Examples of Lean Six Sigma projects 
Scrap Reduction ($250K annual savings) 
(BLACK BELT CERTIFICATION PROJECT ) 
 Project involved over 40 people, mechanics, electricians, supervisors, lead hands, operators, across 4 shits 
 Project was completed in 8 months 
 Problem Statement: Packaging scrap was 2.4% 
 Objective to reduce scrap from 2.4% to 1.2% 
 Measure Phase tools: Detailed PFD, X-Y matrix, Gauge R&R were used to gather data 
 Significant factor: DOE revealed baskets style cartons were significant factors in overall Finishing scrap 
 Improvements: modified tooling on turn section of gluer, replacing pneumatic cylinder with load cell for better carton control, IMPLEMENTED 5S using SHADOW BOARDS, developed SOP and standardized it. 
 Control Plan: error proofed critical settings and implemented regular hourly SPC checks 
Lean Start-Up and development (estimated savings =$300K/year)-- Alcan Packaging (2011) 
 Project Objective: Reduce floor space by 30% by implementing LEAN principles into diverse culture 
 Led team of 20 senior technicians and tool and die makers 
 LEAN TASKS COMPLETED: 
o VALUE STREAM MAP OF CURRENT AND FUTURE STATE PROCESSES 
o TAKT TIME & Cycle Time Analysis 
o Waste reduction 
o 5S 
o Lean Training 
 Results: 
o New layout with 40% less space utilized 
o Reduced inventory levels by 30% 
o 280 Employees trained on LEAN principles 
o Visual aids such as: white boards, Quality Alerts, Set-Up instructions 
Lean - Packaging Productivity Improvement ( $250K/Year savings) 
FGF Brands Foods 
 Project Objective: Improve productivity from current 240packs/Hr to 310 packs/Hr 
 Led Project consisting of 60 people across all 3 shifts 
 BOSCH Packaging was main bottleneck with lengthy set-up times and downtime due to machine utilization 
 Improvements: Developed CURRENT STATE VALUE STREAM MAP, identified areas of WASTE, developed FUTURE STATE VALUE STREAM MAP, implemented 5S across all shifts, trained all set-up operators and lead hands on basic Lean principles, implemented SMED (Single Minute Exchange Die), developed standardized SOP’s for set-up/change-over, implemented 5s and shadow boards for all tooling storage 
 Results: 
o Improved productivity from 240 packs/Hr to over 331 packs/Hr, 
o Reduced Set-Up Time from 30 min to under 5 min 
o Reduced waste from 14% to under 3% 
 Savings: $300K/Year in OEE improvement (machine utilization and direct labour absorption)
Page 2 of 5 
Injection mould set-up reduction project --($500K/annual savings) 
 Problem Statement: 22 injection moulds ranging from 93 weeks new to moulds over 10 years old), varied in sizes & capacities, had set-up/changeover times from 4-6hrs, resulting over $500K machine inefficiencies and productivity losses 
 Project Involved over 50 tool and die makers, lead process operators, lead hands, supervisors 
 Objective: Reduce the set-up time from 6hrs to under 2hrs 
 Significant Improvements: over 4.5hrs of Set-Up Time was reduced by the following IMPROVEMENTS: 
o Implemented SMED principles, with 5S SHADOW BOARDS, standardized tool carts, SET-UP SOP 
o New water manifolds with shorter hoses and different IN/OUT connectors 
o Standardized bolt lengths and utilized quick-connect clamps 
o Interchangeable inserts and standardized back plates with different hole pattern 
o Standardized Mould kits & implemented shadow boards 
o Documented SOP and validated set-up/changeover on different shifts 
 These improvements resulted in over $500K annual savings 
Magnum 2000 (TS-16949) Lean/Quality initiative---Summer 2009 
 Problem Statement: 
 1st time yield quality was at 62% 
 Led team of 30 people, operators, QA Inspectors, Lead Hands, Operators 
 Used 100% inspection to sort out defects in a machining operation 
 Premature Tool wear causing defects and downtime 
 Poor process flow and scheduling issues causing “RUSH” orders and panic mode 
 Rotary Transfer Machines: 
• 16 Station Hydromat CNC 
• Buffoli Transfer Machine CNC 
• Hydromat - 10 Station 
• Hydromat - 12 Station 
 Other Equipment: 
• In-feed and thru-feed grinding equipment 
• Durr parts washer 
• Full chip and oil recovery systems 
• Fully integrated MRP system 
 Improvements: 
 Developed VSM of current process and reviewed NVA for waste reduction 
 Implemented 5S in all machining area so that tool locations and spares were easily located and replaced when worn 
 Implemented in-process sampling checks based on AQL of 0.4 (99.6% confidence level) using GO/NO-GO gauges, vernier measurements 
 Set-up and Implemented SPC for in-process checks which allowed operators to monitor trends and adjust tooling as needed before it’s too late 
 Redesigned tooling for a 16 station CNC HYDROMAT which reduced premature tool wear by 25% 
 Developed & Implemented Preventative Maintenance procedures which reduced downtime by 30% 
 Designed Rough Grinding and Finish Grinding process parameters for machining water pump bearings achieving surface finishes of 0.1-0.2μm Ra (4-8 μin) consistently 
 Eliminated 100% inspection 
 Validated Testing through Reliability studies and implemented statistical process controls which reduced leak test failures from 14% to less than 0.5% improved packaging productivity by 32%
Page 3 of 5 
GENERATOR COIL EFFICIENCY IMPROVEMENT (savings $800K/year) 
Voith Hydro 
 Project Objective: Improve Current State Coil winding operation by 30% (28 Coils to 40 Coils/Day) 
 Project involved 3 shifts over 80 UNION WORKERS 
 Current Process Limitations: Direct Labour underutilized (65%) and bottleneck process Final Taping has MOL restriction on 4Hr/shift Max exposure time 
 Improvements: Developed Lean Flexible work Cell, Cross-Functionally trained all operators on Final Taping, developed rotation schedule to ensure every 2hrs Final Taping Operators are rotated, implemented internal KANBAN for pre-staging material and implemented 5S to reduce Non-Value add time (walking around looking for tools)., trained all set-up operators/lead hands on basic Lean principles 
 Results: 
 Improved productivity from 27 to 40 Coils/day 
 Increased Direct Labour Utilization from 65% to over 80% 
 Reduced floor space by 30% 
 Reduced WIP by 40%
Page 4 of 5 
30 
40 
50 
60 
70 
80 
90 
100 
1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
Direct Labour Utilization 
DLV 
Baseline 
Target 
Week 
% Utilization 
10 
15 
20 
25 
30 
35 
40 
45 
1 
2 
3 
4 
5 
6 
7 
8 
9 
10 
11 
12 
Avg Coils/Day 
Week 
Coil Productivity by week 
Avg Coils/Day 
Baseline 
Target
Page 5 of 5 
Flexo Efficiency improvement project ($600K annual savings)-- MeadWestvaco Packaging 
 Problem was poor productivity (15Kpcs/hr) 
 Objective was to improve Flexo Print Cut efficiency by 30% (from 15k pcs/hr to 20k pcs)/hr 
 Significant factors Die Cutting, Ink transfer, Varnish, & Carton type 
 Improvement: DOE used to optimize printing process parameters such as: Ink density & viscosity, Anilox density, Varnish viscosity & improved die set-up time 
 Implemented SPC checks part of the Control plan. 
Warehouse Management System (WMS) project–(over $800K/annual savings) ---MeadWestvaco Packaging, 
 Managed a complex Supply-Chain project between MWV Paper Mill/Sales/Marketing & Coco-Cola purchasing, on improving on time delivery, increasing sales and reducing storage time of FG cartons for Coca Cola 
 Objective: increase Coca-Cola carton turnover rate by 30% & reduce warehouse space by 200,000 ft ² 
 Project was completed in 11 months 
 Improvements: WMS (Warehouse Management System) implemented with full automated KANBAN of Coca-Cola cartons allowing Coca Cola full access to view our warehouse inventory and give us signals when to start producing new cartons using colour codes for SKU inventory levels, Green=Don’t produce, Yellow-start, Red=late 
 Realized savings: on-time deliveries improved from 92% to 99.5% within 3 month, and warehouse space by 170,000ft². The but a new project was launched between MWV sales/marketing and Coca Cola purchasing to increase carton revenue (see below for details) 
Sales & Coca-Cola carton turnover -part of the WMS project–(over $300K/annual savings 
 Problem: Graphics design on Coca Cola cartons took too long, resulting long carton development time and lack of input from MWV Sales/Marketing and Graphics 
 Objective: increase Coca-Cola sales by 40% and carton turnover rate by 30% 
 Improvement: MWV Graphics designers to be involved in the preliminary carton design and sales to use VOC (Voice Of the Customer) to visit and survey Coca Cola plants for their feedback

More Related Content

What's hot

Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakharMohammad IFTAKHAR
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS Julian Kalac P.Eng
 
Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesTKMG, Inc.
 
Lean Six Sigma project Caponera
Lean Six Sigma project CaponeraLean Six Sigma project Caponera
Lean Six Sigma project CaponeraAnnalisa Caponera
 
Six Sigma Project on Distribution Efficiency
Six Sigma Project on Distribution EfficiencySix Sigma Project on Distribution Efficiency
Six Sigma Project on Distribution Efficiencymrt77
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectSumit K Jha
 
Six-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleSix-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleDheerendra S Negi
 
Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Eng Marzouk
 
Lean Six Sigma-Case study
Lean Six Sigma-Case studyLean Six Sigma-Case study
Lean Six Sigma-Case studysourov_das
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleAndrew Schwartz
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingAnkit Sharma
 
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case StudyNitesh Verma
 
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)Inter Alliance Werardt
 
Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Abhay Yadav
 
Improve On-time deliveries_ Lean Six Sigma Green Belt Project
Improve On-time deliveries_ Lean Six Sigma Green Belt ProjectImprove On-time deliveries_ Lean Six Sigma Green Belt Project
Improve On-time deliveries_ Lean Six Sigma Green Belt ProjectMahit Ohri
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalSumon Kumar Kundu
 

What's hot (20)

Lean six sigma black belt project by iftakhar
Lean six sigma black belt project   by iftakharLean six sigma black belt project   by iftakhar
Lean six sigma black belt project by iftakhar
 
Six sigma-black-belt-project-sample
Six sigma-black-belt-project-sampleSix sigma-black-belt-project-sample
Six sigma-black-belt-project-sample
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
Value Stream Mapping: Case Studies
Value Stream Mapping: Case StudiesValue Stream Mapping: Case Studies
Value Stream Mapping: Case Studies
 
Lean Six Sigma project Caponera
Lean Six Sigma project CaponeraLean Six Sigma project Caponera
Lean Six Sigma project Caponera
 
Six Sigma Project on Distribution Efficiency
Six Sigma Project on Distribution EfficiencySix Sigma Project on Distribution Efficiency
Six Sigma Project on Distribution Efficiency
 
Service revamp lean six sigma black belt project
Service revamp lean six sigma black belt projectService revamp lean six sigma black belt project
Service revamp lean six sigma black belt project
 
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case Study
 
Six-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sampleSix-Sigma-Black-Belt-Project-sample
Six-Sigma-Black-Belt-Project-sample
 
Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...
 
Lean Six Sigma-Case study
Lean Six Sigma-Case studyLean Six Sigma-Case study
Lean Six Sigma-Case study
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Lean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete trainingLean six sigma Yellow Belt Complete training
Lean six sigma Yellow Belt Complete training
 
Lean Process Improvement Techniques
Lean Process Improvement TechniquesLean Process Improvement Techniques
Lean Process Improvement Techniques
 
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case Study
 
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
 
Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)
 
Spaghetti Diagrams
Spaghetti DiagramsSpaghetti Diagrams
Spaghetti Diagrams
 
Improve On-time deliveries_ Lean Six Sigma Green Belt Project
Improve On-time deliveries_ Lean Six Sigma Green Belt ProjectImprove On-time deliveries_ Lean Six Sigma Green Belt Project
Improve On-time deliveries_ Lean Six Sigma Green Belt Project
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
 

Viewers also liked

Viewers also liked (15)

Lean Six Sigma Black Belt Project Storyboard - The Retension Process
Lean Six Sigma Black Belt Project Storyboard - The Retension ProcessLean Six Sigma Black Belt Project Storyboard - The Retension Process
Lean Six Sigma Black Belt Project Storyboard - The Retension Process
 
Improving On Time Delivery
Improving On Time DeliveryImproving On Time Delivery
Improving On Time Delivery
 
5. effective, on time delivery
5. effective, on time delivery5. effective, on time delivery
5. effective, on time delivery
 
Getting On Time Delivery (OTD) from Suppliers - Always
Getting On Time Delivery (OTD) from Suppliers - AlwaysGetting On Time Delivery (OTD) from Suppliers - Always
Getting On Time Delivery (OTD) from Suppliers - Always
 
How Lean Six Sigma Helps You Get A Job - GoLeanSixSigma.com
How Lean Six Sigma Helps You Get A Job - GoLeanSixSigma.comHow Lean Six Sigma Helps You Get A Job - GoLeanSixSigma.com
How Lean Six Sigma Helps You Get A Job - GoLeanSixSigma.com
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best ppt
 
GRV Heads_pub
GRV Heads_pubGRV Heads_pub
GRV Heads_pub
 
Presentation of dommer scrap reduction
Presentation of dommer scrap reductionPresentation of dommer scrap reduction
Presentation of dommer scrap reduction
 
6 sigma
6 sigma6 sigma
6 sigma
 
Intro of marketing
Intro of marketingIntro of marketing
Intro of marketing
 
Six Sigma
Six SigmaSix Sigma
Six Sigma
 
Six Sigma Sample Project
Six Sigma Sample ProjectSix Sigma Sample Project
Six Sigma Sample Project
 
Plastic injection moulding ppt
Plastic injection moulding pptPlastic injection moulding ppt
Plastic injection moulding ppt
 
Six sigma ppt
Six sigma pptSix sigma ppt
Six sigma ppt
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 

Similar to Lean Six Sigma Projects

Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018Julian Kalac P.Eng
 
Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultantbharat kumar
 
Case study electronics industry
Case study   electronics industryCase study   electronics industry
Case study electronics industryGanesh TN
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going leanbwu.nl
 
Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16Art Rehn
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Chris Baichoo
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTFASI93
 
William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016Randy Kent
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARSAQIB MANIAR
 
Troy Schlegel- Accomplishments
Troy Schlegel- AccomplishmentsTroy Schlegel- Accomplishments
Troy Schlegel- AccomplishmentsTroy Schlegel
 
ASQ CSSBB Affidavit Example
ASQ CSSBB Affidavit ExampleASQ CSSBB Affidavit Example
ASQ CSSBB Affidavit ExampleGovind Ramu
 

Similar to Lean Six Sigma Projects (20)

Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
 
Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultant
 
Case study electronics industry
Case study   electronics industryCase study   electronics industry
Case study electronics industry
 
Muhammad Portfolio
Muhammad PortfolioMuhammad Portfolio
Muhammad Portfolio
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going lean
 
Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16
 
Resume
ResumeResume
Resume
 
dapski042116
dapski042116dapski042116
dapski042116
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 
TCN_CV_R3ap
TCN_CV_R3apTCN_CV_R3ap
TCN_CV_R3ap
 
Projects summary
Projects summaryProjects summary
Projects summary
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPT
 
William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016
 
CV_2016_rev_4_RW
CV_2016_rev_4_RWCV_2016_rev_4_RW
CV_2016_rev_4_RW
 
Elizabeth rubio cv-2
Elizabeth rubio   cv-2Elizabeth rubio   cv-2
Elizabeth rubio cv-2
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
Troy Schlegel- Accomplishments
Troy Schlegel- AccomplishmentsTroy Schlegel- Accomplishments
Troy Schlegel- Accomplishments
 
MY CV
MY CVMY CV
MY CV
 
ASQ CSSBB Affidavit Example
ASQ CSSBB Affidavit ExampleASQ CSSBB Affidavit Example
ASQ CSSBB Affidavit Example
 
0DBG 1Pager
0DBG 1Pager0DBG 1Pager
0DBG 1Pager
 

More from Julian Kalac P.Eng

SIX SIGMA IMPROVES OEE performance from 20% to 39.1%
SIX SIGMA IMPROVES  OEE performance from 20% to 39.1%SIX SIGMA IMPROVES  OEE performance from 20% to 39.1%
SIX SIGMA IMPROVES OEE performance from 20% to 39.1%Julian Kalac P.Eng
 
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.EngJulian Kalac P.Eng
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowJulian Kalac P.Eng
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSJulian Kalac P.Eng
 
Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Julian Kalac P.Eng
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment Julian Kalac P.Eng
 
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS Julian Kalac P.Eng
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVERJulian Kalac P.Eng
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureJulian Kalac P.Eng
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutJulian Kalac P.Eng
 
Custom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverCustom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverJulian Kalac P.Eng
 
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHJulian Kalac P.Eng
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE Julian Kalac P.Eng
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE Julian Kalac P.Eng
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over timeJulian Kalac P.Eng
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACJulian Kalac P.Eng
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian KalacJulian Kalac P.Eng
 
The hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALACThe hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALACJulian Kalac P.Eng
 

More from Julian Kalac P.Eng (20)

SIX SIGMA IMPROVES OEE performance from 20% to 39.1%
SIX SIGMA IMPROVES  OEE performance from 20% to 39.1%SIX SIGMA IMPROVES  OEE performance from 20% to 39.1%
SIX SIGMA IMPROVES OEE performance from 20% to 39.1%
 
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Design for Six Sigma in Automotive
Design for Six Sigma in Automotive
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment
 
Lean logistics
Lean logisticsLean logistics
Lean logistics
 
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag Out
 
Custom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverCustom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeover
 
MWV CONTROL VS SPEC
MWV CONTROL VS SPECMWV CONTROL VS SPEC
MWV CONTROL VS SPEC
 
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over time
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian Kalac
 
The hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALACThe hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALAC
 

Recently uploaded

Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 

Recently uploaded (20)

Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 

Lean Six Sigma Projects

  • 1. Page 1 of 5 Examples of Lean Six Sigma projects Scrap Reduction ($250K annual savings) (BLACK BELT CERTIFICATION PROJECT )  Project involved over 40 people, mechanics, electricians, supervisors, lead hands, operators, across 4 shits  Project was completed in 8 months  Problem Statement: Packaging scrap was 2.4%  Objective to reduce scrap from 2.4% to 1.2%  Measure Phase tools: Detailed PFD, X-Y matrix, Gauge R&R were used to gather data  Significant factor: DOE revealed baskets style cartons were significant factors in overall Finishing scrap  Improvements: modified tooling on turn section of gluer, replacing pneumatic cylinder with load cell for better carton control, IMPLEMENTED 5S using SHADOW BOARDS, developed SOP and standardized it.  Control Plan: error proofed critical settings and implemented regular hourly SPC checks Lean Start-Up and development (estimated savings =$300K/year)-- Alcan Packaging (2011)  Project Objective: Reduce floor space by 30% by implementing LEAN principles into diverse culture  Led team of 20 senior technicians and tool and die makers  LEAN TASKS COMPLETED: o VALUE STREAM MAP OF CURRENT AND FUTURE STATE PROCESSES o TAKT TIME & Cycle Time Analysis o Waste reduction o 5S o Lean Training  Results: o New layout with 40% less space utilized o Reduced inventory levels by 30% o 280 Employees trained on LEAN principles o Visual aids such as: white boards, Quality Alerts, Set-Up instructions Lean - Packaging Productivity Improvement ( $250K/Year savings) FGF Brands Foods  Project Objective: Improve productivity from current 240packs/Hr to 310 packs/Hr  Led Project consisting of 60 people across all 3 shifts  BOSCH Packaging was main bottleneck with lengthy set-up times and downtime due to machine utilization  Improvements: Developed CURRENT STATE VALUE STREAM MAP, identified areas of WASTE, developed FUTURE STATE VALUE STREAM MAP, implemented 5S across all shifts, trained all set-up operators and lead hands on basic Lean principles, implemented SMED (Single Minute Exchange Die), developed standardized SOP’s for set-up/change-over, implemented 5s and shadow boards for all tooling storage  Results: o Improved productivity from 240 packs/Hr to over 331 packs/Hr, o Reduced Set-Up Time from 30 min to under 5 min o Reduced waste from 14% to under 3%  Savings: $300K/Year in OEE improvement (machine utilization and direct labour absorption)
  • 2. Page 2 of 5 Injection mould set-up reduction project --($500K/annual savings)  Problem Statement: 22 injection moulds ranging from 93 weeks new to moulds over 10 years old), varied in sizes & capacities, had set-up/changeover times from 4-6hrs, resulting over $500K machine inefficiencies and productivity losses  Project Involved over 50 tool and die makers, lead process operators, lead hands, supervisors  Objective: Reduce the set-up time from 6hrs to under 2hrs  Significant Improvements: over 4.5hrs of Set-Up Time was reduced by the following IMPROVEMENTS: o Implemented SMED principles, with 5S SHADOW BOARDS, standardized tool carts, SET-UP SOP o New water manifolds with shorter hoses and different IN/OUT connectors o Standardized bolt lengths and utilized quick-connect clamps o Interchangeable inserts and standardized back plates with different hole pattern o Standardized Mould kits & implemented shadow boards o Documented SOP and validated set-up/changeover on different shifts  These improvements resulted in over $500K annual savings Magnum 2000 (TS-16949) Lean/Quality initiative---Summer 2009  Problem Statement:  1st time yield quality was at 62%  Led team of 30 people, operators, QA Inspectors, Lead Hands, Operators  Used 100% inspection to sort out defects in a machining operation  Premature Tool wear causing defects and downtime  Poor process flow and scheduling issues causing “RUSH” orders and panic mode  Rotary Transfer Machines: • 16 Station Hydromat CNC • Buffoli Transfer Machine CNC • Hydromat - 10 Station • Hydromat - 12 Station  Other Equipment: • In-feed and thru-feed grinding equipment • Durr parts washer • Full chip and oil recovery systems • Fully integrated MRP system  Improvements:  Developed VSM of current process and reviewed NVA for waste reduction  Implemented 5S in all machining area so that tool locations and spares were easily located and replaced when worn  Implemented in-process sampling checks based on AQL of 0.4 (99.6% confidence level) using GO/NO-GO gauges, vernier measurements  Set-up and Implemented SPC for in-process checks which allowed operators to monitor trends and adjust tooling as needed before it’s too late  Redesigned tooling for a 16 station CNC HYDROMAT which reduced premature tool wear by 25%  Developed & Implemented Preventative Maintenance procedures which reduced downtime by 30%  Designed Rough Grinding and Finish Grinding process parameters for machining water pump bearings achieving surface finishes of 0.1-0.2μm Ra (4-8 μin) consistently  Eliminated 100% inspection  Validated Testing through Reliability studies and implemented statistical process controls which reduced leak test failures from 14% to less than 0.5% improved packaging productivity by 32%
  • 3. Page 3 of 5 GENERATOR COIL EFFICIENCY IMPROVEMENT (savings $800K/year) Voith Hydro  Project Objective: Improve Current State Coil winding operation by 30% (28 Coils to 40 Coils/Day)  Project involved 3 shifts over 80 UNION WORKERS  Current Process Limitations: Direct Labour underutilized (65%) and bottleneck process Final Taping has MOL restriction on 4Hr/shift Max exposure time  Improvements: Developed Lean Flexible work Cell, Cross-Functionally trained all operators on Final Taping, developed rotation schedule to ensure every 2hrs Final Taping Operators are rotated, implemented internal KANBAN for pre-staging material and implemented 5S to reduce Non-Value add time (walking around looking for tools)., trained all set-up operators/lead hands on basic Lean principles  Results:  Improved productivity from 27 to 40 Coils/day  Increased Direct Labour Utilization from 65% to over 80%  Reduced floor space by 30%  Reduced WIP by 40%
  • 4. Page 4 of 5 30 40 50 60 70 80 90 100 1 2 3 4 5 6 7 8 9 10 11 12 Direct Labour Utilization DLV Baseline Target Week % Utilization 10 15 20 25 30 35 40 45 1 2 3 4 5 6 7 8 9 10 11 12 Avg Coils/Day Week Coil Productivity by week Avg Coils/Day Baseline Target
  • 5. Page 5 of 5 Flexo Efficiency improvement project ($600K annual savings)-- MeadWestvaco Packaging  Problem was poor productivity (15Kpcs/hr)  Objective was to improve Flexo Print Cut efficiency by 30% (from 15k pcs/hr to 20k pcs)/hr  Significant factors Die Cutting, Ink transfer, Varnish, & Carton type  Improvement: DOE used to optimize printing process parameters such as: Ink density & viscosity, Anilox density, Varnish viscosity & improved die set-up time  Implemented SPC checks part of the Control plan. Warehouse Management System (WMS) project–(over $800K/annual savings) ---MeadWestvaco Packaging,  Managed a complex Supply-Chain project between MWV Paper Mill/Sales/Marketing & Coco-Cola purchasing, on improving on time delivery, increasing sales and reducing storage time of FG cartons for Coca Cola  Objective: increase Coca-Cola carton turnover rate by 30% & reduce warehouse space by 200,000 ft ²  Project was completed in 11 months  Improvements: WMS (Warehouse Management System) implemented with full automated KANBAN of Coca-Cola cartons allowing Coca Cola full access to view our warehouse inventory and give us signals when to start producing new cartons using colour codes for SKU inventory levels, Green=Don’t produce, Yellow-start, Red=late  Realized savings: on-time deliveries improved from 92% to 99.5% within 3 month, and warehouse space by 170,000ft². The but a new project was launched between MWV sales/marketing and Coca Cola purchasing to increase carton revenue (see below for details) Sales & Coca-Cola carton turnover -part of the WMS project–(over $300K/annual savings  Problem: Graphics design on Coca Cola cartons took too long, resulting long carton development time and lack of input from MWV Sales/Marketing and Graphics  Objective: increase Coca-Cola sales by 40% and carton turnover rate by 30%  Improvement: MWV Graphics designers to be involved in the preliminary carton design and sales to use VOC (Voice Of the Customer) to visit and survey Coca Cola plants for their feedback