This document describes the process of generating electricity from coal, beginning with coal mining and transport, processing the coal at the power plant, generating steam in boilers using the coal, producing work in turbines using the steam, and generating electricity using generators connected to the turbines. Key components and processes discussed include open-cast coal mines, transporting coal to the plant using a merry-go-round system, crushing and storing coal at the plant, pulverizing coal to a fine powder, burning the powdered coal in boilers to produce high-pressure steam, expanding the steam in a turbine to produce rotational work, and using generators connected to the turbines to convert the rotational work into electricity delivered to the power grid.
2. Heat Input (Q1)
Work output (W1)
Work input (W2) Heat rejection (Q2)
Cycle efficiency=Net work output (W1-W2)/Heat input (Q1)
3. Adiabatic Expansion in
Turbine
Constant Pressure Heat
Rejection in Condenser
Pump Work
Sensible heat Addition in
Economizer
ENTROPY
T
E
M
P
E
R
A
T
U
R
E
Latent Heat Addition in
Evaporator (constt. Pressure) Super Heating
L + V
BASIC RANKINE CYCLE (SUB-CRITICAL)
4.
5. Steam power plants operate
on Rankine Cycle, DM water
as working fluid.
Sensible heat is added in
economiser +furnace
Steam generation takes
place in waterwall.
Heat transfer in furnace and
enclosed superheater takes
place thru radiation.
condenser
CEP
LPH
BFP
HPH+Eco
w/w
SH
HPT
IPT
RH
LPT
8. COAL TO ELECTRICITY
S W I T C H Y A R D / G R I D
G E N E R A T O R T R A N S F O R M E R
G E N E R A T O R
T U R B I N E
B O I L E R
P U L V E R I Z E R
B U N K E R
C R U S H E R
T R A C K H O P P E R
M G R
M I N E S
AIR
STEAM
FLUE GAS
CONDENSOR
COAL
PUMP
9. MINES
MINES: GEVRA(SOUTH EASTERN COALFIELD LTD)
TYPE: OPEN CAST MINES
TYPE OF COAL: E& F GRADE
COAL SIZE :<200MM
10. GRADING OF COAL
GRADE KCAL/KG
A >6200
B 5600-6200
C 4490-5600
D 4200-4490
E 3360-4200
F 2400-3360
G 1300-2400
11. MGR
(MERRY GO ROUND SYSTEM)
MINES END
NTPC
END
TRACK
HOPPERS
SILOS
TOTAL TRACK LENGTH: 34.80 KM
LENGTH OF LOAD LINE: 14.86
KM
LENGTH OF EMPTY LINE: 19.94
KM
RAIL TRACK
12. MGR
(MERRY GO ROUND SYSTEM)
ONE WAGON CAPACITY: 60-65 TONS
ONE RAKE : 34 WAGONS~ 2000 TONS
TOTAL RAKES IN A DAY~ 19(APPROX)
WAGON TYPE: BOTTOM DISCHARGE (PNEUMATIC)
SPEED OF WAGONS DURING LOADING:0.8 KM/HR
TOTAL TIME FOR LOADING :35-40 MINUTES
TRAVEL TIME: 30 + 30 MINS
16. CHP
COAL HANDLING PLANT
TRANSPORTS COAL FROM TRACK HOPPERS TO
BUNKERS AT MAIN PLANT
THROUGH PADDLE FEEDERS,CONVEYOR BELTS,
CRUSHERS ETC.(CRUSHED COAL SIZE <20 mm )
ALSO STACKS THE COAL IN STACKYARD AND
RECLAIMS WHEN NEEDED
17. CHP
COAL HANDLING PLANT
BUNKERS
6 BUNKERS (EACH 390 TON CAP) IN A 200 MW UNIT
9 BUNKERS (EACH 900 TON CAP) IN A 500 MW UNIT
TRIPPER CONVEYORS FOR TRANSFERING COAL FROM
CONVEYOR TO BUNKER
20. MAIN PLANT
MILL/PULVERIZER
PULVERIZES COAL FROM 20 MM SIZE TO 200 MESH
SIZE i.e> 70% SHOULD PASS THRU 200 MESH(200
HOLES/SQ.INCH)~ 75 MICRON
BOWL ROTATED BY MOTOR AND 3 ROLLERS AT 120
DEG APART (BOWL MILL)
PULVERIZED COAL IS TAKEN TO BOILER BY
HOT+COLD PRIMARY AIR
21. Hot Air
Gate
Cold Air
Inspection Door CoalCoal
MillMill
Hot Air
Duct
Scraper
Housing
Hot Air Damper
Gear
Housing
Grinding
Chamber
Discharge
System
Classifying
System
Coal from bunker
Grinding
Rolls
Coal discharge
Air flow
Classification
of desired
fineness Coal
Pulverized Coal
Dropping of
undesired
coarse Coal
BOWL MILL
26. MAIN PLANT
TURBINE
THREE CYLINDER: HP,IP AND LP CYLINDER
ROTATES AT 3000 RPM (DECIDED BY GRID FREQ
AND GENERATOR POLE)
n=120f/P
n=speed, f=frequency of grid, P=no of poles of generator
27. TURBINE
• HP TURBINE (SINGLE FLOW)
• IP TURBINE( DOUBLE FLOW)
• LP TURBINE (DOUBLE FLOW)
NO OF STAGE
• HP TURBINE (25 STAGE)
• IP TURBINE( 20+20 STAGE)
• LP TURBINE(8+8 STAGE)
37. MAIN PLANT
GENERATOR & GENERATOR TRANSFORMER
400 KV BUS IN
SWITCHYARD
GENERATOR
TRANSFORMER
GENERATOR
15.75 KV 400 KV
CIRCUIT BREAKER
OUTGOIN
G
LINE