R&M and Power Costs analysis
and Reduction Strategy
 Aim -23% reduction in overall R&M and Power Costs in
the region
 How
 Reduce rate of breakdown – spares quality and correct use of
the machine
 Use of quality spares at the right price –eliminate the middleman
 Accountability – machine ownership scheme (artisan + operator)
 Moving towards Total Productive Maintenance –reduced
workshop labour from 34 to 23 and sawmill R&M from 43 to 25
@ 06/2012
 Key skills retention and training schemes –toolbox scheme
Charter Mobile
Equipment Age
Distribution
1 1
2
1
1
1
1
2
1
2
1
5
3
1
5
1
2
1
2
0
2
4
6
8
10
12
1 2 3 4 5 6 7 8 9 10+.
Telleloggers Skidder FE Loaders
Haulers MAN Tractors
Fire Tenders Roads
• 77% of 34 production
mobile equipment is 4
years old
• Maintenance cost
increases with age
Focus on
61%
33%
6%
FY12 Mobile Equip R&M Costs-
Actual
Spares Tyres Oils
• Spares
• Quality- rate of
replacement &
quality of repair
• Price
• User -reduce
need
• Tyres
• Correct spec tyre
for the operation
• State of roads
Major Costs &
Strategy
0
2
4
6
8
10
12
14
actual2010 actual 2011 actual 2012 Budget2012 budget
2013
Target
Mobile Equip R&M for
Plantation($/Ha)
Plantation($/Ha)
• Budget cost
• 4 new tractor
engines
• 1 fire tender
gearbox
• Target -25%
reduction -$13 -
$9.8/Ha
• Strategy
• Partially rebuild
engines –too old for
new engines
• Replace the old
tractors in FY14
Major Costs &
Strategy
0
1
2
3
4
5
6
7
8
9
10
actual2010 actual 2011 actual 2012Budget2012 budget
2013
Target
Mobile Equip R&M for
Harvesting($/m3)
Harvesting($/m3)
• Budget cost
• 3 new Tellelogger
engines
• 3 new hauler
engines
• 4 new Walking
Beams
• Target – 30%
reduction $9.12 -
$6.38/m3
• Strategy
• Spread engine
replacement over 2
yrs
• Cover with rebuilds
@ a cost 20% of
new
0
0.5
1
1.5
2
2.5
3
actual2010 actual 2011 actual 2012Budget2012 budget
2013
Target
Mobile Equip R&M for
Sawmill($/m3)
Sawmill($/m3)
• Budget
• 1 new FE Loader
engine
• Focus on
strategies to
eliminate FE
double handling at
the deck to save
on fuel
consumption
0
5
10
15
20
25
actual2010 actual 2011 actual 2012 Budget2012 budget 2013 Target
Sawmill R&M ($/m3)
Sawmill R&M ($/m3)
Sawmill R & M costs Reduction
Strategy
 Aim -30% reduction in R&M cost from $10.51 to $8.4/m3
 Labour utilisation – moving towards TPM….50% reduction in units
 Integration of first-line maintenance personnel into production teams
 Reliability cost -rate of breakdown
 Spares quality –at least 60% reduction in premature bearing collapse when we fitted SKF
bearing in the plant
 Adhere to the planned maintenance schedule
 Equipment ZESA grid instability protection – reduce the rate of electric motor
rewinding
 Quality of repairs work to reduce rework -retain and train key skills –PLC;
SCADA; High Voltage Switchgear Services
 Spares cost
 Buy quality from the manufacturer –eliminate the middleman
 Transport cost –Lathe & Milling Machine on site will reduce the cost machined spares
sourcing by at least 2 Mutare-Chimanimani-trips cost
0
2
4
6
8
10
12
14
actual2010 actual 2011 actual 2012 Budget2012 budget 2013 Target
Power($/m3)
Power($/m3)
Power Costs Reduction Strategy
 Aim – 27% reduction in power cost from $8.71 to
$7.5/,3
 Spilling engine generator
 Consistently run in grid mode @ 450kW – 40% of sawmill power need @ $0.05/kWH
compared to ZESA @ $0.13/kWH & diesel generator @ $0.32/kWH
 Timely spares procurement to reduce its down time
 Power Factor monitoring-maintain it at unit
 Maximum demand management- Daily checklist in place
 Lighting cost –phase-out and replace ordinary light bulbs with equivalent
energy savers in the Region
FY12 Structure
34
Engineer
Wkshop
Supt
Autoelec
+ Asst
3 mechs
5 Svcmen
Welder Chghand
Svcman
Bike mech
Trailer
mech
3 tyre
fitters
Wkshop
Clerk
Project
Welder
Planner23 heads
Workshops FY13

More Related Content

What's hot (20)

Maintenance Management (presentation)
Maintenance Management (presentation)Maintenance Management (presentation)
Maintenance Management (presentation)
 
16 major losses tng
16 major losses tng16 major losses tng
16 major losses tng
 
Maintanance management
Maintanance managementMaintanance management
Maintanance management
 
Maintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of MaintenanceMaintenance Strategy, Types of Maintenance
Maintenance Strategy, Types of Maintenance
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
Machinery Maintenance
Machinery MaintenanceMachinery Maintenance
Machinery Maintenance
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
3..maintenance management
3..maintenance management3..maintenance management
3..maintenance management
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive Maintenance
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Basics in Maintenance
Basics in MaintenanceBasics in Maintenance
Basics in Maintenance
 
Maintenance
MaintenanceMaintenance
Maintenance
 
TPM: Planned Maintenance
TPM: Planned MaintenanceTPM: Planned Maintenance
TPM: Planned Maintenance
 
Plant maintenance basics
Plant maintenance basicsPlant maintenance basics
Plant maintenance basics
 
Planned Maintenance.
Planned Maintenance.Planned Maintenance.
Planned Maintenance.
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Tpm preview
Tpm previewTpm preview
Tpm preview
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenance
 
Maintenance
MaintenanceMaintenance
Maintenance
 

Viewers also liked

Viewers also liked (8)

Budgeting
BudgetingBudgeting
Budgeting
 
Organisation maintenance
Organisation maintenanceOrganisation maintenance
Organisation maintenance
 
Services généraux
Services générauxServices généraux
Services généraux
 
Maintenance and other operating expenses
Maintenance and other operating expensesMaintenance and other operating expenses
Maintenance and other operating expenses
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Budget
BudgetBudget
Budget
 
Building maintenance
Building maintenanceBuilding maintenance
Building maintenance
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 

Similar to R&M and Power Costs Reduction Strategies

Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultantbharat kumar
 
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
[Oil & Gas White Paper] Optimizing Pipeline Energy ConsumptionSchneider Electric
 
On the road to green machines...how oem's can improve the energy efficiency o...
On the road to green machines...how oem's can improve the energy efficiency o...On the road to green machines...how oem's can improve the energy efficiency o...
On the road to green machines...how oem's can improve the energy efficiency o...Schneider Electric
 
Energy Savings & Green Considerations in Motion Control Webinar
Energy Savings & Green Considerations in Motion Control WebinarEnergy Savings & Green Considerations in Motion Control Webinar
Energy Savings & Green Considerations in Motion Control WebinarDesign World
 
03. timken india ltd tsl sustanability expo
03. timken india ltd  tsl sustanability expo03. timken india ltd  tsl sustanability expo
03. timken india ltd tsl sustanability expoEEGRAB
 
Assistant manager in maintenance
Assistant manager in maintenanceAssistant manager in maintenance
Assistant manager in maintenanceDivyeshVasvelia
 
OEE - One Metric to Rule them All
OEE - One Metric to Rule them AllOEE - One Metric to Rule them All
OEE - One Metric to Rule them AllVibra
 
updated_resume_280815
updated_resume_280815updated_resume_280815
updated_resume_280815sunil kandwal
 
Brochure of optimization product
Brochure of optimization productBrochure of optimization product
Brochure of optimization productarun mishra
 
NYPD3 Selective Reopener Nersa public hearings - 23 June 2015
NYPD3 Selective Reopener  Nersa public hearings  - 23 June 2015NYPD3 Selective Reopener  Nersa public hearings  - 23 June 2015
NYPD3 Selective Reopener Nersa public hearings - 23 June 2015Matthew Le Cordeur
 

Similar to R&M and Power Costs Reduction Strategies (20)

Productivity Benchmarking in Spinning Mills
Productivity Benchmarking in Spinning MillsProductivity Benchmarking in Spinning Mills
Productivity Benchmarking in Spinning Mills
 
Maintenance Head
Maintenance  HeadMaintenance  Head
Maintenance Head
 
CV-PRAVEEN KUMAR
CV-PRAVEEN KUMARCV-PRAVEEN KUMAR
CV-PRAVEEN KUMAR
 
Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultant
 
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
[Oil & Gas White Paper] Optimizing Pipeline Energy Consumption
 
On the road to green machines...how oem's can improve the energy efficiency o...
On the road to green machines...how oem's can improve the energy efficiency o...On the road to green machines...how oem's can improve the energy efficiency o...
On the road to green machines...how oem's can improve the energy efficiency o...
 
Energy Savings & Green Considerations in Motion Control Webinar
Energy Savings & Green Considerations in Motion Control WebinarEnergy Savings & Green Considerations in Motion Control Webinar
Energy Savings & Green Considerations in Motion Control Webinar
 
CustomerCopy_doc_doc
CustomerCopy_doc_docCustomerCopy_doc_doc
CustomerCopy_doc_doc
 
Ashu_Rastogi
Ashu_RastogiAshu_Rastogi
Ashu_Rastogi
 
Resume-vel
Resume-velResume-vel
Resume-vel
 
MY CV
MY CVMY CV
MY CV
 
mp singh 15 12 2014
mp singh 15 12 2014mp singh 15 12 2014
mp singh 15 12 2014
 
03. timken india ltd tsl sustanability expo
03. timken india ltd  tsl sustanability expo03. timken india ltd  tsl sustanability expo
03. timken india ltd tsl sustanability expo
 
Assistant manager in maintenance
Assistant manager in maintenanceAssistant manager in maintenance
Assistant manager in maintenance
 
OEE - One Metric to Rule them All
OEE - One Metric to Rule them AllOEE - One Metric to Rule them All
OEE - One Metric to Rule them All
 
Cotopaxi Presentation - India
Cotopaxi Presentation - IndiaCotopaxi Presentation - India
Cotopaxi Presentation - India
 
updated_resume_280815
updated_resume_280815updated_resume_280815
updated_resume_280815
 
Brochure of optimization product
Brochure of optimization productBrochure of optimization product
Brochure of optimization product
 
Logi-Opt
Logi-OptLogi-Opt
Logi-Opt
 
NYPD3 Selective Reopener Nersa public hearings - 23 June 2015
NYPD3 Selective Reopener  Nersa public hearings  - 23 June 2015NYPD3 Selective Reopener  Nersa public hearings  - 23 June 2015
NYPD3 Selective Reopener Nersa public hearings - 23 June 2015
 

R&M and Power Costs Reduction Strategies

  • 1. R&M and Power Costs analysis and Reduction Strategy  Aim -23% reduction in overall R&M and Power Costs in the region  How  Reduce rate of breakdown – spares quality and correct use of the machine  Use of quality spares at the right price –eliminate the middleman  Accountability – machine ownership scheme (artisan + operator)  Moving towards Total Productive Maintenance –reduced workshop labour from 34 to 23 and sawmill R&M from 43 to 25 @ 06/2012  Key skills retention and training schemes –toolbox scheme
  • 2. Charter Mobile Equipment Age Distribution 1 1 2 1 1 1 1 2 1 2 1 5 3 1 5 1 2 1 2 0 2 4 6 8 10 12 1 2 3 4 5 6 7 8 9 10+. Telleloggers Skidder FE Loaders Haulers MAN Tractors Fire Tenders Roads • 77% of 34 production mobile equipment is 4 years old • Maintenance cost increases with age
  • 3. Focus on 61% 33% 6% FY12 Mobile Equip R&M Costs- Actual Spares Tyres Oils • Spares • Quality- rate of replacement & quality of repair • Price • User -reduce need • Tyres • Correct spec tyre for the operation • State of roads
  • 4. Major Costs & Strategy 0 2 4 6 8 10 12 14 actual2010 actual 2011 actual 2012 Budget2012 budget 2013 Target Mobile Equip R&M for Plantation($/Ha) Plantation($/Ha) • Budget cost • 4 new tractor engines • 1 fire tender gearbox • Target -25% reduction -$13 - $9.8/Ha • Strategy • Partially rebuild engines –too old for new engines • Replace the old tractors in FY14
  • 5. Major Costs & Strategy 0 1 2 3 4 5 6 7 8 9 10 actual2010 actual 2011 actual 2012Budget2012 budget 2013 Target Mobile Equip R&M for Harvesting($/m3) Harvesting($/m3) • Budget cost • 3 new Tellelogger engines • 3 new hauler engines • 4 new Walking Beams • Target – 30% reduction $9.12 - $6.38/m3 • Strategy • Spread engine replacement over 2 yrs • Cover with rebuilds @ a cost 20% of new
  • 6. 0 0.5 1 1.5 2 2.5 3 actual2010 actual 2011 actual 2012Budget2012 budget 2013 Target Mobile Equip R&M for Sawmill($/m3) Sawmill($/m3) • Budget • 1 new FE Loader engine • Focus on strategies to eliminate FE double handling at the deck to save on fuel consumption
  • 7. 0 5 10 15 20 25 actual2010 actual 2011 actual 2012 Budget2012 budget 2013 Target Sawmill R&M ($/m3) Sawmill R&M ($/m3)
  • 8. Sawmill R & M costs Reduction Strategy  Aim -30% reduction in R&M cost from $10.51 to $8.4/m3  Labour utilisation – moving towards TPM….50% reduction in units  Integration of first-line maintenance personnel into production teams  Reliability cost -rate of breakdown  Spares quality –at least 60% reduction in premature bearing collapse when we fitted SKF bearing in the plant  Adhere to the planned maintenance schedule  Equipment ZESA grid instability protection – reduce the rate of electric motor rewinding  Quality of repairs work to reduce rework -retain and train key skills –PLC; SCADA; High Voltage Switchgear Services  Spares cost  Buy quality from the manufacturer –eliminate the middleman  Transport cost –Lathe & Milling Machine on site will reduce the cost machined spares sourcing by at least 2 Mutare-Chimanimani-trips cost
  • 9. 0 2 4 6 8 10 12 14 actual2010 actual 2011 actual 2012 Budget2012 budget 2013 Target Power($/m3) Power($/m3)
  • 10. Power Costs Reduction Strategy  Aim – 27% reduction in power cost from $8.71 to $7.5/,3  Spilling engine generator  Consistently run in grid mode @ 450kW – 40% of sawmill power need @ $0.05/kWH compared to ZESA @ $0.13/kWH & diesel generator @ $0.32/kWH  Timely spares procurement to reduce its down time  Power Factor monitoring-maintain it at unit  Maximum demand management- Daily checklist in place  Lighting cost –phase-out and replace ordinary light bulbs with equivalent energy savers in the Region
  • 12. Engineer Wkshop Supt Autoelec + Asst 3 mechs 5 Svcmen Welder Chghand Svcman Bike mech Trailer mech 3 tyre fitters Wkshop Clerk Project Welder Planner23 heads Workshops FY13