More Related Content
Similar to MWV CONTROL VS SPEC
Similar to MWV CONTROL VS SPEC (20)
More from Julian Kalac P.Eng
More from Julian Kalac P.Eng (20)
MWV CONTROL VS SPEC
- 1. What is the difference between out of control and
out of specification?
- 3. -6s -5s -4s -3s -2s -1s 0 1s 2s 3s 4s 5s 6s
Process Capability
Control Limits
- 5. Rumble strip Highway
5
DPMO / Control Chart
20000
25000
30000
35000
40000
45000
50000
55000
60000
65000
70000
75000
80000
85000
90000
95000
100000
2/5/2
0012/19/20013/5/2
0013/19/20014/2/2
0014/16/20014/30/20015/14/20015/28/20016/11/20016/25/20017/9/2
0017/23/20018/6/2
0018/20/20019/3/2
0019/17/200110/1/2001
10/15
/2001
10/29
/2001
11/12
/2001
11/26
/2001
12/10
/2001
12/24
/2001
DPMO
Baseline
DPMO
UCL
LCL
Mean
Goal
Process
Change
REGIONAL
CONTROL
BEGINS
Control Limits
- 6. 6
Control Limits
-7
-6
-5
-4
-3
-2
-1
0
1
2
3
4
5
6
7
DPMO / Control Chart
20000
25000
30000
35000
40000
45000
50000
55000
60000
65000
70000
75000
80000
85000
90000
95000
100000
2/5/2
0012/19/20013/5/2
0013/19/20014/2/2
0014/16/20014/30/20015/14/20015/28/20016/11/20016/25/20017/9/2
0017/23/20018/6/2
0018/20/20019/3/2
0019/17/200110/1/2001
10/15
/2001
10/29
/2001
11/12
/2001
11/26
/2001
12/10
/2001
12/24
/2001
DPMO
Baseline
DPMO
UCL
LCL
Mean
Goal
Process
Change
REGIONAL
CONTROL
BEGINS