Project 2010 Screen Common Views
To Display a View: Click the View tab on the
Ribbon and select a view from the Task or
Resource Views groups. Or, click a view button
in the status bar of the program window. Or,
click the Task tab or Resource tab on the
Ribbon, click the button list arrow in the View
group, and select a view.
Gantt Chart: This is the default task view.
Displays a task list with bar chart information.
Calendar: Displays tasks and durations in a
monthly calendar.
Network Diagram: Displays a sequence or
logic diagram that shows the project’s tasks and
dependencies.
Resource Sheet: Displays a list of resources
and their details in rows and columns.
Resource Usage: Displays assigned tasks
grouped under each resource.
Resource Form: Displays resource information
in a form view.
Resource Graph: Displays a graph of
resources and their costs, etc. over time.
Task Usage: Displays a list of tasks showing
assigned resources under each task.
Task Form: Displays task information in a form
view.
Task Sheet: Displays a list of tasks and their
details in rows and columns.
Team Planner: The default resource view.
Choose from more advanced and specific views.
Timeline: Displays a list of tasks with a baseline
schedule and Gantt bars.
Tracking Gantt: Displays a list of tasks with a
baseline schedule and Gantt bars.
More Views: Choose from a list of more
advanced and specific views.
Keyboard Shortcuts
Task or Resource <Shift> + <F2>
Information
Assign Resources <Alt> + <F10>
Help <F1>
View Context- <Shift> + <F1>
Sensitive Help
Go To Selected Task <Ctrl> + <Shift>
+ <F5>
Link Selected Task <Ctrl> + <F2>
Unlink Selected <Ctrl> + <Shift>
Task + <F2>
Zoom In <Ctrl>+ </>
Zoom Out <Ctrl> + < * >
The Fundamentals
• To Create a New Project: Click the File tab on the
Ribbon and select New.
• To Create a Project from a Template: Click
the File tab on the Ribbon and select New. Select a
template under the Office.com Templates section,
or click My Templates and select a template.
• To Create a New Project from an Excel
Spreadsheet or SharePoint List: Click the File tab
on the Ribbon and select New from Excel
workbook or New from SharePoint task list.
• To Save a Project File: Click the Save button on
the Quick Access Toolbar, click File tab on the
Ribbon and select Save. Or, press <Ctrl> + <S>.
• To View Information about a Project: Click the
Project tab on the Ribbon and click the Project
Information button in the Properties group.
• Set the Working Time Calendar: Click the Project
tab on the Ribbon and click the Change Working
Time button in the Properties group. Select the
date(s) you want to change and select a new
calendar, or enter the new working hours in the
From: and To: boxes.
• To Update the Project: Click the Project tab on
the Ribbon and click the Update Project button in
the Status group.
• To Set the Status Date: Click the Project tab on
the Ribbon and click the Status Date button in the
Status group. Select the status date to report
progress of the project.
• To Save a Baseline Plan: Click the Project tab on
the Ribbon and click the Set Baseline button in the
Properties group. Select the Set baseline option,
save the plan for the entire project or selected
tasks, click OK.
• To Save an Interim Plan: Click the Project tab on
the Ribbon and click the Set Baseline button in the
Properties group. Select the Set interim plan
option, save the plan for the entire project or
selected tasks, click OK.
• To Calculate Project Changes: Click the Project
tab on the Ribbon and click the Calculate Project
button in the Schedule group.
• To Open the Timescale Dialog Box: Click the
View tab on the Ribbon, click the Timescale list
arrow in the Zoom group, and select Timescale. Or,
double-click inside the timescale header.
• To Adjust the Timescale: Click the View tab on
the Ribbon and click the Timescale list arrow in the
Zoom group. Or, change the options in the
Timescale dialog box.
• To Adjust the Zoom Level: Click and drag the
Zoom Slider to zoom in or out. Or, click the View
tab on the Ribbon and click the Zoom button in the
Zoom group. Choose a zoom option from the list.
• To Jump to a Tasks: Select the task you wish to
view. Click the View tab on the Ribbon and click the
Zoom Selected Tasks button in the Zoom group.
• To View the Entire Project: Click the View tab on
the Ribbon and click the Zoom Entire Project
button in the Zoom group.
File tab
Quick Access Toolbar Minimize Ribbon
Vertical
Scroll Bar
Horizontal
Scroll Bar
Status
Bar
Gantt
chart
Gantt spreadsheet
Timeline
Pane
divider
Ribbon
View
buttons
Zoom
slider
Microsoft
®
Project 2010 Quick Reference Card
Soe Naing Win Email : snw1975@gmail.com
Plan and Manage the Project Working with Resources and Costs
• There are six basic steps to follow when planning a project: (1) Define a
project (2) Plan project activities (3) Plan for and gather resources (4) Plan
project costs (5) Plan for quality and risks (6) Plan security and
communication.
• To Add a Resource: In a resource view, click the Resource tab on the
Ribbon and click the Add Resources button in the Insert group. Select the
type of resource you want to add and enter its information.
• To Enter Resource Availability: Click the Information button in the
Properties group of the Resource tab. Enter the Available To and Available
From dates in the Resource Availability table, and enter the Maximum Units
available in the Units field.
• To Assign a Resource: Select a task. Click the Resources tab on the
Ribbon and click the Assign Resources button in the Assignments group.
Select the resource(s) and click Assign.
• To Enter Costs: In a resource view, enter cost amounts in the Std. Rate field,
the Ovt. Rate field, or the Cost/Use field. Then choose when you’d like to
begin accruing the resource cost in the Accrue At field.
• To Enter Fixed Costs: Click the View tab on the Ribbon and click the Tables
button in the Data group. Select Cost from the list. Select the task for which
you want to enter a fixed cost and type the cost in the Fixed Cost field.
View Tools
• Viewing the Timeline: By default a timeline of the entire project appears
above the selected view. To turn this on or off, click the View tab on the
Ribbon and check or uncheck the Timeline check box in the Split View group.
• Applying Groups: Click the View tab on the Ribbon and click the Group By
list arrow in the Data group. Select a group from the list.
• Applying Filters: Click the View tab on the Ribbon and click the Filter list
arrow in the Data group. Select a filter from the list.
• Applying Tables: Click the View tab on the Ribbon and click the Tables
button in the Data group. Select a table from the list.
• Sort the Information: Click the View tab on the Ribbon and click the Sort
button in the Data group. Select a sorting option from the list.
Tracking Progress
• Always save a baseline plan before updating progress.
• To Update Tasks: Select the task you want to update. Click the Task tab on
the Ribbon and click a % Complete button in the Schedule group.
• To Mark Tasks On Track: Select the tasks that you want to mark as on track.
Click the Task tab on the Ribbon and click the Mark on Track button in the
Schedule group.
• To Update Resources: In Resource Usage or Task Usage view, click the
View tab on the Ribbon and click the Tables button in the Data group. Find
the resource you want to update and update new actual work value.
• To Check Project Variance: Click the View tab on the Ribbon and click the
Tables button in the Data group. Select Variance from the list.
Balancing the Project
• To Identify an Overallocated Resource: Open Resource Usage view and
click the Format tab under Resource Usage Tools on the Ribbon. Click the
Overallocation check box in the Details group. Or, click the Resource tab on
the Ribbon and click the Next Overallocation button in the Level group.
• To Balance the Project: Click the Resource tab on the Ribbon and click the
Level All button in the Level group.
• To Balance Tasks for a Specific Resource: Select a resource. Click the
Resource tab on the Ribbon and click the Level Resource button in the Level
group.
• To Reassign Work: Open Team Planner view. Click and drag a task from an
overallocated resource to another resource.
• Project management is the
process of planning, organizing,
and managing tasks and
resources to accomplish an
objective within constraints of
time, resources, or cost.
• Adjusting one constraint of the
Project Triangle affects the
other two.
Working with Tasks
• To Enter a Task: In a task view, type the task’s name in the Task Name
column and press <Enter>. Or, click the Task tab and click the Insert Task
button in the Insert group. A new task is inserted above the selected task.
• To Enter Blank Row: Click the Task tab, click the Insert Task button list
arrow in the Insert group and select Blank Row. A blank row is inserted
above the selected task.
• To Enter Task Duration: Type the duration (m = minutes; h = hours; d =
days; w = weeks; mo = months) in the Duration column and press <Enter>.
• To Create a Milestone: Click the Task tab on the Ribbon and click the Insert
Milestone button in the Insert group. Or enter 0 (zero) in the Duration column.
• To Create a Recurring Task: Click the Task tab, click the Insert Task button
list arrow in the Insert group, and select Recurring Task. Enter information
into the Recurring Task Information dialog box and click OK.
• To Access Task Information: Select the task. Click the Task Information
tab on the Ribbon and click the Information button in the Properties group.
• To Organize the Task List: Create summary tasks and subtasks by selecting
the task(s) and clicking the Outdent Task or Indent Task button in the
Schedule group of the Task tab on the Ribbon.
• To Link Tasks: Press <Ctrl>, select the two tasks you want to link in the
order they should be linked, and click the Link Tasks button in the Schedule
group of the Task tab on the Ribbon.
• To Unlink Tasks: Press <Ctrl> and select the linked tasks in the order they
are linked. Click the Unlink Tasks button in the Schedule group of the Task
tab on the Ribbon.
• To Split a Task: Select the task, click the Split button in the Schedule group
of the Task tab, and use the dividing tool to split the task’s Gantt bar.
• To Change How Existing Tasks Are Scheduled: Click the task’s Task
Mode list arrow and select Auto Scheduled or Manually Scheduled.
• To Change How New Tasks Are Scheduled: Click the status bar and select
Auto Scheduled or Manually Scheduled.
• To Enter Lag or Lead Time: Click the successor task and click the
Information button in the Properties group. Click the Predecessors tab and
enter a lead time with a (-) minus sign or lag time with a (+) plus sign in the
Lag box.
• To Enter a Task Deadline or Constraint: Click the task to which you want to
add a deadline and click the Information button in the Properties group. Click
the Advanced tab and enter a deadline into the Deadline box, or choose the
constraint you want to use and enter the Constraint date.
• To Apply a Filter: Click the column list arrow and select the filter you want to
apply to the task list.
Project Triangle
Time – Know the
deadline for your
project.
Cost – This includes
the people and the
equipment that do
the work, and the
materials they use.
Scope – This includes the quality, functions, and
features of your product or service, and the work
required to deliver it.
Soe Naing Win Email : snw1975@gmail.com

More Related Content

What's hot

10 Fine-tuning Project Plan
10 Fine-tuning Project Plan10 Fine-tuning Project Plan
10 Fine-tuning Project PlanSoe Naing Win
 
Creating a task list
Creating a task listCreating a task list
Creating a task listahmed hamza
 
03 Setting-up resources
03  Setting-up resources  03  Setting-up resources
03 Setting-up resources Soe Naing Win
 
Microsoft Project - MSP | 2013-2016
Microsoft Project - MSP | 2013-2016Microsoft Project - MSP | 2013-2016
Microsoft Project - MSP | 2013-2016Rajeev Sharma
 
08 Fine-Tuning Resource Details
08 Fine-Tuning Resource Details08 Fine-Tuning Resource Details
08 Fine-Tuning Resource DetailsSoe Naing Win
 
MICROSOFT PROJECT
MICROSOFT PROJECTMICROSOFT PROJECT
MICROSOFT PROJECTSmit Patel
 
How to Create S-Curve by MS Project 2010
How to Create S-Curve by MS Project 2010How to Create S-Curve by MS Project 2010
How to Create S-Curve by MS Project 2010Ong-Art Sanpinit
 
sMs project tutorial_iit
sMs project tutorial_iitsMs project tutorial_iit
sMs project tutorial_iitKushal Patel
 
2010 ms project 2010 (2)
2010 ms project 2010 (2)2010 ms project 2010 (2)
2010 ms project 2010 (2)douggillis
 
Ms project management
Ms  project managementMs  project management
Ms project managementchinunki4
 
204460 create s curve reports
204460 create s curve reports204460 create s curve reports
204460 create s curve reportsp6academy
 
How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013Ong-Art Sanpinit
 
Ms project 2010 level 1&amp;2
Ms project 2010 level 1&amp;2 Ms project 2010 level 1&amp;2
Ms project 2010 level 1&amp;2 Rolf Kühnast
 
Understanding How Microsoft Project Thinks
Understanding How Microsoft Project ThinksUnderstanding How Microsoft Project Thinks
Understanding How Microsoft Project Thinksjblack34
 
Ms project 2000 tutorial
Ms project 2000 tutorialMs project 2000 tutorial
Ms project 2000 tutorialpaolocollector
 
Understanding Microsoft Project 'Calendars' ‘Working Time’, etc
Understanding Microsoft Project 'Calendars' ‘Working Time’, etcUnderstanding Microsoft Project 'Calendars' ‘Working Time’, etc
Understanding Microsoft Project 'Calendars' ‘Working Time’, etcKhalid Noor Mohammed
 

What's hot (20)

10 Fine-tuning Project Plan
10 Fine-tuning Project Plan10 Fine-tuning Project Plan
10 Fine-tuning Project Plan
 
Creating a task list
Creating a task listCreating a task list
Creating a task list
 
Project management software
Project management softwareProject management software
Project management software
 
03 Setting-up resources
03  Setting-up resources  03  Setting-up resources
03 Setting-up resources
 
Microsoft Project - MSP | 2013-2016
Microsoft Project - MSP | 2013-2016Microsoft Project - MSP | 2013-2016
Microsoft Project - MSP | 2013-2016
 
08 Fine-Tuning Resource Details
08 Fine-Tuning Resource Details08 Fine-Tuning Resource Details
08 Fine-Tuning Resource Details
 
MS Project
MS Project MS Project
MS Project
 
MICROSOFT PROJECT
MICROSOFT PROJECTMICROSOFT PROJECT
MICROSOFT PROJECT
 
Ms project lectures
Ms project lecturesMs project lectures
Ms project lectures
 
How to Create S-Curve by MS Project 2010
How to Create S-Curve by MS Project 2010How to Create S-Curve by MS Project 2010
How to Create S-Curve by MS Project 2010
 
sMs project tutorial_iit
sMs project tutorial_iitsMs project tutorial_iit
sMs project tutorial_iit
 
2010 ms project 2010 (2)
2010 ms project 2010 (2)2010 ms project 2010 (2)
2010 ms project 2010 (2)
 
Ms project management
Ms  project managementMs  project management
Ms project management
 
204460 create s curve reports
204460 create s curve reports204460 create s curve reports
204460 create s curve reports
 
Omni plan 2-manual
Omni plan 2-manualOmni plan 2-manual
Omni plan 2-manual
 
How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013
 
Ms project 2010 level 1&amp;2
Ms project 2010 level 1&amp;2 Ms project 2010 level 1&amp;2
Ms project 2010 level 1&amp;2
 
Understanding How Microsoft Project Thinks
Understanding How Microsoft Project ThinksUnderstanding How Microsoft Project Thinks
Understanding How Microsoft Project Thinks
 
Ms project 2000 tutorial
Ms project 2000 tutorialMs project 2000 tutorial
Ms project 2000 tutorial
 
Understanding Microsoft Project 'Calendars' ‘Working Time’, etc
Understanding Microsoft Project 'Calendars' ‘Working Time’, etcUnderstanding Microsoft Project 'Calendars' ‘Working Time’, etc
Understanding Microsoft Project 'Calendars' ‘Working Time’, etc
 

Viewers also liked

Viewers also liked (6)

Ch17 scheduling
Ch17 schedulingCh17 scheduling
Ch17 scheduling
 
Project Scheduling & Controls
Project Scheduling & ControlsProject Scheduling & Controls
Project Scheduling & Controls
 
00 Introduction of project scheduling
00 Introduction of project scheduling00 Introduction of project scheduling
00 Introduction of project scheduling
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 

Similar to MS Project 2010 Quick Reference Card

Project Web Access Quick Reference Guide For Team Members
Project Web Access Quick Reference Guide For Team MembersProject Web Access Quick Reference Guide For Team Members
Project Web Access Quick Reference Guide For Team MembersToney Sisk
 
Project management course lecture Notes from Yom college
Project management course lecture Notes from Yom collegeProject management course lecture Notes from Yom college
Project management course lecture Notes from Yom collegeAbebaw31
 
Project Management Quick Reference Guide For Microsoft Project 2007
Project Management Quick Reference Guide For Microsoft Project 2007Project Management Quick Reference Guide For Microsoft Project 2007
Project Management Quick Reference Guide For Microsoft Project 2007Toney Sisk
 
Project Management Quick Reference Guide for Microsoft Project 2007
Project Management Quick Reference Guide for Microsoft Project 2007Project Management Quick Reference Guide for Microsoft Project 2007
Project Management Quick Reference Guide for Microsoft Project 2007Toney Sisk
 
Creating events starttofinish
Creating events starttofinishCreating events starttofinish
Creating events starttofinishDixie Stephens
 
Devry proj 586 week 3 project guidelines microsoft project new
Devry proj 586 week 3 project guidelines microsoft project newDevry proj 586 week 3 project guidelines microsoft project new
Devry proj 586 week 3 project guidelines microsoft project newuopassignment
 
Assessment Tools
Assessment ToolsAssessment Tools
Assessment Toolsvlegsa
 
The VLE @ GSA - assessment tools
The VLE @ GSA - assessment toolsThe VLE @ GSA - assessment tools
The VLE @ GSA - assessment toolsvlegsa
 
Yom Institute Presentation project management course
Yom Institute Presentation project management courseYom Institute Presentation project management course
Yom Institute Presentation project management courseAbebaw31
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013Ong-Art Sanpinit
 
Office 2013 reference card
Office 2013 reference cardOffice 2013 reference card
Office 2013 reference cardShahid Husain
 
MProjectTutorial.pdf
MProjectTutorial.pdfMProjectTutorial.pdf
MProjectTutorial.pdfdhansingh21
 
Lesson 2 PMT Getting Started with Project 2013.pptx
Lesson 2 PMT Getting Started with Project 2013.pptxLesson 2 PMT Getting Started with Project 2013.pptx
Lesson 2 PMT Getting Started with Project 2013.pptxamirasghar6
 
اكسيل كارت الاستخدام السريع لحساب الارباح و الوارد و المنصرف لاصحاب الاعمال ...
اكسيل كارت الاستخدام السريع لحساب  الارباح و الوارد و المنصرف لاصحاب الاعمال ...اكسيل كارت الاستخدام السريع لحساب  الارباح و الوارد و المنصرف لاصحاب الاعمال ...
اكسيل كارت الاستخدام السريع لحساب الارباح و الوارد و المنصرف لاصحاب الاعمال ...Ahmed Farahat
 

Similar to MS Project 2010 Quick Reference Card (20)

Version One Highlights
Version One HighlightsVersion One Highlights
Version One Highlights
 
Project Web Access Quick Reference Guide For Team Members
Project Web Access Quick Reference Guide For Team MembersProject Web Access Quick Reference Guide For Team Members
Project Web Access Quick Reference Guide For Team Members
 
Project management course lecture Notes from Yom college
Project management course lecture Notes from Yom collegeProject management course lecture Notes from Yom college
Project management course lecture Notes from Yom college
 
Project Management Quick Reference Guide
Project Management Quick Reference GuideProject Management Quick Reference Guide
Project Management Quick Reference Guide
 
Project Management Quick Reference Guide For Microsoft Project 2007
Project Management Quick Reference Guide For Microsoft Project 2007Project Management Quick Reference Guide For Microsoft Project 2007
Project Management Quick Reference Guide For Microsoft Project 2007
 
Project Management Quick Reference Guide for Microsoft Project 2007
Project Management Quick Reference Guide for Microsoft Project 2007Project Management Quick Reference Guide for Microsoft Project 2007
Project Management Quick Reference Guide for Microsoft Project 2007
 
Creating events starttofinish
Creating events starttofinishCreating events starttofinish
Creating events starttofinish
 
Devry proj 586 week 3 project guidelines microsoft project new
Devry proj 586 week 3 project guidelines microsoft project newDevry proj 586 week 3 project guidelines microsoft project new
Devry proj 586 week 3 project guidelines microsoft project new
 
Assessment Tools
Assessment ToolsAssessment Tools
Assessment Tools
 
Ppsi pertemuan-3
Ppsi pertemuan-3Ppsi pertemuan-3
Ppsi pertemuan-3
 
The VLE @ GSA - assessment tools
The VLE @ GSA - assessment toolsThe VLE @ GSA - assessment tools
The VLE @ GSA - assessment tools
 
Yom Institute Presentation project management course
Yom Institute Presentation project management courseYom Institute Presentation project management course
Yom Institute Presentation project management course
 
Access2013 ch06
Access2013 ch06Access2013 ch06
Access2013 ch06
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013
 
Office 2013 reference card
Office 2013 reference cardOffice 2013 reference card
Office 2013 reference card
 
MProjectTutorial.pdf
MProjectTutorial.pdfMProjectTutorial.pdf
MProjectTutorial.pdf
 
Lab report watson
Lab report watsonLab report watson
Lab report watson
 
Lesson 2 PMT Getting Started with Project 2013.pptx
Lesson 2 PMT Getting Started with Project 2013.pptxLesson 2 PMT Getting Started with Project 2013.pptx
Lesson 2 PMT Getting Started with Project 2013.pptx
 
اكسيل كارت الاستخدام السريع لحساب الارباح و الوارد و المنصرف لاصحاب الاعمال ...
اكسيل كارت الاستخدام السريع لحساب  الارباح و الوارد و المنصرف لاصحاب الاعمال ...اكسيل كارت الاستخدام السريع لحساب  الارباح و الوارد و المنصرف لاصحاب الاعمال ...
اكسيل كارت الاستخدام السريع لحساب الارباح و الوارد و المنصرف لاصحاب الاعمال ...
 
Access 2007
Access 2007Access 2007
Access 2007
 

Recently uploaded

Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentationcraig524401
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sectorthomas851723
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineeringthomas851723
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)jennyeacort
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Reviewthomas851723
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...AgileNetwork
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insightWayne Abrahams
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentationmintusiprd
 

Recently uploaded (17)

Board Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch PresentationBoard Diversity Initiaive Launch Presentation
Board Diversity Initiaive Launch Presentation
 
LPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business SectorLPC Warehouse Management System For Clients In The Business Sector
LPC Warehouse Management System For Clients In The Business Sector
 
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Rajarhat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Rajarhat 👉 8250192130 Available With Room
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Introduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-EngineeringIntroduction to LPC - Facility Design And Re-Engineering
Introduction to LPC - Facility Design And Re-Engineering
 
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
Call Us🔝⇛+91-97111🔝47426 Call In girls Munirka (DELHI)
 
LPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations ReviewLPC Operations Review PowerPoint | Operations Review
LPC Operations Review PowerPoint | Operations Review
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Servicesauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
sauth delhi call girls in Defence Colony🔝 9953056974 🔝 escort Service
 
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
ANIn Gurugram April 2024 |Can Agile and AI work together? by Pramodkumar Shri...
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Reflecting, turning experience into insight
Reflecting, turning experience into insightReflecting, turning experience into insight
Reflecting, turning experience into insight
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
Fifteenth Finance Commission Presentation
Fifteenth Finance Commission PresentationFifteenth Finance Commission Presentation
Fifteenth Finance Commission Presentation
 

MS Project 2010 Quick Reference Card

  • 1. Project 2010 Screen Common Views To Display a View: Click the View tab on the Ribbon and select a view from the Task or Resource Views groups. Or, click a view button in the status bar of the program window. Or, click the Task tab or Resource tab on the Ribbon, click the button list arrow in the View group, and select a view. Gantt Chart: This is the default task view. Displays a task list with bar chart information. Calendar: Displays tasks and durations in a monthly calendar. Network Diagram: Displays a sequence or logic diagram that shows the project’s tasks and dependencies. Resource Sheet: Displays a list of resources and their details in rows and columns. Resource Usage: Displays assigned tasks grouped under each resource. Resource Form: Displays resource information in a form view. Resource Graph: Displays a graph of resources and their costs, etc. over time. Task Usage: Displays a list of tasks showing assigned resources under each task. Task Form: Displays task information in a form view. Task Sheet: Displays a list of tasks and their details in rows and columns. Team Planner: The default resource view. Choose from more advanced and specific views. Timeline: Displays a list of tasks with a baseline schedule and Gantt bars. Tracking Gantt: Displays a list of tasks with a baseline schedule and Gantt bars. More Views: Choose from a list of more advanced and specific views. Keyboard Shortcuts Task or Resource <Shift> + <F2> Information Assign Resources <Alt> + <F10> Help <F1> View Context- <Shift> + <F1> Sensitive Help Go To Selected Task <Ctrl> + <Shift> + <F5> Link Selected Task <Ctrl> + <F2> Unlink Selected <Ctrl> + <Shift> Task + <F2> Zoom In <Ctrl>+ </> Zoom Out <Ctrl> + < * > The Fundamentals • To Create a New Project: Click the File tab on the Ribbon and select New. • To Create a Project from a Template: Click the File tab on the Ribbon and select New. Select a template under the Office.com Templates section, or click My Templates and select a template. • To Create a New Project from an Excel Spreadsheet or SharePoint List: Click the File tab on the Ribbon and select New from Excel workbook or New from SharePoint task list. • To Save a Project File: Click the Save button on the Quick Access Toolbar, click File tab on the Ribbon and select Save. Or, press <Ctrl> + <S>. • To View Information about a Project: Click the Project tab on the Ribbon and click the Project Information button in the Properties group. • Set the Working Time Calendar: Click the Project tab on the Ribbon and click the Change Working Time button in the Properties group. Select the date(s) you want to change and select a new calendar, or enter the new working hours in the From: and To: boxes. • To Update the Project: Click the Project tab on the Ribbon and click the Update Project button in the Status group. • To Set the Status Date: Click the Project tab on the Ribbon and click the Status Date button in the Status group. Select the status date to report progress of the project. • To Save a Baseline Plan: Click the Project tab on the Ribbon and click the Set Baseline button in the Properties group. Select the Set baseline option, save the plan for the entire project or selected tasks, click OK. • To Save an Interim Plan: Click the Project tab on the Ribbon and click the Set Baseline button in the Properties group. Select the Set interim plan option, save the plan for the entire project or selected tasks, click OK. • To Calculate Project Changes: Click the Project tab on the Ribbon and click the Calculate Project button in the Schedule group. • To Open the Timescale Dialog Box: Click the View tab on the Ribbon, click the Timescale list arrow in the Zoom group, and select Timescale. Or, double-click inside the timescale header. • To Adjust the Timescale: Click the View tab on the Ribbon and click the Timescale list arrow in the Zoom group. Or, change the options in the Timescale dialog box. • To Adjust the Zoom Level: Click and drag the Zoom Slider to zoom in or out. Or, click the View tab on the Ribbon and click the Zoom button in the Zoom group. Choose a zoom option from the list. • To Jump to a Tasks: Select the task you wish to view. Click the View tab on the Ribbon and click the Zoom Selected Tasks button in the Zoom group. • To View the Entire Project: Click the View tab on the Ribbon and click the Zoom Entire Project button in the Zoom group. File tab Quick Access Toolbar Minimize Ribbon Vertical Scroll Bar Horizontal Scroll Bar Status Bar Gantt chart Gantt spreadsheet Timeline Pane divider Ribbon View buttons Zoom slider Microsoft ® Project 2010 Quick Reference Card Soe Naing Win Email : snw1975@gmail.com
  • 2. Plan and Manage the Project Working with Resources and Costs • There are six basic steps to follow when planning a project: (1) Define a project (2) Plan project activities (3) Plan for and gather resources (4) Plan project costs (5) Plan for quality and risks (6) Plan security and communication. • To Add a Resource: In a resource view, click the Resource tab on the Ribbon and click the Add Resources button in the Insert group. Select the type of resource you want to add and enter its information. • To Enter Resource Availability: Click the Information button in the Properties group of the Resource tab. Enter the Available To and Available From dates in the Resource Availability table, and enter the Maximum Units available in the Units field. • To Assign a Resource: Select a task. Click the Resources tab on the Ribbon and click the Assign Resources button in the Assignments group. Select the resource(s) and click Assign. • To Enter Costs: In a resource view, enter cost amounts in the Std. Rate field, the Ovt. Rate field, or the Cost/Use field. Then choose when you’d like to begin accruing the resource cost in the Accrue At field. • To Enter Fixed Costs: Click the View tab on the Ribbon and click the Tables button in the Data group. Select Cost from the list. Select the task for which you want to enter a fixed cost and type the cost in the Fixed Cost field. View Tools • Viewing the Timeline: By default a timeline of the entire project appears above the selected view. To turn this on or off, click the View tab on the Ribbon and check or uncheck the Timeline check box in the Split View group. • Applying Groups: Click the View tab on the Ribbon and click the Group By list arrow in the Data group. Select a group from the list. • Applying Filters: Click the View tab on the Ribbon and click the Filter list arrow in the Data group. Select a filter from the list. • Applying Tables: Click the View tab on the Ribbon and click the Tables button in the Data group. Select a table from the list. • Sort the Information: Click the View tab on the Ribbon and click the Sort button in the Data group. Select a sorting option from the list. Tracking Progress • Always save a baseline plan before updating progress. • To Update Tasks: Select the task you want to update. Click the Task tab on the Ribbon and click a % Complete button in the Schedule group. • To Mark Tasks On Track: Select the tasks that you want to mark as on track. Click the Task tab on the Ribbon and click the Mark on Track button in the Schedule group. • To Update Resources: In Resource Usage or Task Usage view, click the View tab on the Ribbon and click the Tables button in the Data group. Find the resource you want to update and update new actual work value. • To Check Project Variance: Click the View tab on the Ribbon and click the Tables button in the Data group. Select Variance from the list. Balancing the Project • To Identify an Overallocated Resource: Open Resource Usage view and click the Format tab under Resource Usage Tools on the Ribbon. Click the Overallocation check box in the Details group. Or, click the Resource tab on the Ribbon and click the Next Overallocation button in the Level group. • To Balance the Project: Click the Resource tab on the Ribbon and click the Level All button in the Level group. • To Balance Tasks for a Specific Resource: Select a resource. Click the Resource tab on the Ribbon and click the Level Resource button in the Level group. • To Reassign Work: Open Team Planner view. Click and drag a task from an overallocated resource to another resource. • Project management is the process of planning, organizing, and managing tasks and resources to accomplish an objective within constraints of time, resources, or cost. • Adjusting one constraint of the Project Triangle affects the other two. Working with Tasks • To Enter a Task: In a task view, type the task’s name in the Task Name column and press <Enter>. Or, click the Task tab and click the Insert Task button in the Insert group. A new task is inserted above the selected task. • To Enter Blank Row: Click the Task tab, click the Insert Task button list arrow in the Insert group and select Blank Row. A blank row is inserted above the selected task. • To Enter Task Duration: Type the duration (m = minutes; h = hours; d = days; w = weeks; mo = months) in the Duration column and press <Enter>. • To Create a Milestone: Click the Task tab on the Ribbon and click the Insert Milestone button in the Insert group. Or enter 0 (zero) in the Duration column. • To Create a Recurring Task: Click the Task tab, click the Insert Task button list arrow in the Insert group, and select Recurring Task. Enter information into the Recurring Task Information dialog box and click OK. • To Access Task Information: Select the task. Click the Task Information tab on the Ribbon and click the Information button in the Properties group. • To Organize the Task List: Create summary tasks and subtasks by selecting the task(s) and clicking the Outdent Task or Indent Task button in the Schedule group of the Task tab on the Ribbon. • To Link Tasks: Press <Ctrl>, select the two tasks you want to link in the order they should be linked, and click the Link Tasks button in the Schedule group of the Task tab on the Ribbon. • To Unlink Tasks: Press <Ctrl> and select the linked tasks in the order they are linked. Click the Unlink Tasks button in the Schedule group of the Task tab on the Ribbon. • To Split a Task: Select the task, click the Split button in the Schedule group of the Task tab, and use the dividing tool to split the task’s Gantt bar. • To Change How Existing Tasks Are Scheduled: Click the task’s Task Mode list arrow and select Auto Scheduled or Manually Scheduled. • To Change How New Tasks Are Scheduled: Click the status bar and select Auto Scheduled or Manually Scheduled. • To Enter Lag or Lead Time: Click the successor task and click the Information button in the Properties group. Click the Predecessors tab and enter a lead time with a (-) minus sign or lag time with a (+) plus sign in the Lag box. • To Enter a Task Deadline or Constraint: Click the task to which you want to add a deadline and click the Information button in the Properties group. Click the Advanced tab and enter a deadline into the Deadline box, or choose the constraint you want to use and enter the Constraint date. • To Apply a Filter: Click the column list arrow and select the filter you want to apply to the task list. Project Triangle Time – Know the deadline for your project. Cost – This includes the people and the equipment that do the work, and the materials they use. Scope – This includes the quality, functions, and features of your product or service, and the work required to deliver it. Soe Naing Win Email : snw1975@gmail.com