Luxury Lighting Manufacturer RMA and Production Process Area Project
Project Sponsor: President/CEO
Project Leader: Steve Lind Project Team: TBD
Project Deadline: 31 December 2012
Issue Statement:
The Returned Material Authorization (RMA) process is not repeatable or timely. To fix this
process the flow of material through the Production Dept. and information flow throughout
the process will be reviewed for improvement. The Production Dept. is responsible for
converting incoming material into saleable material that is returned to inventory or is
scrapped. The items coming into the Dept. may be from conversion requests from either
Visual Comfort (VC) request or Supplier error, Customer requested modifications, rewiring for
EC or other requirements or RMA material. A solution to the RMA and Production flow process
should maximize efficiency and minimize expense.
Goals of the Project:
1. RMA response time to the Customer will be within 48 hours and include the terms for
paying for freight.
2. RMA disposition by the Production Dept. will be within 48 hours of receipt of material,
including response to the Customer and rework. A plan of action for procurement of
missing replacement parts will be included in the disposition and the final disposition
will be within 60 days.
3. A communication and corrective action tracking tool will be implemented to provide
Supplier feedback and drive corrective action.
4. All other production work orders will be completed within 72 hours of all material
availability and PDO issued.
5. Production work on hold for parts or design work required will be completed within 60
days.
6. Current quality issues that drive RMAs and production work will be identified and an
approved plan of action put in place to resolve the majority of causes.
Results:
1. RMA response time consistently executed in under 48 hours with RMA volume
increasing related to shipment volume increase.
2. Parts ordering process for repair of defective returned and stock material developed
and linked to the RMA database.
3. RMA database developed in Access and linked to CRM, WMS and ERP systems.
4. Quality feedback on internally discovered defects and Customer returned defectives
implemented.
5. Dashboard for all Production Dept. metrics developed and consistently executed.
6. Monthly meetings held with Chinese Suppliers to review all defects and drive
corrective actions.

More Related Content

What's hot

Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management Planvivian weeks
 
Design, standards and quality assurance
Design, standards and quality assuranceDesign, standards and quality assurance
Design, standards and quality assuranceonlinemetallurgy.com
 
Ch4 project management process
Ch4 project management processCh4 project management process
Ch4 project management processKittitouch Suteeca
 
12.1 Plan Procurement Management
12.1 Plan Procurement Management12.1 Plan Procurement Management
12.1 Plan Procurement ManagementDavidMcLachlan1
 
Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington
 
Risk elimination and safety committee
Risk elimination and safety committeeRisk elimination and safety committee
Risk elimination and safety committeeHpm India
 
Quality management templates
Quality management templatesQuality management templates
Quality management templatesselinasimpson371
 
12.3 Control Procurements
12.3 Control Procurements12.3 Control Procurements
12.3 Control ProcurementsDavidMcLachlan1
 
Project quality management
Project quality managementProject quality management
Project quality managementsyeda zoya mehdi
 
Department Objectives
Department ObjectivesDepartment Objectives
Department Objectivesjoe3242
 
Project management basics variations and change control
Project management basics variations and change controlProject management basics variations and change control
Project management basics variations and change controlClaire Davies
 
Quality-Management-System-Procedure
Quality-Management-System-ProcedureQuality-Management-System-Procedure
Quality-Management-System-ProcedureJ Pauli?in
 

What's hot (20)

MAY 2015 Resume
MAY 2015 ResumeMAY 2015 Resume
MAY 2015 Resume
 
Quality plan
Quality planQuality plan
Quality plan
 
Quality Management Plan
Quality Management PlanQuality Management Plan
Quality Management Plan
 
Design, standards and quality assurance
Design, standards and quality assuranceDesign, standards and quality assurance
Design, standards and quality assurance
 
Ch4 project management process
Ch4 project management processCh4 project management process
Ch4 project management process
 
Lean service2
Lean service2Lean service2
Lean service2
 
12.1 Plan Procurement Management
12.1 Plan Procurement Management12.1 Plan Procurement Management
12.1 Plan Procurement Management
 
Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington resume - July 2016
Bruce Billington resume - July 2016
 
Risk elimination and safety committee
Risk elimination and safety committeeRisk elimination and safety committee
Risk elimination and safety committee
 
Cal Tech Presentation 2015
Cal Tech Presentation 2015Cal Tech Presentation 2015
Cal Tech Presentation 2015
 
Quality management forms
Quality management formsQuality management forms
Quality management forms
 
Quality management templates
Quality management templatesQuality management templates
Quality management templates
 
PM FrameWork: Module 3
PM FrameWork: Module 3PM FrameWork: Module 3
PM FrameWork: Module 3
 
12.3 Control Procurements
12.3 Control Procurements12.3 Control Procurements
12.3 Control Procurements
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Department Objectives
Department ObjectivesDepartment Objectives
Department Objectives
 
Project scope management 2
Project scope management 2Project scope management 2
Project scope management 2
 
Project management basics variations and change control
Project management basics variations and change controlProject management basics variations and change control
Project management basics variations and change control
 
Project manegement
Project manegementProject manegement
Project manegement
 
Quality-Management-System-Procedure
Quality-Management-System-ProcedureQuality-Management-System-Procedure
Quality-Management-System-Procedure
 

Similar to Luxury Lighting Mfr RMA and Production Process Area Project

Supply Chain Liaison 5 Step Management Program
Supply Chain Liaison 5 Step Management ProgramSupply Chain Liaison 5 Step Management Program
Supply Chain Liaison 5 Step Management ProgramStephen O'Neil
 
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDFProject-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDFRubab Tanveer
 
Manufacturing quality qm
Manufacturing quality qmManufacturing quality qm
Manufacturing quality qmAshu0711
 
asme_product_development_cycle.ppt
asme_product_development_cycle.pptasme_product_development_cycle.ppt
asme_product_development_cycle.pptbibhu518
 
Process Optimisation
Process OptimisationProcess Optimisation
Process OptimisationAdam Payne
 
Capstone project IT Management 17 page due in 48 hours.docx
Capstone project IT Management 17 page due in 48 hours.docxCapstone project IT Management 17 page due in 48 hours.docx
Capstone project IT Management 17 page due in 48 hours.docxstirlingvwriters
 
Growing your business with BPM
Growing your business with BPMGrowing your business with BPM
Growing your business with BPMinnovelocity
 
Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017indi7257
 
Moneycrops project plaining and control
Moneycrops project plaining and controlMoneycrops project plaining and control
Moneycrops project plaining and controlNarendra Ghanellu
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newshyaminfo06
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newNoahliamwilliam
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) neweshwaryyyy
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newshyaminfo00
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newshyaminfo00
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdfAddisu15
 

Similar to Luxury Lighting Mfr RMA and Production Process Area Project (20)

Supply Chain Liaison 5 Step Management Program
Supply Chain Liaison 5 Step Management ProgramSupply Chain Liaison 5 Step Management Program
Supply Chain Liaison 5 Step Management Program
 
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDFProject-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
 
Corrective Action_.pptx
Corrective Action_.pptxCorrective Action_.pptx
Corrective Action_.pptx
 
Manufacturing quality qm
Manufacturing quality qmManufacturing quality qm
Manufacturing quality qm
 
asme_product_development_cycle.ppt
asme_product_development_cycle.pptasme_product_development_cycle.ppt
asme_product_development_cycle.ppt
 
build-for-speed-brochure
build-for-speed-brochurebuild-for-speed-brochure
build-for-speed-brochure
 
Six Sigma DMAIC Case Study
Six Sigma DMAIC Case StudySix Sigma DMAIC Case Study
Six Sigma DMAIC Case Study
 
Qms & iatf presentation1
Qms & iatf presentation1Qms & iatf presentation1
Qms & iatf presentation1
 
Process Optimisation
Process OptimisationProcess Optimisation
Process Optimisation
 
Capstone project IT Management 17 page due in 48 hours.docx
Capstone project IT Management 17 page due in 48 hours.docxCapstone project IT Management 17 page due in 48 hours.docx
Capstone project IT Management 17 page due in 48 hours.docx
 
Growing your business with BPM
Growing your business with BPMGrowing your business with BPM
Growing your business with BPM
 
Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017Uop ops-571-final-exam-guide-new-2017
Uop ops-571-final-exam-guide-new-2017
 
Moneycrops project plaining and control
Moneycrops project plaining and controlMoneycrops project plaining and control
Moneycrops project plaining and control
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
Uop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) newUop ops 571 final exam guide new 2017 (score 3030) new
Uop ops 571 final exam guide new 2017 (score 3030) new
 
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
250250902-141-ISACA-NACACS-Auditing-IT-Projects-Audit-Program.pdf
 
Session 4 gdas pmp study group presentation
Session 4   gdas pmp study group presentationSession 4   gdas pmp study group presentation
Session 4 gdas pmp study group presentation
 

Luxury Lighting Mfr RMA and Production Process Area Project

  • 1. Luxury Lighting Manufacturer RMA and Production Process Area Project Project Sponsor: President/CEO Project Leader: Steve Lind Project Team: TBD Project Deadline: 31 December 2012 Issue Statement: The Returned Material Authorization (RMA) process is not repeatable or timely. To fix this process the flow of material through the Production Dept. and information flow throughout the process will be reviewed for improvement. The Production Dept. is responsible for converting incoming material into saleable material that is returned to inventory or is scrapped. The items coming into the Dept. may be from conversion requests from either Visual Comfort (VC) request or Supplier error, Customer requested modifications, rewiring for EC or other requirements or RMA material. A solution to the RMA and Production flow process should maximize efficiency and minimize expense. Goals of the Project: 1. RMA response time to the Customer will be within 48 hours and include the terms for paying for freight. 2. RMA disposition by the Production Dept. will be within 48 hours of receipt of material, including response to the Customer and rework. A plan of action for procurement of missing replacement parts will be included in the disposition and the final disposition will be within 60 days. 3. A communication and corrective action tracking tool will be implemented to provide Supplier feedback and drive corrective action. 4. All other production work orders will be completed within 72 hours of all material availability and PDO issued. 5. Production work on hold for parts or design work required will be completed within 60 days. 6. Current quality issues that drive RMAs and production work will be identified and an approved plan of action put in place to resolve the majority of causes. Results: 1. RMA response time consistently executed in under 48 hours with RMA volume increasing related to shipment volume increase. 2. Parts ordering process for repair of defective returned and stock material developed and linked to the RMA database. 3. RMA database developed in Access and linked to CRM, WMS and ERP systems.
  • 2. 4. Quality feedback on internally discovered defects and Customer returned defectives implemented. 5. Dashboard for all Production Dept. metrics developed and consistently executed. 6. Monthly meetings held with Chinese Suppliers to review all defects and drive corrective actions.