4. 4
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
PQI IMPACT
3
Drawing &
technical
douments
Controlled
QC
personnel
assigned as
per Sch Q
Handling
storage &
preservatio
n
E & I work
acceptance
Mechanical
Work
Acceptance
Skipping of
ITP activity
Document
Rejections
Civil Work
Acceptance
Jun.21 0.6 2.2 2.6 0.2 1 2.3 0.6 0.2
Jul.21 1.9 0 1.9 0.5 0.9 0.6 1.1 1
Aug. 21 1.9 0 1.9 0.5 1.2 0.6 1.2 1
Sept.21 4.6 2.5 2.3 2 1.7 1.3 0 0
Oct.21 0.7 1.6 4.2 1.7 2.9 0.7
0.7
1.6
4.2
1.7
2.9
0.7
4.6 2.5
2.3
2
1.7
1.3
0 0
1.9
0
1.9
0.5
1.2
0.6
1.2 1
1.9
0
1.9
0.5
0.9
0.6
1.1 1
0.6
2.2
2.6
0.2
1
2.3
0.6
0.2
0
2
4
6
8
10
12
14
Rejection
%
PQI Element
PQI Impact Month wise
5. 5
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Quality Statistics
PQI Analysis For October 2021
PQI
Item
Description
Impact
%
Remarks
2.7 Handling, Storage &
preservation
4.2% SANCR # 500017033, INCR:6600019725.
3.3 Mechanical Work
acceptance
2.9% SALBE:4500237550/4500237877/4500239436/450024027
6/4500243409/4500244649/4500244662
3.5 E & I Work Acceptance 1.7% SALBE:4500238120/4500243460
2.3 Quality Personnel
assigned as per Sch. Q
1.6% Shortage of MCCL QC Personnel & Rotating QC Inspector
for Contractor.
2.2 Drawings & Technical
Documents Controlled
0.7% LBE:4500243751
2.6 Material Receiving
Inspection
0.7% LBE:4500244835
2.1 Skipping of ITP Activity 0.7% LBE:4500242003
6. 6
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
RCA for SANCR 500017033
Description: Preservation failure of storage and handling Material
Main Contractor ENPPI and Sub-Contractors Petrojet failure to maintain proper material preservation at Brown Field and
Green Field Laydown Area of STG Project at SHEDGUM Gas Plant.
Root Cause:
Lack of Communication and provision of required resources, in addition to supervision discrepancies in maintaining the
material with proper demarcation and implementing the requirements of preservation procedures.
Root Cause Analysis:
Meeting arranged with all parties including Project Management, Warehouse, Sub-Contractors and Site Quality Team in order
to discuss the preservation issue:
Lack of provision of required resources (Space constraint, designated manpower, Protective materials) to ensure that
warehouse can be properly laid out to accommodate all the material as per the requirements of preservation procedures.
Sufficient manpower is not provided to comply with the preservation requirements even after providing required awareness
regarding handling storage and preservation. The issues highlighted through weekly preservation walkthrough were also not
getting proper attention due to lack of resources in addition to the improper maintaining of material with suitable
demarcation (Under inspection, released for construction, quarantined material and storage as per discipline) resulted
misuse of storage area. Additional area provided for storage was also not utilized properly by providing designated areas.
Shortage of Contractors QC personnel specially the piping QC Inspector resulted lack of attention for Receiving Inspection
of valves and preservation at Contractors location in addition to Sub-Contractor negligence of the preservation procedures
requirements and failed in maintaining piping and tested Valves preservation.
So, additional precautions became evident to ensure proper implantation of handling and preservation requirements and to
ensure compliance to COMPANY requirements, necessary actions were concluded as follows:
- Investigation and unveiling of root causes.
- Evaluating the current condition and identifying the gaps.
- Assignment of adequate resources, including personnel and protective materials
- Assignment of responsibility regarding proper implementation of preservation and handling requirements
7. 7
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Correction Plan
Sr. No Action Item Responsibility Actions taken
Target
Date
Remarks
1
Meeting arranged with all parties including Project
Management, Warehouse, Sub-Contractors and Site Quality
Team in order to discuss the preservation issue QA
Meeting was conducted to
identify the root cause and
agreed actions for moving
forward. Completed
2
Conducted preservation walkthrough participated by
COMPANY, QC, warehouse in charge and construction
personnel to identify issues and take suggestions and to list
items.
QC/Shahid
Butt
Conducted on 29th Sept.
21 and comments shared
with Client. Completed
3
A repeated walkthrough was conducted headed by QC
Manager on 5th of October 2021 joined by Warehouse and
Construction personnel to attend the issues identified. QC/Shahid
Butt
Issues identified are being
attended Ongoing
To be reviewed on regular
basis
4
Inspection status was updated for all major items and for
better traceability, inclusion of items descriptions on the
Inspection status board.
-
QC/Shahid
Butt
Action Completed and
concurred by Client Completed
To be maintained for all
new Material
5
Tested valves that are not preserved properly to be
identified for re-testing.
PTJ/ENPPI QCS
List of Valves with poor
preservation is shared with
PTJ. Ongoing
To be reviewed on regular
basis during walkthrough.
6
Area for Demolished material will be identified and kept
separately out side warehouse.
Warehouse I/C
All the Material removed
form warehouse Ongoing
To be maintained and
monitored as an ongoing
action.
7
All pipes and fitting with dirt inside to be cleaned by air
and end protection shall be provided and stored as per
preservation requirement.
Warehouse I/C Attended Ongoing
To be maintained and
monitored as an ongoing
action.
8
Housekeeping and removing the unwanted material
dumped in warehouse . The material shall be moved to the
designated areas.
Warehouse I/C
Completed for major part
of the warehouse. Ongoing
To be reviewed on regular
basis
9
Items requiring proper cover at open storage Area shall be
covered by requirement.
Warehouse I/C
Completed for major part
of the warehouse. Ongoing
To be reviewed on regular
basis
10
Material stored in new yard shall be segregated, with
proper sign boards and the layout shall be provided
including Area for quarantine material.
Warehouse I/C
To be maintained and
monitored as an ongoing
action. Ongoing
This activity to be
maintained throughout
the project phase
8. 8
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Corrective Action
Preservation walkthrough will be performed by preservation committee on
every Wednesday. COMPANY will be invited to participate in the
walkthrough.
Communication group (Construction/QC teams) was created to follow-up
the preservation works on spot and on daily basis through dedicated QC
Supervisors/inspectors per each discipline. All the issues identified shall be
rectified on the spot by the committee with the support of warehouse in
charge and their warehouse team
The issues requiring longer lead time for action are to be recorded and to be
closed within next walkthrough. All such items are to be communicated
within through committee communication group and implementation shall be
carried out under direct monitoring of CM/PM upon closure.
After the walkthrough the outcome to be discussed with SAPID Supervisor
explaining resolution action plan.
The open items not closed on time as agreed to be brought to the Notice of
Project Manager.
9. 9
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Corrective Action
New warehouse area shall be laid out properly to ensure proper
demarcation and the layout shall be created.
Team leader from construction is assigned to liaise with warehouse for
immediate actions on deviations and obtain concurrence from QC for action
taken.
Additional piping QC will be assigned to provide focused attention on Material
receiving inspection and to monitor preservation at warehouse and Sub-
Contractors area so that the issues can be promptly highlighted for the major
items such as piping and valves.
10. 10
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Preventive Action
Awareness training on preservation procedure shall be repeated to all
concerned.
Additional Awareness training shall be conducted for warehouse team
regarding handling and storage as per designated layout for the new arrived
material, identification of inspected and quarantine material and repacking
and preservation maintenance of the remaining material after partial
shipment for installation.
Monitor preservation of major equipment’s, valves and pipes etc. through
weekly preservation RFI’s.
Stock of preservation material to be constantly maintained in order to avoid
lapses in maintenance of preservation.
warehouse in charge in liaison with material Receiving QC shall Monitor and
report preservation status on daily basis.
Close Monitoring from CONTRACTOR and SUBCONTRACTOR QC Teams shall be
exerted to ensure that this violation will not be repeated.
11. 11
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Preservation Walkthrough Committee
Committee
Members
Discipline Contractor/Sub-
Contractor
Whattsapp. No. Remarks
Salah Gaber/
Seoudi
Mohammed
Mechanical ENPPI Preservation of Mechanical equipment's
Saqib Javed Piping/Welding ENPPI Piping, Fittings, Valves- Ware house, PTJ yard & site
Manuroop Instrumentation ENPPI Instrumentation- Warehouse and site
Mujeeb Electrical ENPPI Electrical- warehouse, Site
Juan Civil ENPPI MCCL yard, site
Mohammad
Hamdi
Coating ENPPI PTJ yard, Site
Mohammed Al-
Sultan
RTR/HVAC Warehouse, site
Abdul Aziz Warehouse in
charge
ENPPI Will participate in Walkthrough with yard helpers with all
resources to resolve the issues on the spot in ENPPI Yard
and plant area.
Mohamed Ismail All Disciplines Petrojet
Abd Elaziz Adnan All Disciplines Petrojet Will participate in Walkthrough with yard helpers with all
resources to resolve the issues on the spot in PTJ Yard and
plant area.
Rajendran
Moorthi
Civil MCCL Will participate in Walkthrough with yard helpers with all
resources to resolve the issues on the spot in MCCL Yard
and plant area.
Nidhin Mohan Structural MCCL MCCL yard, site
Said Madhshiru RTR/HVAC MCCL Warehouse, site
12. 12
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Mechanical Work Acceptance
LBE Description SALBE# 4500237550 –Contractor and Sub contractor not reviewed properly the Package as
per hold point of SATIP-A-004 Activity no 1.2
Root Cause Sub-Contractor and Contractor QC neglected to verify the packages prior to Client submission.
Corrective action Provided awareness to the QC on the requirement. Punch items list is introduced in the
packages. This issue will be included as a miner risk in the risk register to avoid recurrence in
future.
LBE Description SALBE # 4500237877- installation and assembly of 2-inch CPVC drinking water line at PCR
East area was crossed to the existing sewer PVC line not complying the 300 mm vertical
distance clearance requirement violating SAES-S-010 and SAES-S-040.
Root Cause Subcontractor executed CPVC 2inch Drinking water line as per Isometric drawings no BB 827954
Rev-0 that was not complying standard requirement.
Corrective action Engineering is in liaison with SAPMT for getting a alternate solution to address the issue, Since
the clashing with existing sewage line. Prior to site activities it is required to review the existing
drawing Contractor Engineering. The line is re-routed as per recommendation.
13. 13
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Mechanical Work Acceptance
LBE Description SALBE# 4500239436 –Contractor and Subcontractor failed to notify the company regarding
absence and failed to maintain required coverage of piping inspector at SITE as per schedule
Q.
Root Cause Shortage of Piping QC with Contractor. During the fit-up Sub-Contractor Piping QC was on work
location. After the fit-up activity released for welding and Piping QC came back to TCF for
documentations.
Corrective action Fit-up RFI# 1401504545 raised in system and accepted prior to release for welding. CV for
additional piping QC submitted for approval.
LBE Description SALBE # 4500240276- Line Number 3”-W-0105-1CGOU and 3”W-0103-ICG0U Attached with
the Equipment Air Receiver R44-D-4436-A and B nozzles are out side the OWS.As per
piping and Instrument drawing BA-826364 line to be in the center of OWS.
Root Cause Mismatch between the actual site condition and the drawings for U/G & A/G piping layout.
Corrective action Redline drawing for A/G line shall be prepared to the actual site condition. For future
construction engineering to validate the drawings for proper matching.
14. 14
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Mechanical Work Acceptance
LBE Description SALBE# 4500243409 –Welding activity with SMAW process low hydrogen electrode E-7018
without recording in welding consumable issuance report SATR-W-2010.
Root Cause Lack of Supervision for procedure Implementation
Corrective action Electrodes shall be registered for maintain the proper record prior issued to welders. Awareness
training is provided.
LBE Description SALBE # 4500244649- Contractors Welding QC was demobilized on the mentioned date
without any email or EPM notification of demobilization or vacation.
Root Cause Contractor misinterpreted the EPM remark made by SAPID hence due to human error notification
was for demobilization was not send assuming that notification is already available.
Corrective action It has been agreed that for any future demobilization advance notification shall be provided
irrespective of previous notifications as per the requirements of Schedule Q. Review QC
Requirement regularly as a part of weekly communication meeting and update client before
making any demobilization
LBE Description SALBE # 4500244662-Contractor Rotating Equipment QC went on an emergency leave.
contractor company did not provide an approved reliever till date
Root Cause As Rotating QC Inspectors mother expired he had to proceed on emergency leave even before
approval or any feedback.
Corrective action Contractor has proposed Fahad Al Helal as alternate QC for covering the role of Rotating QC.
Hence CV is provided for SAP generation for CBT and interview.
15. 15
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
E& I Work Acceptance
LBE Description SALBE # 4500238120- Contractor ENPPI have carried out RGS Conduit installation for
armored instrument cables from instrument to Junction box R44-2000-AJB-0006.SAES-J-902
para 13.1.1.2 states clearly that armored instrumentation cables shall be routed in cable
trays and the cable tray installation shall be as per SAES-J-902 para 9.8.
Root Cause Contractor follow the SAES-J-902, Section 13 Para- 13.1.
Corrective action As per SAES-J-902, Section 13 Para- 13.1 state that, the Above ground Routing Instrumentation
Secondary cables may be run on a conduit or in a cable tray as detailed below.
1- Cable between field instruments and junction box shall be routed above ground utilizing one
of the following options either SAES-J-902, Para-13.1.1.1 Conduit or SAES-J-902, Para-13.1.1.2
Tray. In addition.
2- As per SAES-J-902, Para- 13.1.1.1 Single twisted pair/triad cables (Secondary instrumentation
cables), as per Table 2, shall be installed in steel conduits from the field instruments to the field
junction boxes.
LBE Description SALBE # 4500243460- Two qualified cable splicers started to perform the cable splicing for
PC- R45-1000-PC-0001 without having Job Clearance Card – JCC from Inspection Department
which is required prior to the commencement of work.
Root Cause Lack of communication.
Corrective action The issue has been highlighted to SAPMT to make necessary arrangement to issue the JCC and
agreed the JCC will be issued after complete witness for one splice by POD & ITD as Contractor
performed the mock up on actual job instead of sample.
16. 16
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Lack of QC Manpower
Contactor has reviewed the current manpower situation with MCCL and Contractor will provide QC coverage
for Civil & Structural activities through Contractors QC by retaining QC manpower. This provision is will be
retained as a contingency Plan for inspection coverage.
For MCCL Structural welding QC CV is submitted under Main Contractor for approval. Contractor has reviewed the
existing MCCL QC staff which can cover the inspection activities with the addition of Welding QC.
CV of Rotating QC is submitted for Client for SAP issue so that candidate can complete CBT and for scheduling
interview
CV for additional Piping QC to cover additional activities and backlog of receiving inspection is submitted for
approval. The Piping inspector has the approval of Mechanical Inspector and will support QCS.
17. 17
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Drawings & Technical Documents Controlled
LBE Description SALBE:4500243751- Wrong drawing was used for redlining by E&I. Additionally updated red
line log was not available as per approved format.
Root Cause Due to lack of oversight Construction selected the J Index drawing for redlining. In the absence
of redline log for E&I readily available log shared by Construction with SAPID.
Corrective action For additional supports redline markup which is done in J drawing SAPID requested to reflect it
steel structure M Index drawing, the markup was done and signed from civil engineer and SAPMT.
Log for redline is corrected as per approved format and shared with SAPID. For clamps all the
issues are rectified and SAPID signed the RFI after modified the clamp resting and overlapping.
Drawing redlining shall be performed by site team in consultation with Engineering to avoid
lapses. Log shall be maintained to reflect real time changes.
18. 18
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Material Receiving Inspection
LBE Description SALBE:4500244835- Low Voltage Motors, 250HP at ACC Area, it was observed the following
comments: 1- Ten (10) low voltage motors were already installed without offering material
receiving inspection.
2- There is no electrical IFC Drawings for motors installation. 3- For similar motors, INCR
#6600019725 was issued on 25-Sep-21 for having incorrect service factor on the LV motor
name plate. 4- Space heater has not been energized for 19 motors while the humidity goes
above 60% as per Manufacturer Recommendation.
Root Cause Because of the service factor not matching with the 17-SAMSS-503 and data sheet contractor QC
issued INCR no: #6600019725 and awaiting vendor reply, and hold the material receiving activity.
But sub-Contractor failed to follow the company standards and installed the motors.
Corrective action Contractor awaiting vendor reply for the mismatch in service factor and then contractor will
offer the material receiving inspection. 2. Space heater is required only if the humidity exceeds
60% as per the vendor confirmation. Contractor regularly monitoring humidity and maintaining
record.
Vendor to follow the company standards and 17-SAMSS-503 for the LV motors. 2.Subcontarctor is
advised for the Energization of space heaters prior to install the motors to avoid the recurrence
of violations
19. 19
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Skipping of ITP activity
LBE Description SALBE # 4500242003- Contractor started the cable puling of DC Power Cable Conductor 120
mm2 from circuit breaker no. R44-P1-CB(A)-004 to battery bank no. R44-P1-SB-003 without
offering the inspection of material receiving for DC cable conductor which is required as per
SATIP-P-103-02.
Root Cause Supplier failed to follow the Standard requirements during manufacturing.
Corrective action Supplier has been notified for making the proper correction at their end and provide actions for
correcting the issue at site. Also the supplier is advised to follow the Standard requirements in
the future designs by identifying the risk in their QMS.
20. 20
Saudi Aramco: Company General Use
Saudi Aramco: Company General Use
Corrective actions- Summary
0
Actions Taken to
improve
Construction PQI
Preservation walkthrough committee formed to perform weekly
walkthrough, attend issues real time and report pending issues to Project
Manager
MCCL QC manpower issue is addressed by arranging coverage by
Contractors QC to avoid lapses in QC coverage.
Vendors(Siemens, EEIC & Caravan) are Notified to provide advance
notification for site activities to be performed at site through
Construction. Awareness on SATIP activities was provided to Vendor. This
action shall be applied all Vendors planned for site activity.
Ensure only CBT passed CV’s are submitted for future requirements
Warehouse area is extended with proper storage layout.
Additional Piping QC with Mechanical background is submitted for approval
Red line drawing log is updated and being maintained.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.
2. Quality Notifications
For the program level Quality notifications, there are a total of 82 Non Conformance reports, 6 worksheets, and 20 EDRs that were issued since the beginning of the project.
Meanwhile, we have only 1 open NCR which are under resolutions with no major impact on the construction activities.
In terms of the 20 EDRs that were issued, there are only 2 EDRs are still open under improvement by the respective Saudi Aramco inspection offices with manufacturers to bridge any gaps for future purchase orders. None of them is considered major.
This concludes the quality brief of FGP.