 Verification, Monitoring & Analysis of Use Of
Energy including submission of Technical Report
containing recommendation for improving
Energy efficiency with cost benefit analysis &
action plan to reduce Energy Consumption
 Turbine-Generator (TG) Heat Rate (Kcal/kwh)
 Boiler Efficiency (%)
 Auxiliary Power Consumption (%)
MaintenanceControl
OperationalControl
Energy Management
Standard
O&M
Practices
Technology
 Equipment Running Hours
 Maximizing Machine loading factor
Standardization of O&M Practices
through Energy Monitoring
Scheduled changeover of
Equipments as per energy
deviation
Most energy efficient
equipment run for
maximum time
Predictive maintenance
 Boiler Maintenance
 Arresting Steam leakages online
 Duct Leakages
 Duct leakages of Air and Flue gas arrested in
every opportunity
 Adoption of Energy Efficient Technology like
> V. F. D installation
> On-line Monitoring System.
 MVAR Management
 Compressor Loading & Unloading.
 Service Auxiliaries such as illumination etc.
 Off Peak Hour CHP running.
 Switchyard Contact thermal observation to avoid losses.
HT Motor
Rated Current
(Amp)
Rated KW Rated RPM
Actual current
(Amp)
Actual KW % IGV / Valve Running Hours
CWP-1 40 Amp 350 742 35.74 320.0 100 24
CWP-2 40 Amp 350 742 37.32 337.0 100 24
BFP-1 156.5 Amp
1475 2986
ID FAN-1 57 Amp
520 993 47.52 442.9
34 24
PA FAN-1 61 Amp
580 1492 50.69
492.6 14.5 24
SA FAN-1 24 Amp
210 1488 18.6 167.4
45 24
CWP-3 40 Amp 350 742
BFP-2 156.5 Amp 1475
2986
130.2 1266.0 61 24
ID FAN-2 57 Amp
520 993 47.11
442.0 24 24
PA FAN-2 61 Amp
580 1492 52.55 516.6
17.7 24
SA FAN-2 24 Amp
210 1488 18.36 164.8
41 24
 A 520 Kw Fan motor operating 24 hrs/day,260 Days perYr with IGV 41% Open
& assuming Rs. 2.50 per KWH.
Now,Cost of running full speed:
520x24x260x2.50=81,12,000 per yr.
After ,VFD installation as for Operation requirement
motor operates full speed(100%) for 12 hrs
80% speed for 12 hrs , with IGV 100% open
Now,Cost of running withVFD controlling the motor:
As per affinity Law: Power α (N)3
520x(1)3x12x260x2.50=40,56,000 per yr
520x(0.8) 3x 12x260x2.50=20,76,672 per yr
Annual Saving : 81,12,000-(40,56,000+20,76,672)=19,79,328 per yr
 Online monitoring.
 Elimination of human error
 Measurable outputs
 Compares and identifies the efficient processes &
equipment
 Different type of reports like
daily, monthly, quarterly or yearly can be generated .
 Report generation and archiving is possible.
Date
Time
(Hours)
Total
Generation
MWH
Plant Auxilary Consumption
Aux.
Consumption Constrction
Power
MWH
Actual Import
MWH
Actual Export
MWH
Max. Demand
MW
Plant
Utilization
Factor %
(PUF)
Rev.
BLA
Rev.
SLDCNET CONSUMP.
[GEN+IMPORT]-
EXPO
%
[SAT+UAT]
MWH
01-Aug-12 00 hr-24 hr 187.9102 45.8375 24.39 45.2517 0.5513 23.5986 165.6713 45.26 17.40 R-1 R-1
02-Aug-12 00 hr-24 hr 0.0000 23.7488 N.A. 23.6113 0.5941 23.7488 0.0000 0 0.00 R-0 R-0
03-Aug-12 00 hr-24 hr 0.0000 21.6696 N.A. 21.4206 0.5188 21.6696 0.0000 0 0.00 R-0 R-0
04-Aug-12 00 hr-24 hr 0.0000 21.4956 N.A. 21.3391 0.5363 21.4956 0.0000 0 0.00 R-0 R-0
05-Aug-12 00 hr-24 hr 0.0000 14.2380 N.A. 14.0888 0.5730 14.2380 0.0000 0 0.00 R-0 R-0
06-Aug-12 00 hr-24 hr 0.0000 15.1342 N.A. 14.9954 0.5521 15.1342 0.0000 0.0000 0.00 R-0 R-0
07-Aug-12 00 hr-24 hr 0.0000 32.9980 N.A. 32.3800 0.5507 32.9980 0.0000 0.0000 0.00 R-0 R-0
08-Aug-12 00 hr-24 hr 842.4411 129.4173 15.36 120.8759 0.9089 11.2774 724.3012 45.2900 78.00
09-Aug-12 00 hr-24 hr 1053.6027 128.0791 12.16 126.6573 0.6385 0.0000 925.5236 45.3000 97.56 R-0 R-0
10-Aug-12 00 hr-24 hr 1048.5206 131.1004 12.50 126.6944 0.5255 0.0000 917.4202 45.3000 97.09 R-1 R-0
11-Aug-12 00 hr-24 hr 681.4661 118.9805 17.46 114.9359 0.5133 0.0000 562.4856 44.3062 63.10 R-0 R-0*
12-Aug-12 00 hr-24 hr 653.8169 116.5612 17.83 114.2477 0.6135 0.0000 537.2557 44.4200 60.54 R-0 R-0*
13-Aug-12 00 hr-24 hr 781.7993 117.7024 15.06 115.4830 0.3110 0.0000 664.0969 38.2202 72.39 R-2 R-2
14-Aug-12 00 hr-24 hr 615.2586 115.3600 18.75 113.0708 0.3113 16.1626 516.0612 40.5771 56.97 R-5 R-3
15-Aug-12 00 hr-24 hr 1007.4397 124.1597 12.32 121.4729 0.2356 0.0000 883.2800 45.3260 93.28 R-0 R-0
16-Aug-12 00 hr-24 hr 1029.1149 126.9881 12.34 121.9607 0.2285 0.0000 902.1268 45.2500 95.29 R-1 R-1
17-Aug-12 00 hr-24 hr 1053.6539 132.9391 12.62 124.5252 0.1753 0.0000 920.7148 45.3109 97.56 R-0 R-0
18-Aug-12 00 hr-24 hr 1045.7193 129.3059 12.37 125.5823 0.2040 0.0000 916.4134 45.3083 96.83 R-1 R-0
19-Aug-12 00 hr-24 hr 1010.5977 129.7518 12.84 124.9794 0.3614 0.0000 880.8459 45.3537 93.57 R-1 R-0
20-Aug-12 00 hr-24 hr 789.4197 124.4742 15.77 118.8999 0.3071 7.8875 672.8330 45.2680 73.09 R-5 R-5
21-Aug-12 00 hr-24 hr 900.6403 123.6932 13.73 122.4100 0.1602 0.0000 776.9471 45.2630 83.39 R-3 R-3
22-Aug-12 00 hr-24 hr 977.1813 131.1305 13.42 126.2523 0.3858 0.0000 846.0508 45.3839 90.48 R-2 R-2
23-Aug-12 00 hr-24 hr 962.7620 126.6416 13.15 125.4549 0.3496 0.0000 836.1204 45.3159 89.14
24-Aug-12 00 hr-24 hr 1033.4637 135.8749 13.15 126.5416 0.3434 0.0000 897.5888 45.8472 95.69 R-0 R-0
25-Aug-12 00 hr-24 hr 797.6023 119.5955 14.99 115.3832 0.2501 16.4098 694.4166 45.2800 73.85 R-2 R-0
26-Aug-12 00 hr-24 hr 1078.7355 135.5828 12.57 129.2128 0.3438 0.0000 943.1527 45.2700 99.88 R-0 R-0
27-Aug-12 00 hr-24 hr 1078.9963 130.5336 12.10 128.8854 0.3392 0.0000 948.4627 45.2907 99.91 R-0 R-0
28-Aug-12 00 hr-24 hr 1080.3202 132.5365 12.27 128.9368 0.3303 0.0000 947.7837 45.3461 100.03 R-0 R-0
29-Aug-12 00 hr-24 hr 1084.6341 135.2539 12.47 128.2091 0.5166 0.0000 949.3805 45.3537 100.43 R-0 R-0
30-Aug-12 00 hr-24 hr 1066.1845 134.8903 12.65 127.9227 0.4280 0.0000 931.2942 45.2835 98.72 R-0 R-0
31-Aug-12 00 hr-24 hr 1084.0267 135.7393 12.52 128.5743 0.4198 0.0000 948.2874 45.3310 100.37 R-0 R-0
TR-1 I/C TR-3 I/C TR-5 I/C
Date KW KVA KVAR VOLT AMP KW KVA KVAR VOLT AMP KW KVA KVAR VOLT AMP
12 Nov 197 217.1 92.96 424 293 313.6 374 201.8 438 419 336.1 456 341 435 709.2
13 Nov 198.2 219.2 93.42 424 297 296.5 354.7 196.3 438.2 466.9 283.8 436.1 326.8 438.1 574
TR-2 I/C TR-4 I/C TR-6 I/C
Date KW KVA KVAR VOLT AMP KW KVA KVAR VOLT AMP KW KVA KVAR VOLT AMP
12 Nov 142.4 166.2 85.37 425 225 220.6 274.7 163.2 440 359 410.4 494.5 267.3 420.3 630.3
13 Nov 141.6 165.3 84.97 424 224.4 217.6 271.8 162.2 440 357 364.1 486.1 264.4 420 560
2 MVA TR-1 = appox. 10.85 to 12 % Loading
2 MVA TR-2 = appox. 08.31 to 10 % Loading
2 MVA TR-3 = appox. 17.77 to 20 % Loading At Full Load 45 MW Generation
2 MVA TR-4 = appox. 13.55 to 15 % Loading
2 MVA TR-5 = appox. 21.85 to 25 % Loading
2 MVA TR-6 = appox. 24.31 to 27 % Loading
 Compressed air is very energy intensive. Only 5% of electrical
energy is converted to useful energy. Use of compressed air for
cleaning is rarely justified.
 Ensure low temperature of inlet air. Increase in inlet air
temperature by 3°C increases power consumption by 1%.
 It should be examined whether air at lower pressure can be used in
the process. Reduction in discharge pressure by 10% saves energy
consumption upto 5%.
 A leakage from a ½” diameter hole from a compressed air line
working at a pressure of 6.5kg/cm2 can drain almost Rs. 2500 per
day.
 Quality of power supply judged from two factors i.e. voltage and
frequency.
a. All generators having defined capability to generate reactive
/active power. If export of reactive power increases
correspondingly reduces active power.
b. Transmission line generates the reactive power according to
voltage level. Higher the voltage level will be the generation of
reactive power.
132 KV Lines - 0.05 MVAR/KM
 MVAR balancing minimizes I2R Losses and increases capacity
utilizations of transformers/lines.
 BLA Power, Line Voltage Fluctuates frequently from
125.4 KV to 132KV to 140 KV
So MVAR should maintain 25 MVAR to 20 MVAR to -8 MVAR
accordingly.
 Lighting conservation done mainly in two Parts:
a. Operational Area
b. Office / Service Area & street Lighting
• Use of CFL lamp in place of GLS lamp can save energy
upto 70%.
• Clean the lamps and fixtures regularly. Illumination
levels fall by 20-30% due to collection of dust.
• Use of sodium vapour lamps for area lighting in place of
mercury vapour lamps saves electricity upto 40%.
BEFORE AFTER
BEFORE AFTER
BEFORE AFTER
BEFORE AFTER
BEFORE AFTER
BEFORE AFTER
BEFORE AFTER
BEFORE AFTER
Energy Saving
Light Load Area Quantity watt Consu KW / Hr Running hr Daily Consum. In KWH Daily KWH Monthly KWH Yearly KWH
TG floor 15 mtr
Before 12 250 3 12 36.0
27.0 810 9720
After 3 250 0.75 12 9.0
AC package
Before 12 36 0.432 24 10.4
8.6 258 3096
After 2 36 0.072 24 1.7
6.6 KV
Before 114 36 4.104 24 98.5
43.2 1296 15552
After 64 36 2.304 24 55.3
0 mtr TG floor
Before 6 250 1.5 12 18.0
9.0 270 3240
After 3 250 0.75 12 9.0
PMCC-3
Before 64 36 2.304 12 27.6
14.7 441 5292
After 30 36 1.08 12 13.0
Compressor
house
Before 14 250 3.5 12 42.0
33.0 990 11880
After 3 250 0.75 12 9.0
wtp mcc & Hall
Before 40 250 10 12 120.0
75.0 2250 27000
After 15 250 3.75 12 45.0
cable celler
room
Before 114 36 4.104 12 49.2
40.6 1218 14616
After 20 36 0.72 12 8.6
DG room
Before 12 250 3 12 36.0
27.0 810 9720
After 3 250 0.75 12 9.0
DM plant MCC
Before 36 36 1.296 12 15.6
6.9 207 2484
After 20 36 0.72 12 8.6
cooling Tower
Before 8 250 2 12 24.0
24.0 720 8640
After 0 250 0 12 0.0
Swith Yard
Before 24 400 9.6 12 115.2
115.2 3456 41472
After 0 400 0 12 0.0
Net Saving per Day/Month/Yr In KWH 424.2 12726 152712
DATE A-Shift B-Shift C-Shift Total Running Hrs
15-Nov-12 2:40 2:10 3:10 8
16-Nov-12 0:30 4:15 2:20 7:30
17-Nov-12 2:20 3:30 2:15 8:05
18-Nov-12 2:37 3:15 3:00 8:52
19-Nov-12 0:50 3:00 2:50 6:40
20-Nov-12 2:40 2:50 2:05 7:35
21-Nov-12 1:25 4:50 2:35 8:50
Peak Hours – 18:00 Hrs to 22:00 Hrs
 LT consumption metering & monitoring
 Capacitor Bank Implementation.
 ESP Efficiency & monitoring.
Target
≥ 10.5%
Aux. Consumption
THANKS
Prepared By:
MANOJ KUMAR MAHARANA
Sr. Engineer
Electrical [O&M]
BLA Power Pvt. Ltd

More Related Content

What's hot

Generator cooling and sealing system 2
Generator cooling and sealing system 2Generator cooling and sealing system 2
Generator cooling and sealing system 2Mohammad Basid
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATEManohar Tatwawadi
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boilerKongkiert Tankayura
 
power-plant-basics
power-plant-basicspower-plant-basics
power-plant-basicskulanji Siva
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiencyManohar Tatwawadi
 
Energy conservation in industry
Energy conservation in industryEnergy conservation in industry
Energy conservation in industrySameer Kumar Rout
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plantSHIVAJI CHOUDHURY
 
Evaluation of a Boiler performance
Evaluation of a Boiler performanceEvaluation of a Boiler performance
Evaluation of a Boiler performanceHashim Hasnain Hadi
 
Hydrogen Purge and Fill
Hydrogen Purge and FillHydrogen Purge and Fill
Hydrogen Purge and FillShad Edwards
 
Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations Ashish Kumar Jain
 
Energy audit boiler and steam lines
Energy audit  boiler and steam linesEnergy audit  boiler and steam lines
Energy audit boiler and steam linesRohil Kumar
 
Fans in thermal power plants
Fans in thermal power plantsFans in thermal power plants
Fans in thermal power plantsSHIVAJI CHOUDHURY
 
STUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSES
STUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSESSTUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSES
STUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSESMohammed Sameer
 
Heat recovery from air compressors
Heat recovery from air compressorsHeat recovery from air compressors
Heat recovery from air compressorsWilson Figueira
 
Heat rate of thermal power plant
Heat rate of thermal power plantHeat rate of thermal power plant
Heat rate of thermal power plantManohar Tatwawadi
 
Boiler efficiency by loss Method
Boiler efficiency by loss MethodBoiler efficiency by loss Method
Boiler efficiency by loss MethodRajeev Saini
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineManohar Tatwawadi
 
Combined Cycle Gas Turbine Power Plant Part 1
Combined Cycle Gas Turbine Power Plant Part 1Combined Cycle Gas Turbine Power Plant Part 1
Combined Cycle Gas Turbine Power Plant Part 1Anurak Atthasit
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGAshish Kumar Jain
 
Energy Conservation Techniques For Industries
Energy Conservation Techniques For IndustriesEnergy Conservation Techniques For Industries
Energy Conservation Techniques For IndustriesShakti Prasad Ghadei
 

What's hot (20)

Generator cooling and sealing system 2
Generator cooling and sealing system 2Generator cooling and sealing system 2
Generator cooling and sealing system 2
 
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATETHERMAL POWER PLANT EFFICIENCY AND HEAT RATE
THERMAL POWER PLANT EFFICIENCY AND HEAT RATE
 
Energy adudit methodology for boiler
Energy adudit methodology for boilerEnergy adudit methodology for boiler
Energy adudit methodology for boiler
 
power-plant-basics
power-plant-basicspower-plant-basics
power-plant-basics
 
Thermal power plant efficiency
Thermal power plant efficiencyThermal power plant efficiency
Thermal power plant efficiency
 
Energy conservation in industry
Energy conservation in industryEnergy conservation in industry
Energy conservation in industry
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plant
 
Evaluation of a Boiler performance
Evaluation of a Boiler performanceEvaluation of a Boiler performance
Evaluation of a Boiler performance
 
Hydrogen Purge and Fill
Hydrogen Purge and FillHydrogen Purge and Fill
Hydrogen Purge and Fill
 
Thermal Power Plant - Emergency situations
Thermal Power Plant   -   Emergency situations Thermal Power Plant   -   Emergency situations
Thermal Power Plant - Emergency situations
 
Energy audit boiler and steam lines
Energy audit  boiler and steam linesEnergy audit  boiler and steam lines
Energy audit boiler and steam lines
 
Fans in thermal power plants
Fans in thermal power plantsFans in thermal power plants
Fans in thermal power plants
 
STUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSES
STUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSESSTUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSES
STUDY AND ANALYSIS OF STEAM TURBINE AND TURBINE LOSSES
 
Heat recovery from air compressors
Heat recovery from air compressorsHeat recovery from air compressors
Heat recovery from air compressors
 
Heat rate of thermal power plant
Heat rate of thermal power plantHeat rate of thermal power plant
Heat rate of thermal power plant
 
Boiler efficiency by loss Method
Boiler efficiency by loss MethodBoiler efficiency by loss Method
Boiler efficiency by loss Method
 
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam TurbineThermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
Thermal Power Plant Simulator, Cold, warm and Hot rolling of Steam Turbine
 
Combined Cycle Gas Turbine Power Plant Part 1
Combined Cycle Gas Turbine Power Plant Part 1Combined Cycle Gas Turbine Power Plant Part 1
Combined Cycle Gas Turbine Power Plant Part 1
 
STEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTINGSTEAM TURBINES Governing System & TROUBLE SHOOTING
STEAM TURBINES Governing System & TROUBLE SHOOTING
 
Energy Conservation Techniques For Industries
Energy Conservation Techniques For IndustriesEnergy Conservation Techniques For Industries
Energy Conservation Techniques For Industries
 

Similar to Energy conservation Activites of thermal power plant

Brent Goliath NCPC-SA
Brent Goliath NCPC-SABrent Goliath NCPC-SA
Brent Goliath NCPC-SA7391456
 
Waterfall Turbine Development Primer - Updated
Waterfall Turbine Development Primer - UpdatedWaterfall Turbine Development Primer - Updated
Waterfall Turbine Development Primer - UpdatedJason Rota
 
Mark Wilkinson - Company presentation
Mark Wilkinson - Company presentationMark Wilkinson - Company presentation
Mark Wilkinson - Company presentationDutch Power
 
1 sbc100192c0201 main_catalog_motor_protection_and_control
1 sbc100192c0201 main_catalog_motor_protection_and_control1 sbc100192c0201 main_catalog_motor_protection_and_control
1 sbc100192c0201 main_catalog_motor_protection_and_controlLuis Antonio González Mederos
 
Proposal Wide Blower No.1 & 2 with inverter
Proposal Wide Blower No.1 & 2  with inverterProposal Wide Blower No.1 & 2  with inverter
Proposal Wide Blower No.1 & 2 with inverterRidhoIrawan12
 
Bảng giá mitsubishi 2020
Bảng giá mitsubishi 2020Bảng giá mitsubishi 2020
Bảng giá mitsubishi 2020PhmAnhHuy
 
Weg vector-duty-motor-tenv
Weg vector-duty-motor-tenvWeg vector-duty-motor-tenv
Weg vector-duty-motor-tenvDaniel García
 
ABB Medium Voltage Indoor Fuses - ABB CEF-S High Voltage Current Limiting Fus...
ABB Medium Voltage Indoor Fuses - ABB CEF-S High Voltage Current Limiting Fus...ABB Medium Voltage Indoor Fuses - ABB CEF-S High Voltage Current Limiting Fus...
ABB Medium Voltage Indoor Fuses - ABB CEF-S High Voltage Current Limiting Fus...Thorne & Derrick International
 
Complete catalogue
Complete catalogueComplete catalogue
Complete catalogueCathy Hsu
 
APC in thermal power plant
APC in thermal power plant APC in thermal power plant
APC in thermal power plant Molla Morshad
 
RK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdf
RK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdfRK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdf
RK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdfRK Engineering
 
Elecon Wrom Gear Catalogue| Sumit Engineers
Elecon  Wrom Gear Catalogue| Sumit EngineersElecon  Wrom Gear Catalogue| Sumit Engineers
Elecon Wrom Gear Catalogue| Sumit EngineersSUMITCHUGH8
 
Rosenberg's OEM Fans for transformer cooling.
Rosenberg's OEM Fans for transformer cooling.Rosenberg's OEM Fans for transformer cooling.
Rosenberg's OEM Fans for transformer cooling.Rosenberg Canada
 
Cataloge schneider mcb c60 h
Cataloge schneider mcb c60 hCataloge schneider mcb c60 h
Cataloge schneider mcb c60 hDien Ha The
 
Cataloge schneider mcb c60 h-dienhathe.vn
Cataloge schneider mcb c60 h-dienhathe.vnCataloge schneider mcb c60 h-dienhathe.vn
Cataloge schneider mcb c60 h-dienhathe.vnDien Ha The
 

Similar to Energy conservation Activites of thermal power plant (20)

Brent Goliath NCPC-SA
Brent Goliath NCPC-SABrent Goliath NCPC-SA
Brent Goliath NCPC-SA
 
Delta ia mds-reg2000_c_en_20161124
Delta ia mds-reg2000_c_en_20161124Delta ia mds-reg2000_c_en_20161124
Delta ia mds-reg2000_c_en_20161124
 
Waterfall Turbine Development Primer - Updated
Waterfall Turbine Development Primer - UpdatedWaterfall Turbine Development Primer - Updated
Waterfall Turbine Development Primer - Updated
 
Mark Wilkinson - Company presentation
Mark Wilkinson - Company presentationMark Wilkinson - Company presentation
Mark Wilkinson - Company presentation
 
1 sbc100192c0201 main_catalog_motor_protection_and_control
1 sbc100192c0201 main_catalog_motor_protection_and_control1 sbc100192c0201 main_catalog_motor_protection_and_control
1 sbc100192c0201 main_catalog_motor_protection_and_control
 
Proposal Wide Blower No.1 & 2 with inverter
Proposal Wide Blower No.1 & 2  with inverterProposal Wide Blower No.1 & 2  with inverter
Proposal Wide Blower No.1 & 2 with inverter
 
Bảng giá mitsubishi 2020
Bảng giá mitsubishi 2020Bảng giá mitsubishi 2020
Bảng giá mitsubishi 2020
 
Saya led light
Saya led lightSaya led light
Saya led light
 
Weg vector-duty-motor-tenv
Weg vector-duty-motor-tenvWeg vector-duty-motor-tenv
Weg vector-duty-motor-tenv
 
ABB Medium Voltage Indoor Fuses - ABB CEF-S High Voltage Current Limiting Fus...
ABB Medium Voltage Indoor Fuses - ABB CEF-S High Voltage Current Limiting Fus...ABB Medium Voltage Indoor Fuses - ABB CEF-S High Voltage Current Limiting Fus...
ABB Medium Voltage Indoor Fuses - ABB CEF-S High Voltage Current Limiting Fus...
 
Complete catalogue
Complete catalogueComplete catalogue
Complete catalogue
 
APC in thermal power plant
APC in thermal power plant APC in thermal power plant
APC in thermal power plant
 
RK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdf
RK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdfRK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdf
RK Engineering AF contactors_overload relays catalog_1SXU100109C0201.pdf
 
chapter 7.pdf
chapter 7.pdfchapter 7.pdf
chapter 7.pdf
 
Elecon Wrom Gear Catalogue| Sumit Engineers
Elecon  Wrom Gear Catalogue| Sumit EngineersElecon  Wrom Gear Catalogue| Sumit Engineers
Elecon Wrom Gear Catalogue| Sumit Engineers
 
Rosenberg's OEM Fans for transformer cooling.
Rosenberg's OEM Fans for transformer cooling.Rosenberg's OEM Fans for transformer cooling.
Rosenberg's OEM Fans for transformer cooling.
 
Poster
PosterPoster
Poster
 
Cataloge schneider mcb c60 h
Cataloge schneider mcb c60 hCataloge schneider mcb c60 h
Cataloge schneider mcb c60 h
 
Cataloge schneider mcb c60 h-dienhathe.vn
Cataloge schneider mcb c60 h-dienhathe.vnCataloge schneider mcb c60 h-dienhathe.vn
Cataloge schneider mcb c60 h-dienhathe.vn
 
Thông số kĩ thuật schneider MCB C60 H
Thông số kĩ thuật schneider MCB C60 HThông số kĩ thuật schneider MCB C60 H
Thông số kĩ thuật schneider MCB C60 H
 

More from MANOJ KUMAR MAHARANA

More from MANOJ KUMAR MAHARANA (6)

eres2013_edu_102.content (1).ppt
eres2013_edu_102.content (1).ppteres2013_edu_102.content (1).ppt
eres2013_edu_102.content (1).ppt
 
CMAA.pdf
CMAA.pdfCMAA.pdf
CMAA.pdf
 
Facility
FacilityFacility
Facility
 
Excitation System & capability curve of synchronous generator
Excitation System &  capability curve of synchronous generatorExcitation System &  capability curve of synchronous generator
Excitation System & capability curve of synchronous generator
 
ISO Clause No 7 Production Realization
ISO Clause No 7 Production RealizationISO Clause No 7 Production Realization
ISO Clause No 7 Production Realization
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 

Recently uploaded

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 

Recently uploaded (20)

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 

Energy conservation Activites of thermal power plant

  • 1. PREPARD BY: MANOJ KUMAR MAHARANA Sr. Engineer Electrical [O&M] BLA Power Pvt. Ltd
  • 2.  Verification, Monitoring & Analysis of Use Of Energy including submission of Technical Report containing recommendation for improving Energy efficiency with cost benefit analysis & action plan to reduce Energy Consumption
  • 3.  Turbine-Generator (TG) Heat Rate (Kcal/kwh)  Boiler Efficiency (%)  Auxiliary Power Consumption (%)
  • 5.  Equipment Running Hours  Maximizing Machine loading factor Standardization of O&M Practices through Energy Monitoring Scheduled changeover of Equipments as per energy deviation Most energy efficient equipment run for maximum time Predictive maintenance
  • 6.  Boiler Maintenance  Arresting Steam leakages online  Duct Leakages  Duct leakages of Air and Flue gas arrested in every opportunity
  • 7.  Adoption of Energy Efficient Technology like > V. F. D installation > On-line Monitoring System.  MVAR Management  Compressor Loading & Unloading.  Service Auxiliaries such as illumination etc.  Off Peak Hour CHP running.  Switchyard Contact thermal observation to avoid losses.
  • 8.
  • 9.
  • 10. HT Motor Rated Current (Amp) Rated KW Rated RPM Actual current (Amp) Actual KW % IGV / Valve Running Hours CWP-1 40 Amp 350 742 35.74 320.0 100 24 CWP-2 40 Amp 350 742 37.32 337.0 100 24 BFP-1 156.5 Amp 1475 2986 ID FAN-1 57 Amp 520 993 47.52 442.9 34 24 PA FAN-1 61 Amp 580 1492 50.69 492.6 14.5 24 SA FAN-1 24 Amp 210 1488 18.6 167.4 45 24 CWP-3 40 Amp 350 742 BFP-2 156.5 Amp 1475 2986 130.2 1266.0 61 24 ID FAN-2 57 Amp 520 993 47.11 442.0 24 24 PA FAN-2 61 Amp 580 1492 52.55 516.6 17.7 24 SA FAN-2 24 Amp 210 1488 18.36 164.8 41 24
  • 11.
  • 12.  A 520 Kw Fan motor operating 24 hrs/day,260 Days perYr with IGV 41% Open & assuming Rs. 2.50 per KWH. Now,Cost of running full speed: 520x24x260x2.50=81,12,000 per yr. After ,VFD installation as for Operation requirement motor operates full speed(100%) for 12 hrs 80% speed for 12 hrs , with IGV 100% open Now,Cost of running withVFD controlling the motor: As per affinity Law: Power α (N)3 520x(1)3x12x260x2.50=40,56,000 per yr 520x(0.8) 3x 12x260x2.50=20,76,672 per yr Annual Saving : 81,12,000-(40,56,000+20,76,672)=19,79,328 per yr
  • 13.  Online monitoring.  Elimination of human error  Measurable outputs  Compares and identifies the efficient processes & equipment  Different type of reports like daily, monthly, quarterly or yearly can be generated .  Report generation and archiving is possible.
  • 14. Date Time (Hours) Total Generation MWH Plant Auxilary Consumption Aux. Consumption Constrction Power MWH Actual Import MWH Actual Export MWH Max. Demand MW Plant Utilization Factor % (PUF) Rev. BLA Rev. SLDCNET CONSUMP. [GEN+IMPORT]- EXPO % [SAT+UAT] MWH 01-Aug-12 00 hr-24 hr 187.9102 45.8375 24.39 45.2517 0.5513 23.5986 165.6713 45.26 17.40 R-1 R-1 02-Aug-12 00 hr-24 hr 0.0000 23.7488 N.A. 23.6113 0.5941 23.7488 0.0000 0 0.00 R-0 R-0 03-Aug-12 00 hr-24 hr 0.0000 21.6696 N.A. 21.4206 0.5188 21.6696 0.0000 0 0.00 R-0 R-0 04-Aug-12 00 hr-24 hr 0.0000 21.4956 N.A. 21.3391 0.5363 21.4956 0.0000 0 0.00 R-0 R-0 05-Aug-12 00 hr-24 hr 0.0000 14.2380 N.A. 14.0888 0.5730 14.2380 0.0000 0 0.00 R-0 R-0 06-Aug-12 00 hr-24 hr 0.0000 15.1342 N.A. 14.9954 0.5521 15.1342 0.0000 0.0000 0.00 R-0 R-0 07-Aug-12 00 hr-24 hr 0.0000 32.9980 N.A. 32.3800 0.5507 32.9980 0.0000 0.0000 0.00 R-0 R-0 08-Aug-12 00 hr-24 hr 842.4411 129.4173 15.36 120.8759 0.9089 11.2774 724.3012 45.2900 78.00 09-Aug-12 00 hr-24 hr 1053.6027 128.0791 12.16 126.6573 0.6385 0.0000 925.5236 45.3000 97.56 R-0 R-0 10-Aug-12 00 hr-24 hr 1048.5206 131.1004 12.50 126.6944 0.5255 0.0000 917.4202 45.3000 97.09 R-1 R-0 11-Aug-12 00 hr-24 hr 681.4661 118.9805 17.46 114.9359 0.5133 0.0000 562.4856 44.3062 63.10 R-0 R-0* 12-Aug-12 00 hr-24 hr 653.8169 116.5612 17.83 114.2477 0.6135 0.0000 537.2557 44.4200 60.54 R-0 R-0* 13-Aug-12 00 hr-24 hr 781.7993 117.7024 15.06 115.4830 0.3110 0.0000 664.0969 38.2202 72.39 R-2 R-2 14-Aug-12 00 hr-24 hr 615.2586 115.3600 18.75 113.0708 0.3113 16.1626 516.0612 40.5771 56.97 R-5 R-3 15-Aug-12 00 hr-24 hr 1007.4397 124.1597 12.32 121.4729 0.2356 0.0000 883.2800 45.3260 93.28 R-0 R-0 16-Aug-12 00 hr-24 hr 1029.1149 126.9881 12.34 121.9607 0.2285 0.0000 902.1268 45.2500 95.29 R-1 R-1 17-Aug-12 00 hr-24 hr 1053.6539 132.9391 12.62 124.5252 0.1753 0.0000 920.7148 45.3109 97.56 R-0 R-0 18-Aug-12 00 hr-24 hr 1045.7193 129.3059 12.37 125.5823 0.2040 0.0000 916.4134 45.3083 96.83 R-1 R-0 19-Aug-12 00 hr-24 hr 1010.5977 129.7518 12.84 124.9794 0.3614 0.0000 880.8459 45.3537 93.57 R-1 R-0 20-Aug-12 00 hr-24 hr 789.4197 124.4742 15.77 118.8999 0.3071 7.8875 672.8330 45.2680 73.09 R-5 R-5 21-Aug-12 00 hr-24 hr 900.6403 123.6932 13.73 122.4100 0.1602 0.0000 776.9471 45.2630 83.39 R-3 R-3 22-Aug-12 00 hr-24 hr 977.1813 131.1305 13.42 126.2523 0.3858 0.0000 846.0508 45.3839 90.48 R-2 R-2 23-Aug-12 00 hr-24 hr 962.7620 126.6416 13.15 125.4549 0.3496 0.0000 836.1204 45.3159 89.14 24-Aug-12 00 hr-24 hr 1033.4637 135.8749 13.15 126.5416 0.3434 0.0000 897.5888 45.8472 95.69 R-0 R-0 25-Aug-12 00 hr-24 hr 797.6023 119.5955 14.99 115.3832 0.2501 16.4098 694.4166 45.2800 73.85 R-2 R-0 26-Aug-12 00 hr-24 hr 1078.7355 135.5828 12.57 129.2128 0.3438 0.0000 943.1527 45.2700 99.88 R-0 R-0 27-Aug-12 00 hr-24 hr 1078.9963 130.5336 12.10 128.8854 0.3392 0.0000 948.4627 45.2907 99.91 R-0 R-0 28-Aug-12 00 hr-24 hr 1080.3202 132.5365 12.27 128.9368 0.3303 0.0000 947.7837 45.3461 100.03 R-0 R-0 29-Aug-12 00 hr-24 hr 1084.6341 135.2539 12.47 128.2091 0.5166 0.0000 949.3805 45.3537 100.43 R-0 R-0 30-Aug-12 00 hr-24 hr 1066.1845 134.8903 12.65 127.9227 0.4280 0.0000 931.2942 45.2835 98.72 R-0 R-0 31-Aug-12 00 hr-24 hr 1084.0267 135.7393 12.52 128.5743 0.4198 0.0000 948.2874 45.3310 100.37 R-0 R-0
  • 15. TR-1 I/C TR-3 I/C TR-5 I/C Date KW KVA KVAR VOLT AMP KW KVA KVAR VOLT AMP KW KVA KVAR VOLT AMP 12 Nov 197 217.1 92.96 424 293 313.6 374 201.8 438 419 336.1 456 341 435 709.2 13 Nov 198.2 219.2 93.42 424 297 296.5 354.7 196.3 438.2 466.9 283.8 436.1 326.8 438.1 574 TR-2 I/C TR-4 I/C TR-6 I/C Date KW KVA KVAR VOLT AMP KW KVA KVAR VOLT AMP KW KVA KVAR VOLT AMP 12 Nov 142.4 166.2 85.37 425 225 220.6 274.7 163.2 440 359 410.4 494.5 267.3 420.3 630.3 13 Nov 141.6 165.3 84.97 424 224.4 217.6 271.8 162.2 440 357 364.1 486.1 264.4 420 560 2 MVA TR-1 = appox. 10.85 to 12 % Loading 2 MVA TR-2 = appox. 08.31 to 10 % Loading 2 MVA TR-3 = appox. 17.77 to 20 % Loading At Full Load 45 MW Generation 2 MVA TR-4 = appox. 13.55 to 15 % Loading 2 MVA TR-5 = appox. 21.85 to 25 % Loading 2 MVA TR-6 = appox. 24.31 to 27 % Loading
  • 16.  Compressed air is very energy intensive. Only 5% of electrical energy is converted to useful energy. Use of compressed air for cleaning is rarely justified.  Ensure low temperature of inlet air. Increase in inlet air temperature by 3°C increases power consumption by 1%.  It should be examined whether air at lower pressure can be used in the process. Reduction in discharge pressure by 10% saves energy consumption upto 5%.  A leakage from a ½” diameter hole from a compressed air line working at a pressure of 6.5kg/cm2 can drain almost Rs. 2500 per day.
  • 17.  Quality of power supply judged from two factors i.e. voltage and frequency. a. All generators having defined capability to generate reactive /active power. If export of reactive power increases correspondingly reduces active power. b. Transmission line generates the reactive power according to voltage level. Higher the voltage level will be the generation of reactive power. 132 KV Lines - 0.05 MVAR/KM  MVAR balancing minimizes I2R Losses and increases capacity utilizations of transformers/lines.  BLA Power, Line Voltage Fluctuates frequently from 125.4 KV to 132KV to 140 KV So MVAR should maintain 25 MVAR to 20 MVAR to -8 MVAR accordingly.
  • 18.  Lighting conservation done mainly in two Parts: a. Operational Area b. Office / Service Area & street Lighting • Use of CFL lamp in place of GLS lamp can save energy upto 70%. • Clean the lamps and fixtures regularly. Illumination levels fall by 20-30% due to collection of dust. • Use of sodium vapour lamps for area lighting in place of mercury vapour lamps saves electricity upto 40%.
  • 27. Energy Saving Light Load Area Quantity watt Consu KW / Hr Running hr Daily Consum. In KWH Daily KWH Monthly KWH Yearly KWH TG floor 15 mtr Before 12 250 3 12 36.0 27.0 810 9720 After 3 250 0.75 12 9.0 AC package Before 12 36 0.432 24 10.4 8.6 258 3096 After 2 36 0.072 24 1.7 6.6 KV Before 114 36 4.104 24 98.5 43.2 1296 15552 After 64 36 2.304 24 55.3 0 mtr TG floor Before 6 250 1.5 12 18.0 9.0 270 3240 After 3 250 0.75 12 9.0 PMCC-3 Before 64 36 2.304 12 27.6 14.7 441 5292 After 30 36 1.08 12 13.0 Compressor house Before 14 250 3.5 12 42.0 33.0 990 11880 After 3 250 0.75 12 9.0 wtp mcc & Hall Before 40 250 10 12 120.0 75.0 2250 27000 After 15 250 3.75 12 45.0 cable celler room Before 114 36 4.104 12 49.2 40.6 1218 14616 After 20 36 0.72 12 8.6 DG room Before 12 250 3 12 36.0 27.0 810 9720 After 3 250 0.75 12 9.0 DM plant MCC Before 36 36 1.296 12 15.6 6.9 207 2484 After 20 36 0.72 12 8.6 cooling Tower Before 8 250 2 12 24.0 24.0 720 8640 After 0 250 0 12 0.0 Swith Yard Before 24 400 9.6 12 115.2 115.2 3456 41472 After 0 400 0 12 0.0 Net Saving per Day/Month/Yr In KWH 424.2 12726 152712
  • 28. DATE A-Shift B-Shift C-Shift Total Running Hrs 15-Nov-12 2:40 2:10 3:10 8 16-Nov-12 0:30 4:15 2:20 7:30 17-Nov-12 2:20 3:30 2:15 8:05 18-Nov-12 2:37 3:15 3:00 8:52 19-Nov-12 0:50 3:00 2:50 6:40 20-Nov-12 2:40 2:50 2:05 7:35 21-Nov-12 1:25 4:50 2:35 8:50 Peak Hours – 18:00 Hrs to 22:00 Hrs
  • 29.  LT consumption metering & monitoring  Capacitor Bank Implementation.  ESP Efficiency & monitoring. Target ≥ 10.5% Aux. Consumption