1. `
PERSONAL
DETAILS
Name Sayed Bessat Eid El kady
Date of Birth
(D/M/Y(
8/12/1976
Nationality Egyptian
Qualifications BSC. Of Communication & Electronics May 2001
Department Communication & Electronics
Degree of
graduation
Good
Project subject Communication Network LAN
Project Degree Excellent
Military State Finished
Marital Status Married
Home Address
3Read St EL Gmhorai st Atfyh MOBILE : +2 01229440289
City
Giza 01114030460
Country Egypt
E-mail
SKYPE
sayed_besat@yahoo.com
:SAYED_BESAT
TRAINING
Training
POWER
PLANT
COURSE
IN ELKURIMAT POWER STATION :-
-TRAINING COURSE ABOUT BASIC AND SITE SPECIEFIC LESSONS ABOUT
OPERATION AND MAINTENANCE OF POWER STATION
IN ELKURIMAT POWER STATION TRAINING CENTR
-PLC SEIMENCE STEP 7 -300 SEMATIC –ALLAN BRADDLY CONROLOGIC
5000 COURSE BY ELSWEEDY COMPONY
-Course in Safety OSHA IN elkurimat training center
- Course in PRIMAVERA project management
Fluent Well Fair
First language
Others
Arabic √
English √
French √
SAYED BESSAT
2. 1/11/2016
Till Now
1/8/2015
To
1/11/2016
Beni Suef CCPP 4800MW I&C Commissioning Engineer
Complet I&C Commissioning for
BOP I/O Remote Modules (ET
200(
W/S Interface panels (ET200) 00CPC71
W/S Interface panels (ET200)
W/S Interface panels (ET200)
W/S Interface panels (ET200)
BOP I/O Remote Modules (ET 200)
BOP I/O Remote Modules (ET 200)
Work in GT INSTRUMENTS AND CHECK ALL SIGNAL FOR
THE 1-ST FIRE ON UNIT GT 42/41
-PREPARE GT 32/31 FOR 1-ST FIRE
UPPER EGYPT ELECTRICITY PRODUCTION Power Plant
COMPANY 2x750MW Gas FIRED
El-KURIMAT III Power Plant combined cycle
INSTRUMENT LEAD MAINTENANCE ENGINEER
For SIEMENS Gas turbine V94.3A:
I have good experience in Siemens Gas Turbine V94.3A in the
following systems:-
- PREPARE TO UPDATE THE CONTROL SYSTEM TO SPPA-T3000
• Fuel gas commissioning and start up.
• Fuel oil commissioning and start up.
• Major and minor inspection for the gas turbine.
• Hot gas path inspection.
• Automation control system (TELEPERM XP AS620) for modification,
simulation and buck up.
• Gas turbine tuning and optimization.
• Troubleshooting of the control system problems.
• Calibration of the field devices “transmitters, switches, gages ……
etc.”
• Fault analysis using the OM 650 display facilities.
• Tools for system analysis, administration, event managing of OM650.
• Analysis hardware and software errors.
• Dealing with the input/output cards, installation, Programming and
faults recovery.
• PLC programming and troubleshooting.
• Temperature sensors “RTD and thermocouple” faults recovery.
• gas detection system, fire alarm system and fire fighting system
SAYED BESSAT
3. 1/4/2015
To 1/8/2015
NOV 2013
To
NOV 2014
• Perform the routine maintenance of the system Components.
• air compressor as Atlascopco and BOOGy
• HYDAC skid (hydraulic skid used for diverter damper system).
Position : I&C Testing &Commissioning Engineer
Company: ARABIAN BEMCO at Riyadh
Project : PP10 Power Planet Simple cycle, 40th Gas
Turbine GE Frame 7EA( A1, A2, B1, B2 and C1) BLOCKS
Project: PP12 Combine Cycle Power Planet 8th gas turbine GE frame
7FA05
RESPONSIBILITIES:
- Check for all I&C equipment, devices, wiring and panels for
turbines
- Follow the Calibration and loop check for all field instruments
- Wiring cold loop and hot loop checks for (TCP)
- All testes for mark vie control system (logic test, signal test,)
- Check for all I&C equipment for BOP. (WTP, ACP, etc...)
- Testing for all valves ( control, motorize, pneumatic and
hydraulic valves)
- Testing of turbine supervisory instrument (BENTLY 3500)
- GT control system modification for combined cycle
- Following and review all testing &commissioning procedures as
per contract and drawing
6*2*2*1 combined cycles (total power 4000 MW)
LOCATION: SAUDI ARABIA QIPP POWER PLANT
Company : Samsung C&T Engineering & Construction Group.
Project : Qurayyh Independent Power Project (4000 MW combined
cycle)
From : 18/11/2013
I have good experience in Commissioning, Calibration, Test, Installation,
and Maintenance for different field instrumentation.
Plant Description
:
1-Twelve (12) Siemens SGT6-PAC 5000F Gas Turbine Generating Units
)GTGs 229 MW(
2-Twelve (12) Heat Recovery Steam Generators (HRSGs(
3-Six (6) Siemens SST6-4000 Steam Turbine Generators (STGs 226 MW(
4-SPPA T-3000 control system
SAYED BESSAT
4. From
MARCH 2011
Till Nov 2013
Check for all I&C equipment, devices, wiring and panels for
turbines
Follow the Calibration and loop check for all field instruments
Wiring cold loop and hot loop checks for (TCP)
INSTRUMENTION AND CONTROL SYSTEM Calibration, Testing,
Installation, and Maintenance for different field instrumentation,
analyzers.
Carry out all Commissioning activities as per SAMSUNG/SEIMENS
recommendation
Assist plant Commissioning & start up staff on daily basis to
achieve the optimum operation conditions for the plant
UPPER EGYPT ELECTRICITY PRODUCTION Power Plant
COMPANY 2x750MW Gas FIRED
IN
El-KURIMAT III Power Plant combined cycle
SR.INSTRUMENT MAINTENANCE ENGINEER
ALSTOM (ALSPA P320) Turbine Generator Control System (TGC)
V2+. System Setup and Configuration, Interfacing Between the
TGC System and the Overall DCS and Other Control Systems.
• Turbine Supervisory Instruments (TSI) Included ( Bearing
Vibration with Bently
• Valves, IP Turbine Combined Valves and LP Stop, Control
Valves).
• Nevada 3500 Module, Speed Measurements, ABS Expansion,
Differential
Bently Nevada Vibration Monitoring System Setup and
Commissioning.
• Lubrication Oil System and Jacking Oil System.
• Steam Seal System for the Steam Turbine.
• Drain System for the Steam Turbine.
• Condenser Evacuation System (Vacuum System for the Main
Condenser).
• Water Box Evacuation System (Priming Water Box).
• Circulating Water System including Chlorine Analyser.
• HP Bypass System and LP Bypass System.
SAYED BESSAT
5. • Tube Cleaning System For the Main Condenser.
• Debris Filter System For the Main Condenser.
INSTALLATION -COMMISSINING INSTRUMENTAION ENGINEER ON
INITEC ENERGIA COMPANY
In EL-Kureimat III power station combined cycle (1 x 750 MW)
Project : - EL-Kuriemat III Power Station (Nominal Combined Cycle 1 X 750 MW).
Client : - ALSTOM for 250 MW Steam Turbine a INITEC ENERGIA for Bop
&and CMI for the BOILER and GE gas turbine 2*250mw Fram 9001FA
Consultant : - PGESCO {Power Generation Engineering and Services Company}
Install the instruments and prepare the fittings
according to P&D and Hook up drawing.
EXTENSIVE KNOWLEDGE FOR DCS TECHNOLOGIES AS
ALSTOM AND GE MARK VI
PLC'S AS Siemens & Allen Bradley
LOOP CHECK & FUNCTION TEST FOR BOP OF THE POWER
PLANT SYSTEMS
TROUBLE SHOOTING HARDWARE INSTRUMENTATION
AND SOFTWARE.
CALIBRATION ALL FIELED INSTRUMENTS (PRESSURE,
FLOW, LEVEL, TRANSMETERS, SMART TRANSMITTERS
&SWITCHES).
PENUMATIC AND HYDROLIC CONTROL VALVES
MOV (ROTORK, AUMA, LIMIT TOURQUE…).
VIBRATION SYSTEMS AS (BENTLY NEVADA 3500
MONITORING SYSTEM)
Instrumentation work for MOTOR DRIVEN PUMPES AS
(KSB, ITUR , FLOWSERVE )for:-
IN THE BALANCE OF PLANT SYSTEMS:
CONDENSATE SYSTEM - HP /LP FEED WATER SYSTEM
CIRCULATING WATER SYSTEM - WASTE WATER &
CHEMICAL WASTE SYSTEM.
FIRE FIGHTING SYSTEM.
Make Trends and Historian Curves to Check the plant
parameter and performance
Help and support the operators to solve their problems
to achieve better efficiency and operation of the plant.
Follow the Plant in different phases from construction
until reliability and normal operation
Arrange lists of the spare parts needed.
SAYED BESSAT
FROM
JUNE 2009
TO
March2011
FROM
MARCH
2003
TO JAN
2008
6. INSTRUMENT CONSTRUCTION ENGINEER IN KAHROMIKA
COMPONY
In EL-Kureimat III power station combined cycle (1 x 750 MW(
Install all local junction box related to field instrument
Install conduit and cable tray
Follow cable pulling and cable termination according
cable and termination list
Install the instruments and prepare the fittings
according to P&D and Hook up drawing.
Design the location of the instrument according to the
field area
Erection for instrumentation (flow transmitter, pressure
transmitter, level transmitter, temperature element,
analyzers, switches).
Install vibration probe (Bentley Nevada system) and
adjust its rang to the control system
Install and test the control valve (flow serve-fisher) and
motorized valve Auma and test its signal and feedback to
control system and also Rotork intelligent valve.
Install all instruments on the big pump condensate-
feed pump –circulating pump
Install all instruments related to Steam Turbine
Auxiliary:- lube oil and gland steam and Vacuum
system(Nash), Debris filter and tube cleaning
system(Technos)
INSTRUMENT MAINTENANCE ENGINEER IN El-KURIMAT II Power
Plant combined cycle Upper Egypt ELECTRICITY PRODUCTION
Company March 2003 till Jan 2008
WORKING AS INSTRUMENTION AND CONTROL
MAINTENANCE ENGINEER RESPOSABLE FOR THE
FOLLOWING:
Maintenance activities on DCS system EMERSON
OVATION including:
BOILER CONTROL SYSTEM.
Temperature control valve Drum level control and steam
pressure control- by pass pressure control
SERVICE AND INSTRUMENTS AIR COMPRESSORS.
CALIBRATION ALL FIELED INSTRUMENTS (PRESSUR &
FLOW&LEVEL & VACUUM TRANSMETERS& SMART
TRANSMITTERS &SWITCHES AND ALL CONTROL ROOM
INDICATORS).
SAYED BESSAT
FROM
JAN 2008
TO JUNE
2009
FROM 2003
TO –DEC
2007
7. • Maintenance Engineer
• Egyptian Armies
•
PERSONAL PROFILE
Reliable and well organized, with good experience and a
common sense approach.
Ability to organize and motivate a team or work equally
well within one.
A good sense of humour and able to communicate
comfortably with people at all levels
KEY SKILLS
Technical ability in the field and in the office.
Practical approach with commercial implication
awareness.
Adaptable, with ability to have valuable input to many
aspects of a project.
SAYED BESSAT
FROM 2001
TO –DEC
2003