management.
 The purpose of Project Management is to identify,
  establish, coordinate and monitor activities, tasks and
  resources necessary for a project to produce a product
  and/or service meeting the agreed requirements.


                                                              5
Different Components of Project Management

Project Integration Management
  Processes required to ensure that various elements of the project
  are properly coordinated.

Project Scope and Time Management
  Processes required to ensure that the project includes all the work
  required to complete it successfully in stipulated time.

Project Cost and Quality Management
  Processes required to ensure quality and that the project is
  completed within the approved budget.

Project Human Resource Management
  Processes required to make the most effective use of the people
  involved in the implementation of the project.
                                                                        6
Key Dimensions of Projects

   Cost

   Time

   Quality




                                  7
Key Dimensions of a Project

                  Cost




                   Scope




                                     Quality
Time



                                               8
Project Cycle Management

   A logical sequence in which the projects are identified,
    prepared, approved and implemented is called project
    cycle.

   It is an approach in project management used to guide
    management activities and decision-making procedures
    during the life-cycle of a project, from the first idea until
    the last ex-post evaluation.




                                                                    9
Project Cycle Management
Within all institutions the cycle shares three common themes:
 
 The cycle defines the key decisions, information

  requirements and responsibilities at each phase;
 The phases in the cycle are progressive – each phase needs

  to be completed for the next to be tackled with success.
 The cycle draws on evaluation to build experience from

  existing projects into the design of future projects.




                                                         10
Stages in PCM

   There are eight broad stages of project cycle:

       Project Identification
       Project Preparation
       Project Appraisal
       Project Approval
       Project Implementation
       Project Monitoring
       Project Completion
       Project Evaluation




                                                     11
Project Cycle




                12
Project Identification

The possible sources of project identification are;

   Development Plans
   Sector Surveys
   Elected Representatives
   Immediate Nature/Calamity Projects
   Expansion of On-going Programmes




                                                      13
Project Formulation

  Projects are usually prepared by the executing organizations/
  agencies and it consists of two stages:
    Feasibility Study

    Project Document



Important Considerations:
    Survey of the area

    Availability of resources

    Yearly allocation

    Capacity of Implementing agency



                                                          14
Project Appraisal

   Critical examination of the project from all aspects is
    called appraisal.

   Analysis of prospective costs and benefits that leads to
    desirability for committing resources.

   It is carried out at two stages:
           Internal Appraisal

           External Appraisal




                                                          15
Project Implementation
   Project implementation entails intense activities and a
    variety of physical work.

   Implementation of activities and financial management
    should be undertaken in accordance with all the
    established guidelines, procedures and regulations
    guiding the project.

   Implementation of the project is the responsibility of
    executing agencies through;
            Organization Staff

            Project Staff



                                                         16
Project Monitoring
  It is the systematic review of development projects at
  appropriate intervals during implementation through well
  defined indicators.
Benefits of Monitoring
 Effective Implementation

 Timely Completion

 Completion within approved cost



Types of Monitoring
 Financial Monitoring

 Physical/Quantitative Monitoring

 Qualitative Monitoring

                                                         17
Project Monitoring

   Levels of Monitoring
      Internal Monitoring

      External Monitoring



Key Monitoring Indicators
    Allocation of Funds

    Release of Funds

    Time Scheduling

    Technical Parameters

    Physical Progress




                                      18
Project Completion
    It is a report submitted immediately after the completion
    of the project. Major emphasis of the report is on the
    following:

   Achievements against Targets/Results of the project;
   Actual expenses vs. budgeted for the project;
   Reasons for:
       Under achievement if the desired targets are not achieved;
       Delay if there is time over run in the project.




                                                                     19
Project Evaluation

Project evaluation examines all aspects of the project
design and assess the overall progress towards the
ultimate objectives.

Types of Evaluation
 End of project evaluation

 Post project completion evaluation




                                                         20
Benefits of PCM

   PCM is an important function of project
    management and can assist local organizations
    to learn from past experiences, improve decision
    making, streamline communication between
    various stakeholders and above all how far the
    objectives of the project have been achieved.




                                                  21
Benefits of PCM

    When PCM is applied effectively, the following benefits
    can be realized;

   Goal/Objective Oriented: Implementation of projects
    will be in accordance with predetermined objectives and
    not on the whims of individuals
   Coordinated        Project     Management:       Project
    execution will be coordinated and overseen by appointed
    project managers, and not by those randomly picked
    without proper consideration.

                                                          22
Benefits of PCM

   Sound & Objective Appraisal: The project will be
    designed and appraised based on sound research and
    feasibility criteria, and not on voting and consensus
    which does not capture the viability issues
   Long Term Planning: PCM improves long-term
    planning because the policy setting’ stage includes
    strategic review of long term goals and objectives;
   Increased Accountability. There will be increased
    accountability for results because individuals and teams
    will be assigned specific results that they must deliver;


                                                           23
Benefits of PCM
   Standard Methods and Procedures. As opposed to
    a mixed up process of managing a project, the PCM
    approach introduces a standard method and procedures
    for running projects stage by stage, which provides
    stakeholders with a road map of expected results, at
    each stage of the process;

   Increased Efficiency in Planning and Use of
    Resources. Through the PCM method, project
    resources are planned for before the project is executed,
    and    adjustments     are    made      during     project
    implementation;
                                                            24
Benefits of PCM

   Stakeholder Ownership. This is enhanced because
    PCM is a participatory process;
   Formal        Documentation.           PCM       requires
    documentation of procedures, processes and results.
    This ensures that there is an accurate record of
    information for every project step;
   Enhanced Monitoring and Evaluation. PCM sets
    in place a process of monitoring based on agreed
    milestones. Without PCM, it is hard to create an effective
    monitoring framework and results are hard to establish


                                                            25

More Related Content

What's hot

Participatory Monitoring and Evaluation
Participatory Monitoring and EvaluationParticipatory Monitoring and Evaluation
Participatory Monitoring and EvaluationLen Fontanilla
 
Project Implementation
Project ImplementationProject Implementation
Project ImplementationShidin Divakar
 
Lfa Logical Framework Analysis
Lfa   Logical Framework AnalysisLfa   Logical Framework Analysis
Lfa Logical Framework AnalysisJFM Lohith Shetty
 
Results Based Monitoring and Evaluation
Results Based Monitoring and EvaluationResults Based Monitoring and Evaluation
Results Based Monitoring and EvaluationMadhawa Waidyaratna
 
Project Planning and Management Notes
Project Planning and Management NotesProject Planning and Management Notes
Project Planning and Management NotesHaris Hassan
 
13 project monitoring and evaluation
13 project monitoring and evaluation13 project monitoring and evaluation
13 project monitoring and evaluationrajkpandey2000
 
Concepts in Participatory Monitoring and Evaluation
Concepts in Participatory Monitoring and Evaluation Concepts in Participatory Monitoring and Evaluation
Concepts in Participatory Monitoring and Evaluation Jo Balucanag - Bitonio
 
project appraisal
project appraisal project appraisal
project appraisal Dronak Sahu
 
Project Planning and Management
Project Planning and Management Project Planning and Management
Project Planning and Management PiyushKumar621
 
Ppt on project appraisal
Ppt on project appraisalPpt on project appraisal
Ppt on project appraisalHachnayen
 
Monitoring and evaluation frameworks logical framework
Monitoring and evaluation frameworks logical frameworkMonitoring and evaluation frameworks logical framework
Monitoring and evaluation frameworks logical frameworkPreston Healthcare Consulting
 
Participatory planning
Participatory planning Participatory planning
Participatory planning Ankit Gola
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Farha Sharmin
 
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKLogical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKMADHUR VERMA
 

What's hot (20)

Participatory Monitoring and Evaluation
Participatory Monitoring and EvaluationParticipatory Monitoring and Evaluation
Participatory Monitoring and Evaluation
 
Project Implementation
Project ImplementationProject Implementation
Project Implementation
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
095 Project Cycle Management
095 Project Cycle Management095 Project Cycle Management
095 Project Cycle Management
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 
Lfa Logical Framework Analysis
Lfa   Logical Framework AnalysisLfa   Logical Framework Analysis
Lfa Logical Framework Analysis
 
Results Based Monitoring and Evaluation
Results Based Monitoring and EvaluationResults Based Monitoring and Evaluation
Results Based Monitoring and Evaluation
 
Project Planning and Management Notes
Project Planning and Management NotesProject Planning and Management Notes
Project Planning and Management Notes
 
13 project monitoring and evaluation
13 project monitoring and evaluation13 project monitoring and evaluation
13 project monitoring and evaluation
 
Concepts in Participatory Monitoring and Evaluation
Concepts in Participatory Monitoring and Evaluation Concepts in Participatory Monitoring and Evaluation
Concepts in Participatory Monitoring and Evaluation
 
project appraisal
project appraisal project appraisal
project appraisal
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
Project Planning and Management
Project Planning and Management Project Planning and Management
Project Planning and Management
 
Ppt on project appraisal
Ppt on project appraisalPpt on project appraisal
Ppt on project appraisal
 
Monitoring and evaluation frameworks logical framework
Monitoring and evaluation frameworks logical frameworkMonitoring and evaluation frameworks logical framework
Monitoring and evaluation frameworks logical framework
 
Participatory planning
Participatory planning Participatory planning
Participatory planning
 
Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1Development project appraisal and sd(L6)1
Development project appraisal and sd(L6)1
 
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAKLogical framework approach DR.MADHUR VERMA PGIMS ROHTAK
Logical framework approach DR.MADHUR VERMA PGIMS ROHTAK
 
Monitoring and Evaluation
Monitoring and EvaluationMonitoring and Evaluation
Monitoring and Evaluation
 

Viewers also liked

3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)Tony
 
Preparation of project ppt
Preparation of project pptPreparation of project ppt
Preparation of project pptMit mysore
 
Project cycle management
Project cycle managementProject cycle management
Project cycle managementPK Agrawal
 
Training workshop on project cycle management
Training workshop on project cycle management Training workshop on project cycle management
Training workshop on project cycle management mohamed osama hussein
 
18611 project identification
18611 project identification18611 project identification
18611 project identificationSingh Deep
 
Module 1 project planning and appraisal
Module 1 project planning and appraisalModule 1 project planning and appraisal
Module 1 project planning and appraisaldmkanchepalya
 
Human aspect of project management
Human aspect of project managementHuman aspect of project management
Human aspect of project managementKinshook Chaturvedi
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluationrexcris
 
Project identification
Project identificationProject identification
Project identificationMohd Arif
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project ManagementMahesh Bendigeri
 
00 Introduction of project scheduling
00 Introduction of project scheduling00 Introduction of project scheduling
00 Introduction of project schedulingSoe Naing Win
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Erik Kijne
 
Project scheduling and control techniques
Project scheduling and control techniquesProject scheduling and control techniques
Project scheduling and control techniquesCjkayes CjKayes
 
Project identification
Project  identificationProject  identification
Project identificationVasanth Rvk
 
Preparation of Project Report
Preparation of Project ReportPreparation of Project Report
Preparation of Project ReportSunny Sabharwal
 

Viewers also liked (20)

3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)3 Project Cycle and Planning (4-6 hours)
3 Project Cycle and Planning (4-6 hours)
 
Project Life Cycle and Phases
Project Life Cycle and PhasesProject Life Cycle and Phases
Project Life Cycle and Phases
 
Project approval, Project Cycle Management, Developmental Planning Administra...
Project approval, Project Cycle Management, Developmental Planning Administra...Project approval, Project Cycle Management, Developmental Planning Administra...
Project approval, Project Cycle Management, Developmental Planning Administra...
 
Preparation of project ppt
Preparation of project pptPreparation of project ppt
Preparation of project ppt
 
Project cycle management
Project cycle managementProject cycle management
Project cycle management
 
Training workshop on project cycle management
Training workshop on project cycle management Training workshop on project cycle management
Training workshop on project cycle management
 
Project identification
Project identificationProject identification
Project identification
 
18611 project identification
18611 project identification18611 project identification
18611 project identification
 
Module 1 project planning and appraisal
Module 1 project planning and appraisalModule 1 project planning and appraisal
Module 1 project planning and appraisal
 
Human aspect of project management
Human aspect of project managementHuman aspect of project management
Human aspect of project management
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
 
Project identification
Project identificationProject identification
Project identification
 
Chapter 1 An Overview Of Project Management
Chapter 1  An Overview Of Project ManagementChapter 1  An Overview Of Project Management
Chapter 1 An Overview Of Project Management
 
00 Introduction of project scheduling
00 Introduction of project scheduling00 Introduction of project scheduling
00 Introduction of project scheduling
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
 
Project scheduling and control techniques
Project scheduling and control techniquesProject scheduling and control techniques
Project scheduling and control techniques
 
Project identification
Project  identificationProject  identification
Project identification
 
project selection
project selectionproject selection
project selection
 
Project Selection
Project SelectionProject Selection
Project Selection
 
Preparation of Project Report
Preparation of Project ReportPreparation of Project Report
Preparation of Project Report
 

Similar to 1 project & project cycle management

Za project & project cycle management
Za   project & project cycle managementZa   project & project cycle management
Za project & project cycle managementhamza khwaja
 
Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Managementchaitanyakrsk
 
A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...ramsey20
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycleAndrei Crăciun
 
Project Management Execution Training
Project Management Execution TrainingProject Management Execution Training
Project Management Execution TrainingAminuddin Seth
 
IT Project Management
IT Project ManagementIT Project Management
IT Project ManagementSravan Banka
 
EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group
 
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group
 
Ppt project mgt. syllabus
Ppt project mgt.  syllabusPpt project mgt.  syllabus
Ppt project mgt. syllabusDrneetu2
 
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410Saqib Imran
 
Project Management and Control Techniques
Project Management and Control TechniquesProject Management and Control Techniques
Project Management and Control Techniquesssuser8e973a
 
Project Execution and Project management (GT IV batch) 2.pptx
Project Execution and Project management (GT IV batch) 2.pptxProject Execution and Project management (GT IV batch) 2.pptx
Project Execution and Project management (GT IV batch) 2.pptxbhanu852126
 
E book project-management
E book project-managementE book project-management
E book project-managementGuruK32
 
1 Definition of project
1   Definition of project1   Definition of project
1 Definition of projectSuhail Hussain
 

Similar to 1 project & project cycle management (20)

Za project & project cycle management
Za   project & project cycle managementZa   project & project cycle management
Za project & project cycle management
 
Basics in Project Management
Basics in Project ManagementBasics in Project Management
Basics in Project Management
 
A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...A fresh look on projects: An introductory overview of project circle planning...
A fresh look on projects: An introductory overview of project circle planning...
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 
Project Management Execution Training
Project Management Execution TrainingProject Management Execution Training
Project Management Execution Training
 
Project Management V1
Project Management V1Project Management V1
Project Management V1
 
IT Project Management
IT Project ManagementIT Project Management
IT Project Management
 
EPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s MethodologyEPC Group's Project Management Organization’s Methodology
EPC Group's Project Management Organization’s Methodology
 
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget InitiativesEPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
EPC Group's PMO Methodology to Ensure On Time and On Budget Initiatives
 
Ppt project mgt. syllabus
Ppt project mgt.  syllabusPpt project mgt.  syllabus
Ppt project mgt. syllabus
 
Prince2017 part 2
Prince2017   part 2Prince2017   part 2
Prince2017 part 2
 
Project management for technologies MGT410
Project management for technologies   MGT410Project management for technologies   MGT410
Project management for technologies MGT410
 
Day 1 framework
Day 1 frameworkDay 1 framework
Day 1 framework
 
Project Management and Control Techniques
Project Management and Control TechniquesProject Management and Control Techniques
Project Management and Control Techniques
 
Project Execution and Project management (GT IV batch) 2.pptx
Project Execution and Project management (GT IV batch) 2.pptxProject Execution and Project management (GT IV batch) 2.pptx
Project Execution and Project management (GT IV batch) 2.pptx
 
Pmi dec 13
Pmi dec 13Pmi dec 13
Pmi dec 13
 
E book project-management
E book project-managementE book project-management
E book project-management
 
1 Definition of project
1   Definition of project1   Definition of project
1 Definition of project
 
IT projects
IT projectsIT projects
IT projects
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 

1 project & project cycle management

  • 1. PROJECT & PROJECT CYCLE MANAGEMENT 1
  • 2. PROJECT DEFINITION “A group of activities that have to be performed in a logical sequence to meet preset objectives outlined by the client” OR “ Temporary endeavors undertaken to create unique products, services or results ” 2
  • 3. PROJECT The core of the project design therefore is deciding •WHAT to improve or change •HOW the project can bring about or contribute to the improvement or change 3
  • 4. Characteristics of a Typical Project  All projects are concerned with Change – creating something new;  All projects exist for a limited and defined period of time: their lifespan consists of a set of activities with a beginning date and a target end date (deadline);  These activities must be performed in a logical order;  All projects have clear and measurable objectives, targets or goals. These objectives must be achieved within specific constraints, especially time and costs (budget);  Each project is a new and unique process. 4
  • 5. What is Project Management? Project Management is the application of knowledge, skills, tools and techniques to project activities in order to meet or exceed stakeholder needs and expectations from the project. Purpose of Project Management. The purpose of Project Management is to identify, establish, coordinate and monitor activities, tasks and resources necessary for a project to produce a product and/or service meeting the agreed requirements. 5
  • 6. Different Components of Project Management Project Integration Management Processes required to ensure that various elements of the project are properly coordinated. Project Scope and Time Management Processes required to ensure that the project includes all the work required to complete it successfully in stipulated time. Project Cost and Quality Management Processes required to ensure quality and that the project is completed within the approved budget. Project Human Resource Management Processes required to make the most effective use of the people involved in the implementation of the project. 6
  • 7. Key Dimensions of Projects  Cost  Time  Quality 7
  • 8. Key Dimensions of a Project Cost Scope Quality Time 8
  • 9. Project Cycle Management  A logical sequence in which the projects are identified, prepared, approved and implemented is called project cycle.  It is an approach in project management used to guide management activities and decision-making procedures during the life-cycle of a project, from the first idea until the last ex-post evaluation. 9
  • 10. Project Cycle Management Within all institutions the cycle shares three common themes:    The cycle defines the key decisions, information requirements and responsibilities at each phase;  The phases in the cycle are progressive – each phase needs to be completed for the next to be tackled with success.  The cycle draws on evaluation to build experience from existing projects into the design of future projects. 10
  • 11. Stages in PCM  There are eight broad stages of project cycle:  Project Identification  Project Preparation  Project Appraisal  Project Approval  Project Implementation  Project Monitoring  Project Completion  Project Evaluation 11
  • 13. Project Identification The possible sources of project identification are;  Development Plans  Sector Surveys  Elected Representatives  Immediate Nature/Calamity Projects  Expansion of On-going Programmes 13
  • 14. Project Formulation Projects are usually prepared by the executing organizations/ agencies and it consists of two stages:  Feasibility Study  Project Document Important Considerations:  Survey of the area  Availability of resources  Yearly allocation  Capacity of Implementing agency 14
  • 15. Project Appraisal  Critical examination of the project from all aspects is called appraisal.  Analysis of prospective costs and benefits that leads to desirability for committing resources.  It is carried out at two stages:  Internal Appraisal  External Appraisal 15
  • 16. Project Implementation  Project implementation entails intense activities and a variety of physical work.  Implementation of activities and financial management should be undertaken in accordance with all the established guidelines, procedures and regulations guiding the project.  Implementation of the project is the responsibility of executing agencies through;  Organization Staff  Project Staff 16
  • 17. Project Monitoring It is the systematic review of development projects at appropriate intervals during implementation through well defined indicators. Benefits of Monitoring  Effective Implementation  Timely Completion  Completion within approved cost Types of Monitoring  Financial Monitoring  Physical/Quantitative Monitoring  Qualitative Monitoring 17
  • 18. Project Monitoring  Levels of Monitoring  Internal Monitoring  External Monitoring Key Monitoring Indicators  Allocation of Funds  Release of Funds  Time Scheduling  Technical Parameters  Physical Progress 18
  • 19. Project Completion It is a report submitted immediately after the completion of the project. Major emphasis of the report is on the following:  Achievements against Targets/Results of the project;  Actual expenses vs. budgeted for the project;  Reasons for:  Under achievement if the desired targets are not achieved;  Delay if there is time over run in the project. 19
  • 20. Project Evaluation Project evaluation examines all aspects of the project design and assess the overall progress towards the ultimate objectives. Types of Evaluation  End of project evaluation  Post project completion evaluation 20
  • 21. Benefits of PCM  PCM is an important function of project management and can assist local organizations to learn from past experiences, improve decision making, streamline communication between various stakeholders and above all how far the objectives of the project have been achieved. 21
  • 22. Benefits of PCM When PCM is applied effectively, the following benefits can be realized;  Goal/Objective Oriented: Implementation of projects will be in accordance with predetermined objectives and not on the whims of individuals  Coordinated Project Management: Project execution will be coordinated and overseen by appointed project managers, and not by those randomly picked without proper consideration. 22
  • 23. Benefits of PCM  Sound & Objective Appraisal: The project will be designed and appraised based on sound research and feasibility criteria, and not on voting and consensus which does not capture the viability issues  Long Term Planning: PCM improves long-term planning because the policy setting’ stage includes strategic review of long term goals and objectives;  Increased Accountability. There will be increased accountability for results because individuals and teams will be assigned specific results that they must deliver; 23
  • 24. Benefits of PCM  Standard Methods and Procedures. As opposed to a mixed up process of managing a project, the PCM approach introduces a standard method and procedures for running projects stage by stage, which provides stakeholders with a road map of expected results, at each stage of the process;  Increased Efficiency in Planning and Use of Resources. Through the PCM method, project resources are planned for before the project is executed, and adjustments are made during project implementation; 24
  • 25. Benefits of PCM  Stakeholder Ownership. This is enhanced because PCM is a participatory process;  Formal Documentation. PCM requires documentation of procedures, processes and results. This ensures that there is an accurate record of information for every project step;  Enhanced Monitoring and Evaluation. PCM sets in place a process of monitoring based on agreed milestones. Without PCM, it is hard to create an effective monitoring framework and results are hard to establish 25