 Definition
 Factors
 Importance
 Terminology
 Examples
 The process of determining rate of any work in
Civil Engineering project like earthwork,
concrete work, brickwork, plastering, painting
etc. is known as Analysis of Rates or simply Rate
Analysis.
 The rates of these works further help in
determining cost of particular work and in turn
cost of the project.
 The rate of any process or work depends on
various factors.
The various factors that are involved in determining
rate of any process or work are mentioned below :
 Specifications of works and material about their
quality, proportion and constructional operation
method.
 Quantity of materials and their costs.
 Cost of labour and their wages.
 Location of site of work and the distances from
source and conveyance charges.
 Overhead and establishment charges
 Profit
 To determine the actual cost per unit of the
items.
 To work out the economical use of materials and
processes in completing the particulars item.
 To calculate the cost of extra items which are
not provided in the contract bond, but are to be
executed as per the directions of the
department.
 To revise the schedule of rates due to increase in
the cost of material and labour or due to change
in technique.
 Labour : May be classified into three types.
 Skilled Ist class
 Skilled IInd class
 Unskilled
Labour charges can be obtained from Schedule of Rates. 30% of
the skilled labour in data should be taken as Ist class and
remaining 70% as IInd class.
 Lead Statement :The distance between the source of
availability of material and construction site is known as
Lead and is calculated in km.The conveyance cost of
material depends on lead
 The lead statement will give the total cost of materials per unit
item including first cost, conveyance loading-unloading,
stacking charges etc.
S.No. Materials Cost at
Source
Per Lead in Km Conveyance
charges per
Km
1 Rough Stone 260.00 cum 18 5.00/cum
2 Sand 12.00 cum 25 4.00/cum
3 Cement 2100.00 tonn Local -
S.No. Mtls. Cost at
Source
Per Lead
in
Km
Conveyance
charges Rs.
Total
Conveyance
charges Rs.
Total Cost
Rs.
1 Rough
Stone
260.00 cum 18 5.00/cum 5×18= 90.00 260+90=
350.00
2 Sand 12.00 cum 25 4.00/cum 4×25= 100.00 100+12=
112.00
3 Cement 2100.00 tonn Local - - 2100/
tonn
Analysis of Rates from Lead Statement
 Lead : During the earthwork, the average horizontal
distance between center of excavation to the center
of deposition is known as Lead.
 Lead is normally calculated in multiple of 50m
 Lift : Similarly during the earthwork, the average
height through which soil has to be lifted from source
to the place of spreading(also known as heaping) is
known as Lift.
 The first Lift is taken upto 2m.
 The extra lift is counted for upto 1m after the first lift and
so on.
Let us say we need to calculate number of lifts
when soil is to be lifted 3.5m from the source.
 Upto 2m : 1 Lift
 1m : 1 Lift
 0.5m : 1 Lift
Total number of Lifts are 3 in this case.
For practicing how to carry out Rate Analysis ,
please refer the following books :
 Estimating and Costing by B.N. Datta, UBSPD,
New Delhi
 Estimating and Costing by G.S. Birdie, Dhanpat
Rai Publication New Delhi
 Estimating and Costing byV.N. Chakravorty,
Calcutta
 Civil Engg. Contracts & Estimates by B.S. Patil,
Orient-Longman Ltd., New Delhi
THANK YOU

More Related Content

What's hot

Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and materialALI HYDER GADHI
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of RatesRaj Shah
 
45010341 planning-estimate
45010341 planning-estimate45010341 planning-estimate
45010341 planning-estimateimaduddin91
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing Vijay325
 
Estimating part 2
Estimating part 2Estimating part 2
Estimating part 2ArunRavi43
 
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...Manoranjan Roy
 
Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line methodmalang1214
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveyingAwanish Shukla
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concreteBala murali
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site MeetingSanjay Patnaik
 
Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimationDhavalMithaiwala
 
How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?Duc Tran Xuan
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity SurveyingLIJI A
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - BriefKai Yun Pang
 
Labour Contract Work Rates – Miscellaneous Works (Residential & Commercial P...
Labour Contract Work Rates – Miscellaneous  Works (Residential & Commercial P...Labour Contract Work Rates – Miscellaneous  Works (Residential & Commercial P...
Labour Contract Work Rates – Miscellaneous Works (Residential & Commercial P...SSudhaVelan
 

What's hot (20)

Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
 
45010341 planning-estimate
45010341 planning-estimate45010341 planning-estimate
45010341 planning-estimate
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
 
Estimating part 2
Estimating part 2Estimating part 2
Estimating part 2
 
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...BUILDING ESTIMATION (Details Estimate For G+2  Storied Building presentation ...
BUILDING ESTIMATION (Details Estimate For G+2 Storied Building presentation ...
 
Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line method
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concrete
 
UNIT 2.pptx
UNIT 2.pptxUNIT 2.pptx
UNIT 2.pptx
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site Meeting
 
Introduction to estimation
Introduction to estimationIntroduction to estimation
Introduction to estimation
 
How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?
 
Estimating and Costing
Estimating and CostingEstimating and Costing
Estimating and Costing
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity Surveying
 
ECA Workshop - Brief
ECA Workshop - BriefECA Workshop - Brief
ECA Workshop - Brief
 
Elemental Cost Analysis
Elemental Cost AnalysisElemental Cost Analysis
Elemental Cost Analysis
 
Labour Contract Work Rates – Miscellaneous Works (Residential & Commercial P...
Labour Contract Work Rates – Miscellaneous  Works (Residential & Commercial P...Labour Contract Work Rates – Miscellaneous  Works (Residential & Commercial P...
Labour Contract Work Rates – Miscellaneous Works (Residential & Commercial P...
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 

Similar to Analysis of rates

Notes on Estimation.ppt
Notes on Estimation.pptNotes on Estimation.ppt
Notes on Estimation.pptashoklalwani6
 
Estimation (power Point).ppt
Estimation (power Point).pptEstimation (power Point).ppt
Estimation (power Point).pptNaumanIjaz12
 
Estimating & costing of civil engineering structures
Estimating & costing of civil engineering structuresEstimating & costing of civil engineering structures
Estimating & costing of civil engineering structuresAyan Sengupta
 
Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Padmasinh Patil
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial buildinglckr117
 
Construction Estimating.pdf
Construction Estimating.pdfConstruction Estimating.pdf
Construction Estimating.pdfSoniaGandhi26
 
Introduction to Quantity Surveying .pptx
Introduction to Quantity Surveying .pptxIntroduction to Quantity Surveying .pptx
Introduction to Quantity Surveying .pptxNSHYAMANANDASINGH
 
Basics of estimation
Basics of estimation Basics of estimation
Basics of estimation ddscte
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.pptSOUMITRAMUDI
 
Estimation and costing book
Estimation and costing bookEstimation and costing book
Estimation and costing bookSubash Pathak
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveyingsooricivil
 
Estimating and costing I Chapter 2.pptx
Estimating and costing I Chapter 2.pptxEstimating and costing I Chapter 2.pptx
Estimating and costing I Chapter 2.pptxcricketreview
 
Quantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptQuantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptTauheedKhan45
 
Ce1402 estimationandquantitysurveying (1)
Ce1402 estimationandquantitysurveying (1)Ce1402 estimationandquantitysurveying (1)
Ce1402 estimationandquantitysurveying (1)hlksd
 

Similar to Analysis of rates (20)

Rate analysis vansheika
Rate analysis   vansheikaRate analysis   vansheika
Rate analysis vansheika
 
Notes on Estimation.ppt
Notes on Estimation.pptNotes on Estimation.ppt
Notes on Estimation.ppt
 
Estimation (power Point).ppt
Estimation (power Point).pptEstimation (power Point).ppt
Estimation (power Point).ppt
 
Estimating & costing of civil engineering structures
Estimating & costing of civil engineering structuresEstimating & costing of civil engineering structures
Estimating & costing of civil engineering structures
 
Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial building
 
Construction Estimating.pdf
Construction Estimating.pdfConstruction Estimating.pdf
Construction Estimating.pdf
 
Ecv
EcvEcv
Ecv
 
Introduction to Quantity Surveying .pptx
Introduction to Quantity Surveying .pptxIntroduction to Quantity Surveying .pptx
Introduction to Quantity Surveying .pptx
 
Basics of estimation
Basics of estimation Basics of estimation
Basics of estimation
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
 
Estimation_and_Costing.ppt
Estimation_and_Costing.pptEstimation_and_Costing.ppt
Estimation_and_Costing.ppt
 
Estimation and costing book
Estimation and costing bookEstimation and costing book
Estimation and costing book
 
estimation and quantity surveying
estimation and quantity surveyingestimation and quantity surveying
estimation and quantity surveying
 
Rate Analysis.pptx
Rate Analysis.pptxRate Analysis.pptx
Rate Analysis.pptx
 
Estimating and costing I Chapter 2.pptx
Estimating and costing I Chapter 2.pptxEstimating and costing I Chapter 2.pptx
Estimating and costing I Chapter 2.pptx
 
ECV All Chapters
ECV All ChaptersECV All Chapters
ECV All Chapters
 
Quantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptQuantity Surveying & valuation.ppt
Quantity Surveying & valuation.ppt
 
Lec05.pptx
Lec05.pptxLec05.pptx
Lec05.pptx
 
Ce1402 estimationandquantitysurveying (1)
Ce1402 estimationandquantitysurveying (1)Ce1402 estimationandquantitysurveying (1)
Ce1402 estimationandquantitysurveying (1)
 

Recently uploaded

Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 

Analysis of rates

  • 1.
  • 2.  Definition  Factors  Importance  Terminology  Examples
  • 3.  The process of determining rate of any work in Civil Engineering project like earthwork, concrete work, brickwork, plastering, painting etc. is known as Analysis of Rates or simply Rate Analysis.  The rates of these works further help in determining cost of particular work and in turn cost of the project.  The rate of any process or work depends on various factors.
  • 4. The various factors that are involved in determining rate of any process or work are mentioned below :  Specifications of works and material about their quality, proportion and constructional operation method.  Quantity of materials and their costs.  Cost of labour and their wages.  Location of site of work and the distances from source and conveyance charges.  Overhead and establishment charges  Profit
  • 5.  To determine the actual cost per unit of the items.  To work out the economical use of materials and processes in completing the particulars item.  To calculate the cost of extra items which are not provided in the contract bond, but are to be executed as per the directions of the department.  To revise the schedule of rates due to increase in the cost of material and labour or due to change in technique.
  • 6.  Labour : May be classified into three types.  Skilled Ist class  Skilled IInd class  Unskilled Labour charges can be obtained from Schedule of Rates. 30% of the skilled labour in data should be taken as Ist class and remaining 70% as IInd class.  Lead Statement :The distance between the source of availability of material and construction site is known as Lead and is calculated in km.The conveyance cost of material depends on lead  The lead statement will give the total cost of materials per unit item including first cost, conveyance loading-unloading, stacking charges etc.
  • 7. S.No. Materials Cost at Source Per Lead in Km Conveyance charges per Km 1 Rough Stone 260.00 cum 18 5.00/cum 2 Sand 12.00 cum 25 4.00/cum 3 Cement 2100.00 tonn Local - S.No. Mtls. Cost at Source Per Lead in Km Conveyance charges Rs. Total Conveyance charges Rs. Total Cost Rs. 1 Rough Stone 260.00 cum 18 5.00/cum 5×18= 90.00 260+90= 350.00 2 Sand 12.00 cum 25 4.00/cum 4×25= 100.00 100+12= 112.00 3 Cement 2100.00 tonn Local - - 2100/ tonn Analysis of Rates from Lead Statement
  • 8.  Lead : During the earthwork, the average horizontal distance between center of excavation to the center of deposition is known as Lead.  Lead is normally calculated in multiple of 50m  Lift : Similarly during the earthwork, the average height through which soil has to be lifted from source to the place of spreading(also known as heaping) is known as Lift.  The first Lift is taken upto 2m.  The extra lift is counted for upto 1m after the first lift and so on.
  • 9. Let us say we need to calculate number of lifts when soil is to be lifted 3.5m from the source.  Upto 2m : 1 Lift  1m : 1 Lift  0.5m : 1 Lift Total number of Lifts are 3 in this case.
  • 10. For practicing how to carry out Rate Analysis , please refer the following books :  Estimating and Costing by B.N. Datta, UBSPD, New Delhi  Estimating and Costing by G.S. Birdie, Dhanpat Rai Publication New Delhi  Estimating and Costing byV.N. Chakravorty, Calcutta  Civil Engg. Contracts & Estimates by B.S. Patil, Orient-Longman Ltd., New Delhi